1.0 GENERAL
1.1 INTRODUCTION
The contractor (M/s. DANWAY Electrical & Mechanical Engineering) is awarded the contract to build and
commission a 132/11 kV substation for Dubai Electricity and Water Authority (DEWA) under a Contract No. 6595.
The substation is referred as 132/11kV VALLEY Substation. The proposed Project level EL±0.000 (Gate level)
corresponds to +82.332 DMD (Dubai Municipality Datum).
1.2 SCOPE
This document describes the general requirements and various design parameters that need to be considered in the
design of buildings/structures and other services/utilities for the proposed substation as per DEWA civil works
specifications Rev-17.
ASCE 7-05, Minimum Design Loads for Buildings and Other Structures
American Institute of Steel Construction (AISC):
- Specification for Structural Steel Buildings (AISC 360-16)
- Manual of Steel Construction—9th Edition
- Specification for the Design, Fabrication and Erection of Structural Steel for Buildings - ASD
- Specification for Structural Joints Using ASTM A325 or A490 Bolts
- Code of Standard Practice for Steel Buildings and Bridges
UBC97 - Uniform Building code
American Association of State Highway and Transportation Officials (AASHTO) - Standards and
Specifications
American National Standards Institute (ANSI) – Standards
American Society of Testing and Materials (ASTM) - Standards, Specifications, and Recommended Practices
American Welding Society (AWS) - Codes and Standards
- D1.1 — Structural Welding Code — Steel
- D1.3 — Structural Welding Code — Sheet Steel
American Society of Civil Engineers (ASCE)
Standard Specifications for Anchor Bolts ASTM F1554-07
Road Note 29 Temperature climate, Flexible and rigid pavement &Medium and heavy traffic
DIN 1072 Roads & Foot bridges: design loads
ASTM C114-69 Standard method of chemical Analysis of Hydraulic cement
PCI07 - Precast Design
3.0 LOADS
3.1 DEAD LOADS
Dead Loads shall comprise of the weight of the structure including weights of walls, floors, roof, finishes, and services
such as ducts, pipe work etc., and any other permanent construction. For design, the following weights of materials
will be considered.
Plain mass cement concrete (or) Screed with or without Tiles 24.00kN/m 3
Reinforced cement concrete 25.00kN/m3
Light weight concrete/screed 12.00kN/m3
Structural Steel 78.50kN/m3
Ceramic tiles (8mm thk) 0.20kN/m2
Roof Tile 24.00kN/m3
Hollow block work 16.00kN/m3
Thermal block work 17.50kN/m3
Solid block work 22.00kN/m3
Plaster 20.00 kN/m3
Ceramic wall tiles (stoneware incl. bedding mortar10mm thk) 0.22kN/m2
Marble 20mm thk. 0.56kN/m2
Dead load for suspended ceiling, Pipes A/C system etc. 1.0 kN/m2
Water proofing etc. 0.5 kN/m2
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
** Superimposed dead load (Screed and other equipment foundations) on all floors shall be considered
based on the thickness.
** All Partition wall should be supported on beams
3.2.5 Fire pump room, Security room, Domestic water tank & Other structures
For soil parameters below +71.13 DMD, shall be considered as per approved soil investigation report.
The ground water table was encountered at a depth of 4.05m (+77.750 DMD) below the existing ground level /
/ 4.582m below Gate level.
From Above calculations, condition 5 is in agreement as per the code, other conditions are not
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
Cp = Net pressure co-efficient for the canopy surface or element given in 2.5.9&2.7
*The Allowable drift against wind shall be maximum height/500
R is Numerical Coefficient representative of the Inherent over Strength and Global Ductility Capacity of
Lateral-Force-Resisting Systems
R = 5.5 for Intermediate Moment Resisting Concrete Frames (Table 16-N)
C V xIxW
Design Base Shear V =
RXT
C V xIxW 0.25 x 1.00 xW 0.0 45 W
V= V= V=
RXT 5.5 xT T
`
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
2.5 xC a xIxW
V max =
R
V min =0.0198 W
The Earthquake Load E, on an element of the structure resulting from combination of the horizontal
component Eh, and Vertical Component Ev,
E=Eh + E v
0.0357 W
Eh =
T
Ev = The Load Effect resulting from the Vertical Component of the earthquake Ground Motion.
E v =0.5 x C a xIxD
E v =0.09 D
D = Dead Load
= redundancy factor
0.0327 x W 1.1 0.0327 x W 1.1 1.1
Eh = x V= x
T 1.4 T 1.4 1.4
Base shear thus obtained will be distributed at different floor levels as lateral loads in Mutually
perpendicular directions.
Note:
i. Seismic forces will be calculated by ETABS Program either by UBC or 0.07g whichever is greater. The orthogonal
effect will be considered as 100%seismic force in one direction and 30% seismic force in the perpendicular direction
as per Cl.1633.1 of UBC-97. The base shear for wind load and seismic load should be calculated and the design shall
be carried out for the governing load case.
ii. Staircase wall shall be designed as shear walls and checked for moment and contour diagrams for respective section
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
capacities.
iii. In seismic load calculation 100% of equipment live loads shall be considered and there shall be no reduction on
equipment loads
3.8 BLAST LOADS
Transformer, Reactor bay walls will be checked for blast load of 5kN/m 2.
5.3 RESULTS
All computer-generated results such as member forces, support reactions, displacements will be provided. Graphical
output of analysis results such as bending moment diagrams, shear force diagram, displacement diagrams, etc will
be provided to substantiate the numerical output.
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
6.0 DESIGN
6.1 CONCRETE WORKS
6.1.1 Materials
a) Cement
The type of cement for all concrete works (for substructure works) in contact with soil and for super
structure shall be based on soil Report. (As per soil Report recommendations)
b) Cast In situ Concrete
The concrete grade used in the various works shall be as follows:
All structural concrete:
Grade C40 with 20 mm downgraded coarse aggregates
Compressive strength of Concrete at 28 days = 40 N/mm 2
Compressive strength considered in structural calculations will be 40 N/mm 2.
