Date 13-Mar-2014

01 April 2021

MOCO BREAKING NEWS


DESCRIPTION Plan Actual Ach REMAIN COAL MINE COAL HAULING
PRODUKSI PRODUKSI
OVER BURDEN 1.203.839,77 8.961,00 0,7% 1.194.878,77 PROJECT BRE SHIFT
PLAN ACT
REMARK PROJECT SHIFT
PLAN ACT
REMARK

COAL GETTING 300.794,39 3.634,22 1,2% 297.160,17 BRE I 5.013,24 2.792,13 L BRE I 5.040,00 - L
COAL HAULING 302.400,00 3.982,50 1,3% 298.417,50 BRE II 5.013,24 842,09 L BRE II 5.040,00 3.982,50 L
STRIPING RATIO 4,00 2,47 62% CJ TOTAL 10.026,48 3.634,22
L TOTAL 10.080,00 3.982,50 L
19
SHIFT 1
Plan Actual OB /
Operator Exavator Plan Coal Getting Act Coal Getting HM WH OB WH CC Plan Prodty Prodty WH Prodty CC Distance Ach WH Remark
Overburden MD
HEX-1204 - 1.496,00 - 4,00 2,58 - 575,00 579,10 - 1.920,00 101% I15: 4,50, I16: 2,00
HEX-1203 - - - - - - 575,00 - - - 0% BD SCM PERGANTIAN PTO
ROHMAN HEX-1202 1.760,00 - 5,00 3,08 - 575,00 585,08 - 2.965,00 102% I15: 4,50, I16: 1,42
FRANS HEX-1201 1.313,00 - 4,00 3,17 - 575,00 331,26 - 3.279,00 58% I15: 4,00, I16: 2,08, TOP LOADING
DANI HEX-424 616,00 - 8,00 3,25 - 240,00 257,23 - - 107% I15: 2,00, GENERAL
- HEX-416 20.064,00 - 5.013,24 - 8,00 - - 240,00 - - - 0% GENERAL
IRUL HEX-433 - 1.020,13 6,00 - 3,50 240,00 - 291,47 8.257,00 121% I15: 3,33, LOADING COAL + GENERAL
MUSLIH HEX-432 - - 6,00 - - 240,00 - - - 0% GENERAL STOK COAL
SWIDI HEX-425 - 1.772,00 7,00 - 4,92 240,00 - 360,41 9.124,00 150% I15: 3,33, LOADING COAL + GENERAL
- EX-450 588,00 - 4,20 3,58 - 240,00 164,09 - 32,00 68% HML
- EX-444 532,00 - 2,80 2,33 - 240,00 228,00 - 18,00 95% HML
TOTAL ACHIEVMENT 20.064,00 6.305,00 5.013,24 2.792,13
18,00 8,42 350,28 749,11

SHIFT 2
Plan Actual OB /
Operator Exavator Plan Coal Getting Act Coal Getting HM WH WH CC Plan Prodty Prodty WH Prodty CC Distance Ach WH Remark
Overburden MD
HEX-1204 - 792,00 - 2,00 1,33 - 575,00 528,00 - - 92% I15: 6,25, I16: 4,92
HEX-1203 - 308,00 - 3,00 1,50 - 575,00 205,33 - - 36% I15: 1,00, I16: 0,5, FRONT LICIN
HEX-1202 - 572,00 - 2,00 1,33 - 575,00 396,00 - - 69% I15: 5,67, I16: 4,50
HEX-1201 - 176,00 - 1,00 0,33 - 575,00 528,00 - - 92% I15: 6,17, I16: 4,50
HEX-424 - - - - - - 240,00 - - - 0%
HEX-416 - 20.064,00 220,00 5.013,24 - 8,00 - - 240,00 - - - 0% GENERAL
HEX-433 - - - 11,00 - - 240,00 - - - 0% GENERAL
SUKAMTO HEX-432 - 430,84 3,00 - 1,50 240,00 - 287,23 - 120% I15: 4,00, I16: 4,25
PONIMAN HEX-425 - 411,25 5,00 - 4,43 240,00 - 92,76 - 39% GENERAL
- EX-450 350,00 - 2,00 1,83 - 240,00 190,91 - 80% HML
- EX-444 238,00 - 1,00 0,83 - 240,00 134,40 - 1.800,00 56% HML
TOTAL ACHIEVMENT 20.064,00 2.656,00 5.013,24 842,09 7,17 5,93 370,60 447,64

