S-Ex - gf.01 Ground Floor Excavation Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6

KEYPLAN:

A
1 2 3 3.1 3.2 4.1 4.2 4.3 S-EX.SC.01
5.1 6 6.1 8
51952
50
8700 8770 10330 9700 4800 4800 4852

367, -1059
3219
1000, -761
A1 0, 0

80
150 mm THICK SKIN WALL

9
CBP-1

78
CBP-1

77
(EXCAVATION SIDE)

CBP-1

76
CBP-1

75
PERMA-ZYME SOIL STABILIZER

CBP-1

74
96

CBP-1

73
CBP-1

72
°
(EARTH SIDE)

1531

CBP-1

71
CBP-181

CBP-1

70
CBP-1

69
CBP-1

68
CBP-1

67
A

CBP-1
CBP-182

66
E

CBP-1

65
CBP-1

64
CBP-1

63
CBP-1

62
CBP-183

CBP-1

61
CBP-1

60
CBP-1

59
2995

CBP-1

58
CBP-184 1250

CBP-1

57
CBP-1

56
CAPP

CBP-1

55
IN

CBP-1

54
CBP-185 1200( G BEAM

CBP-1

53
CBP-1

52
W) x 1

CBP-1

51
200(D PROJECT TITLE:

CBP-1

50
CBP-186 )

CBP-1

49
CBP-1

48
CBP-1

47
CBP-1

46
CBP-187 BP3

CBP-1

45
ONE WEST

CBP-1

44
1000
1250

CBP-1

43
CBP-1

42
CBP-188

CBP-1

41
CBP135 - CBP180 CBP181 - CBP244 CBP1 - CBP134, CBP245 - CBP292

CBP-1

40
300 T

CBP-1

39
HK GF PROPOSED 8-STOREY OFFICE

CBP-1

38
CBP-1
CBP-189

37
10470

AMSL+102.0M

CBP-1

36
CBP-1
AND 6-STOREY WAREHOUSE

35
2000 31569, -8357

CBP-1
CBP-190 BP3

CBP-1

00
BUILDING

1250

Ø8
1200(D)
31663, -9101

800
600 T

00

00
CBP-191 HK

EAM

Ø7

Ø7
2000
CBP-192 WEST AVE., COR. BULACAN ST., QUEZON CITY

CAPPING B
1200(W) x

SEE PLAN
CBP-193 BP3 CBP-134

VARIES
200 OWNER / CLIENT:
300 T
HK
CBP-194 CBP-133

B1 TO GF
CBP-195 CBP-132
12 BP3
ONE WEST REALTY

1675
CBP-196 2000
S-EX.CN.01 CBP-131
B CBP-197
CBP-130
CORPORATION
CBP-198 BP3
B1 (UPPER SPLIT)

2000
1250 CBP-129 DIAMETER 700 DIAMETER 700 DIAMETER 800 AMSL+98.0M

2794
CBP-199
200 CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi)
CBP-128 B1 (LOWER SPLIT)
CBP-200 VERTICAL BARS 7-Ø25 (0.89%) VERTICAL BARS 8-Ø25 (1.02%) VERTICAL BARS 8-Ø25 (0.78%)
AMSL+97.0M ARCHITECT:
CBP-201 CBP-127 CONFINEMENT TIES Ø12 @ 100 mm CONFINEMENT TIES Ø12 @ 100 mm CONFINEMENT TIES Ø12 @ 100 mm
REST OF TIES Ø12 @ 150 mm REST OF TIES Ø12 @ 150 mm REST OF TIES Ø12 @ 150 mm
CBP-202 BP3 CBP-126

600 THK

MAXIMUM LIVE LOAD


300 THK
8000

SEE S-EX.DE.01 FOR Unit 103, 1st floor SY2 Campus


CBP-203 9801 Kamagong Street, San Antonio Village
CBP-125 CURTAILMENT DETAILS

20.00 kPa
Makati City 1203

400 THK
300 THK

600 THK

00
T (632) 328 3640 F (632) 310 5236
CBP-204

00
00

Ø8
500 EXCAVATION AND CBP-124

Ø7
Ø7

SEE PLAN
VARIES
D CBP-205 CONSTRUCTION ACCESS
JOSE PEDRO C. RECIO
CBP-123
CBP-206 12 LANDSCAPE:
CBP-122
CBP-207 S-EX.CN.01
CBP-121

