MPMcatalogo Tecnico2020

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 81

TECHNICAL N EW

DATA SHEETS COLD LIN


E

PLASTIC PROTECTIONS
AND SAFETY BARRIERS

high shock
absorption

modular
design

adaptable
height

easy
installation

JAN UARY 2020


CONTENTS
DATA SHEETS / ASSEMBLY INSTRUCTIONS

04 08
COLD LINE REMOVABLE SAFETY BARRIERS
ROD PE 70 37 REMOVABLE SAFETY BARRIERS 90 118
ROD PE 120 40 REMOVABLE SAFETY BARRIERS 150 120
ROD FLOOR 70 43
ROD FLOOR 120 48 09
COLUMN PROTECTION
05
PEDASTRIAN AND SAFETY BARRIERS
01 COPRO 90
COPRO 150
122
125
RACK PROTECTIONS HR 90 51
HUG TOWER 128
PED 90 54 131
TOWER
RACK PROTECTORS PED 150 57
RPS/RPM/RPL/RPL XL 600
RACK CORNER
03
06
CORNER PED 90
CORNER PED 150
60
63 10
PED 90 REINFORCED 67 LOADING BAYS PROTECTIONS
PED 150 REF LINK 70
RACK-END BARRIERS DOCK GATE 135
SM 8
06
LM
FENCE 90
11
14 DOORS 11
FENCE 150 16 CORNER PROTECTION
FENCE 150 REINFORCED 18 FULL FRAME 74
DP 90 ONEWAY CP 100/200 139
77
02 DP 90 SWING
DP 150 ONEWAY
81
12
85
BOLLARD DP150 SWING 89 KERB
GRD 90 20
LIFT GATE 90 93
GRD 150 21
LIFT GATE 150 97 KERB 200/300 141

03 07 13
GUARD RAIL LINK WALL PROTECTION
TRUCK LINE 23 LINK SINGLE 101
GR 90 25 LINK LM 104 WALL BUMPERS
GR 150 30 LINK 150/1 107 WP 100/150 146
GRIN 90 33 LINK 150/2 111 ANTISHOCK SYSTEM
GRIN 150 34 LINK 150/3 115 ASP 200 149
01. RACK PROTECTIONS RACK PROTECTORS

RPS/RPM/RPL/RPL XL 600
PROTEZIONE MONTANTE MEDIO
MEDIUM RACK PROTECTOR

RPS

RPM

RPL

RPL XL

IMPACT TEST PASSED


according to
EN 15512:2009

2 3
01. RACK PROTECTIONS RACK PROTECTORS 01. RACK PROTECTIONS RACK PROTECTORS

RPS/RPM/RPL/RPL XL UPRIGHT SIZE LAYOUT


ISTRUZIONI DI INSTALLAZIONE PLEASE CHECK SIZE MENTIONED AS ‘‘A’’ AND ‘‘B’’
ASSEMBLY INSTRUCTIONS ON YOUR UPRIGHT IN ORDER TO CHOOSE THE RIGHT PVC PROTECTOR
CUSTOMIZED PROTECTORS AVAILABLE ON REQUEST

RACK
A B
PROTECTOR
RACK
A B

B
PROTECTOR 70 50

B
70 50 75 45
75 45 75 50
A 75 50
76 50
A 76 50
80 35
80 35
2 40 80 40
RPS RPS 80
80 42 80 42
80 44 80 44
80 45 80 45

B
80 50

B
80 50
85 40
85 40
85 45
A 85 50 85 45
A
90 35 85 50
80 57 90 35
80 60 80 57
3 90 48
80 60

B
RPM 90 50
90 48
90 60

B
RPM100 45 90 50
100 50 90 60
A 100 55 100 45
120 60 100 50
A RPL
122 69
100 55
130 60
130 65
120 60
122 69
RPL

B
4 130 60
130 65

B
A

Rev. n°. 01 Data 25/09/18


A
Modifica: PRIMA EMISSIONE Firma Fabio M.
1° Controllo
Materiale Q.tà

4 Scala Denominazione 5
2° Controllo
Via Europa 2, Fratte (PADOVA) Italy
DATABASE
www.mpmpvc.com E-mail: info@mpmpvc.com
Nr. Disegno
01. RACK PROTECTIONS RACK CORNER 01. RACK PROTECTIONS RACK CORNER
GUARD RAIL - ROD 70 INSTALLATION Ø12mm
to be installed w

RACK CORNER RACK CORNER


RACK CORNER 1 2 INSTALLATION 3
GUARD RAIL - ROD 70 INSTALLATION
IMPACT TEST PASSED
according to MIN 75mm* 19
PROTEZIONE ANGOLO SCAFFALE EN 15512:2009 ISTRUZIONI DI INSTALLAZIONE
RACK CORNER ASSEMBLY INSTRUCTIONS
MIN 75mm*

ONLY WITH MECHANICAL ANCHOR M12


GUARD RAIL - SMGUAR RACK CORNER INSTALLATION
Ø12 mm
INSTALLATION
80
to be installed with me

D RA Ø12mm
IL - RO 1 2 3
OP CAP D 70 4 5
to be installed with mechanical anchor M12 only 6
1 5
1 2 3
HUG TOW CAP RACK CORNER INST
MIN 75mm*
19
INSTA MIN 75mm* MIN 75mm*
LLATI
ON
OW HV MIN 75mm*

80mm
Ø12mm
TOW HV Ø12mm
80mm
43 94
4 5
to be installed with mechanical anchor M12 only
6

TOW 19 1 4 2 5 3 6
TOP CAP
pag.1 2 6
13,5
0

100
84 19

Il presente disegno, a sensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
MIN 75mm*

185
TOW HV
MIN 75mm*
53

19 Ø12mm

5
80mm
T=60Nm
2 3 T=60Nm
2 4 3 5
to be installed with mechanical anchor M12 only
6 RACK CORNER

Il presente disegno, a sensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
10
pag.1
V 1 2 3 7 8 installed with mechan
to be
pag.1 3 7
1 2 3
A A
RACK CORNER INSTALLATION
PROTEX MIN 75mm*
MIN 75mm*
2 EX V
1 2 MIN 75mm*
MIN 75mm*
WALL T=60Nm
3

87ml

87ml
Ø12mm
Ø12 mm
mm
8080mm
510

RACK
2/3 pag.1 RACK CORNER 80mm

MIN 150mm* 2/3


FIX P CORNER RACK Ø12mm
4 5 46 FIX P CORNER RACK
5 6 4 7 5 8 6
4 5 6 4 8

4
IMPACT RESISTANCE: 2800 J* IMPACT RESISTANCE: 2800 J*
19
5 * The unit data is proved by test, stored in MPM, on excellent conditions goods. Such tests cannot take note of particular situations, installation or bad maintenance.
ata is proved by test, stored in MPM, on excellent conditions goods. Such tests cannot take note of particular situations, installation or bad maintenance. 87ml
M12 00 Data 14/03/2019 Firma

0 Data 14/03/2019
4 Firma
6 _______

2/3 1:3
_____ _____
_______ Via Europa 2, Fratte (PADOVA) Italy
RACK CORNER 500 T=60Nm
_______
www.mpmpvc.com E-mail: info@mpmpvc.com (RC 500)
1:3 Tel +39.049.9301773 Fax +39.049.9300427

_____ _____
6 (PADOVA) Italy RACK CORNER 500 to be installed with mechanical anchor M12 only
7
Europa 2, Fratte
_______ pag.1
mpvc.com E-mail: info@mpmpvc.com (RC 500) 1 2 3
.049.9301773 Fax +39.049.9300427
pag.1
01. RACK PROTECTIONS RACK-END BARRIERS 01. RACK PROTECTIONS RACK-END BARRIERS

GUARD RAIL - ROD 70 INSTALLATION

SM SM
GUARD RAIL - ROD 70 GUARD RAIL - SM INSTALLATION INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - SM
1
LIGHT LOAD /
GUARD RAIL A DOPPIA BARRIERA FOR HANDPALLET
TRUCKS
ISTRUZIONI DI INSTALLAZIONE
DOUBLE RAIL BARRIER ASSEMBLY INSTRUCTIONS

GUARD RAIL - SM INSTALLATION


GRT 90 Ø12 mm 1 2
WALL 1
GUARD RAIL - LM INSTALLA
CON 90
MIN 150mm*
19

PEC 70

GR 90 HV GUARD RAIL - SM INSTALLATION


GR70 HO 4

1 2
FIX P 90 19 9 mm
(IMPORTANT) 2
GUARD RAIL - SM WALL
1 INSTALLATION 2
WALL

MIN 150mm*
M12
MIN 150mm*

2 19 3
1 2 3 4
2 3 2 3
9 mm
70 4 (IMPORTANT)
pag.1
4
70

3
1 2
55

19
A WALL
205

87ml
MIN 200mm*
1 2
2/3 19
WALL
150

87ml
87ml
4 5 6
WARNING
The 1
distance of installation depends 2
2/3 2/3
MIN 150mm* pag.1 on speed and weight
WALL of vehicle
CENTER TO CENTER
B
4 5 4 6 5 6 WALL 4 pag.1
5 6
CENTER TO CENTER
4
CENTER TO CENTER MIN 150mm*

1 2
WALL
omunicato a terzi, senza previa autorizzazione.

