PD 1586 The Philippine EIS System
PD 1586 The Philippine EIS System
1586
“Philippine Environmental Impact
Statement (EIS) System”
Procedural Screening
Minor Offense
Violations of administrative ECC
conditions which will not have a direct
significant impact to the environment.
Major Offense
Violations od substantive ECC
conditions which will have a significant
impact to the environment.
Schedule of Penalty Reduction in case of
Violations of ECC Conditions
CRITERIA PENALTY
Category A.
Environmentally Critical Projects (ECPs) with
significant potential to cause negative
environmental impacts.
Category B.
Projects that are not categorized as
ECPS, but which may cause negative
environment impacts because they
are located in Environmentally Critical
Areas (ECA’s)
Coverage of the Philippine EIS System
(MC 2014-05)
Category C.
Projects intended to directly enhance
environmental quality or address existing
environmental problems not falling under
Category A or B.
Category D.
Projects unlikely to cause adverse
environmental impacts.
Environmentally Critical Projects
I. Heavy Industries
I. Non-Ferrous Metal Industries, Iron and
Steel Mills, Petroleum and Petrochemical
Industries and Smelting Plants.
X. Water bodies
Not covered
Covered (Required to secure ECC) (may secure
Project size
Projects/ CNC)
parameter
Description Cat A: ECP Cat B: Non-ECP Cat: D s
EIS EIS IEE C PD
1.3 Petroleum and Petrochemical Industries (Includes HC products such as LNG / CNG, etc.)
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.3.3 Recycling oil and Daily
≥ 5 but > 1 MT but
other related petroleum- ≥ 10 MT ≤ 1MT production
< 10 MT < 5 MT
based chemicals rate
1.3.4 LPG / LNG /CNG / Total
similar product storage none ≥ 10 MT < 10 MT none storage
and refilling capacity
1.3.5 Storage of
petroleum,
petrochemical or related ≥ 20 kL Total
products (including none ≥ 20K kL but ≤ 20 kL storage
blending) < 20K kL capacity
1.3.6 Refilling station
project / gasoline station
Annual
≥ 10K but 200 but
1.4 Smelting Plants ≥ 15K MT ≤ 200 MT production
< 15K MT < 10K MT
rate
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.5 Chemical Industries
1.5.1 Mfg, processing
Annual
and/or use of substance
none ≥ 10 MT < 1 MT none production
included in the PCL and
rate
CCO per RA 6969
1.5.2 Manufacture of
agrichemicals, industrial Annual
200 but
chemicals and other none ≥ 30K MT ≤ 200 MT production
< 30K MT
substance not in the rate
PCL or CCO
1.5.3 Manufacture of Annual
explosives, propellants none ≥ 5 MT < 5 MT none production
and industrial gases rate
1.5.4 Pharmaceutical
industries and mfg. of
Annual
soap and detergents, > 200 but
none ≥ 50K MT ≤ 200 MT production
health products, and < 50K MT
rate
other consumer
products
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.5.5 Surface coating
industries (paints,
Annual
pigments, varnishes, > 200 but
none ≥ 30 MT ≤ 200 MT production
lacquers, ant-capacity < 30K MT
rate
fouling coating, printing
inks)
1.6 Agriculture, food and related industries
1.6.1 Animal products
processing, canning Annual
slaughterhouses, etc) > 200 but production
none ≥ 2.5K MT ≤ 200 MT
including marine < 2.5K MT rate
products, crabmeat
etc.)