Cylindrical strength of the concrete (fc’) = 0.8*fc = 0.8*40 = 32 N/mm2.
Coefficient of thermal expansion of Concrete is9 x 10-6 / C CL: 7.1 & 7.3.4.4 ACI 22R-01
E Concrete =4700*sqrt(fc’) = 26587 N/mm2
Poisson’s ratio : 0.2
e) Protection screed:
Grade C20 with 10 mm downgraded coarse aggregates.
Compressive strength at 28 days – 20 N/mm2
f) Structural screed:
Grade C40 with 10 mm downgraded coarse aggregates.
Compressive strength at 28 days – 40 N/mm2
g) Non-Structural screed:
Grade C20 with 10 mm downgraded coarse aggregates.
Compressive strength at 28 days – 20 N/mm2
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
h) Reinforcement
i. Steel reinforcement shall be deformed, type 2, complying with BS 4449.
For design, the specified characteristic strength considered will be as follows:
Grade of steel Characteristic strength (N/mm2)
Grade 460 (fy): 460 N/mm2.
E Steel : 200 kN/mm2
Diameter of reinforcement Bar used shall be : 8, 10, 12, 16, 20, 25& 32. (Max. bar length 12m)
The Epoxy coated reinforcement & its relevant parameters shall be as per ASTM A775/ A775M* (if
applicable).
ii. Welded wire mesh Steel fabric reinforcement will comply with BS 4483. The preferred range of
designated fabric types will be as per table 1 of BS 4483 (Grade of steel S355).
6.1.2 Loads
Various loads to be considered for design shall be as indicated in item 3.0 of this design criteria.
10
2 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 0.5 LLR + 1.6 SPS + 1.6 CR-1
10
3 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 0.5 LLR + 1.6 SPS + 1.6 CR-2
10
4 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 0.5 LLR + 1.6 SPS + 1.0 BL-1
10
5 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 0.5 LLR + 1.6 SPS + 1.0 BL-2
10
6 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 0.5 LLR + 1.6 SPS + 1.0 BL-3
10
7 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 0.5 LLR + 1.6 SPS + 1.0 BL-4
10
8 1.2 DL + 1.2 FL + 1.0 LL + 1.6 LLR + 1.0 CR-1
10
9 1.2 DL + 1.2 FL + 1.0 LL + 1.6 LLR + 1.0 CR-2
11
0 1.2 DL + 1.2 FL + 1.0 LL + 1.6 LLR + 1.0 BL-1
11
1 1.2 DL + 1.2 FL + 1.0 LL + 1.6 LLR + 1.0 BL-2
11
2 1.2 DL + 1.2 FL + 1.0 LL + 1.6 LLR + 1.0 BL-3
11
3 1.2 DL + 1.2 FL + 1.0 LL + 1.6 LLR + 1.0 BL-4
11
4 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 1.6 SPS + 0.5 LLR
11
5 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 0.5 LLR + 1.6 SPS + 1.6 CR-1
11
6 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 0.5 LLR + 1.6 SPS + 1.6 CR-2
11
7 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 0.5 LLR + 1.6 SPS + 1.0 BL-1
11
8 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 0.5 LLR + 1.6 SPS + 1.0 BL-2
11
9 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 0.5 LLR + 1.6 SPS + 1.0 BL-3
12
0 1.2 DL + 1.2 FL + 1.6 LL + 1.6 SP + 1.6 WP + 1.6SSP + 0.5 LLR + 1.6 SPS + 1.0 BL-4
4
12
5 1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ-Y
12
6 1.42DL+1.1(LL+LLR)+1.1EQ-X+1.6SP+0.33EQ+Y
12
7 1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ-X
12
8 1.42DL+1.1(LL+LLR)+1.1EQ-Y+1.6SP+0.33EQ+X
12
9 1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+1.6WP+1.6SSP+0.33EQ+Y
13
0 1.42DL+1.1(LL+LLR)+1.1EQ-X+1.6SP+1.6WP+1.6SSP+0.33EQ-Y
13
1 1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+1.6WP+1.6SSP+0.33EQ+X
13
2 1.42DL+1.1(LL+LLR)+1.1EQ-Y+1.6SP+1.6WP+1.6SSP+0.33EQ-X
13
3 1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+1.6WP+1.6SSP+0.33EQ-Y
13
4 1.42DL+1.1(LL+LLR)+1.1EQ-X+1.6SP+1.6WP+1.6SSP+0.33EQ+Y
13
5 1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+1.6WP+1.6SSP+0.33EQ-X
13
6 1.42DL+1.1(LL+LLR)+1.1EQ-Y+1.6SP+1.6WP+1.6SSP+0.33EQ+X
13
7 1.42DL+1.1(LL+LLR)+1.1EQ+X(+ecc)+1.6SP+0.33EQ+Y(+ecc)
13
8 1.42DL+1.1(LL+LLR)+1.1EQ-X(+ecc)+1.6SP+0.33EQ-Y(+ecc)
13
9 1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ+X(+ecc)
14
0 1.42DL+1.1(LL+LLR)+1.1EQ-Y(+ecc)+1.6SP+0.33EQ-X(+ecc)
14
1 1.42DL+1.1(LL+LLR)+1.1EQ+X(-ecc)+1.6SP+0.33EQ-Y(-ecc)
14
2 1.42DL+1.1(LL+LLR)+1.1EQ-X(-ecc)+1.6SP+0.33EQ+Y(-ecc)
14
3 1.44DL+1.1(LL+LLR)+1.1EQ+Y(-ecc)+1.6SP+0.33EQ-X(-ecc)
14
4 1.42DL+1.1(LL+LLR)+1.1EQ-Y(-ecc)+1.6SP+0.33EQX(-ecc)
14
5 1.42DL+1.1(LL+LLR)1.1EQ+X(+ecc)+1.6SP+0.33EQ-Y(+ecc)
14
6 1.42DL+1.1(LL+LLR)+1.1EQ-X(+ecc)+1.6SP+0.33EQ+Y(+ecc)
14
7 1.42DL+1.1(LL+LLR)+1.1EQ-Y(+ecc)+1.6SP+0.33EQ+X(+ecc)
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
14
8 1.42DL+1.1(LL+LLR)+1.1EQ-Y(+ecc)+1.6SP+0.33EQ-X(+ecc)
14
9 1.42DL+1.1(LL+LLR)1.1EQ+X(-ecc)+1.6SP+0.33EQ-Y(-ecc)
15
0 1.42DL+1.1(LL+LLR)+1.1EQ-X(-ecc)+1.6SP+0.33EQ+Y(-ecc)
15
1 1.42DL+1.1(LL+LLR)+1.1EQ-Y(-ecc)+1.6SP+0.33EQ+X(-ecc)
15
2 1.42DL+1.1(LL+LLR)+1.1EQ-Y(-ecc)+1.6SP+0.33EQ-X(-ecc)
15
3 1.42DL+1.1(LL+LLR)+1.1EQ+X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+Y(+ecc)
15