MIN 150mm*
120

4 4
C 120

pag.1
8 9
pag.1
PEC 70
01. RACK PROTECTIONS RACK-END BARRIERS 01. RACK PROTECTIONS RACK-END BARRIERS

SM LM
GUARD RAIL - SM INSTALLATION

7 IMPACT TEST PASSED


according to HEAVY LOAD /
ISTRUZIONI DI INSTALLAZIONE GUARD RAIL A DOPPIA BARRIERA EN 15512:2009 FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS DOUBLE RAIL BARRIER

GUARD RAIL - SM INSTALLATION T=60Nm

5 9 GRT 150
7

CON 150

Ø12 mm
PEC 150
MS -80LImm
AR DRAUG
* The distance of installation depends on speed and weight of vehicle T=60Nm

8 7
6 10 GR90 HO
GR150 HV LM

FIX P 150 LM

UARD RAIL - SM INSTALLATION


* The distance of installation depends on speed and weight of vehicle
11 01 M12
1 2 3 4
7

500
pag.2

elcihev fo thgiew dna deeps no sdneped noitallatsni fo ecnatsid ehT *

150
INSTALLATION T=60Nm

T=60Nm 8 CENTER TO CENTER


CENTER TO CENTER
CENTER TO CENTER
B

150

T=60Nm
pag.2
distance of installation depends on speed and weight of vehicle
10 11

C
01. RACK PROTECTIONS RACK-END BARRIERS 01. RACK PROTECTIONS RACK-END BARRIERS
1 2
INSTALLATION WALL

LM LM
GUARD RAIL - SM
GUARD RAIL - SM INSTALLATION INSTALLATION
70 INSTALLATION
GUARD RAIL - SM INSTALLATION 7
MIN 150mm* 19
ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

INSTALLATION
GUARD RAIL - SM INSTALLATION
Ø12 mm 1 2 4
WALL 1 5 9
GUARD RAIL - LM INSTALLATION 7

MIN 150mm*
19

19

Ø12 mm

GUARD RAIL - LM NOITALLAINSTALLATION


TSNI ML -80LImm
AR DRAUG
4 * The distance of installation depends on speed and weight of vehicle T=60Nm

1 2
19
WALL
20 mm
(IMPORTANT) 2 9 8 76 10
1 2
WALL
pag.1
MIN 150mm*

MIN 150mm*

2 3

2 3 mN06=T
20 mm
4 (IMPORTANT) GUARD RAIL - SM INSTALLATION
* The distance of installation depends on speed and weight of vehicle
pag.1 11 01
4
3 7 7
1 2
WALL
87ml

MIN 200mm*

2/3
87ml
87ml

5 6 pag.2
WARNING
The 1
distance of installation depends 2 elcihev fo thgiew dna deeps no sdneped noitallatsni fo ecnatsid ehT *
2/3 on speed and weight of vehicle
2/3 T=60Nm
pag.1 WALL GUARD RAIL - SM INSTALLATION
5 6 WALL 4 pag.1
5 6
7 4 T=60Nm 8
MIN 200mm*

6 4 5 6
T=60Nm
pag.2
* The distance of installation depends on speed and weight of vehicle
12 13
pag.1
01. RACK PROTECTIONS RACK-END BARRIERS 01. RACK PROTECTIONS RACK-END BARRIERS
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
FENCE 90 FENCE 90
GUARD RAIL - ROD 70 INSTALLATION

LIGHT LOAD /
BARRIERE DI PROTEZIONE PER SCAFFALI FOR HANDPALLET
TRUCKS
ISTRUZIONI DI INSTALLAZIONE
RACK END BARRIER ASSEMBLY INSTRUCTIONS

Ø12 mm
GRA 90 1

GR 90

GR 90
2
19
GUARD RAIL - FENCE 90 INSTALLATION
FIX P90

Ø12 mm

M12
2 3 80 mm

1 2 3 4
2 3 2 3 3
Ø12mm
70

A
350

87ml
19
255

70

2/3 4

87ml
87ml
4 5 6
WARNING
2/3 2/3
The distance of installation depends
on speed and weight of vehicle

4 CENTER TO CENTER 5 4 6 5 61 2 3
WALL
B CENTER TO CENTER +70

CENTER TO CENTER +120


MIN 150mm*
T=60Nm 5
120
90

to a terzi, senza previa autorizzazione.

Ø12mm
80mm
90 120
90

4 5 6
C
pag.1
14 15
01. RACK PROTECTIONS RACK-END BARRIERS 01. RACK PROTECTIONS RACK-END BARRIERS Ø12mm

GUARD RAIL - ROD 70 INSTALLATION


GUARD RAIL - ROD 70 INSTALLATION
FENCE 150 FENCE 150
GUARD RAIL - ROD 70 INSTALLATION
19
HEAVY LOAD /
BARRIERE DI PROTEZIONE PER SCAFFALI FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE
RACK END BARRIER ASSEMBLY INSTRUCTIONS

GUARD RAIL - FENCE 150 INSTALLATION

Ø12 mm 2
WALL
1

MIN 100mm*
GRA 150

GUARD RAIL - FENCE 150 INSTALLATION


Ø12mm

Ø12mm
80mm

GR 150

2
GUARD RAIL - FENCE 150 INSTALLATION
19 19

GR 150
Ø12mm
FIX P150
Ø12 mm
GUARD RAIL - FENCE 150 INSTALLATION
2 3 80 mm T=60
2
WALL
M12 19
2 3 2 3 Ø12mm
3
MIN 100mm*

CENTER TO CENTER - 150

19 Ø12mm
80mm
2 Ø12mm

87ml
WALL
120

2/3 4
550
403

87ml
120

87ml
4 5 6
MIN 100mm*

WARNING
2/3 The distance of installation depends 2/3
on speed and weight of vehicle
2 19
WALL
4 5 4 6 5 6 WALL 80mm
Ø12mm

T=60Nm
CENTER TO CENTER MIN 100mm*

CENTER TO CENTER +120 T=60Nm 5


CENTER TO CENTER +180

Ø12mm
2 80mm

WALL
120

160

pag.1
150

150 180 MIN 100mm* T=60Nm

16 17
01. RACK PROTECTIONS RACK-END BARRIERS 01. RACK PROTECTIONS RACK-END BARRIERS
GUARD RAIL - ROD 70 INSTALLATION Ø12mm

GUARD RAIL - ROD 70 INSTALLATION


FENCE 150 REINFORCED FENCE 150 REINFORCED
GUARD RAIL - ROD 70 INSTALLATION

HEAVY LOAD / 19
BARRIERE DI PROTEZIONE PER SCAFFALI FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE GUARD RAIL - FENCE 150 REINFORCED INSTALLATI
RACK END BARRIER ASSEMBLY INSTRUCTIONS

Ø12 mm
GRA 150
WALL
1

MIN 200mm* Ø12m


CON 150

GUARD RAIL - FENCE 150 REINFORCED INSTALLATION


Ø12mm
80mm
GR 150

GR 150 19

2
19

FIX P150 Ø12mm

GR 90 HO
GUARD
GUARD RAIL - FENCE 150 RAIL - FENCE 150 REINFORCED
REINFORCED INSTALLATION
Ø12 mm
INSTALLATION
T=60Nm
WALL
2 3 80 mm
M12
2 3 2 3
19
MIN 200mm* 3

CENTER TO CENTER - 150 mm


Ø12mm Ø12mm
80mm
Ø12mm

87ml
CENTER TO CENTER - 150 WALL
120 2/3 4
120

87ml
87ml
19
4 5 6
403

550

MIN 200mm*
120

120
240,5

2/3 19
150,5

2/3
550
403
90

4 5 6
240,5

4 5 6
105,5

Ø12mm
80mm
90

WARNING T=6
The distance of installation depends
CENTER TO CENTER on speed and weight of vehicle
WALL T=60Nm 5
CENTER TO CENTER
CENTER + 120 mm
TO CENTER
WALL
CENTER TO CENTER +120
CENTER TO CENTER + 180 mm
CENTER TO CENTER +180
WALL MIN 100mm*
MIN 200mm*
120

160

MIN 200mm*
pag.1 80mm
T=60Nm
Ø12mm
150

150 180
18 19
02. BOLLARD 02. BOLLARD

GRD 90 LIGHT LOAD /


GRD 150 IMPACT TEST PASSED
according to HEAVY LOAD /
PALO PROTEZIONE FOR HANDPALLET
TRUCKS
PALO PROTEZIONE EN 15512:2009 FOR FORKLIFTS

BOLLARD BOLLARD

1 2 3 4

1 2 3 4
150

GRT 90
GRT 150
A
A

GR 90
GR 150
B
B

legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
gge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.

C
C

FIX P 90
FIX P 150

D
D

150
M12

IMPACT RESISTANCE: 450 J M12

IMPACT RESISTANCE: 1500 J


E
E
Rif. UNI EN 22768/1
Rif. UNI EN 22768/1
Classe di tolleranza Scostamenti limite per dimensioni lineari *
Classe di tolleranza Scostamenti limite per dimensioni lineari * 3 6 30 120 400 1000 2000
3 6 30 120 400 1000 2000 0,5°
0,5° Desig. Denominazione. 3 6 30
Desig. Denominazione. 3 6 30 120 400 1000 2000 4000 120 400 1000 2000 4000
f fine ±0.05 ±0.05 ±0.1 ±0.15 ±0.2 ±0.3 ±0.5 f fine ±0.05 ±0.05 ±0.1 ±0.15 ±0.2 ±0.3 ±0.5
m media ±0.1 ±0.1 ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2 m media ±0.1 ±0.1 ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2
c grossolana ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2 ±3 ±4 c grossolana ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2 ±3 ±4
20 v molto grossolana ±0.5 ±1 ±1.5 ±2.5 ±4 ±6 ±8 v molto grossolana ±0.5 ±1 ±1.5 ±2.5 ±4 ±6 ±8 21
* Esclusi smussi e raccordi per eliminazione di spigoli. * Esclusi smussi e raccordi per eliminazione di spigoli.
* Per dimens. di 0.5 mm, lo scostamento si indica dopo la dimens. * Per dimens. di 0.5 mm, lo scostamento si indica dopo la dimens.
Rev. n°. 00 Data 12/01/16 Modifica: Prima emissione Firma Rev. n°. 00 Data 12/01/16 Modifica: Prima emissione Firma Fabio M.
02. BOLLARD Ø12mm 03. GUARD RAIL

