Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

CURRICULUM VITAE

Post Applied: - Construction Engineer (Electrical)

HEM KUMAR
Total Experience – 16 Years
COMMUNICATION ADDRESS
RAY International LLC. Total Exp. oil & Gas -12 Years
Post Box No. 203
Post Code 134
Jawharat Al Shatie, Alkhuwair (Muscat)
Sultanate of Oman.
Mobile No. 00968-96972721.
E-mail: hemrakhee@gmail.com,
hem.kumar@rayoman.com

CAREER OBJECTIVE:

To work in a competitive team for challenging projects that provides an Opportunity to acquire new
Skills and enhance existing skills.

RESPONSIBILITIES

 Installation and Testing of various types of Electrical equipments.


 Preparation/acceptance of materials as per standard for field installation.
 Carrying out the inspection of work being performed at site or at subcontractors.
 Preparation/Review of job procedure, work list, inspection and plan for field work.
 Review of vendors documents, drawing for field apparatus.

PRESENT ASSIGNMENT

Presently assigned as an Electrical Supervisor in RAY International LLC.

The following activities are carried out as a Construction Engineer Electrical.

 Review and construct the project through technical proposals of Method Statement and Procedures.
 Checking of Project drawings and documentation for the compliance of the project specification.
 Construction materials takeoff, Supervision of Installation, Testing and Commissioning.
 Documentation of QC check list of all Electrical activities. And submission of test packs.
 Preparation of all field engineering changes and as built mark-up.

EXPERIENCE (15 years)

Oman : From 23rd April 2007 to till Date


India : 5-Years (5th May 2002 to 16th April 2007)

EDUCATIONAL QUALIFICATION

Technical Qualification : Diploma in Electrical Engineering. (HRD and MEA approved)


 P a g e | 1/5
TRAINING ATTENDED: INDIA

Apprenticeship from SNL BEARINGS LTD, Ratu, Ranchi (Jharkhand) from 14/08/2003 TO 13/08/2004

TRAINING ATTENDED Training Attended: OMAN (PDO)

 H2S awareness approved by PDO Oman


 Job Hazard Analysis Approved by PDO Oman
 Initial Fire Response Approved by PDO Oman
 Coaching and Mentoring approved by PDO Oman
 Safety Leadership for Supervisors course Approved by PDO Oman
 Permit To Work signatory Course & License Approved by PDO Oman
 Authorized Electrical Person Course & License Approved by PDO Oman
 Heart saver First AID (AHA) Course Approved by PDO Oman.
 Gas Tester Approved by PDO Oman.

LANGUAGE PROFICIENCY : English, Hindi

COMPUTER SKILLS

Operating System : Windows 98, 2000


Application Software : MS Office – Word, Excel, Access, Power point, Outlook express.

DETAILS OF WORK EXPERIENCE

Organization : Wood Group – CCC (Oman Branch)


Clint : PETROLEUM DEVELOPMENT OMAN
Project : Engineering Maintenance and Construction (EMC)
Period : April 2013 to April 2015.
Designation : Electrical and Instrument Supervisor.(Assistance Head of Department)
Responsibility:

 Installation Supervision and Inspection of all Electrical system for HV and LV, Cable, Switchgear,
Transformer, Emergency Generator and Lighting and small Power System.
 Attending client meeting for safety and progress report.
 Preparing progress report and submit to Construction manager.
 Construction activities Supervision of OHL work.
 Ensure site Installation by Sub contractor meet site Quality, standard, specification and as per Drawing.
 Witnessing of testing result for testing Electrical system Equipment and installation.
 Checking and approving materials and equipment at point of delivery to site.
 Coordination with the Discipline Engineers and Supervisor for as built drawing generation.
 Monitor and report Subcontractor daily manpower on site and highlighting schedule and concerns to the
system Engineers.
 Assist System Engineers and commissioning and testing.
 Installation Supervision of panels, conduits, trays, battery for UPS System.
 Supervision of Heat Tracing Work.
 Supervision and Handling all activities of shutdown.
 Involved in QA/QC Activities.

 P a g e | 2/5
Organization : ARABIAN INDUSTRIES LLC.
Clint : PETROLEUM DEVELOPMENT OMAN
Project : AMAL STEEM PROJECT (OFF PLOT SURFACE FACILITIES)
Period : MAY 2010 to April 2013.
Designation : Electrical Supervisor
Responsibility:

 Supervision of 33 kV OHL works.


 Work progress meeting attendant with Client.
 Work progress report preparing and submit to Construction manager.
 Installation Supervision of 33kVA/415V Transformers.
 Supervision of Beam pumps Maintenance Work.
 Installation Supervision of HV, LV Switchgear and lighting panels, Gland, end termination Power and
control cables.
 Installation Supervision of Power distribution panels, conduits, trays, battery for UPS System.
 Supervision of Heat Tracing Work.
 Installation Supervision of Conduits and Cables for smoke detector.
 Supervision of Preparation of Cable Tag & Ferrule.
 Handling all activities of shutdown.
 Involved in QA/QC Activities.

Organization : GALFAR ENGINEERING & CONTRACTING CO. SAOG


Client : PETROLEUM DEVELOPMENT OMAN
Project : MABRUK 132kV substation (Near Qarnalam)
Period : July 2008 to May 2009.
Designation : Electrical Supervisor
Responsibility:

 Installation Supervision of132kV, 33 kV/415V Transformers, Switchgear Panels.