MONITORING START STOP HEX-1204 HEX-1203 HEX-1202 HEX-1201 HEX-424 HEX-416 HEX-433 HEX-432 HEX-425 HEX-450 HEX-444
SHIFT 1 START 14:40 0:00 14:00 14:35 14:30 0:00 13:35 9:50 9:50 14:06 15:00
STOP 17:24 0:00 17:40 0:00 17:25 0:00 17:30 0:00 17:30 18:00 17:55
SHIFT 2 START 18:25 0:00 18:28 19:30 0:00 19:00 0:00 0:00 18:45 18:15 19:00
STOP 19:45 0:00 19:45 19:45 0:00 20:00 0:00 0:00 5:20 20:00 20:00

Crusher Activity SHIFT I NAMA SHIFT II NAMA


Weather Condition
SHIFT 1 SHIFT 2
CRUSHER SECT HIGHWALL HENDRIK SECT HIGHWALL MIFTAKHUL MUNIR
Rain Slippery START STOP START STOP SECT LOWWALL BUDI SECT LOWWALL ONGKI
10,75 7,25 CR-002 13:15 17:30 19:07 05:48 GROUP LEADER OB GROUP LEADER OB SELAMET HEREYANTO
Inten(mm) Frek Rain GROUP LEADER COAL ZULFA GROUP LEADER COAL YOGA
- 4,00 GROUP LEADER DISPOSAL EMILIO GROUP LEADER DISPOSAL FARID WAJEDI

ccr® report PLAN UNIT SERVICE TODAY

NO EGI UNIT ESTIMASI RFU


SCHEDULE SERVICE

" We Can Do It " HEX-425 02/04/2021 ( 08:00 - 12:00 )


1 PS I
2 HDT-708 02/04/2021 ( 08:00 - 12:00 ) PS I
Hasan 3 HTL-009 02/04/2021 ( 08:00 - 10:00 )
PS II
validate by
Monitor & Control 4 HWT-008 02/04/2021 ( 08:00-08:00 )
SCH REPLACE REAR SEAL ENGINE
5

TOTAL HRS
NO EQ. NUM MAINTENANCE LOCATION COMPONENT PROBLEM START BD ESTIMASI RFU START RFU HM AGING DAY TOTAL MINUTES RESPONS TIME
B/D

1 HGD 201 WORKSHOP ATTACHMENT OLI TRANSMISI BOCOR 01/04/2021 10:45 25.325,00 20,76 -
2 HEX 1203 SEAM D ATTACHMENT OLI PTO BOCOR 02/04/2021 06:17 1,23 -
3

OPERATIONAL ISSUE
NO. PROBLEM TODAY CORRECTIVE ACTION PIC STATUS

1 PERLUNYA PEMADAMAN TERKAIT BATUBARA SEAM G YANG TERBAKAR MENUNGGU PENGATURAN SETTINGAN DARI ENGINEERING SHE-ENGINEERING OPEN

PROGRESS KPI PRODUKSI DIHARAPKAN DAPAT MENAMPILKAN INFO TERKAIT PROGRESS IKH, DEVIASI DARI PLAN, SERTA PRODUCTIVITY, DAN REVIEW START STOP DALAM
2 WAKTU DEKAT
PRODUKSI OPEN

3 DEBU BERLEBIH PADA AREA LW HINGGA VIEWPOINT DISEBABKAN WATERFILL TERENDAM READY MALAM HARI PROGRESS PERCEPATAN PERBAIKAN AREA WATERFILL PRODUKSI OPEN

GL PRODUKSI COAL GETTING DAN HML MENGINFOKAN KEPADA DRIVER DT TETAP MENGUTAMAKAN KESELAMATAN DAN PRIORITAS ALAT MUAT PRODUKSI-HML-
4 SHE MENGINFOKAN AGAR MEMPERHATIKAN JALAN MASUK HD, DT COAL GETTING, DAN DT HML DIKARENAKAN AKSES JALAN BERADA DEPAN FRONT HEX-1202
BESAR SHE
OPEN

WORK INSTRUCTION RENTAL REQUEST