INSTALLATION

GRD 90/150 TRUCK LINE


INSTALLATION
70 INSTALLATION
GUARD RAIL - GRD 19 INSTALLATION
GUARD RAIL - GRD INSTALLATION HEAVY LOAD /
ISTRUZIONI DI INSTALLAZIONE FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS

GUARD RAIL - GRD INSTALLATION

Ø12 mm 1 2 3 Ø12mm
GRC 150
1
Ø12mm
WALL

NUT M20

MIN 150mm* WASHER M20


GUARD RAIL - GRD 19
INSTALLATION
19
WASHER PE M20 GRT 150
GUARD RAIL - GRD INSTALLATION
Ø12mm

80mm Ø12mm

1
4
2
5
3
2 6
WALL 1 2 3
19 19
WALL

MIN 150mm* Ø12mm


MIN 150mm*
Ø12mm
Ø12 mm
THREADED ROD M20

80mm Ø12mm
80 mm
2 3 80mm Ø12mm
4 5 6
1 2 3 T=60Nm
19
2 3
WALL depends on speed
* The distance of installation 4 and weight of vehicle 19 35 6 1 2 3 4 5 6 7 8

MIN 150mm*
A

GRC 150
200 1200 1200 1200 200

Il presente disegno, a sensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
4000
DADO M20
T=60Nm
WARNING GRT 150
* The distance of installation depends on speed and weight of vehicle 80mm Ø12mm RONDELLA M20
The 1 2 3
87ml

distance of installation depends


1 on speed and2 weight of vehicle 3 B
RONDELLA PE M20
T=60Nm
WALL WALL
4 5 6
* The distance of installation depends on speed and weight of vehicle
200 1300 1300 200

WALL 2/3
4
3000
87ml
87ml

5 6MIN 150mm* MIN 150mm* 120

2/3 2/3 200 800 800 200

152

152
2000

5 6 Ø12mm
80mm 80mm Ø12mm D

196,10
BARRA FILETTATA M20
T=60Nm 200 1100 200

4 5 6 1500
4 5 speed 6
* The distance of installation depends onT=60Nmand weight of vehicle 5
E

200 600 200 IMPACT RESISTANCE: 4525 J *


1000 45° vehicle impact energy

* The unit data is proved by tests, stored in MPM, on excellent conditions goods. Such tests cannot take note of particular situations, installation or bad maintenance.

Rev. n°. 00 Data 14/05/2018 Modifica: PRIMA EMISSIONE Firma Fabio M.


1° Controllo
F Materiale PVC Q.tà
_____ _______
175 400 175 100 300 100 Denominazione
Scala 1:5
750 500 _____ _____ 2° Controllo
T=60Nm Via Europa 2, Fratte (PADOVA) Italy
TRUCK LINE _______
_____
www.mpmpvc.com E-mail: info@mpmpvc.com
Nr. Disegno
22 23
Tel +39.049.9301773 Fax +39.049.9300427

T=60Nm 1 2 3 4
* The distance of installation depends on speed and weight of vehicle
* The distance of installation depends on speed and weight of vehicle
03. GUARD RAIL 03. GUARD RAIL

TRUCK LINE GR 90
RAIL - RODGUARD
70 RAIL - TRUCK LINE INSTALLATION
INSTALLATION
GUARD RAIL - TRUCK LINE INSTALLATION
GUARD RAIL N - ROD
OITAL70
LATSNI INSTALLATION
07 DOR - LIAR DRAUG
GUARD RAIL - TRUCK LINE INSTALLATION LIGHT LOAD /
ISTRUZIONI DI INSTALLAZIONE WARNING BARRIERA SINGOLA FOR HANDPALLET
TRUCKS
GUARD RAIL -INSTRUCTIONS
ASSEMBLY TRUCK LINE INSTALLATIONThe distance of installation depends SINGLE-RAIL BARRIER
on speed and weight of vehicle

INSTALLATION
INSTALLATION
GRC 90
CHEMICAL Ø24 mm Ø24mm
ANCHOR
Ø24mm NUT M16
Ø24mm WASHER M16 GRT 90
30
Ø24mm

30
30
CHEMICAL
ANCHOR CHEMICAL
30
ANCHOR
30
CHEMICAL
CHEMICAL ANCHOR
ANCHOR GRS 90
2 3

GRSS 90
1 1 2 2 3 3

1
1
21
2
3 223 3 3
32 M16

2 3
87ml

Ø24mm
Ø24 mm
Ø24mm 200mm

87ml
200mm
lm78

Ø24mm Ø24mm
200mm 200 mm
200mm
2/3
4 53/2 6 2/3
4 5 6
4 4 5 5 45 66 5
6 6 6 5 4
4 5 6
87ml

3
3 2/3

5 6 50mm
35ml

50mm
50mm 50mm
50 mm
35ml

35ml

35ml

2/3
2/3
GUARD RAIL - TRUCK LINE
2/3 2/3 INSTALLATION
GUARD RAIL - TRUCK LINE INSTALLATION
pag.18
GUARD RAIL - TRUCK LINE INSTALLATION
7 9
pag.1 7 7 8 8 9 9 1100

pag.1 pag.1 7 pag.1 8 9


1.gap
87ml

T=120Nm
87ml

2/3
2/3 1000

6
6

T=120Nm
T=120Nm 100 100
T=120Nm
* The distance of installation depends on speed and weight of vehicle
24 * The distance of installation depends on speed and weight of vehicle 25
* The distance of installation depends on speed and weight of vehicle
Ø18mm

03. GUARD RAIL 03. GUARD RAIL


GUARD RAIL - ROD 70 INSTALLATION
2
INSTALLATION WALL

70 GR 90 INSTALLATION
INSTALLATION CHEMICAL
MIN 100mm*
ANCHOR
24
GR 90
ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS
M16 GALVANISED STEEL M16 GALVANISED STEEL
Ø16mm
WITH EXPANSION SCREW WITH EXPANSION SCREW
95mm
1 NOITALLATSNI 2 3 GUARD RAIL - GUARD RAIL 90 CHEMICAL GUARD RAIL
INSTALLATION
- GUARD RAIL 90 CHEMICAL
07 DOR - LIAR DRAUG
WALL
7 8 79 8
Ø16 mm 1 5 8
MIN 100mm*

Ø18mm
120mm

4 5 6
2 2 3
10 11GUARD RAIL - GUARD RAIL
10 90 CHEMICAL 11 INSTALLATI

7 6 T=120Nm
8 99
24
pag.1

GUARD RAIL - GUARD RAIL 90 INSTALLATION 90mm

20ml
Ø16 mm

87ml
95 mm 2/3
GUARD RAIL - GUARD RAIL 90 CHEMICAL INSTALLATION 2/3
2 3 T=60Nm
GUARD RAIL - GUARD RAIL 90 CHEMICAL INSTALLATION T=60Nm
4 5 6
pag.1 * The distance of installation depends on speed and weight of vehicle * The distance of installation depends on speed and weight of vehicle
2 3 3 3 2 7 8 9
10 11

7 10
Ø16mm
Ø18mm
87ml
lm78

3/2 2/3 24
T=60Nm
CHEMICAL 10 11
87ml
87ml

5 6 6
pag.1
ANCHOR 5 4 * The distance of installation depends on speed and weight of vehicle
4
2/3 2/3
WARNING
5 6 The distance of installation depends
on speed 1and weight of vehicle 2 3
WALL
WALL

MIN 100mm*
T=60Nm
2 * The distance of installation depends on speed and weight of vehicle
WALL
Ø18mm
120mm

pag.2 pag.2
MIN 100mm* 4 5 6 1.gap

26 27

Ø16mm
Ø18mm

03. GUARD RAIL 03. GUARD RAIL


GUARD RAIL - ROD 70 INSTALLATION
INSTALLATION
70 GR 90 INSTALLATION CHEMICAL
ANCHOR
24
GR 90
ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS
M16 STAINLESS STEEL ANCHOR M16 STAINLESS STEEL ANCHOR

WITH RESIN WITH RESIN


1 2 3 GUARD RAIL - GUARD RAIL 90 CHEMICAL GUARD RAIL
INSTALLATION
- GUARD RAIL 90 CHEMICAL
INSTALLATION WALL
NOITALLATSNI 07 DOR - LIAR DRAUG 7 8 79 8
CHEMICAL Ø18 mm
1 5 8
ANCHOR
MIN 100mm*

Ø18mm
120mm
90 mm
4 5 6

10 11GUARD RAIL - GUARD RAIL


10 90 CHEMICAL 11 INSTALLATI
2 2 3
7 6 T=60Nm
8 99
24

GUARD RAIL - GUARD RAIL 90 CHEMICAL INSTALLATION 90mm

20ml
Ø18 mm
2/3

87ml
GUARD RAIL - GUARD RAIL 90 CHEMICAL 120 mm INSTALLATION
2 3 GUARD RAIL - GUARD RAIL T=60Nm
90 CHEMICAL INSTALLATION T=60Nm
2/3
pag.1 * The distance of installation depends on speed and weight of vehicle * The distance of installation depends on speed and weight of vehicle
4 5 7 6 8 9
3 3 2 10 11

7 10
Ø18mm
Ø18mm
87ml

3
lm78

2/3 24
T=60Nm
CHEMICAL 10 11
87ml

3/2
5 6 24
ANCHOR * The distance of installation depends on speed and weight of vehicle

6
CHEMICAL 5 4
ANCHORpag.1 4
2/3
WARNING
The distance of installation depends
on speed 1and weight of vehicle 2 3
WALL
WALL

