Consultant’s Site Visit to Precast Plant

Building Project: HOUSING DEVELOPMENT COMPRISING OF 1 BLOCK OF 29/25-STOREY FLATS (TOTAL:126 UNITS) WITH BASEMENT CARPARK,
COMMERCIAL, SOCIAL COMMUNAL FACILITIES, PRECINCT PAVILION & ELECTRICAL SUBSTATION AT JALAN TECK WHYE/CHOA CHU
KANG
Name of Main Contractor/ KAY LIM CONSTRUCTION & TRADING PTE Date: 30th Sept 2017
COMPANY: LTD 1
No. of visit (Cumulative):
Name of Consultant KTP CONSULTANT PTE LTD Name of Precaster: G&W PRECAST PTE LTD/G&W BUILDING
QP/COMPANY: Plant Location: MATERIALS SDN BHD
Consultant Rep: KELVIN KONG Plant RTO: Mr. Jothi
HP No: 8588 4039 HP No:
9851 5756
HDB Project Director: Ms. Sin Xiaojun Overall Construction Progress
~18%
status (%) to-date:

S/N Consultant observations (with photographs) Instruction to Contractor


1 Pre-pour inspection (component marking and serial number) No pre pour inspection at time of visit

2 Component quality of finished product

Instructed contractor to make good on pinholes on concrete surface formed by


air bubbles trapped during concreting works. Affected components are Precast
Chute and Precast Duct.
3 Storage of precast components

Instructed contractor to repair chipped off defect on Precast Gable end Walls
clouded in photo above.

4 Highlight any quality issues which may affect site progress None observed

5 Any other observations


No Other Observations

Prepared by/date: <<KELVIN KONG / 3/10/2017>>