4 1.42DL+1.1(LL+LLR)+1.1EQ-X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(+ecc)
15
5 1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(+ecc)
15
6 1.42DL+1.1(LL+LLR)+1.1EQ-Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(+ecc)
15
7 1.42DL+1.1(LL+LLR)+1.1EQ+X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(-ecc)
15
8 1.42DL+1.1(LL+LLR)+1.1EQ-X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+Y(-ecc)
15
9 1.44DL+1.1(LL+LLR)+1.1EQ+Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(-ecc)
16
0 1.42DL+1.1(LL+LLR)+1.1EQ-Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQX(-ecc)
16
1 1.42DL+1.1(LL+LLR)1.1EQ+X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(+ecc)
16
2 1.42DL+1.1(LL+LLR)+1.1EQ-X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+Y(+ecc)
16
3 1.42DL+1.1(LL+LLR)+1.1EQ-Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(+ecc)
16
4 1.42DL+1.1(LL+LLR)+1.1EQ-Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(+ecc)
16
5 1.42DL+1.1(LL+LLR)1.1EQ+X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(-ecc)
16
6 1.42DL+1.1(LL+LLR)+1.1EQ-X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+Y(-ecc)
16
7 1.42DL+1.1(LL+LLR)+1.1EQ-Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(-ecc)
16
8 1.42DL+1.1(LL+LLR)+1.1EQ-Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(-ecc)
16
9 1.09DL+1.1EQ+X+1.6SP+0.33EQ+Y
17
0 1.09DL+1.1EQ-X+1.6SP+0.33EQ-Y
17 1.09DL+1.1EQ+Y+1.6SP+0.33EQ+X
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
1
17
2 1.09DL+1.1EQ-Y+1.6SP+0.33EQ-X
17
3 1.09DL+1.1EQ+X+1.6SP+0.33EQ-Y
17
4 1.09DL+1.1EQ-X+1.6SP+0.33EQ+Y
17
5 1.09DL+1.1EQ+Y+1.6SP+0.33EQ-X
17
6 1.09DL+1.1EQ-Y+1.6SP+0.33EQ+X
17
7 1.09DL+1.1EQ+X+1.6SP+1.6WP+1.6SSP+0.33EQ+Y
17
8 1.09DL+1.1EQ-X+1.6SP+1.6WP+1.6SSP+0.33EQ-Y
17
9 1.09DL+1.1EQ+Y+1.6SP+1.6WP+1.6SSP+0.33EQ+X
18
0 1.09DL+1.1EQ-Y+1.6SP+1.6WP+1.6SSP+0.33EQ-X
18
1 1.09DL+1.1EQ+X+1.6SP+1.6WP+1.6SSP+0.33EQ-Y
18
2 1.09DL+1.1EQ-X+1.6SP+1.6WP+1.6SSP+0.33EQ+Y
18
3 1.09DL+1.1EQ+Y+1.6SP+1.6WP+1.6SSP+0.33EQ-X
18
4 1.09DL+1.1EQ-Y+1.6SP+1.6WP+1.6SSP+0.33EQ+X
18
5 1.09DL+1.1EQ+X(+ecc)+1.6SP+1.1EQ+Y(+ecc)
18
6 1.09DL+1.1EQ-X(+ecc)+1.6SP+0.33EQ-Y(+ecc)
18
7 1.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ+X(+ecc)
18
8 1.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ+X(+ecc)
18
9 1.09DL+1.1EQ+X(-ecc)+1.6SP+1.1EQ+Y(+ecc)
19
0 1.09DL+1.1EQ-X(-ecc)+1.6SP+0.33EQ-Y(-ecc)
19
1 1.09DL+1.1EQ+Y(-ecc)+1.6SP+0.33EQ+X(-ecc)
19
2 1.09DL+1.1EQ-Y(-ecc)+1.6SP+0.33EQ-X(-ecc)
19
3 1.09DL+1.1EQ+X(+ecc)+1.6SP+0.33EQ-Y(+ecc)
19
4 1.09DL+1.1EQ-X(+ecc)+1.6SP+0.33EQ+Y(+ecc)
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
19
5 1.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ-X(+ecc)
19
6 1.09DL+1.1EQ-Y(+ecc)+1.6SP+0.33EQ-X(+ecc)
19
7 1.09DL+1.1EQ+X(-ecc)+1.6SP+0.33EQ-Y(-ecc)
19
8 1.09DL+1.1EQ-X(-ecc)+1.6SP+0.33EQ+Y(-ecc)
19
9 1.09DL+1.1EQ+Y(-ecc)+1.6SP+0.33EQ-X(-ecc)
20
0 1.09DL+1.1EQ-Y(-ecc)+1.6SP+0.33EQ+X(-ecc)
20
1 1.09DL+1.1EQ+X(+ecc)+1.6SP+1.6WP+1.6SSP+1.1EQ+Y(+ecc)
20
2 1.09DL+1.1EQ-X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(+ecc)
20
3 1.09DL+1.1EQ+Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(+ecc)
20
4 1.09DL+1.1EQ+Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(+ecc)
20
5 1.09DL+1.1EQ+X(-ecc)+1.6SP+1.6WP+1.6SSP+1.1EQ+Y(+ecc)
20
6 1.09DL+1.1EQ-X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(-ecc)
20
7 1.09DL+1.1EQ+Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(-ecc)
20
8 1.09DL+1.1EQ-Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(-ecc)
20
9 1.09DL+1.1EQ+X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(+ecc)
21
0 1.09DL+1.1EQ-X(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+Y(+ecc)
21
1 1.09DL+1.1EQ+Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(+ecc)
21
2 1.09DL+1.1EQ-Y(+ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(+ecc)
21
3 1.09DL+1.1EQ+X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-Y(-ecc)
21
4 1.09DL+1.1EQ-X(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+Y(-ecc)
21
5 1.09DL+1.1EQ+Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ-X(-ecc)
21
6 1.09DL+1.1EQ-Y(-ecc)+1.6SP+1.6WP+1.6SSP+0.33EQ+X(-ecc)
*********************** As per ASCE 7-05 (Clause 2.3.2)
21 1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8W+X
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
21
8 1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8W-X
21
9 1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8W+Y
22
0 1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8W-Y
22
1 1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6W+X
22
2 1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6W-X
22
3 1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6W+Y
22
4 1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6W-Y