MIN 100mm*
T=60Nm
1 2 3
87ml

* The distance of installation depends on speed and weight of vehicle


WALL
Ø18mm
2/3 120mm

pag.2 pag.2
6 MIN 100mm* 4 5 6

1.gap
28 29

Ø18mm
Ø2

03. GUARD RAIL 03. GUARD RAIL

GUARD RAIL - ROD 70

GR 150 GR 150
GUARD RAIL - ROD 70 INSTALLATION
3

GUARD
HEAVY
RAIL - ROD 70 LOAD /
INSTALLATION CHEMICAL
ANCHOR
BARRIERA SINGOLA FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE
SINGLE-RAIL BARRIER ASSEMBLY INSTRUCTIONS

ONLY WITH RESIN


GRC 150 1 2 3

NUT M20
GUARDRAIL
GUARD RAIL- -ROD
ROD70
70 INSTALLATIONGUARD RAIL - GUARD RAIL 150
INSTALLATION
WALL
INSTALLAT
NOITALLATSNI 1 07 DOR - LIAR
WASHER M20 CHEMICAL Ø24 mm
ANCHOR MIN 100mm*
WASHER PE M20 GRT 150

Ø2
150mm

4 5 6
Ø24m

GRS 150

2 2

30
GUARD RAIL - GUARD RAIL 90 INSTALLATION
100mm 30
THREADED ROD M20

35ml
CHEMICAL
ANCHOR
GUARD RAIL - GUARD RAIL 90 CHEMICAL INSTALLATION
2/3
1 2 3 4 5 6 7 8
Ø24 mm

Il presente disegno, a sensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
2 3 150 mm
A pag.1
2 GRC 150
3
4 5
200 1200 1200 1200 200

1 2
3 32
4000
DADO M20
3
GRT 150 WALL Ø16mm
RONDELLA M20 Ø18mm
B
RONDELLA PE M20

200 1300 1300 200

3000
MIN 100mm*

87ml
120 24
C
2 3 CHEMICAL
2 3 2/3 ANCHOR
Ø24m

lm78
200 800 800 200 GRS 150
152

2000 150mm
202

87ml
4 5 6 3/2
WARNING
50

4 5 6 65
D
2/3 The distance of installation depends pag.1
on speed 1and weight of vehicle 2 3 4
146,10

BARRA FILETTATA M20


200 1100 200
WALL

4 5 6
1500

WALL

MIN 100mm*

E 2
WALL

87ml
200 600 200

IMPACT RESISTANCE: 3200 J

87ml
1000
100mm
Ø18mm
120mm

35ml
2/3
Rev. n°. 01 Data 08/06/17 Modifica: AGGIORNATO RESISTENZA Firma Fabio M.
MIN 100mm* 2/3 4 5 6
2/3
1° Controllo
F Materiale Q.tà
_____
4 5 6
_______
175 400 175 100 300 100

4 5 6
Scala 1:5 Denominazione
750 500 _____ _____ 2° Controllo

Via Europa 2, Fratte (PADOVA) Italy
GR 150 EXP _______
www.mpmpvc.com E-mail: info@mpmpvc.com
Tel +39.049.9301773 Fax +39.049.9300427
Nr. Disegno
_____
1 2 3 4
30 pag.1 31
pag.1 Ø16mm
95mm 90mm

ml
03. GUARD RAIL 03. GUARD RAIL

GR 150 GRIN 90 LIGHT LOAD /


ISTRUZIONI DI INSTALLAZIONE GUARD RAIL CONTINUO FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS CONTINOUS GUARD RAIL

ONLY WITH RESIN

GUARD RAIL - GUARD RAIL 90 CHEMICAL GUARD RAIL


INSTALLATION
- GUARD RAIL 90 CHEMICAL INSTALLATION

7 8 79 8 9
5 8

100 mm

10 11GUARD RAIL - GUARD RAIL


10 90 CHEMICAL 11 INSTALLATION GRIN 90

7 6 T=120Nm
8 99

GRINCO 90

M12
GUARD RAIL - GUARD RAILT=60Nm
90 CHEMICAL INSTALLATION T=60Nm

* The distance of installation depends on speed and weight of vehicle * The distance of installation depends on speed and weight of vehicle
7 8 9 GRINT 90
10 11 1 2 3 4

7 10
CENTER TO CENTER

T=60Nm
10 11 CENTER TO CENTER
* The distance of installation depends on speed and weight of vehicle

T=60Nm

* The distance of installation depends on speed and weight of vehicle

previa autorizzazione.
32 pag.2 pag.2 33
GUARD RAIL - ROD 70
03. GUARD RAIL 03. GUARD RAIL
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
GRIN 150 GRIN 90/150
GUARD RAIL - ROD 70 INSTALLATION
IMPACT TEST PASSED
according to HEAVY LOAD /
GUARD RAIL CONTINUO AFNORNP P98-310 FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE
CONTINOUS GUARD RAIL ASSEMBLY INSTRUCTIONS

NOITALLATSNI 07 DOR - LIAR


GUARD RAIL - GRIN 90 INSTALLATION GUARD RAIL - GRIN 90 INSTALLAT
1 2 3
Ø12 mm WALL
1
MIN 200mm*

GUARD RAIL - GRIN 90 INSTALLATION


Ø12mm
80mm

62
4
2

19
GRIN 150 GUARD RAIL - GRIN 90 INSTALLATION

Ø12 mm
GUARD RAIL - GRIN 90 INSTALLATION
GRINCO 150 80 mm T=60

M12 2 3
4 5
1pag.1 32 23
2 3 WALL 3
GRINT 150 2 3

MIN 200mm*
1 2 3 4

Ø12mm
12 CENTER TO CENTER - 12
200
150

144

lm78
80mm

87ml
1 2 3
71

A 1 2 3 WALL 3/2
4 2/3 6
WALL 6 4 5

87ml
87ml
4 5 6 pag.1
50

MIN 200mm*
175 2000 2000 175
2/3 2/3
MIN 200mm*
WARNING
4 5 4 6 5 6 Ø12mm
The 1 2 3
120

distance of installation depends


60 on speed and weight of vehicle 80mm
WALL
WALL
T=6
B 4 Ø12mm 6
MIN 200mm*
80mm
106 394 250 250 394 106 T=60Nm 5
170

pag.1
200

1 2 3
500 500 500
WALL
4 6 Ø12mm
terzi, senza previa autorizzazione.

80mm
MIN 200mm*
pag.1 4 6
34 C T=60Nm 35

Ø12mm
10 11 12
GUARD RAIL - GRIN 90 INSTALLATION
03. GUARD RAIL 04. COLD LINE
7 8 9

GRIN 90/150 ROD PE 70


GUARD RAIL - GRIN 90 INSTALLATION -30°
10 11 12
7 8 9
13 14 15
LIGHT LOAD /
ISTRUZIONI DI INSTALLAZIONE PALO PROTEZIONE FOR HANDPALLET
RESISTANT TO TRUCKS
ASSEMBLY INSTRUCTIONS BOLLARD LOW TEMPERATURES

GUARD RAIL - GRIN 90 INSTALLATION


10 11 12

7 GUARD RAIL - GRIN


8
13
90 14 9
INSTALLATION
15
80mm

10 11 12 PCC 70
16 18
7 6 8 11 9 16 1 2 3 4
NUT M20

SPRING WASHER M 20

80mm WASHER M20


A
T=60Nm
- GRIN 90 INSTALLATION
13 14 16 13 15 14 18 15
10 11 12
8 97 pag.2
12 17
10 11 12
GUARD RAIL - GRIN 90 INSTALLATION

7 8 9
GUARD RAIL - GRIN 90 INSTALLATION
PC 70 266
7 80mm 8 9

INSTALLATION GUARD RAIL - GRIN 90


T=60Nm
INSTALLATION
16 18 80mm B
913 14
pag.2 15 19
11 GUARD RAIL
13 - GRIN 90 12
16
14 INSTALLATION
15
18

7
88 9
13 18
10 11 12

110

PM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
10 11 12
T=60Nm

- GRIN 90
pag.2 INSTALLATION 80mm
80mm
C
THREADED ROD M20
T=60Nm
14816 16 15 9 GUARD
18 RAIL
18- GRIN 90 INSTALLATION
12 * The distance of installation depends on speed and weight of vehicle
10 11 12
19
13 14 9 pag.2
15 14 19
13 14 15

80mm
T=60Nm
GUARD RAIL - GRIN 90 T=60Nm INSTALLATION D
18 80mm
80 mm
11 pag.2 19 12
80mm
PVC TUBE
13
15
pag.2 14 * 15
The distance of installation depends on speed and weight of vehicle
16 1618 18
10 15 20

NUT M20

T=60Nm
IMPACT RESISTANCE: 150 J
80mm
T=60Nm
E
36 80mm T=60Nm 37
16 18
Rif. UNI EN 22768/1
* The distance of installation depends on speed and weight of vehicle
14 15 Classe di tolleranza Scostamenti limite per dimensioni lineari *
GUARD RAIL - ROD
04. COLD LINE 04. COLD LINE
7 8
INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION

ROD PE 70 ROD PE 70
-30° 2 3 -30°

ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE


INSTALLATION
ASSEMBLY INSTRUCTIONS
RESISTANT TO
LOW TEMPERATURES ASSEMBLY INSTRUCTIONS
RESISTANT TO
LOW TEMPERATURES

GUARD RAIL - ROD 70 INSTALLATION


T=120Nm
GUARD RAIL - ROD INSTALLATION

87ml
CHEMICAL
INSTALLATION
ANCHOR N OIT
CHEMICAL
ANCHOR
ROD
RODREPLACEMENT
REPLACEMENT
2/3
AL 7 8
CHEMICAL
GUARD RAIL - ROD 70mm
Ø38 LA INSTALLATION 4 5 6
ANCHOR TSN GUARD RAIL - ROD 70 1 INSTALLATION 5 1
12
I 2 3
CHEMICAL
ANCHOR
CHEMICAL
ANCHOR

Ø38 mm
T=120Nm
Ø38mm

87ml
115 mm 07
DO ROD REPLACEMENT
46 R- 2/3
Ø38mm LIA
46 2 4 23 R Dpag.1
5 6 1 6 2 2
RA
UG Ø56mm
46