1.6.2 Coconut
processing plants (incl. > 200 but Annual
none ≥ 25K MT ≤ 200 MT
production of coconut < 25K MT production
based products) rate
1.6.3 Distillation and Annual
200 MT but
Fermentation Plants (e.g. none ≥ 50K MT ≤ 200 MT production
< 50K MT
bio-ethanol project) rate
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.6.4 Food preservation For canning,
(e.g., drying, freezing) and Regardless of refer to other
none none none
similar methods aside from capacity (applicable
canning categories)
Annual
> 200 MT but (rated)
1.6.10 Sugar Mills none ≥ 50K MT ≤ 200 MT
< 50K MT production
rate
1.7 Other Processing/Manufacturing Industries
Annual
1.7.1 Leather and related > 200 but
none ≥ 2.5K MT ≤ 200 MT production
industries < 2.5K MT
rate
Annual
1.7.2 Textile, wood, rubber > 1K but
none ≥ 50K MT ≤ 1K MT production
and fiber glass industries < 50K MT
rate
with
Regardless
1.7.3 Wood and metal processing without
none none of capacity
furniture assembly (bleaching, processing
or area
sanding, etc.)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Annual
1.7.4 Glass-based
none none > 30K MT ≤ 30K MT production
products manufacturing
rate
> 15K MT
Regard-less of or Annual use
production Regardless of ≤ 15K MT of
1.7.5 Metal-based capacity if production and substances
involving the capacity does not in PCL or
products manufacturing
use of ≥ 1MT if involving the involve the use CCO (EIS)
(including none per year of use of < 1MT of substances
semiconductors, substances per year of included Annual
electronics) included in substances in the PCL and production
the PCL and included in CCO rate (IEEC &
CCO the PCL and Category D)
CCO
w/o dyeing
and only Regardless
1.7.6 Garment
involves of
manufacturing / none none With dyeing
spinning, capacity
industries
cutting and Or area
sewing
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Annual
1.7.7 Pulp and Paper ≥ 10K MT but >200 MT but
≥ 50K MT ≤ 200 MT production
Industries < 50K MT < 10K MT rate
Annual
1.7.8 Paper and plastic-
none none > 15K MT ≤ 15K MT production
based products rate
Total/GFA
including
parking,
1.7.9 Car and Trucks none ≥ 2.5 Ha < 2.5 Ha none open space
Assembly and other
areas
1.7.10 Shipbuilding, Boat/ship
boat- building and other capacity
(based on
marine vessel ≤ 5 DWT and
> 500 but max. cap. of
manufacturing / can handle ship and
fabrication (including none ≥ 500 DWT < 500 DWT boat that
1 boat
ship breaking and at a time can be
salvaging) fabricated/
handled by
the facility)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
2.2 Forestry Projects
Annual
volume of
2.2.1 Community Based trees to be cut
Forest Resources
Utilization (CBFRU); for equal to or
more than 5K
Integrated Forest m3 - processing
Management shall de done
Agreement (IFMA) at the EMB RO,
≥ 5K m3 but ˃ 100 m3 but
projects; Timber License ≥ 10K m3 ≤ 100 m3 however,
˂ 10K m3 ˂ 5K m3 approval will
Agreement (TLA);
Private Land Timber be at the EMB
CO as per
Utilization (PLTU); Other Memorandum
Forestry Projects; Forestry from the
project co-managed Secretary
with DENR; dated
December 13,
2006
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
Equivalent
products
per year
for more
than 4,000
m3 -
processing
2.2.2 Wood Processing ˃ 4K m3 but ˃ 100 m3 but
≥ 10K m3 ≤ 100 m3 shall be done
Projects ˂ 10K m3 ≤ 4K m3
at the EMB
RO, however,
approval will
be at EMB
CO as per
Memorandu
m dated
December
13, 2006
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
Introduction
Introduction Introduction
of exotic
of exotic of exotic
2.2.3 Introduction of flora
fauna fauna
regardless of
Exotic Fauna and Flora regardless of regardless of
number or none
in Public and Private number or number or
area if
Forests area if area if
located in
located in located in
public or
public land private land
private land
≤ 10 AU Grazing
≥ 500 ≥ 100 AU capacity for
and
2.2.4 Grazing projects Animal Unit but ˂ 100 AU category D;
˂ 1 AU per Animal Unit
(AU) ˂ 500 AU
ha (AU)
Establishment or facilities for wildlife farming, protection, conservation,
commercial purposes
2.2.5 Wildlife Farming or regardless
any related projects as of area
defined by BMB butterfly
none none except for
farming
butterfly
farming
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
2.2.6 Breeding /
propagation of any Parental Parental
Philippine threatened stock over stock < 50
none none
species, exotic species, 50 heads/ heads/
or non-threatened/ species species
indigenous species
2.2.7 Livestock Animal Industries
a. Livestock/piggery
˃ 100 but Stocking
Projects – (eg. none ≥ 5K heads ≤ 100 heads
˂ 5K heads population
pigs/goats)
˃ 10K but
c. Livestock/poultry ≥ 100K Stocking
none ˂ 100K ≤ 10K heads
Projects - (e.g., birds) heads population
heads
3. INFRASTRUCTURE PROJECTS
≥ 1,000 ha
3.1.2 Irrigation projects ˃ 300 but Service
none (service ≤ 300 ha
(distribution system only) ˂ 1,000 ha Area
area)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC Project
Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s
With water
source
(e,g.,
infiltration
Levels III Level II /
gallery, etc.)
