PROFESSIONAL
SUMMARY
An electrical engineer with a
total of [8 years] of experience
in the United Arab Emirates,
including "5 years" in the
contracting field, °2 years* with
engineering consultancy, and
"one year" in facility
management
| have exceptional problem-
solving and troubleshooting
skills and am seeking a position
in which these skills can be
ulilized and enhanced for the
betterment of the company.
CONTACT
PHON!
971) 54738-8213,
UNKEDIN:
Inkecin.com/in/mahmoud-chid-
1b9b403135
EMAIL
Mahmouddlidi206@amailcom
Dii05I@gmailcom
Mahmoud Dridi
Hectrical Engineer
054-738-8213
WORK EXPERIENCE:
Blectrical Engineer Sep 2020 - present
Almas Malaki Technical Services LLC
Project: Facility management
> Duties & Responsibilities:
Estimating materials, labor, and costs for budget preparation.
The Head of Department receives reguar reports on activities and electrical
maintenance work.
¥ Leading a group of technicians for MEP maintenance work
¥ Take inventory of the necessary mateials and tools, and place orders
Scheduled the delivery date and updated all ofthe purchase orders.
Ensuring compliance wth specications, codes, or customer requirements
\¥ Case studies on accidents and near-misses in the work field, and making sure of labor
safy during facity maintenance.
¥ provide technical support for maintenance technician's
Undertake market research feasibly studies, preliminary or detailed designs (preparing,
ving, and assembling drawings, schematics, masterplans, design calculations and
reports, technical specifications) and work supervision
Assistant Electrical Project Engineer. Nov 2019-Mar 2020
United Masters Electromechanical LLC
Project: downtown views II [G + 8P +50 TYP +2 Roof].
+ Client: EMAAR
+ Consultant: AECOM,
+ Main Contractor: Al Basti d& Muktha LLC (ABM).
> Duties & Responsibilities:
\/ Prepare an electrical load schedule and schematic chagram,
Y Coordinating wit civil and mechanical work
‘Designing of LV Rooms, Electrical Rooms, load schedule voltage drop, and Single Line
Diagrams.
\/ Supervision of love current systems, such a fie alarm, vdeo intercom, telephone,
CCW, access control, public address, lighting contol, BY, ome automation earthing
and lighting protection et.
{Ree of architectural, structural, mechanical, and 1D drawings for preparing electrical
‘drawings and wall coordination drawings
Coordinate with suppliers and subcontractors related to the electrical work
“ Hancling the electrical requirements for machines and equipment suchas: chilled water
pumps, transfer pumps, booster pumps, FAHUS, fans, motorized dampers, ecEDUCATION
Bachelor's Degree in Electrical
Engineering (POWER). 2007-2012
Palestine Technical University - Kadoorie
Palestine-Tulkarm,
cumuiotive average “Good”
PERSONAL DETAILS
Jordanian
Jun 1989
Married
islam
UAE employment visa
UAE Driving License
LANGUAGE
Arabic
[Mother Language]
English
Speaking 65%
Ustening 75%
Whiting 70%
Reading 85%
whitespace architects
Project: 126 Villas in Dubai Hills Estate.
+ Client: EMAAR
+ Consultant: whitespace arc
+ Main Contractor: Parkway Intemational Contracting
> Duties & Responsibilities:
V Review all electrical shop drawings in compliance with tender drawings/IFC, local
authority requirements, and 800.
¥ Handling electrical inspection requests (R's).
\¥ Review all material submittals in compliance with project specifications, BOQ, local
authority, client requirements, and vendor list
Examine the statement method in relation to project specifications, local authority, HSE,
and tsk assessment
¥ Handling inspections of testing and commissioning forall electrical power systems
¥ Review all payment applications submitted by contractors.
¥ Coordination with mechanical and civil work i required.
‘Proposing value engineering and cost-savings measures tothe client.
Handling claims and variations raised by the contractor.
\ Provice weekly/monthly progress reports and review project time programs to notice
clients’ or contractors’ delays,
Review and follow up on RFs related to work & design raised by the contractor.
¥ Provide site quality observation reports and NCRs when requted
¥ Creating draft letters and responses to all technical and contractual letters from the
‘lien and contractor, and submitting them to RE for review.
¥ Controling the quality ofthe electrical work onsite.
¥ Reviewing manpower reports, procurement schedules, work progress reports,
‘engineeting logs, and presenting briefs tothe cient.
J Review of submited 2s-bult drawings.
¥ Preparing a snag lst tthe site for final handling over
Electrical Engineer. Feb 2013 - Jul 2017
Eagle Electromechanical Co. LLC
Project If: The Pad Tower - Business Bay ~ Dubai [3B+G+P+M+22 TYP].
rab Experts Engineering Consultants - AREX
+ Main Contractor: Modern Building
+ Client: Omni
Consultant: A
> Duties & Responsibilities:
V Make electrical power systems shop drawings in compliance with IFC/tender drawings,
tocal authority requirements, and 800.
Review all material submittals in compliance with project specifications, BOQ, local
authority, client requirements, and vendor list
V make a method of statement in compliance wth the project specifications, local
authority, HSE, and sk assessment.
\ Handing ll electrical testing and commissioning inspections like continu, insulation
‘earthing, ELCB/RCD, thermal imaging, etc
¥ Coordination with mechanical and civil work as required,
¥ make claims and variations
\ Provice weekly/monthly progress reports and review project time programs to notice
clients’ or contractors’ delays
Y Make RFs iit is required
¥ Reviewing manpower reports, procurement schedules, work progress reports,
‘engineeting logs, and presenting briefs tothe client.Project I: The Pad Tower - Business Bay — Dubai [3B+G+P+M+22 TYP].
+ Owner: Al FAHAD.
+ Consultant: Golden Square
‘+ Main Contractor: KELE Contracting
> Duties & Responsibilities:
Make Daly/weehy and monthly progress reports and work pans
Monitoring and supervising the site's work and progres.
“issuing MIR and R for steworks
°/ Follow up wth the store to provide all the required materials and tools without any
ety.
‘Testing and commissioning of the electrical work
Y Planning and Organizing of Materials and Manpower.
Mert fe a
ee) a «
Sefoware’s wrod Ea
epi a ™
SKILLS
DEW Regioion TT) 2%
DE Region ET) rx
Regulations — werressateyce (sx
FOUYSEAARegdatin TT} rox
cuentiy EOS ET) 0x
Rectal Pover Oesgn AT 75%
Rectal sep dovings TT) sx
Cost Estimation Ee «
Engineering sills terial Order a o.
Beectrcal Testing & Comm TT) 10%
Pring a
menage a
Lar Contr Ea «.