SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2012) Rev 6 30-Apr-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Final Inspection of Intumescent Fireproofing Application SAIC-B-2010 30-Apr-13 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements:

Dry film thickness (provides two hour fire protection) & includes SAES-B-006,
A1
congested & hard to reach areas (as checked by the Inspector). Para 7.1

SAES-H-001
A2 Surface finish of Fireproofing coatings is uniform & acceptable.
Para 9.2.6.c

Curing of all coatings per Technical Data Sheet is complete. (Refer:


A3 SAES-H-101v
Saudi Aramco Data Sheets)

SAES-H-001
A4 Areas with defects were properly repaired & are acceptable.
Para 9.2.6

All tests (adhesion, cross-hatch, etc) & Random Sampling are completed SAES-B-006,
A5
& accepted Para 9.2.6.e

SAES-B-006,
A8 Caulking & sealant application & curing is clean & complete.
Para 8.1.4.1

Adhesion strength of coating systems met data sheet specs SAES-H-001


A9
Para 9.2.6.d

Non Conformance Reports related to application were resolved. SAES-H-001


A10
Para 10.2.6

Top flat surfaces of FP'd horizontal pipe supports were not FP'd with SAES-B-006,
A11
intumescent coatings to allow freedom of movement. Para 5.2.b

B Quality Control (Use also SATR-A-2011 for Punchlisting)

Final Acceptance Report is complete & includes 4 QC documents:


QC Equipment Check Sheet (Att SAES-H-001
B1
B), Daily Job Logs, In-process Inspection Sheets (Att C), Paints/Coatings Para 10.2
& Equipment Logs (Att D)
REMARKS:

REFERENCE DOCUMENTS:
1. SAES-B-006, Fireproofing for Plants, (20 November, 2011)
2. SAES-H-001, Coating Selection and Application Requirements for Idustrial Plants and Equipement (10 April, 2011)
3. SAES-H-102, Safety Requirements for Coating Applications (24 October, 2012)
4. API Publication 2218 - Fireproofing Practices in Petroleum & Petrochemical Processing Plants Latest Edition

ATTACHMENTS: N/A
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2012) Rev 6 30-Apr-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Final Inspection of Intumescent Fireproofing Application SAIC-B-2010 30-Apr-13 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2