B2 TO B1
CBP-208
C CBP-209 CBP-120

1100
BP3
BP3
CBP-210 CBP-119
1250
CBP-211 LANDSCAPE CONSULTANT
200 CBP-118
12 DIAMETER 700 DIAMETER 700 DIAMETER 800
CBP-212 B2 (UPPER SPLIT) MECHANICAL:
S-EX.CN.01 CBP-117 CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) AMSL+92.8M
CBP-213 14-Ø25 (1.79%) 16-Ø25 (2.04%) 16-Ø25 (1.56%)
272 Mac Arthur St., Veterans Village,
VERTICAL BARS VERTICAL BARS VERTICAL BARS Pasong Tamo, Quezon City, 1106
150 mm THICK SKIN WALL CBP-116 B2 (LOWER SPLIT) Unit 3742, Tower 2, Grass Residences,
Nueva Viscaya St., Sto. Cristo,
CBP-214 CONFINEMENT TIES Ø12 @ 100 mm CONFINEMENT TIES Ø12 @ 100 mm CONFINEMENT TIES Ø12 @ 100 mm
7997

(EXCAVATION SIDE) AMSL+91.8M

2000
Quezon City, 1107

2000
PERMA-ZYME SOIL STABILIZER CBP-115 REST OF TIES Ø12 @ 150 mm REST OF TIES Ø12 @ 150 mm REST OF TIES Ø12 @ 150 mm CONSULTING
CBP-215 STRUCTURAL
(EARTH SIDE)
ENGINEERS, CO.
CBP-216 CBP-114
LINE
PROPERTY 2000
300 THK 2000 1350
200

SEE DEVELOPED ELEVATION


CBP-217 CONSULTING ENGINEER

00
-2864, -26051 CBP-113

0
00

Ø8
0
Ø7
Ø7
BP2 FIRE PROTECTION:
CBP-244

CBP-243

CBP-242

CBP-241

CBP-240

CBP-239

CBP-238

CBP-237

CBP-236

CBP-235

CBP-234

CBP-233

CBP-232

CBP-231

CBP-230

CBP-229

CBP-228

CBP-227

CBP-226

CBP-225

CBP-224

CBP-223

CBP-222

CBP-221

CBP-218 CBP-112
-19668, -28151 BP2 BP2 BP2

VARIES
272 Mac Arthur St., Veterans Village,

1105
Pasong Tamo, Quezon City, 1106
-20139, -28734 CBP-219 600 THK CBP-111 Unit 3742, Tower 2, Grass Residences,
Nueva Viscaya St., Sto. Cristo,

D Quezon City, 1107

TIP OF PILE TO B2
CBP-220 CBP-110 CONSULTING
600

600

600
STRUCTURAL
CBP-245
ENGINEERS, CO.
5675 180 1750 CBP-109
CAPPING BEAM -2868, -28151
CBP-246
500

1200(W) x 1200(D) 12 CONSULTING ENGINEER


CBP-108

1200(W) x 1200(D)
CBP-247 S-EX.CN.01 ELECTRICAL:

CAPPING BEAM
CBP-107
6600

272 Mac Arthur St., Veterans Village,


CBP-248 400 THK Pasong Tamo, Quezon City, 1106
CBP-106 DIAMETER 700 DIAMETER 700 DIAMETER 800 Unit 3742, Tower 2, Grass Residences,
Nueva Viscaya St., Sto. Cristo,
MAXIMUM LIVE LOAD CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) Quezon City, 1107
CBP-249
20.00 kPa CBP-105 TIP OF PILE CONSULTING
11 VERTICAL BARS 7-Ø25 (0.89%) VERTICAL BARS 8-Ø25 (1.02%) VERTICAL BARS 8-Ø25 (0.78%)
STRUCTURAL
CBP-250
S-EX.CN.01 CONFINEMENT TIES Ø12 @ 100 mm CONFINEMENT TIES Ø12 @ 100 mm CONFINEMENT TIES Ø12 @ 100 mm ENGINEERS, CO.
CBP-104
C CBP-251
1500
1250 REST OF TIES Ø12 @ 150 mm REST OF TIES Ø12 @ 150 mm REST OF TIES Ø12 @ 150 mm
64615

GENERAL NOTE: DO NOT SCALE FROM DRAWING; USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS' DRAWINGS. THE ARCHITECT TO BE IMMEDIATELY NOTIFIED OF DISCREPANCIES. COPYRIGHT OF THE DRAWING RETAINED BY THE ARCHITECT.
CONSULTING ENGINEER
CBP-103
CBP-252 SANITARY:
E CBP-102
750

