Offer For FRP and Epoxy Coating 11-09-2021

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

QUOTE VRI/TL/FRP/QT/36

Issue Date: 11 / 09 / 2021


Valid Until: 11 / 10 / 2021
VEENA RUBBER INDUSTRIES Enquiry Number: Verbal

No 3, KRISHI Complex, Phase III, Behind Telephone Exchange, Place of Supply: CT (22)

Autonagar, Vijayawada, AD (37) 520007, IN


9866428323/9848125127
veenarubberindustries@yahoo.co.in
GSTIN: 37ABVPN1160A1ZR

Quote To Ship To
THERMAX INSTRUMENTATION LTD Thermax Instrumentation Ltd
Sai Chambers, 15, Mumbai - Pune Road, Wakdewadi,, Pune, MH NMDC Steel and Iron Plant, Nagarnar, Bastar, Jagdalpur, CT (22), IN
(27) 411003, IN
GSTIN: 27AACCT1032C1ZZ

Item Qty Price Taxable Value IGST Amount


S.No HSN/SAC
Description UoM (₹) (₹) (₹) (₹)

1 Application charges for FRP 9988 120.00 4,200.00 5,04,000.00 90,720.00 5,94,720.00
(resin coating) SQM 18%
Charges for the internal FRP lining of
storage tanks
with 3mm thk VINAYL ESTER RESIN.
2 Application charges for Epoxy 9988 100.00 1,400.00 1,40,000.00 25,200.00 1,65,200.00
coating SQM 18%
Supply and application charges coal
tar epoxy coating RO reject water
storage tanks.

220.00 Total @18% 6,44,000.00 1,15,920.00 7,59,920.00


SQM
Total Taxable Value ₹6,44,000.00
Total Tax Amount ₹1,15,920.00
Total Value (in figure) ₹7,59,920
Total Value (in words) ₹ Seven Lakh Fifty-nine Thousand Nine Hundred
Twenty Only

Terms & Conditions

Delivery Period: Within 45 days from the date of commencement of work for ACID/ALKALI
storage tanks (FRP work)
Within 15 days from the date of commencement of work RO Reject water tank work.
For Veena Rubber Industries
Payment: 100% within 20 days of completion of work.
Delivery : NMDC, Nagarnar, Bastar Dist, Chhattisgarh
ANNEXURE - I

SCOPE OF WORK : VEENA RUBBER INDUSTRIES

1. Supply and Application of 3mm thick FRP lining (resin coating) in the internal surface of the already
exisiting FRP storage tanks.
2. Resin used for lining shall be VINYLESTER RESIN.
3. Only the bottom half of the tank shall be resin coated (FRP lined) with 3mm thk FRP coating.
4. All the required material like Resin, Mesh, all tools and tackles etc shall be in our scope.
5. Internal scaff holding erection shall be done at our cost.
6. All the man power deputed to the work shall be covered for ESI and PF or grouped WC policy
7. All the required PPE like helmets, masks, etc shall be arranged by us
(Breathing Air Apparatus if required shall be arranged by Thermax).

SCOPE OF WORK : Thermax Instrumentation Ltd

1. The tanks should be dry and free from moisture.


2. Compressed air through air hoses should be provided internally to the tanks so that there is
proper air circulation for workmen to carry out the work.
3. As there is only one manhole an exhaust fan cannot be used for the tank hence compressed
air through hoses is mandatory.
4. Required power, drinking water should arranged nearest to the tank.
5. Gate passes and other permits to be provided.