PRESIDENTIAL DECREE NO.

1586
“Philippine Environmental Impact
Statement (EIS) System”

ENGR. DIVINA C. CAMARAO


Chief, Environmental Impact Assessment Sect.
DENR EMB-NCR
Introduction

Salient Features of the Law

Procedural Screening

ECC/CNC Online Procedures


Scope of the EIS System

Section 4 of PD 1586 provides that no


person, partnership or corporation shall
undertake or operate any such
declared environmentally critical
project (ECP) or area (ECA) without first
securing an Environmental Compliance
Certificate (ECC).
EIA and ECC Defined

• Environmental Impact Assessment

A process that involves predicting and


evaluating the likely impacts of a project
(including cumulative impacts) on the
environment during construction,
commissioning, operation and
abandonment. It also includes designing
appropriate preventive, mitigating and
enhancement measures addressing
these consequences to protect the
environment and the community’s
welfare.
EIA and ECC Defined

• Environmental Compliance Certificate

A document issued by the DENR/EMB after


a positive review of an ECC application,
certifying that based on the
representations of the proponent, the
proposed project or undertaking has
complied with all the requirements of the
EIS System and has committed to
implement its approved Environmental
Management Plan to address the
environmental impacts.
ECC VALIDITY

ECC is valid through out the entire project


lifetime provided:

1. There is no significant project expansion


2. There is no change in technology
3. There is no change in location
4. Project was implemented within five (5)
years from the date of issuance
Required Documents for Securing ECC

I. Environmental Impact Statement (EIS)

II. Initial Environmental Examination (IEE) Report

III. Programmatic Environmental Impact


Statement (PEIS)

IV. Programmatic Environmental Performance


Report and Management Plan (PEPRMP)

V. Environmental Performance Report and


Management Plan (EPRMP)
Penalty for Violation/s

Any person, corporation or partnership


found violating Section 4 shall be
punished by suspending or cancelling
their certificate and/or pay a fine in an
amount not to exceed fifty thousand
pesos (P50,000) for every violation.
Fines, Penalties and Sanctions

I. Imposition of Fines and Penalties


a. Without an ECC

b. Violation of ECC conditions

II. Suspension of ECC


III. Imposition of Cease and Desist
Classification of Violation for ECC
conditions

Minor Offense
Violations of administrative ECC
conditions which will not have a direct
significant impact to the environment.
Major Offense
Violations od substantive ECC
conditions which will have a significant
impact to the environment.
Schedule of Penalty Reduction in case of
Violations of ECC Conditions
CRITERIA PENALTY

1st Offense 2nd Offense 3rd Offense 4th Offense

PhP 50,000.00 plus ECC


suspension with option of
DENR-EMB to cease
operations if deemed
Minor
PhP 10,000.00 PhP 25,000.00 PhP 50,000.00 necessary but with
Offenses
corresponding
requirement for
continued EMP
implementation
PhP 50,000.00 plus ECC
suspension with option of
DENR-EMB to cease
operations if deemed
Major
PhP 25,000.00 PhP 50,000.00 necessary but with
Offenses
corresponding
requirement for
continued EMP
implementation
Procedural Screening
Coverage of the Philippine EIS System
(MC 2014-05)

Category A.
Environmentally Critical Projects (ECPs) with
significant potential to cause negative
environmental impacts.

Category B.
Projects that are not categorized as
ECPS, but which may cause negative
environment impacts because they
are located in Environmentally Critical
Areas (ECA’s)
Coverage of the Philippine EIS System
(MC 2014-05)

Category C.
Projects intended to directly enhance
environmental quality or address existing
environmental problems not falling under
Category A or B.

Category D.
Projects unlikely to cause adverse
environmental impacts.
Environmentally Critical Projects
I. Heavy Industries
I. Non-Ferrous Metal Industries, Iron and
Steel Mills, Petroleum and Petrochemical
Industries and Smelting Plants.

II. Resource Extractive Industries


I. Mining and Quarrying Projects, Forestry
Projects, Dikes for/and Fishpond
Development Projects

III. Infrastructure Projects


I. Dams, Power Plants, Reclamation
Projects, Roads and Bridges

IV. Golf-Course Projects


Environmentally Critical Areas
(Presidential Proclamation No. 2146)

I. National Parks, Watershed Reserves, Wildlife


Preserves and Sanctuaries declared by Law

II. Areas set aside as aesthetics, potential


tourist spots

III. Areas which constitute the habitat for any


endangered or threatened species of
Indigenous Philippine Wildlife (Flora and
Fauna)

IV. Areas of unique historic, archeological,


geological, or scientific interests

V. Areas which are traditionally occupied by


cultural communities or tribes
Environmentally Critical Areas
(Presidential Proclamation No. 2146)

VI. Areas frequently visited and/or hard-hit by natural


calamities: Geologic Hazard Areas, Flood-prone Areas,
Hard-hit by depressions, storms and typhoons (provinces
affected by tropical cyclone in the past)

VII. Areas with critical slope

VIII. Areas classified as prime agricultural lands

IX. Recharge area of aquifers

X. Water bodies

XI. Mangrove Areas

XII. Coral Reefs


CO RO RO
PROJECT CLASSIFICATION AND CATEGORIZATION
ONLINE
MC 05 s 2014 – Annex “A”
Not covered
Covered (Required to secure ECC)
(may secure CNC)
Projects/ Project size
Description Cat A: ECP Cat B: Non- ECP Cat: C/D parameters
EIS EIS * IEE Checklist PD