22
5 0.9 DL + 1.6 SP + 1.6W+X
22
6 0.9 DL + 1.6 SP + 1.6W-X
22
7 0.9 DL + 1.6 SP + 1.6W+Y
22
8 0.9 DL + 1.6 SP + 1.6W-Y
22
9 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 1.6 LLR + 0.8W+X
23
0 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 1.6 LLR + 0.8W-X
23
1 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 1.6 LLR + 0.8W+Y
23
2 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 1.6 LLR + 0.8W-Y
23
3 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 0.5 LLR + 1.6W+X
23
4 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 0.5 LLR + 1.6W-X
23
5 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 0.5 LLR + 1.6W+Y
23
6 1.2 DL + 1.2 SP + 1.2WP + 1.2 SSP + 1.0 LL + 0.5 LLR + 1.6W-Y
23
7 0.9 DL + 1.6 SP + 1.6WP + 1.6 SSP + 1.6W+X
23
8 0.9 DL + 1.6 SP + 1.6WP + 1.6 SSP + 1.6W-X
23
9 0.9 DL + 1.6 SP + 1.6WP + 1.6 SSP + 1.6W+Y
24 0.9 DL + 1.6 SP + 1.6WP + 1.6 SSP + 1.6W-Y
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
31
6 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0FL +0.75 LL + 0.75 LLR
31
7 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0CR-1 +0.75 LL + 0.75 LLR
31
8 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0CR-2 +0.75 LL + 0.75 LLR
31
9 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0BL-1 +0.75 LL + 0.75 LLR
32
0 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0BL-2 +0.75 LL + 0.75 LLR
32
1 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0BL-3 +0.75 LL + 0.75 LLR
32
2 1.0DL+1.0SP+1.0WP+1.0SSP+1.0SPS +1.0BL-4 +0.75 LL + 0.75 LLR
*********************** As per UBC97 (Clause 1612.3.2)
32
3 1.0DL+0.72EQ+X+1.0SP+0.22EQ+Y
32
4 1.0DL+0.72EQ-X+1.0SP+0.22EQ-Y
32
5 1.0DL+0.72EQ+Y+1.0SP+0.22EQ+X
32
6 1.0DL+0.72EQ-Y+1.0SP+0.22EQ-X
32
7 1.0DL+0.72EQ+X+1.0SP+0.22EQ-Y
32
8 1.0DL+0.72EQ-X+1.0SP+0.22EQ+Y
32
9 1.0DL+0.72EQ+Y+1.0SP+0.22EQ-X
33
0 1.0DL+0.72EQ-Y+1.0SP+0.22EQ+X
33
1 1.0DL+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.22EQ+Y
33
2 1.0DL+0.72EQ-X+1.0SP+1.0WP+1.0SSP+0.22EQ-Y
33
3 1.0DL+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.22EQ+X
33
4 1.0DL+0.72EQ-Y+1.0SP+1.0WP+1.0SSP+0.22EQ-X
33
5 1.0DL+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.22EQ-Y
33
6 1.0DL+0.72EQ-X+1.0SP+1.0WP+1.0SSP+0.22EQ+Y
33
7 1.0DL+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.22EQ-X
33
8 1.0DL+0.72EQ-Y+1.0SP+1.0WP+1.0SSP+0.22EQ+X
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
33
9 1.0DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)
34
0 1.0DL+0.72EQ-X(+Ecc)+1.0SP+0.22EQ-Y(+ecc)
34
1 1.0DL+0.72EQ+Y(+Ecc)+1.0SP+0.22EQ+X(+ecc)
34
2 1.0DL+0.72EQ-Y(+ecc)+1.0SP+0.22EQ-X(+ecc)
34
3 1.0DL+0.72EQ+X(-ecc)+1.0SP+0.22EQ+Y(-ecc)
34
4 1.0DL+0.72EQ-X(-Ecc)+1.0SP+0.22EQ-Y(-Ecc)
34
5 1.0DL+0.72EQ+Y(-Ecc)+1.0SP+0.22EQ+X(-ecc)
34
6 1.0DL+0.72EQ-Y(-ecc)+1.0SP+0.22EQ-X(-ecc)
34
7 1.0DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ-Y(+ecc)
34
8 1.0DL+0.72EQ-X(+ecc)+1.0SP+0.22EQ+Y(+ecc)
34
9 1.0DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ-X(+ecc)
35
0 1.0DL+0.72EQ-Y(+ecc)+1.0SP+0.22EQ+X(+ecc)
35
1 1.0DL+0.72EQ+X(-ecc)+1.0SP+0.22EQ-Y(-ecc)
35
2 1.0DL+0.72EQ-X(-ecc)+1.0SP+0.22EQ+Y(-ecc)
35
3 1.0DL+0.72EQ+Y(-ecc)+1.0SP+0.22EQ-X(-ecc)
35
4 1.0DL+0.72EQ-Y(-ecc)+1.0SP+0.22EQ+X(-ecc)
35
5 1.0DL+0.72EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(+ecc)
35
6 1.0DL+0.72EQ-X(+Ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(+ecc)
35
7 1.0DL+0.72EQ+Y(+Ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(+ecc)
35
8 1.0DL+0.72EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(+ecc)
35
9 1.0DL+0.72EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(-ecc)
36
0 1.0DL+0.72EQ-X(-Ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(-Ecc)
36
1 1.0DL+0.72EQ+Y(-Ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(-ecc)
36 1.0DL+0.72EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(-ecc)
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
2
36
3 1.0DL+0.72EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(+ecc)
36
4 1.0DL+0.72EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(+ecc)
36
5 1.0DL+0.72EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(+ecc)
36
6 1.0DL+0.72EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(+ecc)
36
7 1.0DL+0.72EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(-ecc)
36
8 1.0DL+0.72EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(-ecc)
36
9 1.0DL+0.72EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(-ecc)
37
0 1.0DL+0.72EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(-ecc)
37
1 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y
37
2 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X+1.0SP+0.22EQ-Y
37
3 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X
37
