REVISED CONSTRUCTION SCHEDULE/S CURVE AND CATCH-UP PLAN

PROJECT: Supply of labor and materials for the construction of solar powered fertigation system (LOT 4)
ID NO.: 2021-03-01058
Name of Bidder: MN COLOMA CONSTRUCTION
Address: Villa Ramos, Abar 1st, San Jose City, Nueva Ecija
Contact No.: 0966-6611800

Item of August September October November


Work
Description 4 5 6 7 8 9 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 2 3 4 5 6 7 8 9 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 2 3 4 5 6 7 8 9 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 2 3 4 5 6 7 8 9 ### ### ### ### ### ###

Main Line (4" dia. HDPE) ### 5.93% 10.07%

Lateral Line (2" dia. PE Pipe)


Const. of Camp & Temporary Facilities &
SPL1 5.49%
Movement of Equipment
SPL2 Permanent Billboard and Tarpaulins ### SUSPENDED
26.23%
800 Surface Pump & Shed 5.20% 2.60%
21.19%
803 I Solar Power Modules (maximum lot area is 50m²) \ 7.46 % 7.46%### ###
### ###

900 Distribution Line (Including 90L Fertigation Tank) 0 % ###

Cummulative Accomplishment % 7.46% 0% 13.73% 57.63%


Accomplishment % Wt 7.46% 7.46% 21.19% 78.82%

Prepared By: Legend ;


MN COLOMA CONSTRUCTION Programmed Accomplishment
Actual Accomplishment
CHEDULE/S CURVE AND CATCH-UP PLAN

November DECEMBER
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 2 3 4 5 6 7 8 9 ### ### ### ### ### ###

100 %
10.07%

23.40%
78.82%

26.23%
7.28% 10.93%

16.88%

10.25%
57.63% 21.18%
78.82% 100.00%