2 x 16” Cryogenic Pipe to accommodate 4000 m3/h LNG transfer. Appendix 1 – TOR PGN-JK-F006-EPS-BD-0001 Process Design Basis
PFD LNG Storage &
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0001
Regasification System
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0005 PnID Jetty and Transfer Line
PnID ORU LNG Storage Tank
Appendix 1 – TOR PGN-JK-F006-EPS-DG-0006
System Stage 1
Line Sizing Calculation
Appendix 2 – TOR PGN-JK-F005-EPS-CA-0204
(FEED Doc.)
Process Simulation Study
Appendix 1 – TOR PGN-JK-F006-EPS-RE-0001
Report (Re-FEED Doc)
To become: Appendix 2 – TOR PGN-JK-F005=EOF-AS-0201 Jetty Assessment
of 10
To become:
Pipe rack foundation installed by relocating existing 4” freshwater
pipe. Appendix 1 – TOR PGN-JK-F006-EPG-DG-0002
Piping Plan Layout For Line
Process Regasification
Terminal
See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 1 Regas
Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2
of 10
Appendix 1 – TOR PGN-JK-F006-EPL-BD-0001 Pipeline Design Basis
3 Gas Pipeline Route From:
Alignment Sheet Pipeline
Appendix 1 – TOR PGN-JK-F006-EPL-DG-0001
See Appendix 1 – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Cilacap
Pipeline NPS 14, Grade X46, Wall Thickness 0.375” Appendix 1 – TOR PGN-JK-F006-EPL-DS-0001 Data Sheet for Line Pipe
Appendix 1 – TOR
5 Design Factor of From: PGN-JK-F006-EPL-BD-0001 Pipeline Design Basis
Design Factor 0.4 Appendix 1 – TOR PGN-JK-F006-EPL-DS-0001 Data Sheet for Line Pipe
To become:
Appendix 1 – TOR PGN-JK-F006-EPL-DS-0001 Data Sheet for Line Pipe
Mill tolerance + 0.1 tselected; - 0.05 tselected
7 Instrumentation Data From:
Communication from
No instrument data communication from ICSS ORU to ICSS Marine Appendix 1 – TOR PGN-JK-F006-EIC-DG-0001
ICSS Architecture ORU &
ICSS ORU to ICSS ORF
Area 70.
Marine Area 70
See Appendix 1 – PGN-JK-F006-EIC-DG-0001 ICSS Architecture
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
ORU & ORF Rev 0, Sheet 3 & 4.
See Appendix 2 – PGN-JK-F005-ETL-PS-0201 Specification for
Interface and Exchange Data Rev 0.
To become:
Instrument data communication from ICSS ORU to ICSS Marine Area
70 is provided.
Specification for Interface and
Appendix 2 – TOR
See Attachment – PGN-JK-F006-EIC-DG-0001 ICSS Architecture PGN-JK-F005-ETL-PS-0201
Exchange Data
Supply in ORU
Back up power supply in ORU is supplied by Emergency Diesel Appendix 1 – TOR PGN-JK-F006-EEL-LS-0001 Electrical Equipment List
Engine Generator.
Appendix 1 – TOR PGN-JK-F006-EEL-RE-0001 Electrical Load Analysis
Datasheet – Power
To become: Appendix 1 – TOR PGN-JK-F006-EEL-DS-0002 Generation Emergency Diesel
Generator (EDG)
AMENDMENT TO TERMS OF REFERENCE (“TOR”)
PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP
Document Impacted to be Considered by
No Item Amendment Bidders
Appendix 1 – TOR PGN-JK-F006-EEL-CA-0002 Cable Sizing
Back up power supply in ORU is supplied by RU IV and/or PLN.
Specification – Power
Appendix 2 – TOR PGN-JK-F005-EEL-PS-0202 Generation Emergency Diesel
Generator