4 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y+1.0SP+0.22EQ-X
37
5 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X+1.0SP+0.22EQ-Y
37
6 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X+1.0SP+0.22EQ+Y
37
7 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ-X
37
8 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y+1.0SP+0.22EQ+X
37
9 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.22EQ+Y
38
0 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X+1.0SP+1.0WP+1.0SSP+0.22EQ-Y
38
1 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.72EQ+X
38
2 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y+1.0SP+1.0WP+1.0SSP+0.22EQ-X
38
3 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.22EQ-Y
38
4 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X+1.0SP+1.0WP+1.0SSP+0.22EQ+Y
38
5 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.72EQ-X
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
38
6 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y+1.0SP+1.0WP+1.0SSP+0.22EQ+X
38
7 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)
38
8 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(+ecc)+1.0SP+0.22EQ-Y(+ecc)
38
9 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ+X(+ecc)
39
0 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(+ecc)+1.0SP+0.22EQ-X(+ecc)
39
1 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(-ecc)+1.0SP+0.22EQ+Y(-ecc)
39
2 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(-ecc)+1.0SP+0.22EQ-Y(-ecc)
39
3 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(-ecc)+1.0SP+0.22EQ+X(-ecc)
39
4 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(-ecc)+1.0SP+0.22EQ-X(-ecc)
39
5 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ-Y(+ecc)
39
6 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(+ecc)+1.0SP+0.22EQ+Y(+ecc)
39
7 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ-X(+ecc)
39
8 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(+ecc)+1.0SP+0.22EQ+X(+ecc)
39
9 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(-ecc)+1.0SP+0.22EQ-Y(-ecc)
40
0 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(-ecc)+1.0SP+0.22EQ+Y(-ecc)
40
1 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(-ecc)+1.0SP+0.22EQ-X(-ecc)
40
2 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(-ecc)+1.0SP+0.22EQ+X(-ecc)
40
3 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(+ecc)
40
4 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(+ecc)
40
5 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(+ecc)
40
6 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(+ecc)
40
7 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(-ecc)
40
8 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(-ecc)
40 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(-ecc)
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
9
41
0 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(-ecc)
41
1 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(+ecc)
41
2 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(+ecc)
41
3 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(+ecc)
41
4 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(+ecc)
41
5 1.0DL+1.0(FL+LL+LLR)+0.72EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(-ecc)
41
6 1.0DL+1.0(FL+LL+LLR)+0.72EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(-ecc)
41
7 1.0DL+1.0(FL+LL+LLR)+0.72EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(-ecc)
41
8 1.0DL+1.0(FL+LL+LLR)+0.72EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(-ecc)
41
9 0.90DL+0.72EQ+X+1.0SP+0.22EQ+Y
42
0 0.90DL+0.72EQ+Y+1.0SP+0.22EQ+X
42
1 0.90DL+0.72EQ+X+1.0SP+0.22EQ-Y
42
2 0.90DL+0.72EQ+Y+1.0SP+0.22EQ-X
42
3 0.90DL+0.72EQ-X+1.0SP+0.72EQ-Y
42
4 0.90DL+0.72EQ-Y+1.0SP+0.22EQ-X
42
5 0.90DL+0.72EQ+X+1.0SP+0.72EQ-Y
42
6 0.90DL+0.72EQ+Y+1.0SP+0.22EQ-X
42
7 0.90DL+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.22EQ+Y
42
8 0.90DL+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.22EQ+X
42
9 0.90DL+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.22EQ-Y
43
0 0.90DL+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.22EQ-X
43
1 0.90DL+0.72EQ-X+1.0SP+1.0WP+1.0SSP+0.72EQ-Y
43
2 0.90DL+0.72EQ-Y+1.0SP+1.0WP+1.0SSP+0.22EQ-X
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
43
3 0.90DL+0.72EQ+X+1.0SP+1.0WP+1.0SSP+0.72EQ-Y
43
4 0.90DL+0.72EQ+Y+1.0SP+1.0WP+1.0SSP+0.22EQ-X
43
5 0.90DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)
43
6 0.90DL+0.72EQ-X(+ecc)+1.0SP+0.22EQ-Y(+ecc)
43
7 0.90DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ+X(+ecc)
43
8 0.90DL+0.72EQ-Y(+ecc)+1.0SP+0.22EQ-X(+ecc)
43
9 0.90DL+0.72EQ+X(-ecc)+1.0SP+0.22EQ+Y(-ecc)
44
0 0.90DL+0.72EQ-X(-ecc)+1.0SP+0.22EQ-Y(-ecc)
44
1 0.90DL+0.72EQ+Y(-ecc)+1.0SP+0.22EQ+X(-ecc)
44