 Installation Supervision of 33 KV Switch Gear panels.
 Installation Supervision of Switch racks, MCC and lighting panels, Gland, end termination Power and
control cables.
 Installation Supervision of panels, conduits, trays, battery for UPS System.
 Installation Supervision of Conduits and Cables for smoke detector.
 Supervision Preparation of Cable Tag & Ferrule.
 Supervision and Handling all activities of shutdown.
 Involved in QA/QC Activities.

Organization : GALFAR ENGINEERING & CONTRACTING CO. SAOG


Clint : PETROLEU DEVELOPMENT OMAN
Project : SNGP Extension Project
Period : Nov 2007 to July 2008
Designation : Electrical Supervisor.
Responsibility:

 Material preparation from Client yard to job site based on the AFC drawing shown.
 Installation Supervision of Distribution panels, Junction box, Conduits and cables for Lighting.
 Installation Supervision of J B, trays, cables and its gland & Termination.
 Supervision of Power and control Cables gland, termination and testing.

 P a g e | 3/5
 Submitting work progress report.

Organization : GALFAR ENGINEERING & CONTRACTING CO. SAOG


Clint : DALEEL PETROLEUM OMAN
Project : Water injection & Treatment Plant Project
Period : April 2007 to Oct 2007
Designation : Electrical Supervisor
Responsibility:

 Preparing work schedule and submit to Construction manager.


 Installation Supervision of 33kVA/415V Transformers.
 Supervision and Handling of HV/LV Cable system.
 Installation Supervision of panels and batteries and trays for UPS system.
 Preparing testing report of electrical apparatus.
 Installation Supervision of conduits, trays, battery for UPS System.
 Installation Supervision of Conduits and Cables for smoke detector.
 Preparation of Cable Tag & Ferrule.
 Supervision of Control Cables end termination.
 Handling all activities of shutdown.

Organization : GALFAR ENGINEERING & CONTRACTING CO. SAOG


Client : PETROLEUM DEVLOPMENT OMAN
Project : Yibal 33kV/11kV substation
Period : May 2009 to may 2010
Designation : Electrical Supervisor
Responsibility:

 Installation Supervision of HV and LV Switch Gears.


 Supervision and handling Erection and Alignment of Bus bar & ducts as per Typical Drawing shown.
 Installation Supervision of cable trays and cable lying.
 Supervision of Analysis clients punch list.
 Handling checklist of Installing and testing electrical equipment.
 Installation Supervision of Power distribution system panels, conduits, trays, battery for UPS System.
 Installation Supervision of Conduits and Cables for smoke detector.
 Supervision of preparation Cable Tag & Ferrule.
 Supervision of Control Cables end termination
 Handling all activities of shutdown.

Organization : EMCONS Automation Pvt Ltd (RANCHI, JHARKHAND)


(Authorized distributer of ALLEN BRADLEY)
Clint : MCC, PLC, SLC, CONTROLOGICS, DCS, VSD Panel Manufacturing co.
Period : Jul. 2004 to Apr. 2007
Designation : Asst.Workshop In charge.
Responsibility : Supervisory------

 Installation of all Electrical equipment in the panel.


 Panel wiring and loop test.
 Testing of all assoceries of panel.
 Cable insulation test and Wiring.
 Panel Maintenance.
 Functional test of MCC, PLC, Control & relay Panel, RTCC Panel.

 P a g e | 4/5
 Site commissioning
 Involved in QA/QC Activities.

Organization : MEDITRON (BIT More Ranchi, JHARKHAND)


(Authorized Distributor of SIEMENCE, JHARKHAND.)
Clint : Hindalco, TATA irán & esponje co, Bokaro steel plant etc.
Project : MCC, PLC PANEL ACB, VCB Panel Manufacturing co.
Period : Jan. 2002 to March 2003
Designation : Asst.Workshop In charge.
Responsibility : Supervisory------

 Installation of all Electrical equipment in the panel.


 DCS and PLC Panel wiring.
 Testing of all assoceries of panel.
 Cable insulation test and Wiring.
 DCS and PLC Panel Maintenance.
 Functional test of MCC, Control & relay Panel, RTCC Panel.
 Involved in QA/QC Activities.
 Site commissioning.

PERSONAL DETAILS:

Name : Hem Kumar


Father’s Name : Sri Shyamanand Roy
Address : Vill + Po – Balha, Parbatta, Khagaria, 851203, Bihar.
Marital Status : Married.
Date of Birth : 01.03.1982
Passport No : M9229855
Passport Issued Date : 13.05.2015
Passport Expiries Date : 12.05.2025
Place of issued : Patna
Contact Number (India) : 0091-9801504257. 7488462493

Salary,

Current salary
Expected salary
Shutdown Experience,

Having Shutdown experience in various plants in OMAN (GALFAR, ARABIAN INDUSTRIES, WOOD GROUP- CCC, RAY
International.)

Having Shutdown experience in various plant in INDIA (Bokaro steel plant, SNL Bearing Company, HINDALCO,)

This information furnished above is true to the best of my knowledge.

 P a g e | 5/5
(HEM KUMAR) Date: -

00968-96972721 Place:

 P a g e | 6/5

You might also like