1. HEAVY AND OTHER PROCESSING/MANUFACTURING INDUSTRIES


2. RESOURCE EXTRACTIVE INDUSTRIES
3. INFRASTRUCTURE PROJECTS Documentary
4. GOLF COURSE AND OTHER TOURISM PROJECTS Requirement
5. OTHER PROJECTS

Category C : Environmental Enhancement or Direct Mitigation


Category D : Not Covered
EIS : Environmental Impact Statement
IEE : Initial Environmental Examination
PD : Project Description
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

Not covered
Covered (Required to secure ECC) (may secure
Project size
Projects/ CNC)
parameter
Description Cat A: ECP Cat B: Non-ECP Cat: D s
EIS EIS IEE C PD

1. HEAVY AND OTHER PROCESSING / MANUFACTURING INDUSTRIES

1.1 Non-Ferrous Metal Annual


Industries ≥ 10K MT but > 200 MT but
≥ 30K MT ≤ 200 MT production
< 30K MT < 10K MT
1.2 Iron and Steel Mills rate

1.3 Petroleum and Petrochemical Industries (Includes HC products such as LNG / CNG, etc.)

1.3.1 Petrochemical or Annual


≥ 10K MT but > 200 MT but production
petroleum-based ≥ 30K MT ≤ 200 MT
< 30K MT < 10K MT rate
products
Annual
> 200 barrels
≥ 10K but production
1.3.2 Refineries ≥ 30K barrels but ≤ 200 barrels
< 30K barrels rate
< 10K barrels
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.3.3 Recycling oil and Daily
≥ 5 but > 1 MT but
other related petroleum- ≥ 10 MT ≤ 1MT production
< 10 MT < 5 MT
based chemicals rate
1.3.4 LPG / LNG /CNG / Total
similar product storage none ≥ 10 MT < 10 MT none storage
and refilling capacity
1.3.5 Storage of
petroleum,
petrochemical or related ≥ 20 kL Total
products (including none ≥ 20K kL but ≤ 20 kL storage
blending) < 20K kL capacity
1.3.6 Refilling station
project / gasoline station

Annual
≥ 10K but 200 but
1.4 Smelting Plants ≥ 15K MT ≤ 200 MT production
< 15K MT < 10K MT
rate
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.5 Chemical Industries
1.5.1 Mfg, processing
Annual
and/or use of substance
none ≥ 10 MT < 1 MT none production
included in the PCL and
rate
CCO per RA 6969
1.5.2 Manufacture of
agrichemicals, industrial Annual
200 but
chemicals and other none ≥ 30K MT ≤ 200 MT production
< 30K MT
substance not in the rate
PCL or CCO
1.5.3 Manufacture of Annual
explosives, propellants none ≥ 5 MT < 5 MT none production
and industrial gases rate
1.5.4 Pharmaceutical
industries and mfg. of
Annual
soap and detergents, > 200 but
none ≥ 50K MT ≤ 200 MT production
health products, and < 50K MT
rate
other consumer
products
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.5.5 Surface coating
industries (paints,
Annual
pigments, varnishes, > 200 but
none ≥ 30 MT ≤ 200 MT production
lacquers, ant-capacity < 30K MT
rate
fouling coating, printing
inks)
1.6 Agriculture, food and related industries
1.6.1 Animal products
processing, canning Annual
slaughterhouses, etc) > 200 but production
none ≥ 2.5K MT ≤ 200 MT
including marine < 2.5K MT rate
products, crabmeat
etc.)
1.6.2 Coconut
processing plants (incl. > 200 but Annual
none ≥ 25K MT ≤ 200 MT
production of coconut < 25K MT production
based products) rate
1.6.3 Distillation and Annual
200 MT but
Fermentation Plants (e.g. none ≥ 50K MT ≤ 200 MT production
< 50K MT
bio-ethanol project) rate
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
1.6.4 Food preservation For canning,
(e.g., drying, freezing) and Regardless of refer to other
none none none
similar methods aside from capacity (applicable
canning categories)

1.6.5 Ice plant / Regardless


none none none
processing of capacity
1.6.6 Agricultural
processing including rice, Annual
> 5K MT but
corn, vegetables, fruits none ≥ 50K MT ≤ 5K MT production
< 50K MT
and other agricultural rate
products
> 1 ton/hr or
mill with
polishing Hourly
1.6.7 Rice / corn mill none none (regardless of ≤ 1 MT/hr production
production rate
rate if with
polishing)
1.6.8 Other types of food
Annual
(and other food by > 200 but
none ≥ 50K MT ≤ 200 MT production
products, additives, etc.) < 50K MT
rate
processing industries
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD

≥ 10K L > 100 L but


≤ 100 L Monthly
1.6.9 Processing of dairy (liquid) or < 10K L (liquid)
none (liquid) or ≤ 1 production
products ≥ 100 MT or > 1 MT but
< 100 MT (solid) MT (solid) rate
(solid)