750

750

750
1150

PERMA-ZYME SOIL STABILIZER


500

500
272 Mac Arthur St., Veterans Village,
CBP-253
600 THK CBP-101
2 CONTIGUOUS BORED PILE DETAILS Pasong Tamo, Quezon City, 1106
Unit 3742, Tower 2, Grass Residences,

150 mm THICK SKIN WALL


Nueva Viscaya St., Sto. Cristo,
CBP-254 BP1 BP1 BP1 BP1 NOT TO SCALE Quezon City, 1107
1250 1680 1010 1800
BP1 CBP-100 CONSULTING

(EXCAVATION SIDE)
STRUCTURAL
CBP-255
2000 2000 ENGINEERS, CO.
300 THK CBP-99

(EARTH SIDE)
CBP-256
CONSULTING ENGINEER
6797

CBP-98
CBP-257 PROJECT MANAGER:
2000

2000
CBP-97
11
CBP-258
BP2 S-EX.CN.01 CBP-96 BP1 BP2 BP3
CBP-259 PLUNGED-IN COLUMN
CBP-95
ONE WEST PM

367
1450

00
00
CBP-260

647

Ø9

Ø9
00
838

Ø9
CBP-94
F

150
CBP-261
PROJECT MANAGER
CBP-93 TOP OF MAT (TOM)
CBP-262 REVISIONS
BP2 CBP-92

200
200

VARIES
NO. DATE DESCRIPTION

200
CBP-263

SPACED 200 MM OC
Ø20 SHEAR STUDS
CBP-91

UPPER HALF
5000

CBP-264

3000 (UPPER HALF)


CBP-90 FORMATION LEVEL (FL)

Ø16-100 HOOPS
2500
CBP-265
CBP-89
CBP-266 UC 356 x 406 x 287 UC 356 x 368 x 177
UC 356 x 406 x 340

59
CBP-88
G CBP-267
CBP-87
DIAMETER 900 DIAMETER 900 DIAMETER 900
1100

1550
CBP-268 CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi)

529
CBP-86

150
VERTICAL BARS 20-Ø25 (1.54%) VERTICAL BARS 20-Ø25 (1.54%) VERTICAL BARS 20-Ø25 (1.54%)
CBP-269 BP2 EXCAVATION AND CONFINEMENT TIES SEE ELEVATION CONFINEMENT TIES SEE ELEVATION CONFINEMENT TIES SEE ELEVATION
CONSTRUCTION ACCESS BP2 CBP-85
CBP-270 198 REST OF TIES SEE ELEVATION REST OF TIES SEE ELEVATION REST OF TIES SEE ELEVATION
PERMA-ZYME SOIL STABILIZER

B CBP-84
PLUNGED-IN STEEL COLUMN
CBP-271
150 mm THICK SKIN WALL

INSTALLATION SEQUENCE

00
00
CBP-83
600 THK

300 THK

Ø9

Ø9
00
400 THK 1: BORE PILE

Ø9
8100

6000
CBP-272
(EXCAVATION SIDE)

MAXIMUM LIVE LOAD CBP-82 2: INSTALL PILE CAGE REBARS ISSUED BY:
20.00 kPa 3: INSTALL KING POST TO
CBP-273

3000 (LOWER HALF)


(EARTH SIDE)

REQUIRED EMBEDMENT STRUCTURAL / CIVIL WORKS:


CBP-81

Ø12-200 HOOPS
300 THK DEPTH WHILE CONCRETE IS

600 THK
CBP-274
11 CBP-80 STILL WET. USE CONCRETE
CBP-275 RETARDERS MINIMUM 4

LOWER HALF
S-EX.CN.01 CBP-79 HOURS.
CBP-276 750 CONSULTING STRUCTURAL ENGINEERS, CO.
CBP-78 272 Mac Arthur St., Veterans Village,
CBP-277 Pasong Tamo, Quezon City, 1106
H 1050
CBP-77
Unit 3742, Tower 2, Grass Residences,
Nueva Viscaya St., Sto. Cristo,
CBP-278 Quezon City, 1107
BP2
B CBP-76
DIAMETER 900 DIAMETER 900 DIAMETER 900
S-EX.SC.01 CBP-279 BP2
1200(W) x 1200(D)

200 CBP-75 CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) CONCRETE fc' 41.4 MPa (6000 psi) TIP OF PILE LOUIECHITO S. NIÑO
CAPPING BEAM