Ø38mm 46

GUARD RAIL - ROD 70 INSTALLATION


1 46 2 3

87ml
2/3

4 5 6
2 3 GUARD RAIL - ROD INSTALLATION
1 pag.12
3 3
T=120Nm 7
3 7 8
Ø38mm
87ml

115mm
2/3
3
3 4 5 6
87ml
87ml

Ø38mm pag.2

87ml
lm7

115mm 2/3
GUARD RAIL - ROD INSTALLATION
T=120Nm
2/3
8

2/3
3/2
4 5 2 6
4 5 6
87ml

pag.1 7 8 REPLACEMENT
ROD
4 8
1 2
2/3

6
87ml

pag.1 2/3
pag.2
6 T=120Nm

5
pag.1 ROD REPLACEMENT
38 2 pag.1 3 39
1 2
04. COLD LINE 04. COLD LINE

GUARD RAIL - ROD 70 INSTALLATION


GUARD RAIL - ROD 120 INSTALLATIO

ROD PE 120 ROD PE 120


-30° -30°

CHEMICAL
HEAVY LOAD / ANCHOR
PALO PROTEZIONE ISTRUZIONI DI INSTALLAZIONE
GUARDLOW
RAIL - ROD 70 INSTALLATION
FOR FORKLIFTS
RESISTANT TO RESISTANT TO
BOLLARD TEMPERATURES ASSEMBLY INSTRUCTIONS LOW TEMPERATURES

GUARD RAIL - ROD 70 INSTALLATION


CHEMICAL
GUARD RAIL - ROD 70 INSTALLATION
ANCHOR N OIT CHEMICAL Ø56mm
PCC 120 ANCHOR
AL
CHEMICAL Ø56
GUARD RAIL - ROD mm
120 LA INSTALLATION
ANCHOR TSN GUARD RAIL - ROD 120 1
I
CHEMICAL
NUT M30 ANCHOR CHEMICAL
ANCHOR
1 2 3 4
SPRING WASHER M30 46

WASHER M30

Ø56 mm
A
Ø38mm
Ø56mm 07
155 mm DO
R-
Ø38mm 46 LIA
46 1 2 23 R

PC 120 433 / 560


46
46
Ø38mm
B
GUARD RAIL - ROD 70 INSTALLATION
1 46 2 3

2 3
2
ensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.

4 5 6
1 2 3
1 23
C 1 2 3
Ø38mm

87ml
115mm
3 2/3
1 2 3 4 5 6
THREADED ROD M30

256ml
87ml
lm7 Ø56mm
155mm 2/3
D
8

2/3
3/2
4 5 2 6
Ø38mm 4 5

87ml
pag.1
4 5 6 4
115mm
2/3

4 Ø38mm 5 6

87ml
6
E
115mm PVC TUBE
2/3
Rif. UNI EN 22768/1 pag.1
IMPACT RESISTANCE: 800 J Classe di tolleranza
4
Desig. Denominazione.
Scostamenti limite per dimensioni lineari *
0,5°
3
3
6
6
30
30 120 400 1000 2000 5 6
120 400 1000 2000 4000
f fine ±0.05 ±0.05 ±0.1 ±0.15 ±0.2 ±0.3 ±0.5
NUT M30
m media ±0.1 ±0.1 ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2
c grossolana ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2 ±3 ±4 5
v molto grossolana ±0.5 ±1 ±1.5 ±2.5 ±4 ±6 ±8 pag.1
* Esclusi smussi e raccordi per eliminazione di spigoli.
40 * Per dimens. di 0.5 mm, lo scostamento si indica dopo la dimens. 2 pag.1 3 41
Rev. n°. 00 Data 14/01/16 Modifica: Prima emissione Firma Fabio M.
1° Controllo
F Materiale Q.tà
GUARD RAIL - ROD INSTALLATION
04. COLD LINE 04. COLD LINE
7 8

ROD PE 120 ROD FLOOR 70


2 3 -30° -30°

ISTRUZIONI DI INSTALLAZIONE BARRIERA SINGOLA


RESISTANT TO RESISTANT TO
ASSEMBLY INSTRUCTIONS LOW TEMPERATURES SINGLE-RAIL BARRIER LOW TEMPERATURES

T=120Nm
GUARD RAIL - ROD INSTALLATION

87ml
ROD
RODREPLACEMENT
REPLACEMENT
2/3
7 8 GRC 90
4 5 6 1 2
5 1
2 3 NUT M16

WASHER M16

GRS 90
T=120Nm
87ml

GRSS 90
ROD REPLACEMENT
2/3

5
pag.1
6 1 6 2 2
M16

GUARD RAIL - ROD INSTALLATION 200 1300 1300 200


T=200Nm 7 3000

7 8

200 800 800 200


70
2000

pag.2

GUARD RAIL - ROD INSTALLATION

105
T=120Nm

7 8 REPLACEMENT
ROD

35
200 1100 200

8 1500

1 2

4
80
200 600 200
1000 50

pag.2
T=120Nm
100 300 100

500
ROD REPLACEMENT
42 43
1 2
04. COLD LINE 04. COLD LINE
GUARD RAIL - ROD 70 INSTALLATION
2
INSTALLATION WALL

ROD FLOORINSTALLATION
70 ROD FLOOR 70
-30° -30°

70 INSTALLATION
MIN 100mm*
ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
RESISTANT TO RESISTANT TO
ASSEMBLY INSTRUCTIONS LOW TEMPERATURES ASSEMBLY INSTRUCTIONS LOW TEMPERATURES
M16 GALVANISED STEEL M16 GALVANISED STEEL
Ø16mm
WITH EXPANSION SCREW WITH EXPANSION SCREW
95mm

NOITALLATSNI 07 DOR - LIAR DRAUG

Ø16 mm 1 5 8

2 2 3

6 T=120Nm 9
24
pag.1

Ø16 mm

87ml
95 mm
GUARD RAIL - GUARD RAIL 90 CHEMICAL INSTALLATION 2/3
2 3
4 5 6

2 3 3 3 2

7 10

Ø18mm
87ml
lm78

3/2 2/3 24
CHEMICAL
87ml
87ml

5 6 6
pag.1
ANCHOR
5 4
4
2/3 2/3
WARNING
5 6 The distance of installation depends
on speed 1and weight of vehicle 2 3
WALL
WALL

MIN 100mm*

Ø18mm
120mm

4 5 6 1.gap

44 45
04. COLD LINE 04. COLD LINE
GUARD RAIL - ROD 70 INSTALLATION
INSTALLATION
ROD FLOOR 70 ROD FLOOR 70
-30° -30°

70 INSTALLATION
ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
RESISTANT TO RESISTANT TO
ASSEMBLY INSTRUCTIONS LOW TEMPERATURES ASSEMBLY INSTRUCTIONS LOW TEMPERATURES
M16 STAINLESS STEEL ANCHOR M16 STAINLESS STEEL ANCHOR

WITH RESIN WITH RESIN

INSTALLATION NOITALLATSNI 07 DOR - LIAR DRAUG


CHEMICAL Ø18 mm
1 5 8
ANCHOR

90 mm

2 2 3
6 T=60Nm 9
24

Ø18 mm

87ml
GUARD RAIL - GUARD RAIL 90 CHEMICAL 120 mm INSTALLATION
2 3
2/3

4 5 6
3 3 2
7 10

Ø18mm
87ml

3
lm78

2/3 24
CHEMICAL
87ml

3/2
5 6 ANCHOR

6 5 4
pag.1
2/3 4
WARNING
The distance of installation depends
on speed 1and weight of vehicle 2 3
WALL
WALL

MIN 100mm*
87ml

Ø18mm
2/3 120mm

6 4 5 6

1.gap
46 47
04. COLD LINE 04. COLD LINE

GUARD RAIL - ROD 70

ROD FLOOR 120 ROD FLOOR 120


GUARD RAIL - ROD 70 -30° INSTALLATION -30°

GUARD RAIL - ROD 70 INSTALLATION


BARRIERA SINGOLA ISTRUZIONI DI INSTALLAZIONE
RESISTANT TO RESISTANT TO
SINGLE-RAIL BARRIER LOW TEMPERATURES ASSEMBLY INSTRUCTIONS LOW TEMPERATURES

ONLY WITH RESIN


GRC 150

GUARDRAIL
GUARD RAIL- -ROD
ROD70
70 INSTALLATIONGUARD RAIL - GUARD RAIL 150
INSTALLATION INSTALLAT
NUT M20
NOITALLATSNI 1 07 DOR - LIAR
CHEMICAL Ø24 mm
WASHER M20 ANCHOR
WASHER PE M20

Ø24m

GRS 150
2 2
30
THREADED ROD M20
30
CHEMICAL
ANCHOR

Ø24 mm

2 3 150 mm

2 3
4 5
1 2
WALL
3 33 2

MIN 100mm*

87ml
2 3
2 3 2/3 Ø24m

lm78
150mm

87ml
4 5 6 3/2
WARNING
4 5 6 65
2/3 The distance of installation depends pag.1
on speed and weight of vehicle 4
600
4 5 6 WALL

MIN 100mm*

87ml
87ml
500
100mm

35ml
2/3
2/3
2/3
4 5 6
4 5 6
48 pag.1 49
pag.1
04. COLD LINE 05. PEDESTRIAN SAFETY BARRIERS

ROD FLOOR 120 HR 90


-30°

LIGHT LOAD /
ISTRUZIONI DI INSTALLAZIONE BARRIERA PEDONALE FOR HANDPALLET
RESISTANT TO TRUCKS
ASSEMBLY INSTRUCTIONS LOW TEMPERATURES HAND RAIL BARRIER