Annual
> 200 MT but (rated)
1.6.10 Sugar Mills none ≥ 50K MT ≤ 200 MT
< 50K MT production
rate
1.7 Other Processing/Manufacturing Industries
Annual
1.7.1 Leather and related > 200 but
none ≥ 2.5K MT ≤ 200 MT production
industries < 2.5K MT
rate
Annual
1.7.2 Textile, wood, rubber > 1K but
none ≥ 50K MT ≤ 1K MT production
and fiber glass industries < 50K MT
rate
with
Regardless
1.7.3 Wood and metal processing without
none none of capacity
furniture assembly (bleaching, processing
or area
sanding, etc.)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Annual
1.7.4 Glass-based
none none > 30K MT ≤ 30K MT production
products manufacturing
rate
> 15K MT
Regard-less of or Annual use
production Regardless of ≤ 15K MT of
1.7.5 Metal-based capacity if production and substances
involving the capacity does not in PCL or
products manufacturing
use of ≥ 1MT if involving the involve the use CCO (EIS)
(including none per year of use of < 1MT of substances
semiconductors, substances per year of included Annual
electronics) included in substances in the PCL and production
the PCL and included in CCO rate (IEEC &
CCO the PCL and Category D)
CCO

w/o dyeing
and only Regardless
1.7.6 Garment
involves of
manufacturing / none none With dyeing
spinning, capacity
industries
cutting and Or area
sewing
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Annual
1.7.7 Pulp and Paper ≥ 10K MT but >200 MT but
≥ 50K MT ≤ 200 MT production
Industries < 50K MT < 10K MT rate

Annual
1.7.8 Paper and plastic-
none none > 15K MT ≤ 15K MT production
based products rate
Total/GFA
including
parking,
1.7.9 Car and Trucks none ≥ 2.5 Ha < 2.5 Ha none open space
Assembly and other
areas
1.7.10 Shipbuilding, Boat/ship
boat- building and other capacity
(based on
marine vessel ≤ 5 DWT and
> 500 but max. cap. of
manufacturing / can handle ship and
fabrication (including none ≥ 500 DWT < 500 DWT boat that
1 boat
ship breaking and at a time can be
salvaging) fabricated/
handled by
the facility)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD

2. RESOURCE EXTRACTIVE INDUSTRIES


2.1 Mining and Quarrying Projects
Annual
> 20K MT but
2.1.1 Coal mining ≥ 700K MT ≤ 20K MT none extraction
< 70K MT
rate
Annual
extraction
rate
2.1.2 Extraction of or/and
metallic ores/minerals ≥ 100K MT project
> 20K MT but
(on shore) Or ≤ 20K MT area
< 100K MT
Area is And (material
And none
≥ 25 ha Area is < 25 recovery
Area is
(regardless ha from TSF
< 25 ha
of capacity) and similar
facility are
included in
this
category)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
2.1.3 Extraction of Non-
metallic Minerals such as Dredging
- Limestone/shale/silica/ Annual
≥ 75K MT only (of river,
clay/placer and other > 20K MT but extraction
Or bay & other
non-metallic < 75K MT ≤ 20K MT rate
Area natural water
-minerals/ ores And And Area is or/and
≥ 20 ha bodies as
- Aggregates (sand, Area is < 20 ha project
(regardless envtl.
stone, gravel including < 20 ha area
dredging with/intended of capacity) enhancemen
for recovery/use of t)
materials)
The reckoning of “commercial extraction” of onshore and offshore oil &
2.1.4 Extraction of Oil
gas projects shall be after DOE’s approval of the Service Contractor’s
and Gas (Land-based)
Declaration of Commerciality.
> 500 but
≥ 4K barrels ≤ 500 barrels Daily
- Commercial extraction < 4K barrels
(or (or none extraction
of oil (or
equivalent) equivalent) rate
equivalent)
Daily
- Commercial extraction > 50K but
≥ 250K m3 ≤ 50K m3 none extraction
of gas < 250K m3
rate
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD

2.1.5 Extraction of metallic


Regardless of
and non-metallic minerals
commercial
including extraction of oil none none none
capacity or
and gas, deuterium
area
(off-shore)

2.1.6 Mineral Processing Projects


Annual
processing
a.) Metallic Mineral or ore ≥ 10K MT but ˂ ˃ 200 MT but ≤ 200 MT
≥ 70K MT rate
processing 70K MT ˂ 10K MT annually
( based on
inputs)
Regardless of
Regardless of
production
production
capacity if
capacity if
involving the
b.) Previous/Noble Metal involving the
use of
Refining (including jewelry- none use of ≥ 1.0 Does not use
< 1.0 MT per
making) MT per year of chemicals
year of
substances
substances
included in
included in
the PCL and
the PCL and
CCO
CCO
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
c.) Non-metallic mineral
processing plants like
cement, other cement
products, clinker,
Annual
limestone, ceramic ≥ 10K MT but ˃ 200 MT but ≤ 200 MT
≥ 50K MT production
industries, manufacture ˂ 50K MT ˂ 10K MT annually
rate
of glass and glass
products, manufacture
and processing of
calcium
d.) Natural stone Annual
(e.g., marble) processing none none ˃ 10K MT ≤ 10K MT production
plant rate
Those that
e.) Batching and are mobile or
Regardless
crushing plant; sand & to be
none none of size or
gravel washing operated for
capacity
less than 1
year
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
2.2 Forestry Projects

Annual
volume of
2.2.1 Community Based trees to be cut
Forest Resources
Utilization (CBFRU); for equal to or
more than 5K
Integrated Forest m3 - processing
Management shall de done
Agreement (IFMA) at the EMB RO,
≥ 5K m3 but ˃ 100 m3 but
projects; Timber License ≥ 10K m3 ≤ 100 m3 however,
˂ 10K m3 ˂ 5K m3 approval will
Agreement (TLA);
Private Land Timber be at the EMB
CO as per
Utilization (PLTU); Other Memorandum
Forestry Projects; Forestry from the
project co-managed Secretary
with DENR; dated
December 13,
2006
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD

Equivalent
products
per year

for more
than 4,000
m3 -
processing
2.2.2 Wood Processing ˃ 4K m3 but ˃ 100 m3 but
≥ 10K m3 ≤ 100 m3 shall be done
Projects ˂ 10K m3 ≤ 4K m3
at the EMB
RO, however,
approval will
be at EMB
CO as per
Memorandu
m dated
December
13, 2006
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
Introduction
Introduction Introduction
of exotic
of exotic of exotic
2.2.3 Introduction of flora
fauna fauna
regardless of
Exotic Fauna and Flora regardless of regardless of
number or none
in Public and Private number or number or
area if
Forests area if area if
located in
located in located in
public or
public land private land
private land

≤ 10 AU Grazing
≥ 500 ≥ 100 AU capacity for
and
2.2.4 Grazing projects Animal Unit but ˂ 100 AU category D;
˂ 1 AU per Animal Unit
(AU) ˂ 500 AU
ha (AU)
Establishment or facilities for wildlife farming, protection, conservation,
commercial purposes
2.2.5 Wildlife Farming or regardless
any related projects as of area
defined by BMB butterfly
none none except for
farming
butterfly
farming
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
2.2.6 Breeding /
propagation of any Parental Parental
Philippine threatened stock over stock < 50
none none
species, exotic species, 50 heads/ heads/
or non-threatened/ species species
indigenous species
2.2.7 Livestock Animal Industries
a. Livestock/piggery
˃ 100 but Stocking
Projects – (eg. none ≥ 5K heads ≤ 100 heads
˂ 5K heads population
pigs/goats)

≥ 1K heads ≤ 100 heads


b. Ostrich Farming none ˂ 1K heads
OR ≥ 1 ha and ≤ 1 ha

˃ 10K but
c. Livestock/poultry ≥ 100K Stocking
none ˂ 100K ≤ 10K heads
Projects - (e.g., birds) heads population
heads

d. Other Livestock ≥ 50 Animal ˃ 10 AU but Stocking


none ≤ 10 AU
projects Unit (AU) ˂ 50 AU population
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
2.2.8 Agriculture Industry
Aggregated
by
a. Agricultural plantation
˃ 50 ha but municipality
(e.g., orchards, including None ≥ 500 ha ≤ 50 ha
˂ 500 ha - based on
rubber plantation)
contracting
party
Annual
˃ 200 MT but
b. Animal feed mill None ≥ 2,500 MT ≤ 200 MT production
˂ 2,500 MT
rate
2.3 Fishery Projects – Dikes for/and Fishpond Development Projects shall refer to natural or
Dikes For/And Fishpond artificial water impoundment involving dike construction and harvesting
Development Projects the same as marketable size and quantities.
2.3.1 Fishery/Aquaculture Based on
Projects using fresh or ≤ 1 ha OR project area
≥ 5 ha but > 1 ha but
brackish water including ≥ 25 ha seaweed (e.g., title,
˂ 25 ha ˂ 5 ha
pearl farm and similar farming lease
activities contract)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC Project


Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s

3. INFRASTRUCTURE PROJECTS

3.1 Dams, Water Supply and Flood Control Project

3.1.1 Dams Reservoir


(including those for flooded/
˃ 5 ha but
irrigation, flood control, inundated
≥ 25 ha OR ˂ 25 ha OR ≤ 5 ha AND
water source and area
≥ 20 million ˃ 5 million ≤ 5 million none
hydropower projects) or/and
m3 m3 but ˂ 20 m3
including run- of-river water
million m3
type. storage
capacity

≥ 1,000 ha
3.1.2 Irrigation projects ˃ 300 but Service
none (service ≤ 300 ha
(distribution system only) ˂ 1,000 ha Area
area)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC Project
Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s
With water
source
(e,g.,
infiltration
Levels III Level II /
gallery, etc.)
3.1.3 Water supply (Distribution Level I Water
none and water
projects (without dam) system only) refilling
treatment
station
facilities
including
desalination,
reverseosmosis
3.2 Power Plants
Total power
3.2.1 Gas-fired thermal ≥ 10 MW but ˃ 1 MW but
≥ 50 MW ≤ 1 MW generating
power plants ˂ 50 MW ˂ 10 MW
capacity

Total power
3.2.2 Geothermal ≥ 10 MW but ˃ 1 MW but
≥ 50 MW ≤ 1 MW generating
facilities ˂ 50 MW ˂ 10 MW
capacity
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
Total power
generating
capacity
For projects
with weir/
≥ 10 MW but
dam/ other
˂ 50 MW OR ˃ 1 MW but
≤ 1 MW impounding
3.2.3 Hydropower with ˂ 10 MW
≥ 50 MW without facility, refer
facilities tunneling AND without
tunneling to dam as
(regardless tunneling
additional
of capacity)
criteria for
multi-
component
project
screening
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Total
3.2.4 Other Thermal
≥ 10 MW but ˃ 1 MW but power
Power Plants (e.g., coal, ≥ 30 MW ≤ 1 MW
˂ 30 MW ˂ 10 MW generating
diesel, bunker, etc.)
capacity

