Construction Notes: Table of Lap Splice & Anchorage Length
Construction Notes: Table of Lap Splice & Anchorage Length
1
CONSTRUCTION NOTES TO BE CONTINUOUS
(TOP & BOT. BARS)
(MIN.) (MIN.)
TOP BARS @
TOP BARS @ RIGHT SUPPORT
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED. LEFT SUPPORT
MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. L1/4 WEB BARS L1/4 L2/4
50 AS SPECIFIED 50 50
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL, MISCELLANEOUS IRON, TOP BARS @
PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEER'S APPROVAL BEFORE FABRICATION. WHERE JOINT IS AT POINT OF STRESS, PROVIDE MID SPAN RC. COLUMN
SHEAR RODS SUBJECT TO STRUCTURAL
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, CHECK WITH MECHANICAL AND ENGINEER'S APPROVAL/RECOMMENDATIONS
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 (PNS 49) GRADE 40 FOR DIA. 12 AND SMALLER BARS
AND GRADE 60 FOR DIA. 16 AND LARGER BARS.
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING REINFORCED L/4 L/4 L/4
CONCRETE STRUCTURES SHALL BE ADHERED TO, UNLESS OTHERWISE SHOWN OR NOTED. TOP BARS
LONG SPAN
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: DISCONT. END
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN ACCORDANCE WITH TABLE 1 (MIN.) (MIN.)
(TABLE OF LAP SPLICE AND ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL
BE STAGGERED WHENEVER POSSIBLE.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED AND SECURED IN PLACE
PRIOR TO PLACING OF CONCRETE.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENTS, AND
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS. BOTTOM BARS BOTTOM BARS
BOTTOM BARS SHORT SPAN LONG SPAN
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS IMMEDIATELY AFTER SHORT SPAN L/5 CONT. L/5 MID
POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED METHODS.
D = FOR BEAM
10.STRIPPING OF FORMS AND SHORES: t = FOR SLAB
BOTTOM BARS
30 BAR DIA. TOP BARS
FOUNDATION ....................................................................................................... 24 HRS. LONG SPAN
(MIN.) LONG SPAN
SUSPENDED SLAB EXCEPT WHEN CONT.
CONT. END
ADDITIONAL LOADS ARE IMPOSED ...........................................................
WALLS ...................................................................................................................
BEAMS ....................................................................................................................
8 DAYS
18 HRS.
14 DAYS 5
BEAM/SLAB CHANGE
SCALE: NTS
TOP BARS
L1/5 L1/5 L2/5 BOT. BARS CONT. L2/5
BOT. BARS MID
BEAM BEAM TOP BARS TOP BARS BEAM
TOP BARS
7
TYPICAL SECTION SLAB DETAIL
SCALE: NTS
STRUCTURAL ENGINEER: PROJECT TITLE : OWNER: SHEET CONTENTS: IND REVISION NOTES DATE SHEET NO.:
PTR NO.:
0042692
5781044
DATE:
PLACE:
01.07.19
TARLAC CITY
LOT AREA: 233.04 SQM
DRAWN BY:
FLOOR AREA:
CHECKED BY:
523.53 SQM
JECO
APPROVED BY/CLIENT:
-
41