TARLAC STATE UNIVERSITY – College of Engineering & Technology

Civil Engineering Department


Engr. Orlando Cruz Sico Jr.

CEP352/351C – Building System Design & Computation 6. The building should provide the degree
MODULE 1______________________________ of shelter with proper content of air,
temperature, light & acoustics.

B uilding Design is a process of providing all


PREPARATION OF BUILDING PLANS AND
CONTRACT DOCUMENTS
information necessary for construction of a
building that will meet the proponents’ or Briefly defined, construction plans consist of
owners’ requirements and also satisfy the public drawings, diagrams and notes showing the
health, welfare & safety requirements base of layout of floors and uses; the elevations or views,
the given applied codes and standards by the cross-sections; specified materials, other
authority. relevant information about the structure. In
general, building plans consist of the following:
Codes and Regulations:
TYPICAL DOCUMENTS REQUIREMENTS FOR
1. National Building Code of the Philippines SECURING A BUILDING PERMIT IN THE
2. Architectural Codes PHILIPPINES
3. National Structural Code of the
Philippines 1. Properly filled – up application forms
4. Electrical Code of the Philippines duly signed and sealed by
5. Fire Code of the Philippines professionals:
6. National Plumbing Code • Building Permit Forms
7. Sanitation Code of the Philippines • Electrical Permit Forms
• Sanitary Permit Forms
Objectives of Building Design: • Other Required Forms
1. Produce drawings or plans that will show 2. Complete Set of Detailed Plans
what is to be constructed. • Architectural plans and detail
2. Provide specifications that will state drawings.
what materials and equipment that are • Structural design computations and
to be incorporated in the building. detail drawings.
• Electrical plans, load analysis,
Building design principles: computations and riser diagrams,
1. The building should be constructed to Specifications.
serve the purposes specified by the • Plumbing plans, details of septic
client. vault, diagrams of plumbing lines,
2. The design should be constructed by Specifications.
known techniques and with available • Mechanical plans and
labor and equipment. Specifications, where required.
3. The building should be usually pleasing • Others: Landscaping and interior
both inside and outside. designs, etc.
4. No part of the building should be posed 3. For construction of Two – Storey
hazard to its occupants. Building
5. The building should be constructed to • Structural Design Analysis – signed
minimize adverse impact on the and sealed by Civil Engineer at
environment. every page

MODULE 1. Building Design Introduction


TARLAC STATE UNIVERSITY – College of Engineering & Technology
Civil Engineering Department
Engr. Orlando Cruz Sico Jr.

For construction of more than Two – estimators, specifications writers and


Storey Building: administrative employees, the Architect must
• Boring and Plate load Test also avail of the technical expertise of Engineers
• Seismic Analysis and Consultants to assist in producing all
4. Proof of Property drawings and accompanying documents for a
• Photocopy of Transfer Certificate given project. Engineers/experts supplementing
of Title the regular work force of the Architect's office
• Photocopy of tax Declaration of are the following:
Property – lot (Certified True Copy)
1. Professional Electrical Engineer or Master
• Photocopy of Current Tax Receipt Electrician - prepares, signs and dry-seals
• Contract of Lease the Electric Plans; including the application
5. Bill of Materials, Cost Estimate and for an electrical permit to be issued by the
Construction Specification concerned government office and the utility
• Signed and sealed by an Engineer company to supply electric power for the
or Architect. project.
6. Survey Lot Plan 2. Sanitary Engineer or Master Plumber -
7. Location Clearance prepares, signs and dry-seals the Plumbing
8. PTR and PRC license of all concerned Plans; including the application for the
engineers and architects plumbing permit from the concerned
9. DOLE Clearance. government unit.
10. Other supporting papers, application 3. Civil – Structural Engineer - designs and
for utilities or clearances required by computes the correct sizes for structural
LGU rules and regulations. frames and other critical parts to achieve
The plans and companion documents are signed economy in the construction, strength,
and dry-sealed by the architect and the stability and safety of the building; signs and
engineers who prepared them. The project dry-seals his work.
owner must also sign them to signify his 4. Mechanical Engineer - prepares plans for
approval. mechanical installation; signs and dry-seals
the plans and application for permit to place
TEAM PLAYERS IN THE PLANNING AND the equipment indicated in the drawings.
CONSTRUCTION OF A PROJECT 5. Geodetic Engineer - draws the lot plan
based from the data on the OCT or TCT of
The principal players assuming lead roles in
the project site if not yet available; or
initiating a project and preparing their plans and
implementing them are the following: surveys the land, computes boundaries; and
locates or relocates concrete Iot
1. Project Owner or Proponent monuments; signs and seals his work.
2. Architects, Engineers and Consultants 6. Geo-technical Engineers – provides proper
3. Contractor, Builder, Construction study of the subsurface condition of the
Manager or Administrator site.
7. Other experts, if required by the nature of
ENGINEERS AND CONSULTANTS REQUIRED IN
the project or by the owner are: Landscape
PREPARING BUILDING PLANS
Architects, Interior Designers,
Aside from his regular staff consisting of Environmental Planners, etc.
draftspersons, architectural designers,