ONLY WITH RESIN

GRT 90

5 8

CON 90

100 mm

6 T=120Nm 9
PEC 90

1 2

GR 90 HV
7 10
FIX P90
A

SQ HO 40X40

M12
CENTER TO CENTER
B CENTER TO CENTER
CENTER TO CENTER

50 C 51
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

INSTALLATION
Ø12mm

HR 90 HR 90
INSTALLATION
70 INSTALLATION
GUARD RAIL - HAND RAIL INSTALLATION

ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI 19


INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

GUARD RAIL - HAND RAIL INSTALLATION

7 9
Ø12 mm Ø12mm
1
GUARD RAIL - HAND RAIL INSTALLATION 5 T=60Nm 8

GUARD RAIL - HAND RAIL INSTALLATION

19
Ø12 mm

80 mm
GUARD RAIL - HAND RAIL INSTALLATION
Ø12mm
Ø12mm
GUARD RAIL - HAND RAIL
7 8 9
30
1
9 mm
(IMPORTANT) 23 6 9
7 9

19
19
GUARD RAIL - HAND RAIL INSTALLATION
2 3

2 3 T=60Nm
9 mm GUARD RAIL - HAND RAIL INSTALLATION
(IMPORTANT)
4 5 6 10
7 9
3 7 10
87ml

Ø12mm

2/3 Ø12mm
80mm
87ml
87ml

5 6

2/3 2/3
pag.1
19
5 6
4

pag.2

52 53
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

GUARD RAIL - ROD 70 INSTALLATION

PED 90 PED 90
GUARD RAIL - ROD 70 GUARD RAIL - PEDESTRIAN INSTALLATION
90 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
LIGHT LOAD /
BARRIERA DI SICUREZZA FOR HANDPALLET
TRUCKS
ISTRUZIONI DI INSTALLAZIONE
SAFETY BARRIER ASSEMBLY INSTRUCTIONS

GUARD RAIL - LM INSTALLATION


GRT 90 Ø12mm
Ø12 mm
1

19

CON 90

2
19 9 mm
1 2 (IMPORTANT)
WALL

PEC 70 GUARD RAIL - PEDESTRIAN 90 INSTALLATION


MIN 150mm*

GUARD RAIL - PEDESTRIAN 90 INSTALLATION


2 3

2 3 2 3
9 mm
(IMPORTANT)
4 5 6
GR 90 HV 3
1 2 3 4 Ø12mm
Ø12mm

FIX P90

87ml
65

1 2
WALL 2/3 19
Ø12mm
A

87ml
87ml
80mm
GR 70 HO 4 5 6
19
2/3 2/3
MIN 200mm* WARNING
pag.1
4 5 4 6 5 6
The distance of installation depends
M12 on speed 1and weight of vehicle 2
WALL
4
WALL

MIN 150mm*
CENTER TO CENTER
B CENTER TO CENTER
CENTER TO CENTER

1 2
4 5 6 WALL
4 5 6

pag.1 MIN 150mm* , senza previa autorizzazione.


54 55
C
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

NOITALLATSNI 07 DOR - LIAGUARD


R DRAURAIL
G - PEDESTRIAN 90 INSTALLATION

PED 90 PED 150 HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE BARRIERA DI SICUREZZA FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS SAFETY BARRIER

GRT 150
GUARD RAIL - PEDESTRIAN 90 INSTALLATION
5 9

Ø12 mm CON 150

80 mm * The distance of installation depends on speed and weight of vehicle

3 2
6 10

PEC 150
lm78

3/2
GUARD RAIL - PEDESTRIAN
6
90 INSTALLATION
5 depends on speed and weight of vehicle
4
* The distance of installation

7
GR 150 HV
1 2

FIX P150

GR 90 HO
pag.2 A

RIAN 90 INSTALLATION 1.gap


T=60Nm 8
CENTER TO CENTER
CENTER TO CENTER
M12 B CENTER TO CENTER

pag.2
distance of installation depends on speed and weight of vehicle C
56 57
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

INSTALLATION
NOITALLATSNI 07 DOR - LGUARD
IAR DRARAIL
UG - PEDESTRIAN 90

PED 150 PED 150


INSTALLATION
70 INSTALLATION

ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE


ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

INSTALLATION
Ø12 mm GUARD RAIL - PEDESTRIAN 90 INSTALLATION
1 5 9

Ø12 mm

80 mm * The distance of installation depends on speed and weight of vehicle

19 20 mm
(IMPORTANT) 2 3 2
6 10

GUARD RAIL - PEDESTRIAN 150 INSTALLATION

GUARD RAIL - PEDESTRIAN 150 INSTALLATION


2 3

lm78
GUARD RAIL - PEDESTRIAN 90 INSTALLATION
2 3 3/2
20 mm
(IMPORTANT)
6 5 depends on speed and weight of vehicle
* The distance of installation 4
3 7
Ø12mm
Ø12mm
87ml

2/3 19

pag.2
87ml
87ml

5 6
19
2/3 GUARD RAIL - PEDESTRIAN 90 INSTALLATION
2/3
WARNING
5 6
The distance of installation depends 1.gap
on speed 1and weight of vehicle 2 2 20mm(IMPORTANT)
4 T=60Nm 8
WALL
WALL

MIN 200mm*

1 2 2 20mm(IMPORTANT)
WALL
6 20mm(IMPORTANT)

4 5 6

* The distance of installation depends on speed and weight of vehicle

MIN 200mm* pag.2


58 59
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

CORNER PED 90 LIGHT LOAD /


CORNER PED 90
BARRIERA DI SICUREZZA FOR HANDPALLET
TRUCKS
BARRIERA DI SICUREZZA
SAFETY BARRIER SAFETY
1 BARRIER 2 3 4

PLEASE CHECK HERE BELOW


GRT 90
GRT 90
WHICH POSITION OF THE CORNER YOU NEED
A

CON 90 CON 90
A L
EXTERNAL B R
EXTERNAL

1115
B

1115
EXTERNAL SX (CE SX)

rieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
CI R-L 90 CE R-L 90
45

45
EXTERNAL DX (CE DX)

FIX P 90
FIX P 90

M12 M12
C D
INTERNAL R
INTERNAL L
INTERNAL SX (CI SX)

IMPACT RESISTANCE: 3819 J *


INTERNAL DX (CI DX)

45° vehicle impact energy

EXTERNAL SX (CE SX) EXTERNAL DX (CE DX) INTERNAL SX (CI SX) INTERNAL DX (CI DX)
45 IMPACT RESISTANCE: 3819 J *
45° vehicle impact energy
... 31/05/2018 ...
EXTERNAL SX (CE SX) EXTERNAL DX (CE DX) INTERNAL SX (CI SX) INTERNAL DX (CI DX)
1115

... _______

... 31/05/2018 ... E


_____ _____
CORNER PED 90
... _______
_______
...

1115 _____ _____


CORNER PED 90
60 _______ 61
31/05/20
GUARD RAIL - CORNER PED 90 INSTALLATION
Ø12mm

05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS


INSTALLATION
INSTALLATION
70 INSTALLATION

CORNER PED 90 Ø12mm


CORNER PED 150
19

HEAVY LOAD /
ISTRUZIONI DI INSTALLAZIONE BARRIERA DI SICUREZZA FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS SAFETY BARRIER


GUARD RAIL - CORNER PED 90 INSTALLATION
INSTALLATION
GUARD RAIL - CORNER PED 90 INSTALLATION
1 2 3
19
Ø12 mm GRT 150

9mm(IMPORTANT)
1 GRT 150
GUARD RAIL - CORNER PED 90 INSTALLATION

Ø12mm

Ø12mm

1 2 3 CON 150 CON 150

9mm(IMPORTANT)
9mm(IMPORTANT)

4 25 6
19
19 9 mm Ø12mm
(IMPORTANT)

19

INSTALLATION
1 2 3 4
9 mm (IMPORTANT)
9mm(IMPORTANT)
1 2 19 3
1 2 3 Ø12mm CI R-L 150 CE R-L 150
63

9mm(IMPORTANT)
4 5
GUARD RAIL - CORNER PED 90 INSTALLATION 80mm
9mm(IMPORTANT)

2 3
pag.1
2 Ø12mm 3
1 2 3
9mm(IMPORTANT) FIX P 150
9mm(IMPORTANT) FIX P 150
9mm(IMPORTANT)

46 Ø12mm 5 6
4 5
80mm 4
Ø12mm
19
M12 M12
87ml

pag.1

2/3
Ø12mm
Ø12mm
80mm 9mm(IMPORTANT)
87ml

19
87ml

80mm
5 3 6
4 5 6
5
9mm(IMPORTANT)

2/3 pag.1 2/3


pag.1
Ø12 mm
5 6

1 2
- 3CORNER
E

ORTANT)
GUARD
GUARD RAILRAIL
- CORNER PED 90 PED 90 80 mm
INSTALLATION INSTALLATION
9mm(IMPORTANT)

Ø12mm
6 80mm 1 2 3 4 7
7 7 8 8 T=60Nm
6 7 8
EXTERNAL SX (CE SX) EXTERNAL DX (CE DX) INTERNAL SX (CI SX) INTERNAL DX (CI DX)
* MPM specifies that such values are the result of a multiplication of the unit data fo
The unit data is proved by tests, stored in MPM, on excellent conditions goods. Such

... Data 31/05/2018 Modifica: ...