3.1.3 Water supply (Distribution Level I Water
none and water
projects (without dam) system only) refilling
treatment
station
facilities
including
desalination,
reverseosmosis
3.2 Power Plants
Total power
3.2.1 Gas-fired thermal ≥ 10 MW but ˃ 1 MW but
≥ 50 MW ≤ 1 MW generating
power plants ˂ 50 MW ˂ 10 MW
capacity
Total power
3.2.2 Geothermal ≥ 10 MW but ˃ 1 MW but
≥ 50 MW ≤ 1 MW generating
facilities ˂ 50 MW ˂ 10 MW
capacity
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
Total power
generating
capacity
For projects
with weir/
≥ 10 MW but
dam/ other
˂ 50 MW OR ˃ 1 MW but
≤ 1 MW impounding
3.2.3 Hydropower with ˂ 10 MW
≥ 50 MW without facility, refer
facilities tunneling AND without
tunneling to dam as
(regardless tunneling
additional
of capacity)
criteria for
multi-
component
project
screening
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Total
3.2.4 Other Thermal
≥ 10 MW but ˃ 1 MW but power
Power Plants (e.g., coal, ≥ 30 MW ≤ 1 MW
˂ 30 MW ˂ 10 MW generating
diesel, bunker, etc.)
capacity
Total
≥ 10 MW but ˃ 1 MW but ≤ 1 MW power
3.2.5 Power Barges ≥ 50 MW
˂ 50 MW ˂ 10 MW generating
capacity
none ˃ 5 but
3.2.6 Fuel cell ≥ 100 MW ≤ 5 MW
˂ 100 MW
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project
Projects/
Cat A: ECP Cat B: Non-ECP Cat D size
Description
parameters
EIS EIS IEE C PD
3.2.7 Renewable energy
projects such as ocean, Total power
˃ 5 but
solar, wind, tidal power none ≥ 100 MW ≤ 5 MW generating
˂ 100 MW
except waste-to-energy capacity
and biogas projects
Total power
3.2.8 Waste-to-energy - ˃ 1 MW but
none ≥ 50 MW ≤ 1 MW generating
power projects ˂ 50 MW
capacity
Total rated
capacity of
3.2.9 Waste-to-energy - ˃ 1 MW but all
none ≥ 5 MW ≤ 1 MT
biogas project ˂ 5 MW processing
and storage
facilities
Total power
3.2.9 Power transmission None
none ˃ 138 KV ≤ 138 KV generating
lines
capacity
Total power
3.2.10 Substation /
none None ˃ 220 KV ≤ 220 KV generating
switchyard
capacity
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
PROVINCIAL
ALL TYPES
ROAD and
NATIONAL OF ROADS:
OTHER
ROAD: ˃ 2 km but
TYPES of
≥ 20.0 km, ˂ 20.0 km
ROADS:
(length with (length with
≥ 20.0 km,
3.4.1 Roads, no critical no critical
(length with ≤ 2 km
new construction slope) OR slope) OR
no critical
≥ 10.0 km ˃ 2 km but
slope) OR
(length with ˂ 10.0 km
≥ 10.0 km
critical (length with
(length with
slope) critical
critical
slope)
slope)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
˃ 50%
˃ 50% increase in
increase in capacity (or
capacity (or in terms of ≤ 50%
in terms or length/width) increase in
length/width) AND capacity (or
3.4.2 Roads , widening, AND > 2 km but
in terms of
rehabilitation and/ or none ≥ 20.0 km, ˂ 20.0 km
(length with (length with
length/
improvement
no critical no critical width) but ≤ 2
slope) OR slope) OR km increase
≥ 10.0 km > 2 km but in length
(length with ˂ 10.0 km
critical slope) (length with
critical slope)
≤ 50 m
3.4.3 Bridges and
Regardless of
viaducts (including ≥ 5 km but ˃ 50 m but
≥ 10.0 km length for
elevated roads), new ˂ 10.0 km ˂ 5.0 km
footbridges /for
construction
pedestrian only
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
All
3.4.6 Pedestrian All overpass
none none underpass
passages projects
projects
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.4.7 Tunnels and sub-
grade roads and ≥ 1.0 km < 1.0 km none none
railways
Regardless
3.4.8 On-grade railway
of length none none none
system, new
and width
3.5 Other Transport Facilities
International Domestic Private
3.5.1 Airports none
Airport Airport airstrips
˃ 1 ha
3.5.2 Land transport ≤ 1 ha Based on
OR
project area
terminal (for buses, Regardless of without
none none (e.g., title,
jeepneys and other size if with service lease