Total
≥ 10 MW but ˃ 1 MW but ≤ 1 MW power
3.2.5 Power Barges ≥ 50 MW
˂ 50 MW ˂ 10 MW generating
capacity

none ˃ 5 but
3.2.6 Fuel cell ≥ 100 MW ≤ 5 MW
˂ 100 MW
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project
Projects/
Cat A: ECP Cat B: Non-ECP Cat D size
Description
parameters
EIS EIS IEE C PD
3.2.7 Renewable energy
projects such as ocean, Total power
˃ 5 but
solar, wind, tidal power none ≥ 100 MW ≤ 5 MW generating
˂ 100 MW
except waste-to-energy capacity
and biogas projects
Total power
3.2.8 Waste-to-energy - ˃ 1 MW but
none ≥ 50 MW ≤ 1 MW generating
power projects ˂ 50 MW
capacity
Total rated
capacity of
3.2.9 Waste-to-energy - ˃ 1 MW but all
none ≥ 5 MW ≤ 1 MT
biogas project ˂ 5 MW processing
and storage
facilities
Total power
3.2.9 Power transmission None
none ˃ 138 KV ≤ 138 KV generating
lines
capacity
Total power
3.2.10 Substation /
none None ˃ 220 KV ≤ 220 KV generating
switchyard
capacity
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC Project


Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s
3.3 RECLAMATION and Area
≥ 5 ha but
other land restoration ≥ 25 ha ˂ 5 ha none reclaimed/
˂ 25 ha
PROJECTS restored

3.4 Road & Bridges

PROVINCIAL
ALL TYPES
ROAD and
NATIONAL OF ROADS:
OTHER
ROAD: ˃ 2 km but
TYPES of
≥ 20.0 km, ˂ 20.0 km
ROADS:
(length with (length with
≥ 20.0 km,
3.4.1 Roads, no critical no critical
(length with ≤ 2 km
new construction slope) OR slope) OR
no critical
≥ 10.0 km ˃ 2 km but
slope) OR
(length with ˂ 10.0 km
≥ 10.0 km
critical (length with
(length with
slope) critical
critical
slope)
slope)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
˃ 50%
˃ 50% increase in
increase in capacity (or
capacity (or in terms of ≤ 50%
in terms or length/width) increase in
length/width) AND capacity (or
3.4.2 Roads , widening, AND > 2 km but
in terms of
rehabilitation and/ or none ≥ 20.0 km, ˂ 20.0 km
(length with (length with
length/
improvement
no critical no critical width) but ≤ 2
slope) OR slope) OR km increase
≥ 10.0 km > 2 km but in length
(length with ˂ 10.0 km
critical slope) (length with
critical slope)

≤ 50 m
3.4.3 Bridges and
Regardless of
viaducts (including ≥ 5 km but ˃ 50 m but
≥ 10.0 km length for
elevated roads), new ˂ 10.0 km ˂ 5.0 km
footbridges /for
construction
pedestrian only
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC Project


Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s
˃ 50%
≤ 50%
≥ 50% increase in
increase in
increase in capacity (or
3.4.4 Bridges and capacity (or
capacity in terms of
viaducts (including in terms of
(or in terms length/widt
elevated roads), none length/
of h)
rehabilitation and / or width) but
length/widt but
improvement ≤ 2 km
h) OR ˂ total
increase in
≥ 10km length
length
of 10 km

3.4.5 Roads – Regardless


flyover/cloverleaf/ none none of length none
interchanges and width

All
3.4.6 Pedestrian All overpass
none none underpass
passages projects
projects
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.4.7 Tunnels and sub-
grade roads and ≥ 1.0 km < 1.0 km none none
railways
Regardless
3.4.8 On-grade railway
of length none none none
system, new
and width
3.5 Other Transport Facilities
International Domestic Private
3.5.1 Airports none
Airport Airport airstrips
˃ 1 ha
3.5.2 Land transport ≤ 1 ha Based on
OR
project area
terminal (for buses, Regardless of without
none none (e.g., title,
jeepneys and other size if with service lease
modes of transportation) service facilities contract)
facilities
˂ 15.0 ha with
3.5.3 Sea port, ≥ 15.0 ha with Based on
reclamation
reclamation project area
causeways, and harbors OR ˃ 1 ha ≤ 1.0 ha (w/o
none OR ≥ 25.0 ha (e.g., title,
(including RO-RO (w/o
but ˂ 25.0 ha reclamation) lease
facilities) (w/o
reclamation) contract)
reclamation)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.6 Buildings including Housing, Storage Facilities and Other Structures
3.6.1 Commercial,
(Business centers with
residential units (mixed
use), malls,
supermarkets, public
markets)
- Fast food / Total/gross
Restaurant floor area
Projects including
˃ 1 ha ≤ 1 ha
- Commercial parking,
none ≥ 5.0 ha but
Establishments open
˂ 5.0 ha (10,000 m2)
(i.e. Showrooms) space and
other
3.6.2 All office and areas
residential building such
as motels,
condominiums, schools,
etc. Inclg. storage
facilities with no hazardous
or toxic materials
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Clinics
(out patient,
Primary, health centers,
3.6.3 Institutional and Secondary, dental clinics)
Tertiary including rural
other structures with none none hospitals or health units;
laboratory facilities Medical X-rayclinic,
Facilities diagnostic
laboratory,assay
laboratory
3.6.4 Storage facilities for
toxic or hazardous materials, Storage
none ≥ 1K MT ˂ 1K MT none
substances or products capacity
(including for those in PCL)
3.6.5 Industrial Parks Based on
(horizontal project area
none ≥ 5 ha ˂ 5 ha none
development) with (e.g., title,
critical slopes leasecontract)