A
6
F Materiale
...
pag.1
Scala 1:20

Via Europa 2, Fratte (PADOVA) Italy


COR
www.mpmpvc.com E-mail: info@mpmpvc.com
Tel +39.049.9301773 Fax +39.049.9300427

1 2 3 4
Ø12mm
9mm(IMPORTANT)

4 5 6 T=60Nm

62 63
T=60Nm
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

GUARD RAIL - ROD 70 INSTALLATION


GUARD RAIL - CORNER PED 150 INSTA

CORNER PED 150 CORNER PED 150


GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION

BARRIERA DI SICUREZZA ISTRUZIONI DI INSTALLAZIONE


SAFETY
1 BARRIER 2 3 4 ASSEMBLY INSTRUCTIONS

PLEASE CHECK HERE BELOW GUARD RAIL - LM INSTALLATION


WHICH POSITION OF THE CORNER YOU NEED Ø12 mm
A 1 1

GUARD RAIL - CORNER PED 150 INSTALLATION

A
EXTERNAL L B
EXTERNAL R

B 4
19
1 Ø12mm
2

25 mm
(IMPORTANT)

rieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
2 3 19
GUARD RAIL - CORNER PED 150 INSTALLATION
2 3 2 3
C
25 mm
(IMPORTANT)
pag.1
4 6

1 3

87ml
C 1
D
INTERNAL R 2
Ø12mm

INTERNAL L 2/3
WALL

87ml
87ml
4 5 6
Ø12
D 80mm
2/3 2/3 19
MIN 200mm*

4 5 4 6 5 6
4 pag.1 6

E
4 5 6
Ø12mm
80mm

pag.1
64 65

pag.1
19

Ø12mm
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS
ARD RAIL - HAND RAIL INSTALLATION

CORNER PED 150 1 2 3


PED 90

25mm(IMPORTANT)
IMPACT TEST PASSED
REINFORCED
19
according to LIGHT LOAD /
ISTRUZIONI DI INSTALLAZIONE AFNORNP P98-310 FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS BARRIERA DI SICUREZZA
SAFETY BARRIER

Ø12mm

GRT 90
25mm(IMPORTANT)
2 53 3
72
CON 90
4 4 6

25mm(IMPORTANT)
PEC 90

19

GR 90 HV 70

GR 70 HO
lm78

Ø12mm
GUARD RAIL - CORNER PED 150 80mm INSTALLATION GRT 150
3/2
GR 150 HR
25mm(IMPORTANT)
7 68 5 9 4
FIX P 90
5 pag.1 5 6 8
M12

GR 120 HR
GR 150 OR

Ø12mm T=60Nm
GUARD RAIL - CORNER PED 150 80mm INSTALLATION
1.gap
7 8 9T=60Nm
6 9

1 2 3 4

Ø12 mm A

80 mm
T=60Nm

CENTER TO CENTER CENTER TO CENTER


TOTAL LENGTH

66 67
D
Ø12mm

05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

INSTALLATION
PED 90 PED 90
GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION
INSTALLATION GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION
70 INSTALLATION

REINFORCED REINFORCED
19

ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE


ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION


INSTALLATION GUARD RAIL - PEDESTRIAN 90 REINFORCEDØ12mm INSTALLATION
7 Ø12mm
8 9 GUARD RAIL - PEDESTRIAN 90 REINFORCED
Ø12 mm 1
1 3 5
2 8
Ø12mm WALL 7 8 9

19
MIN 150mm*
19

lm78
Ø12mm

19 10
GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION 3/2
GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION
6 5 10 4
1
19
WALL 4 51 2 6 7 68 9 9
WALL

19
GUARD RAIL - PEDESTRIAN 90 REINFORCED
MIN 150mm* INSTALLATION
MIN 150mm*

2 3
* The distance of installation depends on speed and weight of vehicle
2 3 Ø12mm
GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION
* The distance of installation depends on speed and weight of vehicle
4 5 6
10
1 6 1.gap
WALL 3 7 8 97

pag.1 Ø12mm
MIN 150mm*
87ml

19

2/3
87ml

5 6 Ø12mm
80mm

19 * The distance of installation depends on speed and weight of vehicle


2/3
10
pag.1 4 5 6
5 6 pag.1 4
WARNING
1
The distance of installation depends
on speed and WALL
weight of vehicle

WALL

MIN 150mm*
1
6 WALL
Ø12 mm pag.2

80 mm * The distance of installation depends on speed and weight of vehicle pag.2

MIN 150mm*
68 69
pag.1
6
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

GUARD RAIL - PEDESTRIAN 90 REINFORCED INSTALLATION GUARD RAIL - PED 150 REF LINK INSTALLATION
GUARD RAIL - PED 150 REF LINK

PED 150 REF LINK GUARD RAIL - ROD 70


GUARD RAIL - ROD 70
HEAVY LOAD /
PED 150 REF LINK INSTALLATION
INSTALLATION

BARRIERA DI SICUREZZA FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE


SAFETY BARRIER ASSEMBLY INSTRUCTIONS

THE PRODUCT IS EQUIPPED WITH SCREWS M8


GUARD RAIL - LM GRT 150
INSTALLATION Ø12mm

Ø12 mm 1 2 3
GUARD RAIL
WALL - PED 150 REF LINK 1
Ø12mm
CON 150

MIN 200mm*
19

LINK 150/150 DX

GUARD RAIL - PED 150 REF LINK INSTALLATION


80mm
GR 90 HO
PEC 150
19
4 5 6

19 1 2 3
1 2 2
WALL
GUARD RAIL - PED 150 REF LINK INSTALLATION
WALL
LINKO 150/150 GR 150 HV LINK 1

MIN 200mm* MIN 200mm*


FIX P 150
LINK 150/150 SX

M12
2 3 Ø12mm
Ø12mm
Ø12 mm
1 2 3 8080mm
mm
2 3
WALL
4 5
pag.1 6
4 5
GR 150 HO LINK
1 2 Ø12mm 3 3
WALL
MIN 150mm*
19

87ml
MIN 200mm*
1 1 2 3 2 4
WALL 2/3
120
19

87ml
87

4 5 6
90

T=60Nm 80mm

WARNING 2/3
240

A MIN 200mm*
4 5 6
1187

4 5 1 The 6 4 2 depends 5 3 6
distance of installation 4
1100

pag.1
240
90

pag.1
on speed and weight of vehicle
WALL

WALL

1 2 3
150

MIN 200mm*
30
71

WALL
CENTER TO CENTER-171 CENTER TO CENTER-171
CENTER TO CENTER CENTER TO CENTER
120

B
160

4 5 GRT 150 6 MIN 200mm*


Ø12mm
80mm
120
70

150 180
Ø12mm
pag.1 CON 150
80mm
ia autorizzazione.

70 71
pag.15 Ø12mm
4 80mm
6
05. PEDESTRIAN SAFETY BARRIERS 05. PEDESTRIAN SAFETY BARRIERS

PED 150 REF LINK PED 150 REF LINK


20mm(IMPORTANT)

13 14 15

ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE


ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

Ø12mm
80mm

GUARDGUARD RAIL 150


RAIL - PED - PED 150
REF LINKREF LINK INSTALLATION
INSTALLATION
Ø12mm GUARD
GUARDRAIL
RAIL -- PED
GUARD 150REF
PED 150
RAIL -REF
PEDLINK
LINK
150 REF LINK INSTA
INSTALLATION
INS
GUARD
GUARD RAILGUARD
RAIL
- PED RAIL
- 150
PED - PED
150
REF REF
LINK 150
LINKREF LINK INSTALLATION
INSTALLATION
INSTALLATION
GUARD RAIL - PED 150 REF LINK LINK
GUARD RAIL - PED 150 REF INSTALLATION
80mm
6 INSTALLATION GUARD RAIL - PED 150 REF LINK INSTALL
GUARD RAIL - PED 150 REF LINK INSTALLATION 19 GUARD
19 20 150 REF LINK
RAIL - PED 20 21 21 INSTA
7 7 6 8 8 9
7 9 19 GUARD RAIL 20 2119
5 17 GUARD RAIL18
- PED 150 REF LINK INSTALLATION
7 7
7 7 7 8 8
8
168 8 9 9 17 9 9
9
18 - PED 150 REF LINK IN
S8 M8
7 8 9 19 19 20 20 21 21
M8 M8 M8M8 19 20 21
M8 19GUARD RAIL - PED 150 REF
20 LINK 21 I
M8
Ø6mm Ø7mm
Ø7mm 19 20 21
Ø7mm Ø7mm Ø7mm
Ø7mm
Ø7mm
70mm 70mm
70mm
70mm 70mm 70mm 20mm(IMPORTANT)
20mm(IMPORTANT)
T=60Nm
70mm GUARD
70mm
RAIL - PED 150 REF LINK INSTALLATION
INSTALLATION
T=60Nm
22 23 20mm(IMPORTANT)
T=60Nm
T=60Nm T=60Nm 22 2320mm(IMPORTANT)24 24
INSTALLATION GUARD
19 RAIL - RAIL
GUARD PED -150
PEDREF
150 LINK
REF20LINK 21T=60Nm
T=60NmT=60NmT=60Nm
INSTALLATION
INSTALLATION 20mm(IMPORTANT)
20mm(IMPORTANT)
INSTALLATION 10 11 12 T=60Nm 20mm(IMPORTANT)
9 10 20mm(IMPORTANT)
20mm(IMPORTANT) 11 12 T=60Nm 22 22 23 23 24 24
8 10 10 10 10 20mm(IMPORTANT)
20mm(IMPORTANT) 9 11
20mm(IMPORTANT)
11
20mm(IMPORTANT) 11 11 12 1210 12 12 20 22 21
23 24 22
9 10 19
20mm(IMPORTANT) 1119pag.2 20 20
12 2121 22 23 24
9 10 20mm(IMPORTANT) 11 12 22 23 20mm(IMPORTANT) 24

22 23 24
Ø12mm Ø12mm
80mm 80mm

Ø12mm
20mm(IMPORTANT) Ø12mm
25 80mm 80mm
25
Ø12mm 26 26 27 27
Ø12mm Ø12mm
80mm
T=60Nm
T=60Nm 22 23 20mm(IMPORTANT)
20mm(IMPORTANT) 24
20mm(IMPORTANT)
80mm 80mm
T=60Nm
20mm(IMPORTANT)
20mm(IMPORTANT)
20mm(IMPORTANT)
20mm(IMPORTANT) 25 26 27
13 14 20mm(IMPORTANT)
15 20mm(IMPORTANT) 25 26 27
12 T=60Nm 13 14 15 20mm(IMPORTANT) Ø12mm
12 13 13 13 13 14 1422 14 14 15 15
23 15 24 2525 25 80mm 26
26 2727
1513 15
26
12 11 13
13 12
22
14
14 23 15 24
23 24 25 27
25 26 27

