Descrpition Unit Total

SI. No Remarks Item QTY Price Amount


A. Preliminaries
AL Charges for preparation and submission of drawings and documents to Landlord and
1 Local Authorities
Charges to be paid to authorities for approvals / Third Party Consultancy Charges / Actuals to be
2 Permit Fees / Any kind of Deposit Fees for Landlord/Management.
3 Contractor All Risk insurance Policy LS 1
4 Mobilization charges of the project and Site Protection charges.
5 Regular & Final Site Cleaning Charges
6 Design Charge
7 Scaffolding
B.Demolition
1 Demolition of existing tile flooring and cart sway debris as per Dubai Municipality Norms. New Lab
2 chasing for LPG trensh at new Lab New Lab Item 1
3 Demolition of wall for Door of office between Labs New Lab
C. Partition
Supply and instatiation of 100mm thick MR gypsum partition.
1 Location: wall between lab and teacher office New Lab msq 130
D-Wall Finishes
1 Supply and application of primer, stucco and 2 top coats of fenomastic paint to walls Optional New Lab and Existing msq 1280
Supply and installation of Cerarmic wall tiles upto an height of 1.5 meters (60x30cm) Client to Advice which type to work
2 RAK of equivalent) to all wall of new lab Optional New Lab msq 590
E. Ceiling
1 Supply and installation of 60x60 cm Access panels. Lower Floor Connection Item 16
Supply and application of Gypson Bord with ,primer, stucco and 2 top coats of fenomastic paint to plain gypsum
2 ceiling.for work opening in lower floor and working floor Openin for Service msq 25
G. Flooring
Supply and installation of waterproofing to wet area and where the connection of drain point and other area
1 which located on backside of cabinet if required New Lab msq 12

Supply & Installation of RAK Ceramic Tile for rasied area which located on new lab should be the same area
2 Location: Reception Area only New Lab msq 160

3 Supply & Installation carpet 60*60 or other material as requested by client Optional Existing Lab Item 440 Client to Advice which type to work
3 Supply & Installation SS trensh of LPG Pipe new Lab Item LPG Subcontractor to Advice
H. Doors
Supply and fixing of 12mm clear tempered doubte leaf frameless manual swing
glass door with straight polished edges fixing by DORMA BTS 75 heavy floor at
Proposed Offices
1 machine, GTM patch fittings, bottom lock and 600mm SS long handle including Between new lab Nos 1 Client to Advice which type to work
transom panel. Size: 1000 x 3000 mm. Location: Entrance at new office between labs

I- Joinery works
1 disassemble and Installation of L Shape work station of stubent New & Existing Lab No 28
3 disassemble and installation of Sink Counter New & Existing Lab No 4
4 disassemble and installation of Teacher Counter New & Existing Lab No 3
K. Electrical & Light Fitting
Supply & Installation of 13 Amps Twin switched socket mounted on work station table including PVC
1 conduiting and wiring. (Make: Schneides/MK PVC White Plate Finish} New Lab No 59
Supply & installation of 13 Amps Single switched socket mounted teacher table including PVC conduiting and
2 wiring. (Make: Schneider/MK PVC White Plate Finish) New Lab No 6

Supply & Installation of floor bax with 2x 13 Amps Twin switched socket, provision
3 for 4 data point including PVC conduiting and wiring. New Lab No 38
5 Supply and installation of necessary cable tray works with supports for above cabling work New Lab Rm 32
6 Supply and installation of necessary cable trunking works for powes works with supports. New Lab Rm 30
7 Supply & installation of Necessary cable trunking works for Data. New Lab Item 1
8 Supply & installation of 32 mm PVC conduit for HDMI/VGI for Screen/TV. New Lab No 8
9 Termination for existing electrical where required as per Client recomenadation New Lab Item 1
10 Shop drawing, As built drawings & load schedule preparation. New Lab Item 1
L. Plumping & Saintery Fittings
1 disassemble and Installation of Sanitary fitting New & Existing Lab Item 1
Modification, Supply & installation of PPR piping for water supply, including
2 necessary PPR fittings for all Lab Sod system including necessary New Lab No 26
fittings fram Proposed Area to Nearest Stub out Ares. (Note: Considered within 60 mtr).
Modification, Supply & installation of UPVC piping for Drainage including necessary Sod system including
3 necessary fittings fram Proposed Area to Nearest Stub out Ares. (Note: Considered within 60 mtr) for all lab New Lab No 26

4 Supply and installation of Floor Trap & Floor Drain New Lab Nos 8
5 Supply & Installation of Angle valve, Bottle trap, Magic Hose, Flexible, & Extension nipple. New Lab Nos 54
6 Shop drawing preparation, conduiting Gravity Test, Pressure Test and Provide reports. New Lab Item 1
7 Core cutting including scanning (2 Nos) and allied civil works, New Lab Item 1
8 Termination for existing drainage and water Supply where required as per Client recomenadation Existing Lab Item 1
M.LPG Gas System
1 Termintion the LPG cnection of existing LAB New Lab Item 1
3 Modification, Supply & installation LPG Connection for Work station New Lab Item 1
4 Modification, Supply & installation LPG Connection for teacher station New Lab Item 1