2 0.90DL+0.72EQ-Y(-ecc)+1.0SP+0.22EQ-X(-ecc)
44
3 0.90DL+0.72EQ+X(+ecc)+1.0SP+0.72EQ-Y(+ecc)
44
4 0.90DL+0.72EQ-X(+ecc)+1.0SP+0.22EQ+Y(+ecc)
44
5 0.90DL+0.72EQ+Y(+ecc)+1.0SP+0.72EQ-X(+ecc)
44
6 0.90DL+0.72EQ-Y(+ecc)+1.0SP+0.22EQ+X(+ecc)
44
7 0.90DL+0.72EQ+X(-ecc)+1.0SP+0.22EQ-Y(-ecc)
44
8 0.90DL+0.72EQ-X(-ecc)+1.0SP+0.22EQ+Y(-ecc)
44
9 0.90DL+0.72EQ+Y(-ecc)+1.0SP+0.22EQ-X(-ecc)
45
0 0.90DL+0.72EQ-Y(-ecc)+1.0SP+0.22EQ+X(-ecc)
45
1 0.90DL+0.72EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(+ecc)
45
2 0.90DL+0.72EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(+ecc)
45
3 0.90DL+0.72EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(+ecc)
45
4 0.90DL+0.72EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(+ecc)
45
5 0.90DL+0.72EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(-ecc)
45 0.90DL+0.72EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(-ecc)
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
6
45
7 0.90DL+0.72EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(-ecc)
45
8 0.90DL+0.72EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(-ecc)
45
9 0.90DL+0.72EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.72EQ-Y(+ecc)
46
0 0.90DL+0.72EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(+ecc)
46
1 0.90DL+0.72EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.72EQ-X(+ecc)
46
2 0.90DL+0.72EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(+ecc)
46
3 0.90DL+0.72EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-Y(-ecc)
46
4 0.90DL+0.72EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+Y(-ecc)
46
5 0.90DL+0.72EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ-X(-ecc)
46
6 0.90DL+0.72EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.22EQ+X(-ecc)
*********************** As per ASCE7-05 (Clause 2.4.1)
46
7 0.6DL+0.7EQ+X+1.0SP+0.21EQ+Y
46
8 0.6DL+0.7EQ-X+1.0SP+0.21EQ-Y
46
9 0.6DL+0.7EQ+Y+1.0SP+0.21EQ+X
47
0 0.6DL+0.7EQ-Y+1.0SP+0.21EQ-X
47
1 0.6DL+0.7EQ+X+1.0SP+0.21EQ-Y
47
2 0.6DL+0.7EQ-X+1.0SP+0.21EQ+Y
47
3 0.6DL+0.7EQ+Y+1.0SP+0.21EQ-X
47
4 0.6DL+0.7EQ-Y+1.0SP+0.21EQ+X
47
5 0.6DL+0.7EQ+X+1.0SP+1.0WP+1.0SSP+0.21EQ+Y
47
6 0.6DL+0.7EQ-X+1.0SP+1.0WP+1.0SSP+0.21EQ-Y
47
7 0.6DL+0.7EQ+Y+1.0SP+1.0WP+1.0SSP+0.21EQ+X
47
8 0.6DL+0.7EQ-Y+1.0SP+1.0WP+1.0SSP+0.21EQ-X
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
47
9 0.6DL+0.7EQ+X+1.0SP+1.0WP+1.0SSP+0.21EQ-Y
48
0 0.6DL+0.7EQ-X+1.0SP+1.0WP+1.0SSP+0.21EQ+Y
48
1 0.6DL+0.7EQ+Y+1.0SP+1.0WP+1.0SSP+0.21EQ-X
48
2 0.6DL+0.7EQ-Y+1.0SP+1.0WP+1.0SSP+0.21EQ+X
48
3 0.6DL+0.7EQ+X(+ecc)+1.0SP+0.21EQ+Y(+ecc)
48
4 0.6DL+0.7EQ-X(+ecc)+1.0SP+0.21EQ-Y(+ecc)
48
5 0.6DL+0.7EQ+Y(+ecc)+1.0SP+0.21EQ+X(+ecc)
48
6 0.6DL+0.7EQ-Y(+ecc)+1.0SP+0.21EQ-X(+ecc)
48
7 0.6DL+0.7EQ+X(-ecc)+1.0SP+0.21EQ+Y(-ecc)
48
8 0.6DL+0.7EQ-X(-ecc)+1.0SP+0.21EQ-Y(-ecc)
48
9 0.6DL+0.7EQ+Y(-ecc)+1.0SP+0.21EQ+X(-ecc)
49
0 0.6DL+0.7EQ-Y(-ecc)+1.0SP+0.21EQ-X(-ecc)
49
1 0.6DL+0.7EQ+X(+ecc)+1.0SP+0.21EQ-Y(+ecc)
49
2 0.6DL+0.7EQ-X(+ecc)+1.0SP+0.21EQ+Y(+ecc)
49
3 0.6DL+0.7EQ+Y(+ecc)+1.0SP+0.21EQ-X(+ecc)
49
4 0.6DL+0.7EQ-Y(+ecc)+1.0SP+0.21EQ+X(+ecc)
49
5 0.6DL+0.7EQ+X(-ecc)+1.0SP+0.21EQ-Y(-ecc)
49
6 0.6DL+0.7EQ-X(-ecc)+1.0SP+0.21EQ+Y(-ecc)
49
7 0.6DL+0.7EQ+Y(-ecc)+1.0SP+0.21EQ-X(-ecc)
49
8 0.6DL+0.7EQ-Y(-ecc)+1.0SP+0.21EQ+X(-ecc)
49
9 0.6DL+0.7EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+Y(+ecc)
50
0 0.6DL+0.7EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-Y(+ecc)
50
1 0.6DL+0.7EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+X(+ecc)
50 0.6DL+0.7EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-X(+ecc)
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
2
50
3 0.6DL+0.7EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+Y(-ecc)
50
4 0.6DL+0.7EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-Y(-ecc)
50
5 0.6DL+0.7EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+X(-ecc)
50
6 0.6DL+0.7EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-X(-ecc)
50
7 0.6DL+0.7EQ+X(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-Y(+ecc)
50
8 0.6DL+0.7EQ-X(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+Y(+ecc)
50
9 0.6DL+0.7EQ+Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-X(+ecc)
51
0 0.6DL+0.7EQ-Y(+ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+X(+ecc)
51
1 0.6DL+0.7EQ+X(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-Y(-ecc)
51
2 0.6DL+0.7EQ-X(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+Y(-ecc)
51
3 0.6DL+0.7EQ+Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ-X(-ecc)
51
4 0.6DL+0.7EQ-Y(-ecc)+1.0SP+1.0WP+1.0SSP+0.21EQ+X(-ecc)
*********************** As per ASCE7-05 (Clause 2.4.1)
51
5 1.0DL+1.0SP+1.0FL+1.0W+X
51
6 1.0DL+1.0SP+1.0FL+1.0W-X
51
7 1.0DL+1.0SP+1.0FL+1.0W+Y
51
8 1.0DL+1.0SP+1.0FL+1.0W-Y
51
9 1.0DL+1.0SP+1.0FL+0.75(LL+LLR)+0.75W+X
52
