ANALISA KESELAMATAN KERJA

JOB SAFETY ANALYSIS


Facility / Site/Fasilitas/Site: Location Site/Lokasi Site: Permit No/No Permit: Permit Type/Jenis Permit: Date/Tanggal:

Task Description / Uraian Pekerjaan: Tool & Equipment / Perkakas & Peralatan Kerja: POB / Jumlah Pekerja:
Loading Unloading Tile Concrite  TMC
 Dump Truck
 Webbing sling
 Shackle
REQUIRED REFERENCES/REFERENSI YANG DIBUTUHKAN JSA REVIEW/ TINJAUAN JSA

Have the relevant Procedures, Standards, Guidelines, or Safe Work Pending confirmation by the Task Leader of site conditions, I agree that the attached JSA identifies the significant Task Steps, Hazards, and Controls.Sesuai
Practices been reviewed? dengan konfirmasi Task Leader kondisi site, Saya setuju bahwa JSA terlampir mengidentifikasi langkah kerja, bahaya dan pengendaliannya.
Yes N/A
Apakah porsedur, standarad, petunjuk atau praktek kerja selamat
sudah di terima? JSA REVIEWER (Supervisor or Designate):JSA Direview oleh:

Attach or List Procedures/Lampirkan daftar procedure:       Name / Signature/Nama/Tanda Tangan:       Company/Perusahaan:      

RISK ASSESSMENT/KAJIAN RESIKO

Must existing Procedures or Work Practices be modified to perform WORK SITE VERIFICATION/VERIFIKASI SITE
this work? (MOC required)/ Haruskah prosedur sebelumnya Yes No
The Work Team has assessed the worksite conditions and confirms/Team kerja telah mengkaji kondisi lokasi kerja dan konfirm:
dimodifkasi untuk melakukan pekerjaan ini?
 The JSA addresses the applicable hazards and necessary controls/JSA sudah lengkap dan benar, hal penting diterapkan untuk mengendalikan bahaya .
After mitigation, are there any hazards that continue to present a  The Team has the appropriate resources (people and equipment) to do the job safely/Team punya sumber daya yang sesuai (manpower dan equipment)
potentially significant risk? (Scenario-Based Risk Assessment untuk melakukan pekerjaan dengan selamat
Yes No
required)Setelah bahaya dihilangkan, apakah ada bahaya lain atau  Others that could be affected by the work have been informed/Hal lain yang punya dampak telah diinformasikan.
resiko signifikan lanjutan?  Energy isolation (if applicable) has been VERIFIED and DEMOSTRATED/Isolasi energy telah di verifikasi dan didemostrasikan
TASK LEADER:
IF YES TO EITHER QUESTION ABOVE, ATTACH THE
MOC OR RISK ASSESSMENT BEFORE PROCEEDING/JIKA YA TERHADAP PERTANYAAN
DIATAS, LAMPIRKAN MOC ATAU RISK ASSESMENT SEBELUM DILANJUTKAN Name / Signature/Nama/Tanda Tangan:       Company/Perusahaan:      

PPE REQUIRED DURING THIS TASK/APD YANG DIBUTUHKAN COMPLETE THE SECTION BELOW IF THIS JSA IS NOT PART OF A PERMIT PACK/LENGKAPI BAGIAN BERIKUT JIKA JSA BUKAN
(Summarize PPE fron the THA and/or Hazard Management Form) BAGIAN DARI PERMIT
(Sign on to the Permit Declaration if this JSA is associated with a Permit Pack)/Tanda tangani pada permit jika JSA merupakan
HARD HAT/HELM SAFETY GLASSES/KACA MATA SAFETY
bagian dari permit
SAFETY SHOES / BOOTS/SAFETY FACE SHIELD/PELINDUNG WAJAH Work Team Declaration/Deklarasi Team work:
SHOES BOOT GOGGLES/PELINDUNG MATA I acknowledge that I have reviewed the attached JSA, I understand my roles/ and responsibilities, and I will comply with the
instructions for this task. Saya mengetahui bahwa saya telah mereview JSA, saya menengerti tugas dan tanggung jawab saya
HEARING PROTECTION/PELINDUNG GLOVES/SARUNG TANGAN:
dan akan mengikuti instruksi sesuai dengan task ini.
TELINGA: COTTON/COTTON
SINGLE/TUNGGAL LEATHER/KULIT
Name (print)/Name: Name (print)/Name:
DOUBLE/DOUBLE IMPACT PROTECTION
OTHER (specify)LAIN-LAIN:
RESPIRATOR TYPE/JENIS APD
CHEMICAL (specify)/KIMIA:
PERNAFASAN (specify):
SCBA CHEMICAL SUIT/BAJU TAHAN KIMIA
DUST MASK/MASKER DEBU APRON/PELINDUNG BADAN

FALL PROTECTION/PELINDUNG JATUH FOUL WEATHER GEAR (specify):


