Interactive Technology Assessment (ITA)

Definition The procedure step/step Actors

Interactive TA aims at influencing the Step1. Draw a contract between the Commissioner – institution which calls for an ITA and
innovation process through early commissioner and the project team which is responsible of the implementation of
interactions between suppliers, users and recommendations.
parties affected. An Hybrid Working Step 2. Sociological survey of the
Group of about 15 people is formed after worldviews Project team – responsible for the ITA. Execution of the
a sociological survey whereby worldviews projects’ tasks such as developing the agenda, logistical
are identified. The Working Group follows Step 3. Selection of the members of the issues, managing the hearings and the follow-up
a process of deliberation on the issue Working Group evaluation along with the necessary publicity. The
during six to ten days on a period of six project staff protects and preserves the integrity of the
months. Deliberation involves: definition Step 4. WG deliberation (framing, process.
of the frame of the problem; hearings; hearing, foresight, preparation of
foresight exercises; and preparation of recommendations) Working group – is the core of the project. Members of
recommendations. The Working Group the WG explore the issue in all the relevant dimensions,
produces a report, which is delivered to Step 5. Reaction of the initiator and deliberate and make recommendations. The WG is
the initiator and which should be made announce of decisions to be taken composed of up to 15 members. Even if difficult, it is
public. much better if the report is collectively written by the
Step 6. Assessment report members of the WG.

Moderator – one moderator is necessary to assist the


jurors’ deliberation and the decisional and
Rationale recommendation process.

Technology Assessment is generally


Working Group selection Assessment Committee – Its members are independent
performed according to the worldviews of of the initiator and they have an acknowledged
promoters of technology. The participation The WG should include the diversity of competence in participatory TA. The assessment
of the parties affected by innovation in an worldviews of the population concerned committee prepares a report on the whole ITA
interactive TA is required to influence by the issue at stake. procedure. This report is meant to be public.
development paths in a desirable
direction. Characterization of worldviews may be
performed by a qualitative survey which
allows at the same time to identify
potential members of the WG. The
selection of the members is based on the
Applicability use of socio-professional criteria as well Commissionner
as diversity of worldviews. Assessment
ITA is more suitable in situations committee
Although using the same criteria, they
characterised by a high uncertainty
are two main possibilities in the setting
regarding facts and value-dissent
up of the WG:
regarding technology-in-its-context. In Project managers
such unstructured situations, ITA may - either invite representatives of formal
influence the technology process through groups
co-construction between users and - or invite individuals Assistant
producers. Moderator
In the latter case, the co-construction
process may be deepen. However, the Working group
link between deliberation and action will
be weaker.
Advantages &
disadvantages Members of a WG have to devote six to
ten days to the ITA experience. It is

ITA may be compared to Consensus


essential that they stay on board from Budget
the beginning to the end of the process.
Conference since it requires a similar It may be necessary to propose them an The average budget of an ITA exercise is in the range
budget and time span. indemnity. 100-150 000 euros.

ITA is better suited for co-construction Do not forget to include a budget for video-taping and for
since it favours direct interactions between the assessment committee!
producers and users of innovation. Also
this should favour the implementation of
recommendations, which may better take
into account technico-economic
constraints. References
The basic methodology:
However, Consensus Conference Grin, J., van de Graaf, H., Hoppe, R., (1997). Technology assessment through interaction. A guide. Den Hag, Rathenau Institute
performs better when techno-development (available at http://www.rathenau.nl)
lacks legitimacy and when it is necessary
On the French ITA on GM Vine:
to engage in public debate.
http://www.inra.fr/Internet/Directions/SED/science-gouvernance/