RFQ # 6200014319
RFQ # 6200014319
RFQ # 6200014319
NOTE:-
- THE COVERING ENVELOPE MUST BE INSCRIBED WITH OUR RFQ NUMBER.
- IF OEM IS TAKING PART IN BID THROUGH ITS AUTHORIZED DEALER/ PARTNER, PLEASE ATTACH
AUTHORIZATION LETTER WITH YOUR QUOTE.
- WE DO NOT ENTERTAIN ANY COMMERCIAL / TECHNICAL UNSEALED QUOTATION.
- IN CASE YOU ARE NOT WILLING TO PARTICIPATE IN THE TENDER KINDLY SEND US YOUR FORMAL REGRET
LETTER VIA E-MAIL OR COURIER.
- ANY BID RECEIVED AFTER THE SUBMISSION DEADLINE SHALL NOT BE CONSIDERED FOR THE SUBJECT
BIDDING.
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes.
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Page : 1 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/67
(PRL#17110)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
30 50.00 PC
Tube 2'' x 9WG x 11'-10 15/16'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
40 50.00 PC
Tube 2'' x 9WG x 11' -3 1/4'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
50 50.00 PC
Page : 2 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
60 50.00 PC
Tube 2'' x 9WG x 10'- 5 1/4'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
70 50.00 PC
Tube 2'' x 9WG x 10'- 2 13/16'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
80 50.00 PC
Tube 2'' x 9WG x 10'- 0 15/16'' Long
Material = SA-192
Page : 3 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
100 50.00 PC
Tube 2'' x 9WG x 10'- 2 3/8'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
110 64.00 PC
Tube 2'' x 9WG x 10'- 5 1/4'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
Page : 4 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
130 41.00 PC
Tube 2'' x 9WG x 11'- 3 1/4'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
140 56.00 PC
Tube 2'' x 8WG x 11'- 7 13/16'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
Page : 5 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
160 3.00 PC
Tube 2'' x 8WG x 23'- 2 15/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/40
(PRL#17102)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
170 58.00 PC
Tube 2'' x 9WG x 23'- 1 1/8'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/39
(PRL#17101)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
180 3.00 PC
Tube 2'' x 8WG x 23'- 1 7/8'' Long
Material = SA-192
Page : 6 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
200 1.00 PC
Tube 2'' x 8WG x 11'- 9 7/16'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
210 1.00 PC
Tube 2'' x 8WG x 11'- 6 19/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
Page : 7 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
230 1.00 PC
Tube 2'' x 8WG x 11'- 2 3/4'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
240 1.00 PC
Tube 2'' x 8WG x 11'- 3 19/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
Page : 8 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
260 1.00 PC
Tube 2'' x 8WG x 12'- 2 1/16'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
270 1.00 PC
Tube 2'' x 8WG x 12'- 8 29/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
280 1.00 PC
Tube 2'' x 8WG x 13'- 6 5/32'' Long
Material = SA-192
Page : 9 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/43
(PRL#17105)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
300 1.00 PC
Tube 2'' x 8WG x 15'- 5 1/8'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
310 1.00 PC
Tube 2'' x 8WG x 16'- 7 31/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/44
Page : 10 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/45
(PRL#17107)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
330 1.00 PC
Tube 2'' x 8WG x 19'- 1 23/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/42
(PRL#17104)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
340 1.00 PC
Tube 2'' x 8WG x 20'- 8 5/32'' Long
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/46
(PRL#17108)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
Page : 11 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
Material = SA-192
MTC 3.1 will be required for material.
Conformance required to attached document
INSP-TR-2201U-Tubes
All tubes shall be as per drawing Sketch#10/13283/47
(PRL#17109)
Additionally 6'' length to be provided on both sides for site
adjustment.
Also mark TOP on appropriate end of all tubes.
For Items# 1 to 35, drawings to be prepared by
manufacturer & same to be approved by PRL before
bending.
360 10.00 PC
Boiler Tube 2" x 8WG x 6000mm Long
Material = SA-192
Conformance required to attached document
INSP-TR-2201U-Tubes
MTC 3.1 will be required for material.
370 50.00 PC
Boiler Tube 2" x 9WG x 6000mm Long
Material = SA-192
Conformance required to attached document
INSP-TR-2201U-Tubes
MTC 3.1 will be required for material.
380 4.00 PC
Boiler Tube 1-3/4'' x 9WG x 6000mm Long
Material = SA-192
Conformance required to attached document
INSP-TR-2201U-Tubes
MTC 3.1 will be required for material.
Page : 12 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
- BIDS RECEIVED FOR MORE THAN ONE LINE ITEMS MAY BE SPLIT THEREFORE THE QUOTES SHOULD BE
BALANCE WITH ALL RESPECTS.
PRL WILL ISSUE SEPARATE SERVICE PURCHASE ORDER FOR INSTALLATION, START-UP, COMMISSIONING.
- SUBMIT YOUR CFR BID BY THE DUE DATE & TIME MENTIONED BELOW:
- EARNEST MONEY 2% OF THE QUOTED VALUE TO BE SUBMITTED WITH COMMERCIAL OFFER IN THE FORM OF
PAY ORDER/DRAFT IN FAVOUR OF PAKISTAN REFINERY LIMITED COUNTER SIGNED BY PAKISTAN BANK IN
CASE OF FOREIGN BIDDER.
