Professional Documents
Culture Documents
Khwopa College of Engineering: Design and Analysis of Multistoreyed Building
Khwopa College of Engineering: Design and Analysis of Multistoreyed Building
INSTITUTE OF ENGINEERING
KHWOPA COLLEGE OF ENGINEERING
DEPARTMENT OF CIVIL ENGINEERING
PROPOSAL FOR
FINAL YEAR PROJECT
ON
PROJECT MEMBERS:
Anish Manandhar (KCE074BCE011)
Bibek Gosai (KCE074BCE019)
Bikesh Khatri (KCE074BCE025)
Dhirendra Bam (KCE074BCE029)
Hemanta Rokaya (KCE074BCE031)
June, 2021
1 Preliminary Design of Elements
The principal purpose for preliminary design of any structure is:
1. Obtain a clear picture of structural action.
2. Establish the dimensions of structural components.
3. Use the preliminary design as a check on the final design.
Preliminary design includes the approximation of size of the structural component of
the buildings for analysis. The preliminary bridges the gap between the design
concept and the detail phase.
Construction Material:
Concrete Grade: M25
Steel Grade: Fe500
Live load on slab = 4 KN/m2 (IS 875:1987 part II, Table I)
Live load on staircase = 3.5 KN/m2 (IS 875:1987 part II, Table I)
Live load on roof = 1.5 KN/m2 (IS 875:1987 part II, Table II)
Brick masonry = 19.2 KN/m3 (IS 875:1987 part I, Table I)
RCC Specific Weight = 25KN/ (IS 875:1987 part I)
Cement Fiber Board = 16.3 KN/m3
limit
α = 7 for cantilever
= 20 for simply supported
= 26 for continuous
β is the modification factor for tension reinforcement
λ is the reduction factor for ratios of span to effective depth for flanged section
γ is the modification factor for compression reinforcement
Considering critical slab BE-13,
1
Longer span (ly) = 7000 mm
Shorter span (lx) = 6725 mm
ly
=1.041<2. So, it is a two-way slab.
lx
Now, using deflection control criteria (cl. 23.2, IS456:2000)
l
≤ αβγλ
d
α = 26 and βλγ = 1.5
6725
d≥ = 172.44 mm > 150 mm
26 ×1.5
So, secondary beam should be provided.
Longer span (ly) = 6725 mm
Shorter span (lx) = 7000/2 = 3500 mm
ly
=1.92<2, so two way slab.
lx
3500
d≥ = 89.74 mm
26 ×1.5
adopt, d = 100 mm
Total effective cover = 30 mm
∴ Total depth of slab (D) = 100 + 30 = 130 mm
2
Hence, size of the primary beam = (300 × 450) mm2
Calculation of load
1. Self weight of slab=.13*6.475*6.725*7*25 = 990.63 KN
2. Primary beam load= (6.475+6.725)*0.32*0.3*7*25 = 221.76 KN
3
3. Secondary beam load= (2.975+3.3625)* 0.32*0.3*7*25 = 106.47 KN
4. Floor finish load =0.02*6.475*6.725*7*23 = 140.21 KN
5. Load due to ceiling plaster =0.012*6.475*6.725*7*20.4 = 74.61 KN
6. Live Load
S. N Floor Calculation Load (kN)
1 Basement 43.54 *4 174.16
2 Ground 43.54 *4*.9 156.744
3 First 43.54 *4*.8 139.328
4 Second 43.54 *4*.7 121.912
5 Third 43.54 *4*.6 104.496
6 Fourth 43.54 *4*.6 104.496
7 Fifth 43.54 *4*.6 104.496
8 Sixth 43.54 *4*.6 104.496
9 Roof 43.54*3.5*.6 91.434
Total 1101.578