This document outlines standards, procedures, rules and discipline for PT Pamapapersada Nusantara. It details that:
1) The Head Office Safety Department is responsible for compiling, revising, and distributing safety standards and procedures based on a standard format that complies with ISO requirements.
2) Job sites must implement the standards and procedures issued by Head Office and are not allowed to create their own.
3) Project managers must create any necessary site-specific safety rules for areas not covered by company-wide policies, and have them approved and signed.
This document outlines standards, procedures, rules and discipline for PT Pamapapersada Nusantara. It details that:
1) The Head Office Safety Department is responsible for compiling, revising, and distributing safety standards and procedures based on a standard format that complies with ISO requirements.
2) Job sites must implement the standards and procedures issued by Head Office and are not allowed to create their own.
3) Project managers must create any necessary site-specific safety rules for areas not covered by company-wide policies, and have them approved and signed.
This document outlines standards, procedures, rules and discipline for PT Pamapapersada Nusantara. It details that:
1) The Head Office Safety Department is responsible for compiling, revising, and distributing safety standards and procedures based on a standard format that complies with ISO requirements.
2) Job sites must implement the standards and procedures issued by Head Office and are not allowed to create their own.
3) Project managers must create any necessary site-specific safety rules for areas not covered by company-wide policies, and have them approved and signed.
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE
DONE? IT BE DONE? FOR DOING IT ? 6.1 -- STANDARDS, PROCEDURES AND RULES 6.1.1 There should be Safety Standards in The Element Standards File will be Initially / Ongoing Head Office Safety Department place, covering all Elements of the compiled, revised and updated by the Project Managers PSMS. These Standards should be Head Office Safety Department. Job Sites Heads of Departments treated as ‘Minimum Standards’ and will receive new / revised Standards and Job Site Safety Department should be implemented on all Job will implement them. Sites. 6.1.2 A standard format, that takes The standard format will be used when Initially / Ongoing Head Office Safety Department cognizance of ISO documentation compiling all ‘Safety Standards’. The requirements, should be used for all standard format will take cognizance of ‘Safety Standards’. ISO documentation requirements. 6.1.3 All Safety Standards should be All Safety Standards will be compiled, Initially / Ongoing Head Office Safety Department compiled / controlled by the Head controlled and distributed by the Head Office Safety Department and Office Safety Department. approved by the Director All Safety Standards will initially be Initially Director Operations Operations. approved by the Director Operations. 6.1.4 All Safety Standards should be Safety Standards will be revised as / when Ongoing S, H & E Board Meeting revised at regular intervals. All required. All subsequent revisions of Head Office Safety Department Revisions should be discussed and Safety Standards will be discussed and approved by the S, H & E Board approved by the S, H & E Board meeting. meeting. PT PAMAPERSADA NUSANTARA 2
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE
DONE? IT BE DONE? FOR DOING IT ? 6.1 -- STANDARDS, PROCEDURES AND RULES -- Continued -- 6.1.5 There should be Safety Procedures The Critical Task Inventory will be Initially / Ongoing Head Office Safety Department in place, covering all Tasks compiled, revised and updated by the Head Project Managers performed within the company. Office Safety Department. Job Sites will Heads of Departments These Procedures should be treated receive new / revised ‘Task Specific Job Site Safety Department as ‘Minimum Standards’ and should Procedures’ and will implement them. be implemented on all Job Sites. 6.1.6 A standard format, that takes The standard format will be used when Initially / Ongoing Head Office Safety Department cognizance of ISO documentation compiling all ‘Task Specific Procedures’. requirements, should be used for all The standard format will take cognizance ‘Safety Procedures’. of ISO documentation requirements. 