BOQ (3) Flat

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Descrpition Unit Total

SI. No Remarks Item QTY


Price Amount
B.Demolition and Mep WORK
1 Demolition of existing WC with flooring of Shower and cart sway debris as per Dubai Municipality Norms. Janitor Bathroom
2 chasing for drain pipe of washing machine in new location Janitor Bathroom Item 1 3,900 3,900
3 Demolition of wash Basin and close all MEP provision Janitor Bathroom
D-Wall Finishes 0
1 Supply and application of primer, stucco and1 top coats of fenomastic paint to walls full flat msq 295 18 5,310 168
E. Ceiling 0
Supply and application of Gypson Bord with ,primer, stucco and 2 top coats of fenomastic paint to plain gypsum
2 ceiling.for work opening in lower floor and working floor Janitor Room msq 16 135 2,160
Supply and application of primer, stucco and1 top coats of fenomastic paint to walls Janitor Room msq 16 25 400
Remove and refix Mep work in the exsiting ceiling Janitor Room no 4 55 220
G. Ktichen Sink 0
1 Supply and installation of of SS (Grade 316) kitchen sink as per the exsiting ,Teka Brand or equevelant kitchen ITEM 1 490 490
H. Doors 0
Repairs to wooden doors, with wooden frames of any size and kind, work to include all required materials,
1 wood, glue screws, hinges, nails, repair to frame , painting and architrave, excluding lock, handle, All flat Nos 7 550 3,850

I- Joinery works 0
Repairs to wooden furniture (kitchen cabinet and other). Work to include all required materials, wood, glue,
1 screws, hinges, nails, repair to frame,painting and architrave, excluding lock, handle, glass . Kitchen and Other No 1 4,900 4,900

K. Marbel Work 0
1 Apply Bolishing , with criztalzation coat of main toiet counter with fixing the wash basin Main Bath Room No 1 1900 1,900
K. Aluminum Work 0
1 Changing damaged fly net mish , Balcony Door No 2 280 560