3.6.6 Industrial Parks Based on


(horizontal project area
none ≥ 25 ha ˂ 25 ha none
development) in flat (e.g.title,leas
areas e contract)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
3.6.7 Subdivision and ˃ 1 ha Based on
project area
other housing projects in none ≥ 5 ha but ≤ 1 ha (e.g.title,lease
areas with critical slopes ˂ 5 ha contract)

3.6.8 Subdivision and ˃ 1 ha Based on


project area
other housing projects in none ≥ 25 ha but ≤ 1 ha (e.g., title, lease
flat areas ˂ 25 ha contract)

3.6.9 Family
none Regardless
dwellings/apartment none none
of area
type

3.6.10 Columbarium and Total/gross floor


similar projects (including area including
none none ˃ 1 ha ≤ 1 ha
funeral parlor and parking, open space
crematorium) and other areas

3.6.11 Cemetery, Based on


project area
memorial park and none none ˃ 5.0 ha ≤ 5.0 ha (e.g., title,lease
similar projects contract)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC Project


Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s

3.7 Pipeline and similar Projects

none
3.7.1 Fuel pipelines none ≥ 20 km < 20 km

3.7.2 Other pipelines/


none ≥ 50 km < 50 km none
cables
3.7.3 Submarine
none ≥ 5 km < 5 km none
pipelines/ cables
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.8 Waste Management Projects
(Commerci
al TSD
3.8.1 Sanitary Landfill for facilities
industrial and other none Multi-users Single-user none are
wastes considered
as “multi-
users”)
Categories
waste
2 to 4
Category 1 handling
Disposal
Disposal per day
3.8.2 Sanitary landfill for Facilities OR
none Facility none (Categorie
domestic wastes only Category 1
< 15 tons s based on
with
DAO
capacity ≥
2006-10)
15 tons
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC Project


Projects/ size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameter
EIS EIS IEE C PD s

Annual
3.8.3 Compost/fertilizer
˃ 3,750 MT ≤ 3,750 MT rated/
making none none
production
rate

≤ 3,750 MT
With (compost
composting annual
3.8.4 Materials Receiving
facilities production
and Recovery Facilities
˃ 3,750 MT rate) or no
(for paper, plastics and none none
( annual composting
other materials)
rated / facility
production (material
rate ) segregation/
sorting only)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
3.8.5 Domestic
wastewater treatment Based on
˃ 30 m3 but
facility (including none ≥ 5,000 m3 ≤ 30 m3 system
< 5,000 m3
septage treatment capacity
facility
Annual
3.8.6 Material recovery
treatment
using pyrolysis or similar
none ≥ 10.0 MT ˂ 10.0 MT none /
technology (e.g., tire
processing
pyrolysis)
capacity
Annual
≥ 10.0 MT treatment
3.8.7 Hazardous waste OR projects /
treatment, recycling with ˂ 10.0 MT processing
and/or disposal facilities radioactive (without capacity
none none
(for recycling of lead, materials radioactive (forconversion
see details in Heavy (regardless materials) of volume
Industries) of amount/ to mass:
quantity) use 1 kg/L
as the factor)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
Daily
treatment /
processing
3.8.8 Industrial and capacity
hospital waste (non- (for
none ≥ 50 m3 < 50 m3 none
hazardous) materials conversion
treatment facilities of volume
to mass:
use 1 kg/L
as the factor)
˃ 15,000 MT
but ˂ 50,000
MT (with or
≥ 50,000 MT ≤ 15,000 MT Annual
3.8.9 Recycling facilities without
and AND does treatment
for paper, plastic, and chemicals)
none involving the not involve /
other non-hazardous OR ≥ 50,000
use of the use of processing
materials MT and
chemicals chemicals capacity
does not
involve the use
of chemicals
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD
4. GOLF COURSE AND OTHER TOURISM PROJECTS
Driving
Regardless
4.1 Golf course projects / Range only. Number of
of number none none
complex Regardless of holes
of holes
area

Project/gross
floor area
shall be the
sum/total of
total/gross
floor area (of
4.2 Resort and other structures)
> 0.1 ha but
tourism / leisure projects none ≥ 5 ha ≤ 0.1 ha plus open
< 5 ha areas and
other facilities
(e.g.,
landscape,
parking,
pools)
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION
ECC CNC
Projects/ Project size
Cat A: ECP Cat B: Non-ECP Cat D
Description parameters
EIS EIS IEE C PD
5. OTHER PROJECTS
regardless
Cut-flower Industry projects none none none of capacity
or area
regardless of See Housing,
Telecommunication Projects none none none
type Buildings,
Storage
Facilities and
Facilities for Barangay Micro- Other
Regardless of Structures for
Business Enterprises (BMBE) none none none
capacity coverage of
Projects
buildings or
structures
Energy projects and non- Must not
commercial mineral and involve
fossil mining projects involving significant
seismic survey, gravity survey, earth moving
geo-scientific, geophysical regardless activities or
none none none
surveys, reconnaissance, of area may not pose
exploration, feasibility studies, significant
piloting, core ecological/
drilling/sampling research vegetative
and devt. activities. disturbance
PROJECT THRESHOLDS FOR COVERAGE SCREENING AND CATEGORIZATION

ECC CNC
Project size
Projects/
Cat A: ECP Cat B: Non-ECP Cat D parameter
Description
s
EIS EIS IEE C PD

Subject to
Retesting of old/existing acquisition
wells in indigenous of relevant
energy resource DENR
regardless of
locations for purposes of none none none regional
area
data gathering and/or environme
verification of validity of ntal
historical energy and/or
resource information forestry
permits
regardless of
Cottage Industries none none none
capacity

Demonstration and Pilot regardless of


none none none
Projects capacity

regardless of
Service Industries none none none
capacity
Multiple Components Projects

The categorization shall be based on all


components of the entire project
(i.e., both existing and new/proposed).
Existing Projects for Expansion/Modification

Existing projects that will undertake expansion,


rehabilitation and/or modification shall request
EMB for amendment of ECC.
Major Amendments
When modification is envisaged to have an
additional and significant negative/adverse impact
to the environment.