6.1.7 All Safety Procedures should be All ‘Task Specific Procedures’ will be Initially / Ongoing Head Office Safety Department compiled / controlled by the Head compiled, controlled and distributed by the Job Site Safety Department Office Safety Department and Head Office Safety Department. approved by the Director Operations. 6.1.8 All Safety Procedures should be ‘Task Specific Procedures’ will be revised Ongoing Head Office Safety Department revised at regular intervals. as / when required, especially after serious incidents. PT PAMAPERSADA NUSANTARA 3
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE
DONE? IT BE DONE? FOR DOING IT ? 6.1 -- STANDARDS, PROCEDURES AND RULES -- Continued -- 6.1.9 All ‘rules’ that are applicable to the Copies of all ‘site rules’ must be Ongoing Project Managers entire company should be published submitted to the Head Office Safety Operations Managers as Company Standards and / or Department. ‘Site rules’ that are Director Operations Procedures. applicable to all Job Sites will be Head Office Safety Department published as Standards or TSP’s, approved and distributed to all Job Sites. There will therefor not be any specific, company wide ‘Safety Rules’, only Standards and Task Specific Procedures’. 6.1.10 All employees must be familiarised There must be a formal Procedure in Initially / Ongoing Operations Managers with all ‘Existing’, all ‘New’ as well place to ensure that all employees are Project Managers as all ‘Revised’ Standards, familiarised with all ‘Existing’, all ‘New’ Heads of Departments Procedures and Rules. as well as all ‘Revised’ Standards, Front Line Supervisors Procedures and Rules. Employees must All Employees sign to acknowledge that information has been discussed with them. 6.2 -- GENERAL SITE STANDARDS, PROCEDURES AND RULES 6.2.1 All Job Sites in the company should Job Sites will receive new / revised Initially / Ongoing Operations Managers implement and adhere to the Safety Safety Standards and will implement Project Managers Standards issued by Head Office. them. Heads of Departments Job Sites will not compile their own ‘Site Initially / Ongoing Job Site Safety Department Specific’ Safety Standards. PT PAMAPERSADA NUSANTARA 4
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE WHAT SHOULD BE HOW IS IT TO BE WHEN SHOULD WHO IS RESPONSIBLE DONE? DONE? IT BE DONE? FOR DOING IT ? 6.2 -- GENERAL SITE STANDARDS, PROCEDURES AND RULES -- Continued -- 6.2.2 All Job Sites in the company should Job Sites will receive new / revised ‘Task Initially / Ongoing Operations Managers implement and adhere to the Safety Specific Procedures’ and will implement Project Managers Procedures issued by Head Office. them. Heads of Departments Job Sites will not compile their own ‘Site Initially / Ongoing Job Site Safety Department Specific’ Task Specific Procedures. 6.2.3 Project Managers should ensure that For all areas / items / events that are not Ongoing Operations Managers there are ‘Site Specific Safety Rules’ covered by the company wide Safety Project Managers in place for all areas / items / events Standards and Procedures, the Project Heads of Departments that are not specifically covered by Manager will ensure that ‘Site Specific Front Line Supervisors the company wide Safety Standards Safety Rules’, or ‘Standard Operating and Procedures. Procedures’ are in place. 6.2.4 All Site Specific Safety Rules should All Site Specific Safety Rules will be Ongoing Project Managers be approved and signed by the signed by the Project Manager and Job Site Safety Departments Project Manager and distributed to all distributed to all concerned on the Job concerned. Site. One copy must also be sent to the Head Ongoing Project Managers 6.2.5 Office Safety Department. Job Site Safety Departments All employees must be familiarised There must be a formal Procedure in Initially / Ongoing Operations Managers with all ‘Existing’, all ‘New’ as well place to ensure that all employees are Project Managers as all ‘Revised’ Site Specific familiarised with all ‘Existing’, all ‘New’ Heads of Departments Procedures and Rules. as well as all ‘Revised’ Site Procedures Front Line Supervisors and Rules. Employees must sign as proof All Employees of familiarisation. PT PAMAPERSADA NUSANTARA 5