modes of transportation) service facilities contract)
facilities
˂ 15.0 ha with
3.5.3 Sea port, ≥ 15.0 ha with Based on
reclamation
reclamation project area
causeways, and harbors OR ˃ 1 ha ≤ 1.0 ha (w/o
none OR ≥ 25.0 ha (e.g., title,
(including RO-RO (w/o
but ˂ 25.0 ha reclamation) lease
facilities) (w/o
reclamation) contract)
reclamation)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.6 Buildings including Housing, Storage Facilities and Other Structures
3.6.1 Commercial,
(Business centers with
residential units (mixed
use), malls,
supermarkets, public
markets)
- Fast food / Total/gross
Restaurant floor area
Projects including
˃ 1 ha ≤ 1 ha
- Commercial parking,
none ≥ 5.0 ha but
Establishments open
˂ 5.0 ha (10,000 m2)
(i.e. Showrooms) space and
other
3.6.2 All office and areas
residential building such
as motels,
condominiums, schools,
etc. Inclg. storage
facilities with no hazardous
or toxic materials
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Clinics
(out patient,
Primary, health centers,
3.6.3 Institutional and Secondary, dental clinics)
Tertiary including rural
other structures with none none hospitals or health units;
laboratory facilities Medical X-rayclinic,
Facilities diagnostic
laboratory,assay
laboratory
3.6.4 Storage facilities for
toxic or hazardous materials, Storage
none ≥ 1K MT ˂ 1K MT none
substances or products capacity
(including for those in PCL)
3.6.5 Industrial Parks Based on
(horizontal project area
none ≥ 5 ha ˂ 5 ha none
development) with (e.g., title,
critical slopes leasecontract)
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
3.6.7 Subdivision and ˃ 1 ha Based on
project area
other housing projects in none ≥ 5 ha but ≤ 1 ha (e.g.title,lease
areas with critical slopes ˂ 5 ha contract)
3.6.9 Family
none Regardless
dwellings/apartment none none
of area
type
none
3.7.1 Fuel pipelines none ≥ 20 km < 20 km
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.8 Waste Management Projects
(Commerci
al TSD
3.8.1 Sanitary Landfill for facilities
industrial and other none Multi-users Single-user none are
wastes considered
as “multi-
users”)
Categories
waste
2 to 4
Category 1 handling
Disposal
Disposal per day
3.8.2 Sanitary landfill for Facilities OR
none Facility none (Categorie
domestic wastes only Category 1
< 15 tons s based on
with
DAO
capacity ≥
2006-10)
15 tons
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
Annual
3.8.3 Compost/fertilizer
˃ 3,750 MT ≤ 3,750 MT rated/
making none none
production
rate
≤ 3,750 MT
With (compost
composting annual
3.8.4 Materials Receiving
facilities production
and Recovery Facilities
˃ 3,750 MT rate) or no
(for paper, plastics and none none
( annual composting
other materials)
rated / facility
production (material
rate ) segregation/
sorting only)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.8.5 Domestic
wastewater treatment Based on
˃ 30 m3 but
facility (including none ≥ 5,000 m3 ≤ 30 m3 system
< 5,000 m3
septage treatment capacity
facility
Annual
3.8.6 Material recovery
treatment
using pyrolysis or similar
none ≥ 10.0 MT ˂ 10.0 MT none /
technology (e.g., tire
processing
pyrolysis)
capacity
Annual
≥ 10.0 MT treatment
3.8.7 Hazardous waste OR projects /
treatment, recycling with ˂ 10.0 MT processing
and/or disposal facilities radioactive (without capacity
none none
(for recycling of lead, materials radioactive (forconversion
see details in Heavy (regardless materials) of volume
Industries) of amount/ to mass:
quantity) use 1 kg/L
as the factor)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Daily
treatment /
processing
3.8.8 Industrial and capacity
hospital waste (non- (for
none ≥ 50 m3 < 50 m3 none
hazardous) materials conversion
treatment facilities of volume
to mass:
use 1 kg/L
as the factor)