0 1.0DL+1.0SP+1.0FL+0.75(LL+LLR)+0.75W-X
52
1 1.0DL+1.0SP+1.0FL+0.75(LL+LLR)+0.75W+Y
52
2 1.0DL+1.0SP+1.0FL+0.75(LL+LLR)+0.75W-Y
52
3 0.6DL+1.0SP+1.0W+X
52
4 0.6DL+1.0SP+1.0W-X
52 0.6DL+1.0SP+1.0W+Y
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
5
52
6 0.6DL+1.0SP+1.0W-Y
52
7 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+1.0W+X
52
8 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+1.0W-X
52
9 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+1.0W+Y
53
0 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+1.0W-Y
53
1 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+0.75(LL+LLR)+0.75W+X
53
2 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+0.75(LL+LLR)+0.75W-X
53
3 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+0.75(LL+LLR)+0.75W+Y
53
4 1.0DL+1.0SP+1.0WP+1.0SSP+1.0FL+0.75(LL+LLR)+0.75W-Y
53
5 0.6DL+1.0SP+1.0WP+1.0SSP+1.0W+X
53
6 0.6DL+1.0SP+1.0WP+1.0SSP+1.0W-X
53
7 0.6DL+1.0SP+1.0WP+1.0SSP+1.0W+Y
53
8 0.6DL+1.0SP+1.0WP+1.0SSP+1.0W-Y
Load abbreviations:
DL = Dead Load
LL = Live Load
LLR = Roof live load
CR-1 & CR-2 = Crane loads
W+X, W-X, W+Y, W-Y = Wind loads in X and Y direction
EQ+X, EQ-X, EQ+Y, EQ-Y = Earthquake loads in X and Y direction
FL = load due to fluids with well-defined pressures and maximum heights
SP = load due to lateral earth pressure
SPS= Earth pressure surcharge
WP = Ground water table pressure
SSP = Submerged soil pressure
Design:
The structure will be designed for Ultimate limit state & Serviceability limit state for the worst combination of
Dead loads, Live loads, Crane loads, Wind loads and Seismic loads as applicable. Design of structural
elements (i.e., Slabs, Walls, Columns, Beams, RC Staircase, and Gantry Girder etc) will be performed using
ETABS /STAAD, PROKON & Excel spread sheets. SAFE/ STAAD will be used to design Isolated/combined
footings, Strip footing and Raft. Excel spread sheets; Manuals & Checklist can also be used for inspection /
checking.
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
6.1.4 Deflection in concrete slabs and beams (Table 24.2.2 of ACI 318-14)
a. Flat roofs or Floors (Not Supporting non-structural elements not likely to be damaged by large
deflections) Immediate deflection due to maximum of Lr = span/250*
b. Flat roofs or Floors (Not Supporting non-structural elements not likely to be damaged by large
deflections) Immediate deflection due to L= Span/360 or 20 mm whichever is lesser.
c. Roofs or floors (supporting non-structural elements likely to be damaged by large deflections)
= Span/480 or 20mm whichever is lesser
d. Roofs or floors (supporting non-structural elements not likely to be damaged by large deflections)
= Span/250*
* Dewa Specification governs.
For R.C beams, the span/Overall depth ratio shall be as per Table 9.3.1.1of ACI 318-14
e. GIS room deflection shall be 10 mm or as per manufacture specifications, whichever is less.
f. As per UBC 97-CL-1630.10.2
Allowable drift is h/40 (fundamental time period is less than 0.7) &
h/50 (fundamental time period is greater than 0.7)
6.1.5 Factor of Safety
Safety factors
Minimum factor of safety for overturning in SLS condition : 1.5
Minimum factor of safety for sliding in SLS condition : 1.5
Minimum factor of safety for Flotation in SLS condition : 1.1
6.1.6 Clear cover to reinforcement
All members in contact with soil or blinding = 75 mm
External columns, beams and walls = 50 mm
Internal columns, beams and walls = 40 mm
Slab External (Exposed) = 40 mm
Slab internal = 40 mm
Internal Faces of Basement wall = 40 mm
Slab / Pre-cast covers = 40 mm
Inner faces of the water/liquid retaining structures = 50mm
*
Note : Cover noted is to the outside bar regardless of whether it is main or secondary reinforcement.
(iii) Length Ldc above shall be permitted to be multiplied by the applicable factors for Reinforcement in excess of that
required by analysis...... (As required)/(As provided) and Reinforcement enclosed within spiral reinforcement not less
than 6 mm diameter and not more than 100 mm pitch or within 12dia ties and spaced at not more than 100 mm on
center ............ 0.75Ldc
6.2 FOUNDATION
6.2.1 Soil parameters as per Soil Investigation Report.
Foundation type should be RAFT for the main building as well as for the other Ancillary buildings. The raft is modeled
as a finite element structure, which is Supported on Wrinkler springs and spring constant is obtained by multiplying the
area of influence of the element with the modulus of sub grade reaction provide in the soil investigation report.
The Analysis of raft is carried out by transferring the loads obtained from analysis of building frame by STAAD
/ETABS. The plate stress contour is obtained from analysis is used for the design of raft.
