Professional Documents
Culture Documents
Jeddah First Industrial City: Ground Floor Layout
Jeddah First Industrial City: Ground Floor Layout
Jeddah First Industrial City: Ground Floor Layout
1 2 3 4 5 6 7 8 9 10 11 12 13 14
W E
A A S
A
B B
F.EX.D
F.EX.D F.EX.D
EXIT
1HR EXIT
1HR EXIT
1HR
B B B
G
EXIT G
EXIT EXIT EXIT EXIT EXIT EXIT G
EXIT
EXIT
B
SYMBOLS & ABBREVIATIONS
F.EX.D
G
1HR
T.D 22 M
T.D 19 M SYMBOL DESCRIPTION
T.D 17 M
F.EX.D
ASSEMBLY POINT
2HR
2-HOUR ZONE (FIRE RESISTANCE RATING) FIRE COMPARTMENT WALL
EXIT
F.EX.D
2HR F.EX.D
TRAVEL DISTANCE
2HR
COMMON PATH
F.EX.D
T.D 27 M
B
2HR
.R.
G
T.D 18 M
1 HOUR FIRE RATED DOOR ( LISTED )
1.HR
F.EX.D
1HR
B
G
EMERGENCY EXIT LIGHT
TOTAL AREA : 4751.00 M²
G
B MANUAL BREAK GLASS CALL POINT STATION MOUNTING
SCHEDULE OF SET BACK
G
B
B
C C
G
EXIT EXIT EXIT EXIT
ASSEMBLY POINT
A FIRE HOSE CABINET WITH WATER 1" HOSE SETBACK
PERCENTAGE
5.20 m
10.65%
4.92 m
2.74%
9.29 m
9.26 %
15.36 m
30.30 %
FIRE EXTINGUISHER 6 kg
F.D 1/2 HOUR FIRE RATED DOOR ( LISTED ) LAND UTILITY SCHEDULE
1/2 HR
PERCENTAGE
2 HOURS FIRE EXIT RATED DOOR WITH ALL ACCESSORIES ( LISTED )
DESCRIPTION AREA BLDG. HEIGHTS TOTAL AREA
F.EX.D
SELF- CLOSING , PANIC BAR , MAGNETIC OPINING 2235.10 m² 8.00 m / 4.00m / 47.04 %
B
G
2HR BUILT AREA
HANG ADM
SIDE WALK AREA 540.95 m² -- 11.39 %
YOU ARE HERE CAR PARKING AREA 414.00 m² -- 8.71 %
LOADING / UNLOADING AREA 48.48m² -- 1.02 %
D
GREEN AREA 86.48 m² -- 1.82 %
D
SET BACK / ASPHALT ROAD AREA 2515.90 m² -- 52.96%
PRODUCTION AREA 1534.50 m² 8.00 m 69.56%
STORAGE AREA / HANGER 336.00 m² 8.00 m 17.86 %
TOTAL PLOT 4751 m² -- 100.00 %
LEGEND:
SYMBOL DESCRIPTION:
1 2 3 4 5 6 7 8 9 10 11 12 13 14
STAMP HERE:
2 3 4 5 6 7 8 9 10 11 12 13
MODON IS NOT LIABLE FOR ANY
B EXIT
EXIT
G
B
EXIT
EXIT
B MISINTERPRETATION REFLECTED HEREIN.
DISCLAIMER : CONSULTANT WILL TAKE FULL
EXIT
B
G
G
G
B
EXIT
SAFETY DIMENSIONS ENGINEERING CONSULTANT
Architectural
Structural
Electrical
Sanitary
Mechanical
Date: Revision:
MO-DAY-YR Rev.01 DESCRIPTION CHECKED BY APRVD.
MO-DAY-YR Rev.01
C C MO-DAY-YR
MO-DAY-YR
Rev.01
Rev.01
MO-DAY-YR
Checked
MO-DAY-YR
Approved
PROJECT LOCATION: