In accordance with the following Terms and Conditions: ARCHITECT’S PROFESSIONAL FEE IN
PHASES FORMAT UNDER (SPP DOCUMENT 202) ON REGULAR DESIGN SERVICES
1.0 DEFINITIONS AND INTERPRETATION
1.1 Architect’s Qualification
1.1.1 REYNALDO M. RAMOS & ASSOCIATES is a proprietorship architectural
firm located at No. 729 Jade Street, CHS, Naga Road, Las Pinas City,
M.M., Philippines, as its MAIN OFFICE with Portal Design Studio in
Vigan City, Ilocos Sur & Satellite Design Studio in Brunei Darussalam.
1.1.2 The Principal Architect “Reynaldo M. Ramos” is duly registered:
* Member; United Architects of the Philippines UAP – (1982)
UAP Brunei Chapter - Chapter President - (FY 2018-2019)
* Qualified Person (QP) through (PBD 12) under the
Ministry Of Development (MOD), Negara Brunei Darussalam - (1998)
* Eastern Regional Organization for Planning and Human Settlements
(EAROPH); “Individual Membership”. – (2019)
* Doctor Fellow of Royal Institute of Architects, Singapore
(DFRIA) – (2019)
1.2 Design and Project Supervision
1.2.1 Part 1- Design; Architect acts as the Client Prime Consultant Adviser
who will translate the Client’s needs and requirements, from
Project Definition Phase to Bidding or Negotiation Phase.
1.2.2 Part 2- Construction Phase; Project Supervision.
1/8
3/8
4/8
__________________________________________________________________________________
PART-2
__________________________________________________________________________________
3.6 Construction Phase
In this phase the Architect performs the following:
3.6.1 makes decisions on all claims of the Owner and Contactor on all
matters relating to the execution and progress of work or the
interpretation of the Contract Documents.
(drawings, specifications, cost and instruction).
3.6.2 prepares change order, Variation Order (VO) gathers and turns over
to the Owner written guarantees required of the Contractor and
(nominated) Sub-Contractors.
3.5.3 make periodic visits to the projects site to familiarize himself with the
general progress and quality of works and make to ascertain that
the works is proceeding in accordance with the Contract
Documents (drawings, specifications, cost and instructions)..
The Architect shall not be required to make exhaustive or continuous
8 – hours on-site supervision to check on the Quality of works
involved and shall not be responsible for the Contractor’s failure to
carry out the construction work in accordance with the Contract
Documents.
3.5.4 determines the amount owing and due to the Contractor and issue
corresponding Certificates for Payment for such amount based on
the observations and the Contractor’s Application of Payment.
These certificate will constitute a certification to the Client that the
work has progressed to the state indicated and that to hid best
knowledge, the quality of work performed by the Contractor is in
accordance with the Contract Documents.
3.5.5 Should more extensive inspection or full-time (8) construction
supervision be required by the Client, a separate full-time supervisor
(clerk of work) shall be hired and agreed upon by the Owner and
Architect subject to the conditions provided in the Standards of
Professional Practice (SPP Document 202) on full time supervision.
When the Architect is requested by the Owner to do full-time super-
vision, his services and professional fees shall be covered separately
in conformance with the application of and appropriate (SPP).