Minor Amendments
When modification has no or negligible
adverse impact to the environment or those that
can be addressed by existing or modified EMP, as
well as request for change in name, address and
similar administrative matters.
Appeal
Any party aggrieved by the final decision on the ECC /
CNC applications may, within 15 days from receipt of
such decision, file and appeal on the following
grounds:

a. Grave abuse of discretion on the part of the


deciding authority, or

b. Serious errors in the review findings.

Deciding Authority Where to file the appeal


EMB Regional Office Director Office of the EMB Director
EMB Central Office Director Office of the DENR Secretary
DENR Secretary Office of the President
Processing Timeframe

a. Maximum processing time for ECC application


online is twenty (20) days.
b. All CNC applications are auto approved.

c. If a project proponent fails to submit required


additional information as per EMB’s request,
the proponent shall resubmit its application
within (a) one year for Category A Projects,
and (b) 6 months for Category B projects –
without having to pay processing and other
fees. Otherwise, it shall be treated as a new
application.
Processing Timeframe

In cases where EMB and the project


proponent have exhausted all
reasonable efforts to generate the
information needed for deciding on the
ECC/CNC application, the responsible
authority shall make a decision based
on the available information as to
comply with the prescribed timeframe.
Abandonment
For projects that shall no longer be
pursued, the proponent should inform
EMB to relieve the former from the
requirement for continued compliance
with the ECC conditions.
For projects that have already
commenced implementation, and
abandonment or decommissioning plan
shall be submitted for approval by EMB
at least six (6) months before the
planned abandonment or
decommissioning.
EMB Circular No. 2020-26:

Implementation of Enhanced Online


Processing of Certificate of
Non=Coverage (CNC) Applications
for Category D Projects
CNC Online Application Procedures
(www.emb.gov.ph)

All CNC applications for Category D projects


involving not more than one (1) hectare land
development and has not been issued ECC may be
processed online.

1. Upon online submission, an Order of Payment and


proponent’s Accountability Statement will be sent
thru email to the proponent together with
instructions regarding payment.

2. After payment of fees, submit scanned copy of


the bank transaction slip, scanned copy of any
government ID issued to the project
proponent/applicant; Site Development Plan;
geotagged photographs of the project site; and
Accountability Statement of the Proponent.
CNC Online Application Procedures
(www.emb.gov.ph)

3. After submission of the complete requirements, an


AUTOAPPROVED CNC will be issued thru the online,
the CNC can be printed online.

4. EMB Regional Office will validate/evaluate the


submitted application and requirements.
Applications validated to be complete will be
forwarded to Repository. Otherwise, a Letter of CNC
cancellation will be sent to the proponent.
Process Flow
PROPONENT: SYSTEM: PROPONENT: SYSTEM:

1. Select project 1. Identify 1. Download & 1. Notify (email)


type and requirements Pay applicant
provide actual based the corresponding receipt of
project size, screening fees documents
2. Answer 2. Generate Order 2. Upload proof of 2. Approve
screening of Payment payment & application and
questions, 3. Email Order of supporting Generate CNC
3. Provide project Payment documents
information

EMB RO: PROPONENT:

1. Evaluate application and attachments 1. Download


2. Generate and upload evaluation report and/or Letter of CNC cancellation Certificate
3. Route to proponent if cancellation or repository if in order

*CNC will be updated from approved to cancelled


Validation of CNC Issued

All CNCs issued can be validated online


through the EMB-EIA Website or Certified
True Copies thereof can be obtained
from the EMB-EIA Central Office.
EMB Circular No. 2015-008::

Implementation of Online Processing


of CNC applications for Category B
Projects requiring IEE Checklist
Report Forms
ECC Online Application Applicability

The processing and issuance of ECC


applications under the online system shall be
limited to new (proposed or existing) and
single component Category B projects.
ECC Online Application Procedure
(www.emb.gov.ph)

1. Register to have an ECC Online account at


the EMB-EIA Website by filling up forms
providing proponent information;
2. Encode the project information in the ECC
Online System to verify if the proposed project
will qualify in the online application process;
3. Once qualified, fill up the online Initial
Environmental Examination (IEE) checklist form;
4. The accomplished IEE checklist with
accountability statement of proponent will be
printed for notarization;
ECC Online Application Procedure
(www.emb.gov.ph)

5. Download other fillable forms such as


Environmental Impact Management Plan IEIMP),
Abandonment Plan, Duly accomplished project
environmental monitoring and audit
prioritization scheme (PEMAPS) questionnaire
(PEMAPS); Project Components and Operation
Information
6. Upload all attachments- filled-out forms and
other requirements
A Topographic Map of
T Project Description impact/affected areas (at least 1km
from the project boundaries)
T
Environmental Impact and Certification from LGU on the
A Management Plan compatibility of proposed project
with existing land use plan
C
Abandonment /
H Decommissioning /
Site Development and/or
Vicinity map signed by
M Rehabilitation Information registered professionals