- SUBMIT A COMPREHENSIVE PROPOSAL / QUOTATION IN COMPLIANCE WITH THE RFQ, PURCHASE ORDER
TERMS AND CONDITIONS (LOCAL / FOREIGN) AND TERMS & CONDITIONS MENTION BELOW.
- BID MUST BE VALID FOR A PERIOD OF 90 DAYS FROM THE DATE OF SUBMISSION.
- INCOMPLETE INFORMATION IN THE BID MAY LEAD TO NON-COMPLIANT & REJECTION OF BID.
- COMPANY SHALL NOT BE LIABLE FOR ANY COSTS AND FOR EXPENSES INCURRED BY THE BIDDER IN THE
PREPARATION AND DELIVERY OF THEIR BID.
- INLAND CHARGES.
Page : 13 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
- DOCUMENTATION CHARGES.
- CERTIFICATE CHARGES.
- COUNTRY OF ORIGIN.
- PORT OF SHIPMENT.
- THIRD PARTY INSPECTION AGENCY SHALL BE HIRED BY PRL DIRECTLY. (IF REQUIRE)
- MTC 3.1 (MILL TEST CERTIFICATE) OR MSDS( MATERIAL SAFETY DATA SHEET) WHICHEVER IS APPLICABLE
WILL BE REQUIRED WITH ORDERED MATERIAL.
- MODE OF PAYMENT:
PAYMENT 100% L/C FOLLOWING WITH 90% ON SIGHT AGAINST PRESENTATION OF DOCUMENTS TO BANK AND
BALANCE 10% UPON INSPECTION AND ACCEPTANCE OF GOODS BY PRL.
'OR' PAYMENT AGAINST DOCUMENTS (CAD)
'OR' PAYMENT THROUGH T.T. AGAINST ORIGINAL SHIPPING DOCUMENTS DIRECTLY RECEIVED TO PRL
WITH-OUT INVOLVING BANK.
- ALL BANK CHARGES OUTSIDE PAKISTAN WILL BE ON BENEFICIARY'S ACCOUNT. IN CASE OF CONFIRMED LC,
CHARGES TO BE BORN BY BENEFICIARY.
Page : 14 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
- PERFORMANCE BOND: PERFORMANCE BOND / GUARANTEE 10% OF THE PURCHASE ORDER VALUE IS
REQUIRED WITHIN 20 DAYS AFTER ISSUANCE OF PURCHASE ORDER ISSUED BY A FIRST CLASS BANK
OPERATING IN PAKISTAN AS PER PRL DRAFT. THIS WILL SERVE TO GUARANTEE THAT THE MATERIAL IS
DELIVERED AS PER SCHEDULE OF REQUIREMENT AND THE PERFORMANCE OF THE EQUIPMENT ORDERED. THE
PERFORMANCE GUARANTEE MUST REMAIN VALID FOR AT LEAST 18 MONTHS AFTER THE DATE OF LAST
SHIPMENT OR 12 MONTHS AFTER THE COMMISSIONING OF THE EQUIPMENT WHICHEVER IS EARLIER.
- IF THE SHIPMENT IS MADE AFTER DUE DATE WHICH AFFECT FROM L/C ESTABLISHED, CHARGES 0.1% PER/DAY
TO THE MAXIMUM 10% OF THE TOTAL PURCHASE ORDER VALUE WILL BE DEDUCTED FROM THE
BENEFICIARY'S PAYMENT.
- FREE OF COST REPLACEMENT AGAINST FAULTY SUPPLIES/ OFF SPECIFICATION SUPPLY INCLUDING ALL
EXPENSES INCURRED IN THIS REGARD AGAINST PURCHASE ORDER.
- IN CASE OF FAULTY/OFF SPECIFICATION SUPPLY - FAULTY SUPPLIES WILL BE RETURN TO BIDDER AGAINST
BANK GUARANTEE WITH EQUIVALENT AMOUNT OF FAULTY EQUIPMENT / ITEMS, WHICH WILL BE PROVIDED
BY BENEFICIARY OR THEIR LOCAL AGENT THROUGH FIRST CLASS PAKISTANI BANK.
- CERTIFICATES REQUIRED ALONG WITH ORIGINAL SHIPPING DOCUMENTS, WARRANTY /GUARANTEE WILL
COVER THE FREE OF COST REPLACEMENT AGAINST FAULTY SUPPLIES/ OFF SPECIFICATION SUPPLY INCLUDING
ALL EXPENSES INCURRED IN THIS REGARD AGAINST PURCHASE ORDER.
- BENEFICIARY'S COMPLIANCE CERTIFICATE WILL REQUIRE ALONG WITH ORIGINAL SHIPPING DOCUMENTS.