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE WHEN SHOULD WHO IS RESPONSIBLE
DONE? DONE? IT BE DONE? FOR DOING IT ? 6.3 -- PERMITS TO WORK (JOB CARDS) AND DANGER (TAG-OUT) CARDS 6.3.1 A survey should be undertaken at A survey must be conducted in each Initially / Ongoing Project Managers each Job Site, to identify all areas Department to identify all areas, items Heads of Departments where ‘Permits to Work’ (Job and situations that require a ‘Permit to Front Line Supervisors Cards) are required. Work’ The ‘HIRA Process’ must be used. 6.3.2 A written Standard, Procedure and / A detailed procedure must be compiled to Initially / Ongoing Project Managers or Rule should be in place to cover control each of the above identified Heads of Departments each of the areas identified in 6.3.1. areas / items / situations. Front Line Supervisors 6.3.3 A survey should be undertaken to A survey must be conducted in each Initially / Ongoing Project Managers identify all areas ‘Danger Cards’ Department to identify all areas, items Heads of Departments (Tag-Out Cards) are required. and situations that require ‘Danger Tags’. Front Line Supervisors 6.3.4 A written Standard, Procedure and / A detailed procedure must be compiled to Initially / Ongoing Project Managers or Rule should be in place to cover control each of the above identified Heads of Departments each of the areas identified in 6.3.3. areas / items / situations. Front Line Supervisors 6.3.5 All Supervisors and Employees All Supervisors and Employees affected Initially / Ongoing Project Managers affected by the Standards, Procedures by the Standards / Rules covered in 6.3.2 Heads of Departments and / or Rules (detailed in 6.3.2 and as well as 6.3.4 above must receive ‘Task Front Line Supervisors 6.3.4 above ) should receive training Specific Training’ on compliance to the All Employees on compliance to the System. System. PT PAMAPERSADA NUSANTARA 6
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE
DONE? IT BE DONE? FOR DOING IT ? 6.3 -- PERMITS TO WORK (JOB CARDS) AND DANGER (TAG-OUT) CARDS -- Continued -- 6.3.6 All ‘Permits to Work’ and ‘Danger The Standards, Procedures or Rules in this Initially / Ongoing Project Managers Tags’ should be signed by the person regard will include the condition that:- Heads of Departments directly responsible for doing the job 1. The personal details of the person who Section Heads and may only be removed by that is directly responsible for doing the task Affected Employees person. must appear on the ‘Permit / Tag’, 2. The person who is directly responsible for doing the task must sign the ‘Permit / Tag’, and 3. Only the person who’s details are on the ‘Permit / Tag’ may sign it off or remove it (unless in the case of an emergency, then the Section Head can remove it following a specific and detailed emergency procedure. The Supervisor must complete a ‘Removal of Danger Tag Form’. 6.4 -- LOCK – OUT SYSTEM AND USAGE 6.4.1 A survey should be undertaken at A survey must be conducted in each Initially / Ongoing Project Managers each Job Site, to identify all areas Department to identify all areas, items and Heads of Departments where a ‘Lock-Out’ procedure is situations that require a ‘Lock-Out’ Section Heads required. The survey should cover all procedure to be in place. All sources of sources of Energy. Energy must be accounted for. PT PAMAPERSADA NUSANTARA 7
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE
DONE? IT BE DONE? FOR DOING IT ? 6.4 -- LOCK – OUT SYSTEM AND USAGE -- Continued -- 6.4.2 A written Standard, Procedure and / A detailed procedure must be compiled to Initially / Ongoing Project Managers or Rule should be in place to cover control each of the identified areas / items Heads of Departments each identified area. The Standard / / situations. The Standard / Procedure / Section Heads Procedure / Rule should include a Rule must include a step to ensure that all All Affected Employees step to ensure that equipment is at equipment is at zero potential, before zero potential, before work may work may commence. commence. 