˃ 15,000 MT
but ˂ 50,000
MT (with or
≥ 50,000 MT ≤ 15,000 MT Annual
3.8.9 Recycling facilities without
and AND does treatment
for paper, plastic, and chemicals)
none involving the not involve /
other non-hazardous OR ≥ 50,000
use of the use of processing
materials MT and
chemicals chemicals capacity
does not
involve the use
of chemicals
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
4. GOLF COURSE AND OTHER TOURISM PROJECTS
Driving
Regardless
4.1 Golf course projects / Range only. Number of
of number none none
complex Regardless of holes
of holes
area
Project/gross
floor area
shall be the
sum/total of
total/gross
floor area (of
4.2 Resort and other structures)
> 0.1 ha but
tourism / leisure projects none ≥ 5 ha ≤ 0.1 ha plus open
< 5 ha areas and
other facilities
(e.g.,
landscape,
parking,
pools)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
5. OTHER PROJECTS
regardless
Cut-flower Industry projects none none none of capacity
or area
regardless of See Housing,
Telecommunication Projects none none none
type Buildings,
Storage
Facilities and
Facilities for Barangay Micro- Other
Regardless of Structures for
Business Enterprises (BMBE) none none none
capacity coverage of
Projects
buildings or
structures
Energy projects and non- Must not
commercial mineral and involve
fossil mining projects involving significant
seismic survey, gravity survey, earth moving
geo-scientific, geophysical regardless activities or
none none none
surveys, reconnaissance, of area may not pose
exploration, feasibility studies, significant
piloting, core ecological/
drilling/sampling research vegetative
and devt. activities. disturbance
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Subject to
Retesting of old/existing acquisition
wells in indigenous of relevant
energy resource DENR
regardless of
locations for purposes of none none none regional
area
data gathering and/or environme
verification of validity of ntal
historical energy and/or
resource information forestry
permits
regardless of
Cottage Industries none none none
capacity
regardless of
Service Industries none none none
capacity
Multiple Components Projects
Minor Amendments
When modification has no or negligible
adverse impact to the environment or those that
can be addressed by existing or modified EMP, as
well as request for change in name, address and
similar administrative matters.
Appeal
Any party aggrieved by the final decision on the ECC /
CNC applications may, within 15 days from receipt of
such decision, file and appeal on the following
grounds:
H Organizational Chart in
charge on environmental
IEE Checklist Sworn
Statement
M concerns
E Proof of authority over the Affidavit of No Complaint
N project site (land title, lease
Project Components &
contract, deed of absolute
T sale, etc.)
Operation Information
S
ECC Online Application Procedure
Approval
Eight (8) working days upon
receipt of complete documentary
requirements and copy of the
bank receipt to include payment
of penalties (if any)
EMB Circular No. 2016-006
CNC Application
1. Category C 1,000.00
2. Category D 1,210.00
Fees and Charges
(in Philippine Pesos,
Environmental Impact Assessment
unless otherwise
provided)
Other Services
1. Request for Miscellaneous Certifications 200.00
2. Request for Certified True Copy of Documents 200.00
SAMPLE CNC
THE ISSUANCE OF THIS CERTIFICATE SHALL
NOT EXEMPT THE GRANTEE FROM
COMPLIANCE WITH APPLICABLE
ENVIRONMENTAL LAWS, RULES AND
REGULATIONS INCLUDING THE PERMITTING
REQUIREMENTS OF OTHER GOVERNMENT
AGENCIES NEITHER CREATE ANY RIGHT NOR
BE USED AS AN AUTHORIZATION TO
IMPLEMENT THE PROJECT, YOU MAY
PROCEED WITH THE IMPLEMENTATION ONLY
AFTER SECURING ALL THE NECESSARY AND
RELEVANT PERMITS FROM OTHER PERTINENT
GOVERNMENT AGENCIES.