Production Schedule

11/10/2021 12/10/2021 13/10/2021 14/10/2021 15/10/2021 16/10/2021 17/10/2021


On Monday, On Tuesday, On On On Friday, I
I am going I am going Wednesday, Thursday, will finish
to be to finish my I will put my I am going to my Short
putting my pre- sets come back Film
pre- production together. I into college, Production
production for my Stop already and start the booklet.
booklet Motion. This have the pre- This will
together for will include materials I production include the
my Stop my need to booklet for location
Motion. I storyboard, create this. my Short recces,
will do the sound list Film. I will story-
Shooting and work on my board,
Script, Props contingency props and shooting
Lists, plans. crew list. script,
Clearances After contingency
college, I am plans and
going to clearances.
time-lapse
the opening
scene for my
Short Film.
18/10/2021 19/10/2021 20/10/2021 21/10/2021 22/10/2021 23/10/2021 24/10/2021
On Monday, On Tuesday, I On On Thursday, I On Friday, I On On Sunday
I will do the will write up Wednesday, am going to will finish Saturday, I morning, I
location the prop list, I will write write up the off the will film the will make
reccee’s the crew list up the shooting storyboards main the icing and
and the and character script for my . section of film the
audition confirmations. profiles for short film. my Stop ending
notes for each Then, I will Motion scenes.
my short character, start the video. I will
film and what storyboarding. bake the
production they will be cakes.
booklet. doing in my
short film. I I am
will then attending a
write up the concert in
sound list the evening,
and so will stop
equipment when the
list. cakes are
baking.
25/10/2021 26/10/2021 27/10/2021 28/10/2021 29/10/2021 30/10/2021 31/10/2021
On On Tuesday, I On On Thursday, On Friday, I On Saturday,
Monday, I am unable to Wednesday, I will be am unable to I will be
am unable film as I am at I am going filming with film as I will visiting Bath
to film as I work from 9- to film Aimee. be working Spa
will be at 6. some more from 9-6. university.
Thorpe of my Stop
Park. Motion, this
will be the
ending
scenes.
01/11/2021 02/11/2021 03/11/2021 04/11/2021 05/11/2021 06/11/2021 07/11/2021
On On Tuesday, On On Thursday, On Friday, I On Saturday, I
Monday, I I will finish Wednesday, I will stay at will finish my am unable to
will transfer my Short I will finish home and Short Film, if film, as I have
all the stop Film recording film my there are any a dress fitting.
motion Planning my Stop Short Film. I scenes that I Then, I am
footage to booklet. I am Motion, by am also haven’t done. going to a
my memory also needed setting up needed to comedy
stick. I will to help film the film with show.
also do my for Cerys. introduction Cerys.
production shots. I am
schedule also needed
for the to help
week, I will Cerys film.
do some
more of the
planning
booklet for
my Short
film.
08/11/202 09/11/2021 10/11/2021 11/11/2021 12/11/2021 13/11/2021 14/11/2021
1
On On Tuesday, I Wednesday On Thursday, On Friday, I On Saturday
Monday, I will do my is our the college is will come morning, I
will come production timetabled closed. In the into college. I will do some
into college schedule for day off. In morning, I will transfer Foley sound
and batch the week. the will do some all the recording for
process my morning, I more filming footage from my Stop
images for have a for my stop my short film Motion.
my Stop driving motion, onto my
Motion. I lesson, and aiming to memory
will then for the rest film the stick, and
put these of the day I walking start putting
images will be scenes. Then, the videos
onto doing some I am going to together.
Premiere filming for travel to
Pro. my short Taplow to
film. This meet Cerys
will include and Hannah
frequent to film some
boosts of scenes for
filming, Cerys’ music
with short video.
breaks in
between.