CBP-280 VERTICAL BARS 10-Ø25 (0.77%) VERTICAL BARS 10-Ø25 (0.77%) VERTICAL BARS 10-Ø25 (0.77%) REG NO. : 0056216 TIN : 102-804-749-000
CBP-74
CONFINEMENT TIES SEE ELEVATION CONFINEMENT TIES SEE ELEVATION CONFINEMENT TIES SEE ELEVATION
CBP-281 PTR NO. : 1531691 ISSUED : 14 JAN 2021 - LAGUNA
CBP-73 REST OF TIES SEE ELEVATION REST OF TIES SEE ELEVATION REST OF TIES SEE ELEVATION
7500

CBP-282
2000

2000

IAPOA NO. : N/A


CBP-72
CBP-283 SHEET CONTENTS:
NOTE
CBP-71 ALTERNATIVE KING POST SECTIONS WITH
3 BORED PILE WITH PLUNGED-IN COLUMN DETAILS
CBP-284 2000 300 THK 2000 MATERIAL BASED ON ASTM A992 GRADE NOT TO SCALE
CBP-70 50 ARE IN THE TABLE BELOW.
CBP-285
750 1145 1075 1055 1075 1075
1062.5

CBP-286
CBP-69 EQUIVALENT KING POST SECTION GROUND FLOOR
600 THK A36 A992 Grade 50
J CBP-287
CBP-68
UC 356 x 406 x 340 UC 356 x 406 x 235
EXCAVATION PLAN
BP2 BP2 BP2 BP2 BP2 BP2 CBP-67 UC 356 x 406 x 287 UC 365 x 368 x 202
CBP-288
3012

UC 356 x 368 x 177 UC 356 x 368 x 129


1062.5

1500 1050 31663, -62701


CBP-289 400 THK
11
CB

ISSUE:
P

MAXIMUM LIVE LOAD CB


-6

S-EX.CN.01 P
FOR CONSTRUCTION
6

CBP-290 CAPPING BEAM 20.00 kPa -6


A K 5
CB

1200(W) x 1200(D)
1138

CBP-291 REMARKS:
-6
CB

4
P-

CB DRAWINGS AND SPECIFICATIONS DULY SINGED, STAMPED, OR


63

CBP-292 P- SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL


62 PROPERTIES AND DOCUMENTS OF THE ARCHITECT, WHETHER THE
CB

OBJECT FOR WHICH THEY ARE MADE FOR IS EXECUTED OR NOT. IT


P-
CBP-11

CBP-21

CBP-31

CBP-41

CBP-51
CBP-1

CBP-10

CBP-12

CBP-13

CBP-14

CBP-15

CBP-17

CBP-18

CBP-19

CBP-20

CBP-22

CBP-23

CBP-24

CBP-25

CBP-27

CBP-28

CBP-29

CBP-30

CBP-32

CBP-33

CBP-34

CBP-35

CBP-37

CBP-38

CBP-39

CBP-40

CBP-42

CBP-43

CBP-44

CBP-45

CBP-47

CBP-48

CBP-49

CBP-50

CBP-52

CBP-53

CBP-54

CBP-55

CBP-57

CBP-58

CBP-59

CBP-60
CBP-2

CBP-3

CBP-4

CBP-5

CBP-7

CBP-8

CBP-9

CBP-16

CBP-26

CBP-36

CBP-46

CBP-56
CBP-6

-20139, -66334
61

SHALL BE UNLAWFUL FOR ANY PERSON, WITHOUT THE CONSENT


OF THE ARCHITECT TO DUPLICATE OR TO MAKE COPIES OF SAID
-19368, -66546 27832, -66546 DOCUMENTS FOR USE IN THE REPETITION OF OTHER PROJECTS OF
BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE.
8700 8770 8630 8680 7520 7200 2502 REPUBLIC ACT 9266
CONSULTING STRUCTURAL
DESIGN BY: L|y|N ENGINEERS, CO. SHEET NO:
52002
COORDINATED BY: RR / NB
150 mm THICK SKIN WALL
CHECKED BY: LN / NT
(EXCAVATION SIDE)
1 2 3 4 5 6 7 8 S-EX.GF.01
PERMA-ZYME SOIL STABILIZER
(EARTH SIDE) 1 GROUND FLOOR EXCAVATION PLAN DRAWN BY: SM / SF

1:100 MTS DATE ISSUED: 02 SEPT 2021

DATE PRINTED: 02 SEPT 2021 SCALE: AS INDICATED

You might also like