Page : 15 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
- ACTUAL, GROSS WEIGHT AND DIMENSION MUST BE MENTIONED IN THE PACKING LIST AND B.L / AWB NO
DISCREPANCY SHOULD BE FOUND IN THE INFORMATION PROVIDED IN EACH DOCUMENT DURING PHYSICAL
EXAMINATION BY PAKISTAN CUSTOM AUTHORITIES. NON-COMPLIANCE TO THIS WILL BE LIABLE TO PENALTY
AS PER PAKISTAN CUSTOM RULES & REGULATION.
- NON-NEGOTIABLE SHIPPING DOCUMENTS CONSISTING OF TWO COPIES OF EACH DOCUMENT MUST BE SENT
TO APPLICANT DIRECTLY AFTER SHIPMENT AND A CERTIFICATE OF COMPLIANCE ALONG WITH COPY OF
COURIER RECEIPT TO THIS EFFECT TO ACCOMPANY WITH THE ORIGINAL DOCUMENTS.
- ONE SET OF INVOICE & PACKING LIST MUST BE SENT TOGETHER WITH CONSIGNMENT. NON-COMPLIANCE TO
THIS WILL BE LIABLE TO PENALTY AS PER PAKISTAN CUSTOM RULES & REGULATION.
- AS PER CUSTOM REGULATIONS ONE SET OF COMPLETE SHIPPING DOCUMENTS I.E. INVOICE & PACKING LIST
MUST BE SENT TOGETHER WITH THE CONSIGNMENT.
- CONSOLIDATED CARGO AND LCL CARGO: THE DOCUMENTS SHALL BE ATTACHED TO THE GOODS OR
PACKAGE AT AN OBVIOUS PLACE. EACH SUCH CONTAINER SHALL ALSO HAVE A CONSOLIDATED PACKING LIST
PERTAINING TO THE GOODS INSIDE IT PLACED ON THE INNER SIDE OF THE DOOR OF CONTAINER.
- IN CASE OF NON-COMPLIANCE PRL WILL BE LIABLE TO CHARGE USD: 50.00 AS IMPOSED BY CUSTOMS
AUTHORITIES.
- BREAK BULK OR BULK CARGO: THE DOCUMENTS WILL BE FURNISHED TO CUSTOMS BY THE CARRIER IN
ENTRY OF THE CONVEYANCE INTO CUSTOMS AREA.
- LETTER FROM PRINCIPAL OVER THEIR ORIGINAL LETTER HEAD CONFIRMING THAT SUPPLIER AS THEIR SOLE
AGENT, IN CASE PRINCIPAL IS NOT DIRECTLY QUOTING.
- DETAILED TECHNICAL DESCRIPTION OF THE OFFERED GOODS (TECHNICAL BROCHURES, DATA SHEETS /
MANUALS, ETC. WITH IMAGES OF THE GOODS SHOULD BE ACCOMPANIED WITH QUOTATION.
Page : 16 of 17
Request For Quotation
RFQ Number / Date
6200014319 / 12.11.2021
Foreign Purchase
- BIDDER TO PROVIDE COMPLETE 'SIGNED AND STAMPED' RFQ BY THE AUTHORIZED PERSON.
KINDLY SUBMIT YOUR TECHNICAL & COMMERCIAL OFFER AS PER FOLLOWING CONDITIONS:
SUBMISSION OF BID:
- THE ENVELOPE SHALL BE MARKED AS "FINANCIAL PROPOSAL" AND "TECHNICAL PROPOSAL" IN BOLD AND
LEGIBLE LETTERS TO AVOID CONFUSION.
- ANY BID RECEIVED BY THE COMPANY AFTER THE DEADLINE FOR SUBMISSION OF BIDS PRESCRIBED BY THE
COMPANY WILL BE REJECTED AND RETURNED UN-OPENED TO THE BIDDER AT HIS SOLE COST AND RISK. ALL
COSTS INCURRED BY BIDDERS IN PREPARATION AND SUBMISSION OF THEIR BIDS WILL REST WITH THE
BIDDERS AND WILL NOT BE REIMBURSED BY THE COMPANY.
- THE FINANCIAL & TECHNICAL BID PROPOSALS AS PER REQUIREMENTS GIVEN IN THIS DOCUMENT AND RFQ
MUST BE RECEIVED BY THE COMPANY AT THE SPECIFIED BELOW ADDRESS NOT LATER THAN AS PER BID
CLOSING DATE AND TIME MENTIONED.
MANAGER C&P
PAKISTAN REFINERY LIMITED
P.O. BOX # 4612, KORANGI CREEK ROAD, KARACHI - 74000. PAKISTAN.
TEL OFF: +92 21 35122131-40 (EXT: 216) DIRECT: +92 21 35092631
- PRL TERMS AND CONDITIONS WILL SUPERSEDE OVER BIDDER'S TERMS AND CONDITIONS.
- THE PRICES AGREED BY THE SUPPLIER AS STATED IN THE PURCHASE ORDER SHALL BE FINAL. NO VARIATION
/ CHANGE IN PRICE SHALL BE ALLOWED.
- IN CASE THE BIDDER IS UNABLE TO QUOTE FOR ANY REASONS, A REGRET LETTER MUST BE EMAILED BEFORE
THE BID SUBMISSION DATE.
Name: Designation:
Phone No:
Page : 17 of 17