Professional Documents
Culture Documents
Rust-Oleum® Specialty Chalkboard Is An Ultra-Hard, Scratch Resistant
Rust-Oleum® Specialty Chalkboard Is An Ultra-Hard, Scratch Resistant
SURFACE PREPARATION
Remove all dirt, grease, oil, salt and chemical contaminants by washing the surface with a commercial
detergent, or other suitable cleaning method. Rinse with fresh water and allow to thoroughly dry.
Remove loose paint and rust with a wire brush or sandpaper. Lightly sand glossy surfaces.
PRIMING Use of a Rust-Oleum® latex primer provides superior adhesion and hiding and is especially
recommended for bare wood and metal, paperboard and hardboard. Apply Chalkboard paint 2 hours
after applying primer. After priming bare wood, sand lightly to smooth out the surface.
APPLICATION
Stir thoroughly. Thinning is not required. In hot, dry conditions, however, you may thin up to 2-oz. water
per quart to extend dry time. Use a good quality synthetic brush, 1/4”-3/8” nap roller or a foam roller
designed to give a smooth finish. Avoid excessive brushing or rolling. Use light, even strokes to ensure
an even flow and the smoothest finish.
Dry and recoat times are based on 77°F (25°C) – 50% relative humidity. Allow more time at cooler
temperatures. Dries to the touch in 30 minutes and to handle in 2 hours. Fully dry in 2-4 hours. May be
recoated after 4 hours.
After 3 days, the chalkboard finish is ready to use. Before writing, condition the surface by rubbing the
side of a piece of chalk over the entire surface and erase. This will leave a coat of chalk dust that will
provide the best erasability. Chalkboard can be wiped clean with a damp cloth. Wait 7 days after
painting before wiping it down. Repeat conditioning step after cleaning.
CLEAN-UP
Clean brush and other application tools immediately with soap and water.
Roseburg Particleboard
PREPARATION
Before installing or processing, allow panels to equalize to site moisture and temperature conditions. If
the underlayment has been exposed to high humidity levels prior to application, sep-arate panels with
dry spacers so that air can circulate and use furnace heat to dry. If subjected to high humidity conditions
after application, use furnace heat to dry before applying floor covering. Do not install before concrete,
plaster, and lumber are dried to approximate conditions that will be found in the structure during
occupancy.
INSTALLATION
Install Roseburg particleboard underlayment immediately prior to covering with finish floor materials.
Never apply Roseburg particleboard underlayment over concrete or below grade. Start laying panels
from a cor-ner of a room. Leave a 3/8” gap between underlayment and walls.Arrange panels so that four
panel corners do not meet at one point.
Butt all panel edges and ends to a light contact. DO NOT FORCE PANELS UP TIGHT.
Underlayment panels must be installed with certification stamps visible on the top side.
Offset underlayment panel joints and subfloor panel joints that are perpendicular to the joists by at least
2”. Offset underlayment joints from subfloor joints, parallel to the joists by a distance of at least one
joist.
When the subfloor is installed perpendicular to the joists, apply underlayment panels with edges over
the joists, and with the ends offset at least 2” from a subfloor joint. Use a minimum particleboard
thickness of 3/8”.
When the subfloor is installed at an angle to the joists, apply the underlayment panels perpendicular to
the joists with end joints parallel to and over a joist. Use a minimum panel thickness of 3/8”.
10200 Louvers and vents
10225 Door louvers
Inverted “Y” blade louver for 1-3/4″ thick doors – recommended for
schools, institutional, industrial and commercial buildings
2. Cut the hole in the door to correspond to the order size of the louver. Assure that the opening is
plumb and square.
3. Insert corridor side of louver into opening. Use setting blocks as necessary
5. Using screws provided, start screws in the pre-drilled holes, aligning with the holes in the other side of
the louver.
6. Verify that louver is correctly positioned on the door, then tighten the screws alternately in a criss-
cross pattern to avoid putting more pressure on one side than the other. Do not over tighten.
PACKAGING:
Applications:
Infill Panels: Stairways, Balconies, Railings
Privacy Screens
Artwork
INSTALLATION
Step 1 Remove (4)screws from door tracks, align bottom foldback hinge with door track.
Step 8 Slightly loosen screws and adjust hinges so that bifolds are level at center and tighten screws.
CONSTRUCTION
A. All covers will be fastened to a base plate by two chrome plated tamper-proof bolts. Cover shall be
one of the following:
Die-cast zinc alloy – One-piece, heavy-duty, rib-reinforced, lightweight, unbreakable, rustproof and all
exposed surfaces shall be bright chrome plated or finished with chip-proof, electrostatically applied
epoxy paint.
Special Image – Digital image applied to die-cast or stainless steel covers using patented Kolorfusion
Sublimation Decoration process.
B. Base plate shall be equipped with (3) 7/8" (22 mm) diameter holes, the bottom one is suitable for use
with surface conduit.
C. All internal parts shall be coated according to Underwriters' Laboratories, Inc. requirements.
E. Options
HEPA Filtration System: Removes 99.999% of viruses from the airstream2 . 1.1" Noise Reduction Nozzle:
Reduces the sound level by 9 decibels by significantly decreasing air deflection noise while only
increasing dry time by approximately 3 seconds
F. Accessories (optional)
Antimicrobial Wall Guards: 89W (Microban®White), 89B (MicrobanBlack), 89S (Brushed Stainless Steel)
XChanger Paper Towel Dispenser Retrofit Kit: 40575, 40576 (ADA Height) ADA-Compliant Recess Kit:
40502