FALL RESTRAINT

LIFE VEST/BAJU PELAMPUNG FLAME RESISTANT CLOTHING/BAJU TAHAN


WORK VEST/BAJU KERJA API

OTHER PPE (specify)/APD Lain:

Note: If the scope of work or the conditions change significantly, STOP THE JOB. Revise the JSA to address the hazards before proceeding. Jika pekerjaan atau kondisi berubah signifikan, STOP PEKERJAAN TSB.
Revisi JSA untuk mengendalikan bahaya sebelum dilanjutkan.
JOB SAFETY ANALYSIS / ANALISA KESELAMATAN KERJA
TASK HAZARD ASSESSMENT FORM / BLANGKO KAJIAN BAHAYA

Task Description/Uraian pekerjaan: Loading offloading material dan peralatan


Page 1 of 3
Loading Unloading Tile Concrite
CONTRACTOR COMPANY
Name of Developed By Position Sign Approved By Position Sign

Wiryo Budi W Construction Construction


Construction
M. Iqbal Other(s)

Zenvanni PS SHE Supt’. SHE

Complete Task Steps / Potential Hazards / Hazard Controls PRIOR to the JSA Reviewer. Complete Assigned Person AT THE WORK SITE (after JSA Reviewer has signed)/
No. TASK STEPS / Langkah POTENTIAL HAZARDS / HAZARDS CONTROLS / KENDALI BAHAYA ASSIGNED
Kerja POTENSI BAHAYA (How can harm be prevented?) /Bagaimana bahaya dapat PERSON / Tanda
(What could go wrong?) / Apa yang dikendalikan Tangan
dapat jadi masalah Name / Nama Complete

1. - Persiapan peralatan dan - Terjepit - Perhatikan dan ikuti prosedur Tehknik Manual Handling
pekerja - Tertimpa (Pengangkatan Manual dengan Baik)
- Terkilir - Pastikan tubuh dan bagian tubuh dalam posisi yang aman
- Pastikan semua pekerja dalam kondisi fit dan siap untuk
bekerja.
- Gunakan sarung tangan saat melakukan pengecekan
material dan peralatan
- Lakukan Daily TBT sebelum memulai pekerjaan
-
2. - Memposisikan - Tertabrak - Pastikan Saat memposisikan Kendaraan (Maju/Mundur)
Crane/TMC Tidak ada pekerja di daerah line offfire
- Truk terperosok - Pastikan jalan / Akses Yang akan dilalaui kendaraan
pengangkut aman untuk dilalui
- Kendaraan menyenggol - Pastikan ada personal yang memberikan aba-aba saat
kendaraan akan bergerak maju atau mundur
- material atau pekerja - Pastikan tidak ada pekerja yang naik diatas Crane saat crane
atau TMC bekerja
-
3. - Loading unloading tile - TMC terbalik - Pastikan material yang diangkat sesuai dengan SWL
concrite menggunakan - Pastikan Out Rigger dikeluarkan penuh dan plate terpasang
TMC, Dump Truck - Dump Truck tergelincir dengan baik dan tempatkan pada media yang keras dan rata
- Pastikan seling yang digunakan dalam keadaan baik dan dan
layak pakai
- Seling Putus - Sesuaikan beban yang diangkat dengan SWL seling
- Pastikan ikatan material aman dan sesuai dengan prosedur
- Material jatuh pengikatan
- Gunakan Tag line pada saat pengangkatan untuk menegetur
material
- Material membentur
- Pastikan aba aba hanya diberikkan oleh signal man yang
telah ditunjuk
- Tertimpa material - Pastikan Area pengangkatan di baricade
- Pastikan area pengangkatan bebas dari pekerja saat
pengangkatan

4. - Loading unloading tile - Cidera pada punggung - Pastikan material yang diangkat sesuai dengan
concrite secara manual - Tangan terjepit kekuatan tangan
ke dalam bak dump - Tertimpa material - Pastikan posisi tangan jauh dari titik jepit saat
truck - Dehidrasi pengangkatan manual
- Pastikan punggung tidak manjadi tumpuan
- Pastikan paha dijadikan tumpuan saat pengangkatan
- Pastikan area kerja pengangkatan di baricade
- Pastikan tersedia air minum di area kerja
- Pastikan pekerja menggunakan sarung tangan cotton

5. - Kondisi Tanggap Darurat / - Darurat Medis - First Aid Responder (FAR) dan First Aid Kit (FAK) harus
Emergency - Penyakit Kerja berada dilokasi kerja
- Sosialisasi Flow-Chart Response dan Notifikasi
- Emergency Contak Nomber dan alat komunikasi tersedia di
lokasi kerja
-
6. - Pekerjaan Selesai - Area Kerja Kotor - Lakukan Housekeeping di lokasi kerja selama aktifitas
- Peralatan Kerja Tertinggal dilakukan
- Sisa Material - Kumpulkan Peralatan Kerja dan tempatkan material pada
posisi aman
- Kumpulkan sisa Material