Revised Construction Schedule/S Curve and Catch-Up Plan: Description
Revised Construction Schedule/S Curve and Catch-Up Plan: Description
PROJECT: Supply of labor and materials for the construction of solar powered fertigation system (LOT 4)
ID NO.: 2021-03-01058
Name of Bidder: MN COLOMA CONSTRUCTION
Address: Villa Ramos, Abar 1st, San Jose City, Nueva Ecija
Contact No.: 0966-6611800
November DECEMBER
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 2 3 4 5 6 7 8 9 ### ### ### ### ### ###
100 %
10.07%
23.40%
78.82%
26.23%
7.28% 10.93%
16.88%
10.25%
57.63% 21.18%
78.82% 100.00%