AMENDMENT TO TERMS OF REFERENCE (“TOR”)

PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP


Document Impacted to be Considered by
No Item Amendment Bidders
1 Cryogenic Pipe Size From: Appendix 1 – TOR PGN-JK-F006-EPS-PH-0001
Operating and Control
Philosophy

2 x 16” Cryogenic Pipe to accommodate 4000 m3/h LNG transfer. Appendix 1 – TOR PGN-JK-F006-EPS-BD-0001 Process Design Basis
PFD LNG Storage &
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0001
Regasification System
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0005 PnID Jetty and Transfer Line
PnID ORU LNG Storage Tank
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0006
System Stage 1
Line Sizing Calculation
Appendix 2 – TOR PGN-JK-F005-EPS-CA-0204
(FEED Doc.)
Process Simulation Study
Appendix 1 – TOR PGN-JK-F006-EPS-RE-0001
Report (Re-FEED Doc)
To become: Appendix 2 – TOR PGN-JK-F005=EOF-AS-0201 Jetty Assessment

2 x 14” Cryogenic Pipe to accommodate 4000 m /h LNG transfer.


3
Appendix 1 – TOR PGN-JK-F006-EPG-DG-0002
Piping Plan Layout For Line
Process Regasification
Terminal

Regas Terminal – Pipe Rack


2 Pipe Rack From: Appendix 2 – TOR PGN-JK-F005-ECV-DG-0215 Member Schedule, Plan and
Modification at Jetty-1 Elevation
Pipe rack foundation installed by relocating existing 16” crude pipe.
See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 0 Regas
Appendix 2 – TOR
Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2
PGN-JK-F005=EOF-AS-0201 Jetty Assessment

of 10
To become:
Pipe rack foundation installed by relocating existing 4” freshwater
pipe. Appendix 1 – TOR PGN-JK-F006-EPG-DG-0002
Piping Plan Layout For Line
Process Regasification
Terminal
See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 1 Regas
Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2
of 10
Appendix 1 – TOR PGN-JK-F006-EPL-BD-0001 Pipeline Design Basis
3 Gas Pipeline Route From:
Alignment Sheet Pipeline
Appendix 1 – TOR PGN-JK-F006-EPL-DG-0001
See Appendix 1 – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Cilacap

Pipeline Cilacap Rev.0 Pipeline Route Selection


Appendix 2 – TOR PGN-JK-F005-EPL-RE-0205
Report
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
Appendix 2 – TOR PGN-JK-F005-EPL-DG-0201 Pipeline Overall Field Layout
To become:
Appendix 2 – TOR PGN-JK-F005-EPL-DG-0203 Pipeline Route Drawing
See Attachment – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Pipeline Road Crossing
Appendix 2 – TOR PGN-JK-F005-EPL-DG-0205
Pipeline Cilacap Rev.1 Typical Details

Specification for Piping and


4 Gas Pipeline Wall From: Appendix 1 – TOR PGN-JK-F006-EPG-PS-0001
Pipeline Material Class
Thickness
Pipeline NPS 14, Grade X46, Wall Thickness 0.5” Appendix 1 – TOR PGN-JK-F006-EPL-BD-0001 Pipeline Design Basis

Pipeline Road Crossing


Appendix 1 – TOR PGN-JK-F006-EPL-RE-0001
Analysis

Pipeline Wall Thickness


To become: Appendix 1 – TOR PGN-JK-F006-EPL-CA-0001
Calculation

Pipeline NPS 14, Grade X46, Wall Thickness 0.375” Appendix 1 – TOR PGN-JK-F006-EPL-DS-0001 Data Sheet for Line Pipe

Alignment Sheet Pipeline


Appendix 1 – TOR PGN-JK-F006-EPL-DG-0001
Cilacap

Appendix 1 – TOR
5 Design Factor of From: PGN-JK-F006-EPL-BD-0001 Pipeline Design Basis

Pipeline Appendix 1 – TOR


Pipeline Road Crossing
Design Factor 0.3 PGN-JK-F006-EPL-RE-0001
Analysis

Pipeline Wall Thickness


To become: Appendix 1 – TOR PGN-JK-F006-EPL-CA-0001
Calculation

Design Factor 0.4 Appendix 1 – TOR PGN-JK-F006-EPL-DS-0001 Data Sheet for Line Pipe

