Download as pdf
Download as pdf
You are on page 1of 8
LQ rh Al Dhabi Contracting SY gl pt ‘ALDHABI CONTRACTING Calculation Notes For Design of GRC Column Eps BALA = plan C3 iy ka gyal CLAS Ye TO ATEYVA 1 Gus TeAYEVEY : cia ‘Tel :20824278 - Fax :20824147 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt Al Dhabi Contracting gl 5 pte Table of Contents 1- Design Criteria 1.1- Introduction 1,2- Product Information and Installation Data 1,.3- Basic Performance Data 2-Load acti anchor 3: Design of anchor bolts 3.1- Anchor bolts Data 3.2- Check of forces 4- Loads acting on angle 80x80x100 5- Check of forces acting on angle 80x80x100 - Conclusiot inal Results Esp BAL plan Cae ye = ypu) GLE PY TAYE NVA: aS FOATENEY yl ‘Tel :20824278 - Fax :20824147 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt A rd Al Dhabi Contracting Pad oYgl a pt ‘ALDHABI CONTRACTING 1. Design Criteria 1.1-Introduction: This calculation note presents design of GRC Anchor structural elements including GRC installed on Concrete works. The GRC unit + frame galvanized angle 80x80x100 mm weight = 98 kg/m Each Panel frame unit = 2.65 m (260 Kg) Each Panel frame is fixed at six points Used Anchor bolt M10 x 120 Screw as showing at Fig. (1): io Thickness _ ih Teed cha rae ete tak ae We ope 1:0 Dp toch i 4 : ; | ange 4s wt mate ae Elevation Section (A-A) Section (B-B) Esp BAMA plan Chae ae = pgp GLAS PY HAVEN EV: GaSe Te ATENWA 2 Cilla ‘Tel :20824278 - Fax :20824147 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt Al Dhabi Contracting duct and Install susie aperowetersngle wen 1,3-Basic Performance Data: Loads, spacing and edge distance ter sngeancrin non-cacked concete C2025 vw | mez eran | Ramutio rise’? | mati tramamanset® | sacry | cdprastance | tices of] Mox tay weicee | ccenae | aaewsar | cows) | coman src pat moa vod | voy | ote | thet | sents | cnt | et] tuned 3 1 35 3 7, is, 1s, 13, = cy a5 as 2 Bez i 40, 100, = 10s. m2 m2, Pa 117, 10. 20 160 o arg mah wba eons oifaang ad pe Staes estan ar ety tc pe gpov td 3p yt on he acon = weeps p19 CSS Ua aus nce Dy a SS, EAE BMA w pills Cae te w ype) Ca Las Ye TOAYENVA 2 GaSe TeATENEY : dite Tel :20824278 - Fax :20824147 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt J ‘Anchor Syetimne Standard stud anchor HSV =f i te ¢ N S Jeecsae yews Re AEE BRU = pllen Clee cy po = sp ggell Lae KY VAY ENYA: cuSlbe TOAVEVEY 2 cite ‘Tel :20824278 - Fax :20824147-32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt A »-A Al Dhabi Contracting rad O 2-Load acting on threads wn well f the panels Each panel loads = 260 kg Each Panel = 2.65 m 2.2 Wind load Pe=CeXKxQ Ce= 0.8 (suction) K=1.00 Q=0.5 x 103x p x V2x Ci x Cs p =1.25 kg/ms V=36 m/sec (Sharm el-sheikh) Ci= 1.00 Cs~ 1.00 Q=0.5 x 102x 1.25 x (36)2x 1x1 =0.81 KN/m? Pe=0.8 x 1 x 0.81 =0.648 KN/m? Area of Panel = 2.65 x 0.65 m? Force/panel = 0.648 x 2.65 x 0.65 =1.11 KN 3.1 Anchor bolts Data clfpl 2 ptt Number of drop in anchor M10 with threaded rod/nut&washer for each panel = 6 anchors 3.2 Check of forces Shear load for acting on anchor = 260 /6 = 43.33 kg = 0.433 KN Normal force acting on each anchor = 1.11/6 = 0.185 KN £04 Balt «allan Cea hak = sydd LAE PY TAY EYVA 2 Sle THAYENEY 2 aisle ‘Tel :20824278 - Fax :20824147 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt Ard Al Dhabi Contracting SYgl so ptt 4- Loads acting on angle 86x80x100 The GRC unit + frame galvanized angle 80x80x100 mm weight = 98 kg/m Length of angle = 10cm Maximum load acting on angle 80x80x100 = W x spacing = 98 x 1.07 = 104.86 kg » Detail (1) Plan Detail (1) Elevation 5- Check of forces acting on angle 80x80x100 Shear force = 104.86 kg Shear Stress = Q/A = 104.86/0.8°8 =16.384*1073 = 0.0163 Ton/cm? EsPE BAMA pllan Cla asks = gyal CLE PY HAVEN EV: GaSe YO AYETVA 1 Cite ‘Tel :20824278 - Fax :208241 47 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt Al Dhabi Contracting Ng pT 4- Conclusion and Final Results Allowable shear for anchor bolt M 10 = 4.5 KN Shear load acting = 0.433 KN < 4.5 KN (Safe) Allowable normal for anchor bolt M 10 = 4.8 KN Shear load acting = 0.185 KN < 4.8 KN (Safe) Shear Stress acting on angle =0.0163 Ton/cm?< 0.84 Ton/cm? (Safe) Enh BAU = ple C3 chase = gpl Lae Ye YOAV ENYA 5 GaSlde POAT EV EY 2 lite ‘Tel :208 24278 - Fax :20824147 - 32 Al Obour Buildings - Salah Salem Road - Cairo - Egypt

You might also like