6.4.3 All Locks, Keys and Lock-Out All ‘Lock-Out Devices’ will be labeled Initially / Ongoing Project Managers Devices should be labeled and and controlled as per the prescribed Heads of Departments controlled. standard (SHE/99/06.03/STD). Section Heads 6.4.4 All Supervisors and Employees All Supervisors and Employees affected Initially / Ongoing Project Managers affected by the Standards, Procedures by the Standards / Rules covered in 6.4.3 Heads of Departments and / or Rules (detailed in 6.4.3 above must receive ‘Task Specific Section Heads above ) should receive training on Training’ on compliance to the System. All Affected Employees compliance to the System. 6.4.5 All equipment that needs to be All equipment that needs to be locked-out Initially / Ongoing Project Managers locked-out should be provided with will be provided with the necessary Heads of Departments lock-out facilities. facilities to enable compliance. Section Heads PT PAMAPERSADA NUSANTARA 8
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE
WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE
DONE? IT BE DONE? FOR DOING IT ? 6.4 -- LOCK – OUT SYSTEM AND USAGE -- Continued -- 6.4.6 ‘Lock-Out Devices’ should be The Standards, Procedures or Rules in Initially / Ongoing Project Managers handled only by the person directly this regard will include the condition Heads of Departments responsible for doing the job and may that:- Section Heads only be removed by that person. 1. The personal details of the person Affected Employees who is directly responsible for doing the task must appear on a ‘Permit / Tag’ that is attached to the ‘Lock-Out Device’, 2. The person who is directly responsible for doing the task must sign the ‘Permit / Tag’, and 3. Only the person who’s details are on the ‘Permit / Tag’ may remove the ‘Lock-Out Device’ (unless in the case of an emergency, then the Section Head can remove it following a specific and detailed emergency procedure. The Supervisor must then complete a ‘Removal of Lock-Out Device Form’. PT PAMAPERSADA NUSANTARA 9
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE DONE? IT BE DONE? FOR DOING IT ? 6.5 -- REVIEW OF ALL STANDARDS, PROCEDURES AND RULES 6.5.1 Safety Standards, Procedures and / or All the Safety Standards, Procedures Ongoing Project Managers Rules should be reviewed:- and / or Rules will be formally reviewed Heads of Departments 1. Whenever a serious incident as per the laid down standard. This will Section Heads occurs the appropriate Standards, include:- Front Line Supervisors Procedures and / or Rules should 1. Whenever a serious incident occurs Safety Departments be reviewed, the appropriate Standards, Procedures Head Office Safety Department 2. Whenever a new method is and / or Rules will be reviewed, introduced or if an existing 2. Whenever a new method is method is changed the introduced or if an existing method is appropriate Standards, Procedures changed the appropriate Standards, and / or Rules should be Procedures and / or Rules will be reviewed, and reviewed, and 3. All the Standards, Procedures and 3. All the Standards, Procedures and / or / or Rules not reviewed as per 1 Rules not reviewed as per 1 and 2 and 2 above should be reviewed above will be reviewed on a bi-annual on a bi-annual basis. basis. 6.5.2 Proper records should be kept of all Proper records will be kept of all Ongoing Head Office Safety Department Safety Standards, Procedures and / or reviewed Safety Standards, Procedures Job Site Safety Department Rules that have been reviewed. and / or Rules. Revisions will be numbered in accordance with ISO requirements as per the required standard. PT PAMAPERSADA NUSANTARA 10
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE DONE? IT BE DONE? FOR DOING IT ? 6.5 -- REVIEW OF ALL STANDARDS, PROCEDURES AND RULES --Continued -- 6.5.3 All employees should receive When new or revised Safety Standards, Ongoing / Continuous Project Managers information about and / or training on Procedures and / or Rules are distributed Heads of Departments all reviewed / revised Safety to Job Sites, all employees must be Section Heads Standards, Procedures and / or Rules. familiarised with the information in a Front Line Supervisors controlled manner. All Employees 6.5.4 The information / training sessions Familiarisation sessions must be enforced Ongoing / Continuous Heads of Departments should include tests (oral or in