Pipeline Road Crossing


6 Mill tolerance for line From: Appendix 1 – TOR PGN-JK-F006-EPL-RE-0001
Analysis
pipe
Mill tolerance ± 0.1 tselected Appendix 1 – TOR PGN-JK-F006-EPL-CA-0001
Pipeline Wall Thickness
Calculation

To become:
Appendix 1 – TOR PGN-JK-F006-EPL-DS-0001 Data Sheet for Line Pipe
Mill tolerance + 0.1 tselected; - 0.05 tselected
7 Instrumentation Data From:
Communication from
No instrument data communication from ICSS ORU to ICSS Marine Appendix 1 – TOR PGN-JK-F006-EIC-DG-0001
ICSS Architecture ORU &
ICSS ORU to ICSS ORF
Area 70.
Marine Area 70
See Appendix 1 – PGN-JK-F006-EIC-DG-0001 ICSS Architecture
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
ORU & ORF Rev 0, Sheet 3 & 4.
See Appendix 2 – PGN-JK-F005-ETL-PS-0201 Specification for
Interface and Exchange Data Rev 0.
To become:
Instrument data communication from ICSS ORU to ICSS Marine Area
70 is provided.
Specification for Interface and
Appendix 2 – TOR
See Attachment – PGN-JK-F006-EIC-DG-0001 ICSS Architecture PGN-JK-F005-ETL-PS-0201
Exchange Data

ORU & ORF Rev 1, Sheet 3 & 4.


See Attachment – PGN-JK-F005-ETL-PS-0201 Specification for
Interface and Exchange Data Rev. 1
8 Control Building From:
Layout
Utilizing Ground Floor and 1st Floor.
See Appendix 2 – PGN-JK-F005-ECV-DG-0206 ORF – Modification
Control Building Layout Rev. 0 ORF – Modification Control
Appendix 2 – TOR PGN-JK-F005-ECV-DG-0206
Building Layout
To become:
Utilizing Ground Floor only.
See Attachment – PGN-JK-F005-ECV-DG-0206 ORF – Modification
Control Building Layout Rev. 1
9 Single Line Diagram From:
See PGN-JK-F006-EEL-DG-0002 Single Line Diagram Rev. 0
Appendix 1 – TOR PGN-JK-F006-EEL-DG-0002 Single Line Diagram
To become:
See PGN-JK-F006-EEL-DG-0002 Single Line Diagram Rev. 1
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
10 Datasheet – Power From:
Generation Gas
See PGN-JK-F006-EEL-DS-0001 Datasheet – Power Generation Gas
Engine
Engine Generator Rev. 0 Datasheet– Power
Appendix 1 – TOR PGN-JK-F006-EEL-DS-0001 Generation Gas Engine
Generator
To become:
See PGN-JK-F006-EEL-DS-0001 Datasheet – Power Generation Gas
Engine Generator Rev. 1
11 Datasheet – Neutral From:
Grounding Resistor
None
To become:
Provided.
See PGN-JK-F006-EEL-DS-0003 Datasheet – Neutral Grounding
Resistor Rev. 0
12 Specification – From:
General Electrical
See PGN-JK-F006-EEL-PS-0002 Specification - General Electrical
Installation
Installation Rev. 0 Specification - General
Appendix 1 – TOR PGN-JK-F006-EEL-PS-0002
Electrical Installation
To become:
See PGN-JK-F006-EEL-PS-0002 Specification - General Electrical
Installation Rev. 1
13 ORF Cable Layout From:
None
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
To become:
Provided.
See Attachment – PGN-JK-F006-EEL-DG-0003 ORF Power and
Control Wiring Layout Rev 0.
14 Datasheet – Variable From:
Speed Drive (VSD)
None
To become:
Provided.
See Attachment – PGN-JK-F006-EEL-DS-0004 Datasheet – Variable
Speed Drive Rev 0.
15 Process Flow From:
Diagram
Unloading Hose Package Size:
• 2 x 16” (Liquid Hose)
• 1 x 12” (Vapor Hose)
See Appendix 1 – PGN-JK-F006-EPS-DG-0001 PFD LNG Storage &
Regasification System Rev 0. PFD LNG Storage &
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0001
Regasification System
To become:
Unloading Hose Package Size:
• 4 x 8” (Liquid Hose)
• 2 x 6” (Vapor Hose)
Capacity:
• Unloading Rate 4000 m3/h
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
• Vapor Return Rate 11500 m3/h
See Attachment – PGN-JK-F006-EPS-DG-0001 PFD LNG Storage &
Regasification System Rev 1.
16 Approved From:
Manufacturer List
None.
(AML) of Pertamina
RU IV To become: Appendix 1 – TOR PGN-JK-F006-PMN-LS-0001
Approved Manufacturer List
Regas Terminal, Pipeline, &
ORF
Provided for interfacing facility between PGN and Pertamina RU IV.
See Attachment – PGN-JK-F006-PMN-LS-0001 Rev. 1 Approved
Manufacturer List Regas Terminal, Pipeline, & ORF.
17 Power Generator From:
“Engineering Design for Dual Fuel Engine”
Refer to Terms of Reference (“TOR”) Proyek EPC Terminal Terms of Reference (“TOR”)
Regasifikasi LNG Cilacap, Doc No. PMO-LNG-F006-GEN-SW-0001 TOR PMO-LNG-F006-GEN-SW-0001 Proyek EPC Terminal
Regasifikasi LNG Cilacap
Rev.0, Page 26, Part 9. Electrical, poin j.
To become:
“Engineering Design for Gas Engine Generator.”
18 Back Up Power From: Appendix 1 – TOR PGN-JK-F006-EEL-BD-0001 Electrical Design Basis