Safe Bearing Capacity of soil and subgrade modulus considered in the design for the main building, boundary walls,
oil water tank, Fire Water Tank, Fire pipe Trenches and the Ancillary Buildings shall be as indicated in Soil
Investigation Report.
6.2.2 Stability
Over all Structural Stability:
The overall structural stability is obtained by limiting the vertical & lateral deflection at each floor level and the total
lateral deflections for the whole structure for the given worst combination of the loads.
Also the stability against overturning of the structure is obtained by using the formula given below.
FOS against overturning: Resisting Moment is 1.5 to 2.0times greater than Overturning Moment
Mr
FO Soverturning = ≥ 1.5
Mo
Excessive cracking and wide cracks affect both durability (corrosion of steel in aggressive environment) and
appearance (for members that are visible).
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
6.6 MASONRY
Design of all block work will be carried out in accordance with various provisions of ACI 530.1-13 (Building Code
Requirements for Masonry Structures). Minimum Characteristic strength of non-load bearing block work will be 7.0
N/mm2.
The various types of block work walls used shall be as follows:
6.7 DETAILING
Detailing of RCC Elements shall be as per American standards of practice.
Preparation of bar bending schedule will conform to ACI 315-99/BS4466.
6.8 WATERPROOFING
All Basements, All Foundations, basement walls and underground structures of main building, pump room,
security room etc should be tanked externally with 4 mm thick SBS modified bituminous membrane having a
non-woven Polyester reinforcement of Minimum 260.sqm.
Two coats of Bitumen emulsion paint shall be provided for cable duct banks.
Boundary wall & it’s component shall be protected with 1.5 mm thick self- adhesive bituminous
membrane.
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
The Roof waterproofing shall comprise of Combo Combo roof waterproofing system using polyurethane
foam (sprayed) of thickness minimum 50mm (40-50Kg/m3), Liquid elastomeric UV protection coating,
Geo textile membrane 1000 gauge, Concrete protection screed grade using 10mm size aggregate with
sprayed elastomeric flexible protective coating of 1000 microns.
7.6 Connections:
All the Braced, Splice, shear and moment connection for the structural elements shall be designed for the all-possible
worst load combinations as per AISC 360.
7.6.1 Ordinary bolts:
Minimum number of bolts at any joint should be two.
All bolts shall be minimum 8.8 grade (A325 Group A)
a) Shear capacity:
Shear capacity, Ps= 0.75* ps As (Refer clause J6 of AISC360)
Where ps= Nominal Shear strength,
As= Shear area of bolt
b) Tension capacity:
Pt= 0.75*pt At (clause J6 of AISC360)
Where, pt= Nominal tensile stress;
At = Tensile stress area of bolt
c) Combined shear and tension:
Fs / Ps + Ft / Pt ≤1.3 (clause J7 of AISC360)
Where, Fs = applied shear
Ft= applied tension
Strength of bolts: (as per table J3.2 of AISC360-16)
A307 bolts (Grade 4.6) A325 (Group-A) bolts (Grade 8.8)
Bolt Grade
(in N/mm2) (in N/mm2)
Shear strength, ps 186 372
Tension strength, pt 310 620
* Bolt spacing, edge distance requirements shall be considered as per clauses J3, J4, J5
Bearing strength and tearout strength of bolts connection shall be calculated as per clause J7 of AISC360 .
7.6.2 Welding
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA
Minimum Gradient
Sewer Diameter
Velocity 0.75 m/S Velocity 0.6 m/s
200 mm 5 3.2
250 mm 3.7 2.4
315 mm 2.7 1.75
mechanical or electrical failure in transformer and reactor vault shall not pollute the ground water and the external
surrounding.
The Oil water from Main Transformer rooms, Earthing transformer rooms will be connected to OWMH and leading to
Underground Oil Water tank and will be mobilized by Vehicular tank trucks. Fire pump house Water and Oil tank
drainage system shall be connected to Underground Oil Water tank.
8.4 Battery room chemical discharge:
The drain water from the battery room shall be routed into a suitably sized neutralization holding tank located at an
appropriate place. The internal walls and floor of the neutralization tank shall be protected with acid/alkali resistant
tile. The tank shall be filled with a suitable agent up to the outlet of the tank to facilitate neutralizing the discharge
accumulated. The treated water shall lead into a soak away of suitable size. Detailed requirements are covered under
drainage general details separately.
The proposed design for the system shall be agreed in principle by the Engineer before commencement of the detailed
design.
if oil/water tank top slab is less than 750mm from paving, then dispersed wheel should be considered on top slab as
surcharge load instead of 33.33 kN/ m2.
Earth Pressure at rest condition due to submerged soil is to be considered.
The required quantity of reinforcement for the tank is to be determined for flexure and crack width.
The following are the primary load cases which are to be considered in the Analysis
1. Dead Load
2. Water Load for Hydro testing
3. Earth pressure (E.P) Under submerged condition
4. Water Load (One Side Empty)
5. Underground Upward Water pressure on Bottom Slab(Water table if high)
6. Surcharge pressure on top of slab and side walls (If under Vehicular road)
7. Surcharge pressure if in the vicinity of nearby structures.
If water table is high dewatering shall be carried out to at least 1.0 m below the excavation level, and the same will be
continued until the backfilling of soil above the oil water tank. The distance of the Oil water tank from the main
building is to be mentioned.
For Volume Refer Section 8.3 of this document.
Boundary wall shall be connected with the nearby structure wherever is necessary, if the space required for
Boundary wall foundation is not available. Manholes, Trenches and Holding tanks shall be considered as a part of
boundary wall, if cannot separate from Boundary wall.
Expansion joint shall be provided at columns after approximately 3 span (considering each span of 3m).
The minimum required degree of compaction shall be, tested according to modified proctor density: 98% for
embankment areas.
SOIL REPORT
Dubai Electricity & Design, Supply, Construction, Installation, Testing
Client: Project: Doc. No:
Water Authority and Commissioning of 132/11kV VALLEY Substation
Main
DANWAY Contract No: 6595 DDCMS-C-15-STRU-316
Contractor
CIVIL DESIGN CRITERIA