by follow-up sessions which include oral Section Heads writing). or written tests. Front Line Supervisors 6.5.5 Proper records should be kept, by Proper records must be kept, by each Job Ongoing / Continuous Heads of Departments each Job Site, of all review sessions Site, of all review sessions. Each Section Heads and employees should sign to employee should sign to acknowledge Front Line Supervisors acknowledge receipt. receipt of the information. All Employees 6.6 -- COMPLIANCE TO STANDARDS, PROCEDURES AND RULES 6.6.1 There should be a System in place to All Employees, but especially the Ongoing / Continuous Project Managers ensure that Safety Standards, Members of Line Management, are Heads of Departments Procedures and / or Rules are responsible to ensure that all Safety Section Heads complied with. Standards, Procedures and / or Rules are Front Line Supervisors complied to on an ongoing basis. (One All Employees way of doing this is by doing Task Observations). PT PAMAPERSADA NUSANTARA 11
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE DONE? IT BE DONE? FOR DOING IT ? 6.7 -- DISCIPLINARY PROCEDURE 6.7.1 There should be a System in place to The Disciplinary Procedure / Code, that Ongoing / Continuous Project Managers deal with employees who contravene forms part of the existing ‘Joint Labour Heads of Departments Safety Standards, Procedures and / or Agreement’ (KKB), must be followed by Section Heads Rules. The system should be all Line Managers when disciplining Front Line Supervisors discussed with and accepted by employees who contravene Safety employee representatives. Standards, Procedures and / or Rules. 6.7.2 Detailed records should be kept of all Detailed records must be kept of all Ongoing / Continuous Project Managers disciplinary cases related to 6.6.1 disciplinary cases related to 6.6.1 above. Heads of Departments above. “ In complying with the Company’s Section Heads ‘Mission / Vision’ Safety should not be Front Line Supervisors compromised”. 6.8 -- SIGNS, COLOUR CODING, NOTICES, LABELLING AND DEMARCATION 6.8.1 A survey should be conducted of all Each Job Site must conduct a survey of Initially / Ongoing Project Managers facilities to determine where all facilities to determine where Heads of Departments appropriate ‘Symbolic Safety Signs’, appropriate ‘Symbolic Safety Signs’, Safety Departments ‘Colour Coding’, ‘Notices’, ‘Colour Coding’, ‘Notices’, ‘Labeling’ ‘Labeling’ and ‘Demarcation’ is and ‘Demarcation’ is required. The required. ‘HIRA Process’ must be used. PT PAMAPERSADA NUSANTARA 12
PSMS PROCEDURES MANUAL
ELEMENT: 6 - STANDARDS, PROCEDURES, RULES AND DISCIPLINE WHAT SHOULD BE HOW IS IT TO BE DONE? WHEN SHOULD WHO IS RESPONSIBLE DONE? IT BE DONE? FOR DOING IT ? 6.8 -- SIGNS, COLOUR CODING, NOTICES, LABELLING AND DEMARCATION -- Continued -- 6.8.2 A Standard, uniform system of The Company Safety Standard number; Initially / Ongoing Project Managers ‘Colour Coding’ and ‘Demarcation’ ‘SHE/99/06.04/STD’ must be applied on Heads of Departments should be applied throughout. all Job Sites. Section Heads 6.8.3 Where Colour Coding and A ‘Colour Code Key Board’ as described Initially / Ongoing Project Managers Demarcation is applied, a ‘Colour in Company Safety Standard number; Heads of Departments Code Key Board’ should be ‘SHE/99/06.04/STD’ must be displayed Section Heads displayed. at strategic points. 6.8.4 A Standard, uniform system of The Company Safety Standard number; Initially / Ongoing Project Managers ‘Symbolic Safety Signs’, ‘Notices’ ‘SHE/99/06.04/STD’ must be applied on Heads of Departments and ‘Labeling’ should be applied all Job Sites. Section Heads throughout. 6.8.5 All employees should be familiar All employees must be familiarised with Initially / Ongoing Project Managers with the Colour Coding, the Colour Coding, Demarcation, Heads of Departments Demarcation, Symbolic Safety Signs, Symbolic Safety Signs, Notices and Section Heads Notices and Labeling Standards. Labeling Standards. 6.8.6 All Notices, Signs, Labeling, Colour All Notices, Signs, Labeling, Colour Initially / Ongoing Project Managers Coding and Demarcation should be Coding and Demarcation must be Heads of Departments maintained in a good legible maintained in a good legible condition. Section Heads condition. Safety Department 13