Supply in ORU
Back up power supply in ORU is supplied by Emergency Diesel Appendix 1 – TOR PGN-JK-F006-EEL-LS-0001 Electrical Equipment List

Engine Generator.
Appendix 1 – TOR PGN-JK-F006-EEL-RE-0001 Electrical Load Analysis

Appendix 1 – TOR PGN-JK-F006-EEL-DG-0202 Single Line Diagram

Datasheet – Power
To become: Appendix 1 – TOR PGN-JK-F006-EEL-DS-0002 Generation Emergency Diesel
Generator (EDG)
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
Appendix 1 – TOR PGN-JK-F006-EEL-CA-0002 Cable Sizing
Back up power supply in ORU is supplied by RU IV and/or PLN.
Specification – Power
Appendix 2 – TOR PGN-JK-F005-EEL-PS-0202 Generation Emergency Diesel
Generator

Appendix 2 – TOR PGN-JK-F005-EEL-RE-0201 Power System Studies

19 Sea Water Piping From:


Material
Sea Water Piping shall use GRE material.
To become:
Specification for Piping and
Appendix 1 – TOR PGN-JK-F006-EPG-PS-0001
Contractor may propose using materials lower than GRE, such as Pipeline Material Class

GRV and GRP as long as they have sufficient allowable span, UV


resistance, and operating pressure and temperature range according
to with the Piping Class E01N. The brand and type of glass pipe
material proposed by Contractor shall be approved by PGN.
From:
Design Pressure of Flare KO Drum is 28.6 barg Appendix 1 – TOR PGN-JK-F006-EPG-DG-0022 ORU Vent Flare System

See Appendix 1 – PGN-JK-F006-EPS-DG-0022 Rev 0 ORU Vent


20 Flare KO Drum Flare System Sheet 2 of 2.
To become: Datasheet ORU HP Flare
Appendix 2 – TOR PGN-JK-F005-EMC-DS-0217
Stack
Design Pressure of Flare KO Drum is 18.6 barg.
From:
See Appendix 6 – PMO-LNG-F006-ECE-CE-0002 Rev.0 Bill of
Quantity
Appendix 6 – TOR PMO-LNG-F006-ECE-CE-0002 Bill of Quantity
21 Bill of Quantity
To become:
See Appendix 6 – PMO-LNG-F006-ECE-CE-0002 Rev.1 Bill of
Quantity
ATTACHMENT – AMENDED DOCUMENTS

Attachment of the Amended Documents can be accessed in the following link:

http://tiny.cc/AttachmentAmendment