E Geotagged photographs of Project/Plant layout signed by


N project site registered professionals
(taken for last 30 days)
T
S
A Duly notarized accountability
Schematic diagram of
T wastewater treatment facility statement of proponent
T Duly accomplished project
Schematic diagram of Air
A Pollution Control Facility
environmental monitoring and audit
prioritization scheme (PEMAPS)
C questionnaire

H Organizational Chart in
charge on environmental
IEE Checklist Sworn
Statement
M concerns
E Proof of authority over the Affidavit of No Complaint
N project site (land title, lease
Project Components &
contract, deed of absolute
T sale, etc.)
Operation Information
S
ECC Online Application Procedure

7. Online applications with the complete


documentary requirements will be evaluated
by the EMB Regional Office within established
timeframe.
8. The result of screening and evaluation, is
either denial or a need to submit additional
information (AI) will be forwarded to
proponent through its online account.
9. Once the requirements had been
completed, the EMB Regional Office will
generate the Order of Payment (for
Processing fees) which will be forwarded to
proponent through its online account.
ECC Online Application Procedure

10. After payment of the processing fee at any


Landbank branch (either thru online payment
system or over-the counter), proof of payment
will be uploaded thru the system.
11. EMB Regional Office will approve the ECC
application, and issuance thereof can be
printed online through proponent’s ECC online
account.
Timeframe

Screening, Review and Evaluation


Twelve (12) working days from
receipt of application.

Approval
Eight (8) working days upon
receipt of complete documentary
requirements and copy of the
bank receipt to include payment
of penalties (if any)
EMB Circular No. 2016-006

ECC Applicants for Mining Projects


including Sand and Gravel Quarry
Projects
Applicant

To ensure consistency in the implementation


of the Philippine Environmental Impact
Statement System and the Philippine Mining
Act, the personality of applicant for a
mineral agreement should be the same as
the personality of the applicant for an ECC.
Therefore, no new application for an ECC
shall be processed and issued in the name
of any applicant unless the same applicant
shall be the entity of corporation as
reflected in a Mineral Production Sharing
Agreement (MPSA) and/or Finance or
Technical Assistance Agreement (FTAA).
DENR Administrative Order No. 2016-28:
New Fees and Charges (December 2016)
Fees and Charges
(in Philippine Pesos,
Environmental Impact Assessment
unless otherwise
provided)

ECC Application – Requiring:


1. Programmatic EIS 15,000.00
2. EIS 10,000.00
3. Programmatic Environmental Peformance
Report & Management Plan (PEPRMP) 10,000.00
4. Environmental Performance Report
&Management Plan (EPRMP) 5,000.00
5. IEE Checklist 5,000.00

CNC Application
1. Category C 1,000.00
2. Category D 1,210.00
Fees and Charges
(in Philippine Pesos,
Environmental Impact Assessment
unless otherwise
provided)

Post-ECC Processing Service:


1. Major Amendment 2,000.00
2. Minor Amendment 1,000.00
3. Relief of ECC Commitments 1,000.00

Other Services
1. Request for Miscellaneous Certifications 200.00
2. Request for Certified True Copy of Documents 200.00
SAMPLE CNC
THE ISSUANCE OF THIS CERTIFICATE SHALL
NOT EXEMPT THE GRANTEE FROM
COMPLIANCE WITH APPLICABLE
ENVIRONMENTAL LAWS, RULES AND
REGULATIONS INCLUDING THE PERMITTING
REQUIREMENTS OF OTHER GOVERNMENT
AGENCIES NEITHER CREATE ANY RIGHT NOR
BE USED AS AN AUTHORIZATION TO
IMPLEMENT THE PROJECT, YOU MAY
PROCEED WITH THE IMPLEMENTATION ONLY
AFTER SECURING ALL THE NECESSARY AND
RELEVANT PERMITS FROM OTHER PERTINENT
GOVERNMENT AGENCIES.

MOREOVER, ANY EXPANSION AND/OR


MODIFICATION OTHER THAN SPECIFIED
ABOVE SHALL BE CONSIDERED AS A
VIOLATION OF P.D. 1586 (EIA SYSTEM) AND
SHALL BE SUBJECTED TO IMPOSITION OF
FINES/PENALTIES AMOUNTING TO
PHP50,000.00.
SAMPLE ECC
1st PART

This Certificate is issued in compliance with the requirements of Presidential Decree


No. 1586 in accordance to DENR Administrative Order (D.A.O.) No. 2003-30 and EMB
Memorandum Circular No. 2014-005. Non-compliance with any of the provisions of
this Certificate shall be a sufficient cause for the cancellation of this Certificate
and/or imposition of a fine in an amount not to exceed Fifty Thousand Pesos
(P50,000.00) for every violation thereof without prejudice to imposition of fines and
penalties under other environmental laws. The EMB-NCR, however, is not precluded
from reevaluating and correcting any deficiencies or errors that may be found after
issuance of this Certificate.
2nd PART
3rd PART SWORN ACCOUNTABILITY
STATEMENT
THANK YOU!
enviapco@gmail.com
enviaplanners@gmail.com

landline: (02) 8 247 3477


smart: +(63) 919 007 4360
globe: +(63) 917 178 1064

No. 27, Unit F, Mayaman St.,


UP Village, Quezon City, 1101

http://enviaconsultancy.com

Like us on Facebook!