T=60Nm T=60Nm
Ø12mm
80mm
28 28 29 29
Ø12mm T=60Nm
Ø12mm Ø12mm T=60Nm
80mm
25 80mm 80mm
Ø12mm Ø12mm
Ø12mmØ12mm 26 27 28 29
20mm(IMPORTANT) Ø12mm
80mm 28 29
20mm(IMPORTANT) 80mm 80mm 80mm Ø12mm T=60Nm
80mmØ12mm T=60Nm
T=60Nm
16 17 80mm 18 T=60Nm
15
20mm(IMPORTANT) 80mm 28 29
15 16 25 17 26 18 27 28 29
16 16
16 16 16 17 17
17 17 17 18 18
18 18 18 28 29T=60Nm
15
14 16 15 17 16 18 26 28 27 29 28
25 26 27

* The distance of *installation depends


The distance on speed
of installation and weight
depends of vehicle
on speed and weight of vehicle

T=60Nm pag.3 pag.3


12mm * The distance of installation depends on speed and weight of vehicle
* The distance of installation depends on speed and weight of vehicle
28 29
T=60Nm pag.3
T=60Nm pag.3
T=60Nm
18 T=60Nm * The distance of installation depends on speed and weight of vehicle
28 T=60NmT=60NmT=60Nm
T=60Nm 29
18 T=60Nm
T=60Nm * The distance of installation depends on speed and weight of vehicle
pag.3
pag.2 * The distance of *installation depends on speed andonweight
speed of vehicle
18 pag.2 T=60Nm pag.3
The distance of installation depends and weight of vehicle
72 pag.2 73
pag.2pag.2pag.2 pag.3 pag.3
pag.2 28 29
pag.2
GUARD RAIL - FULL FRAME
06. DOORS 06. DOORS

GUARD RAIL - ROD 70 INSTALLATION

FULL FRAME HEAVY LOAD /


FULL FRAME
PROTEZIONE PORTA FULL FRAME FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE
FULL FRAME DOOR PROTECTION ASSEMBLY INSTRUCTIONS

GUARD RAIL - FULL FRAME INSTALLAT


GRA 150
GUARD RAIL - FULL FRAME INSTALLATION
*STANDARD DIMENSIONS
GUARD
19
RAIL - FULL FRAMEØ16 mm GUARD RAIL - FULL FRAME
GR 150
Ø14 mm
UP TO 4500mm HIGH
AND 4000mm WIDE GUARD RAIL - FULL FRAME INSTALLATION
Ø16m

1 2
GRS 150 SF 12
1
GRC 150 2 3
2 3 Ø16mm
24

GUARD RAIL - FULL FRAME INSTALLA


GR 150

2 3 24
1 4 2 35
2
Ø12mm

87ml
Ø14mm

87ml
500 1170 500
Ø
M12
2/32/3
500 1170 500 GRA150
FIX P 150 Ø
120

4 4 5 5 GR150
6 6 M12
1 2 100mm
NUT M12 1 2 3
GRA150
WASHER M12

87ml
4 5 6
120

GR150

M12 GRS 150


3
2/3
pag.1 19
4 5 6 GRC150
H
120

Il presente disegno, a sensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
BIGGER PLATE FFB GRS 150

Ø16mm
GRC150
H

120 GR150 100mm

e disegno, a sensi di legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
1800

M16
1 2 3
WARNING
GR150
4 5
1800

4 The distanceFIXP150
of installation
5 depends
pag.1 6 4
on speed and weight of vehicle
M12
CENTER TO CENTER - 120
CENTER TO CENTER and also on the dimension of the
FIXP150
CENTER TO CENTER +120 full frame
pag.1 WALL
pag.1
CENTER TO CENTER - 120
CENTER TO CENTER 1 2
WALL
M12
3
WARNING CENTER TO CENTER +120 100mm

Full frame up to 4000mm high and Ø16mm


pag.1 M12
4 5
5
6
90

4000mm wide can be used without 100mm


MIN 200mm*
160

being mounted to the wall Ø16 mm


pag.1
M12
90

160
150

150 180

pag.1
00 Data Firma

_____ 100 mm
150

150 180 _______


Ø16mm
_____ _____ 100mm
74 00 Data Firma
75
Via Europa 2, Fratte (PADOVA) Italy
www.mpmpvc.com E-mail: info@mpmpvc.com
Tel +39.049.9301773 Fax +39.049.9300427 _____
_______
80
_____ _______

_____ _____ Ø12mm


24
06. DOORS 06. DOORS
Ø12mm
Ø14mm
Ø12mm Ø12mm

FULL FRAME DP 90 ONE WAY


Ø14mm Ø14mm

3
LIGHT LOAD /
ISTRUZIONI DI INSTALLAZIONE 19 PORTA PEDESTRIAN 90 FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS 19 19
DOOR PEDESTRIAN 90

GUARD RAIL - FULLRAIL


GUARD FRAME
- FULL FRAME INSTALLATION
INSTALLATION

7 7 8 8 VERTICAL POST DP 90
6 1 6 2 7 3 8
1 1 2 2 3 3
GR 70 HO

HINGE VERTICAL POST DP 90

Ø16mm
mm CAP 50X25
T=60Nm
Ø12mm
80mm T=60Nm T=60Nm GR REINFORCMENT
Ø12mm Ø12mm
80mm 80mm
4 5 6
HINGE DP 90
4 4 5 5 6 6
9 Ø14 mm
GUARD 10
Ø14mm RAIL - FULL FRAME
11 INSTALLATION
GUARD RAIL - FULL FRAME INSTALLATION
Ø14mm Ø14mm
7 8 9
9090mm
mm 7 8 9 GATE STOP 90

90mm 90mm

GUARD RAIL
GUARD GUARD
- FULLRAIL
FRAME- FULLRAIL - FULL FRAME
FRAME INSTALLATION INSTALLATION
INSTALLATION
9ml

pag.1
9ml

INSTALLATION
7
pag.1 7 7
pag.1 8 8 2/3 8 2/3 9 9 9 WIDTH

12 13 14 MIN 600 - MAX 1000

9 10 11 12
10 11 12

70

420
9ml

9ml
9ml

2/3 2/3 2/3

1180
T=60Nm
10 10 10 11 11 11 12 12 12

350
T=60Nm

12 13 14
13 14
15 16 17

345
pag.2 T=60Nm T=60Nm T=60Nm
pag.2
T=60Nm
T=60Nm
45

T=60Nm 13 13 13 14 14 14 T=60Nm

120
90

90
120
76 77
06. DOORS 06. DOORS

GUARD RAIL - ROD 70 INSTALLATION

DP 90 ONE WAY DP 90 ONE WAY


GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION

PORTA PEDESTRIAN 90 ISTRUZIONI DI INSTALLAZIONE


DOOR PEDESTRIAN 90 ASSEMBLY INSTRUCTIONS

1 2 3 4
1 2 3 4
PLEASE CHECK HERE BELOW GUARD RAIL - LM INSTALLATION
HOW THE SIZE OF THE DOOR IS TO BE MEASURED Ø12 mm GUARD
1 RAIL - DOOR PEDESTRIAN
2 90
1
A
A

Ø12mm
80mm

4 5

19 2
B
B

................mm
................mm

2 3
Ø12 mm

ella MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
2 3 2 3 80 mm

PLEASE CHECK HERE BELOW pag.1


C 32
C WHICH DIRECTION OF OPENING YOU NEED 1

87ml
1 2
WALL 2/3

87ml
87ml
4 5 6
Ø12mm
80mm
2/3 2/3
MIN 200mm*
D
D 4 5 6 4
4 5 6 45

A B C D

4 5 6

E T
E
pag.1
78 79
pag.1
19

06. DOORS 06. DOORS


Ø12mm

1 DP 90 ONE WAY 2 3 DP 90 SWING LIGHT LOAD /


ISTRUZIONI DI INSTALLAZIONE PORTA PEDESTRIAN 90 FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS 19 DOOR PEDESTRIAN 90

GUARD RAIL - SWING GATE 90 IN

Ø12mm
80mm
T=60Nm 5 9
24 35 6

CAP 50X25

6.3

HINGE
Ø12mm
80mm
GUARD RAIL - DOOR PEDESTRIAN 90 INSTALLATION VERTICAL POST
T=60Nm

5 6 7 6 8 10 9 1 2 3

M6 GR 70 HO
pag.1
M6

70
Ø12mm
80mm

280
4 5 6

70
VERTICAL POST

1160

280
T=60Nm GUARD RAIL - DOOR PEDESTRIAN 90 INSTALLATION PEC 70

70
GUARD RAIL7- DOOR PEDESTRIAN
10 90 8 INSTALLATION
9

344
7 11
T=60Nm
7 8 9

10
MIN 600 - MAX 1000

pag.1
GR 90 HV

45
GRT 150

120

90
90
120

15 mm
GUARD RAIL - DOOR PEDESTRIAN 90 INSTALLATION

70
CON 90
10

280
7 8 9 FIX P 90
10 8 T=60Nm 12

70
1160

280
M12
PEC 70

70
CAP 50X25

6.3
344
GR REINFORCEMENT

HINGE 00 Data
10

M6
MIN 600 - MAX 1000
MIN 1200 - MAX 2000
M6
VERTICAL POST
GR 90 HV Via Europa 2, Fratte

45
www.mpmpvc.com E
Tel +39.049.9301773 F

10
120

90
GR 70 HO
90
80 120 81
06. DOORS 06. DOORS Ø12m

GUARD RAIL - ROD 70 INSTALLATION

DP 90 SWING DP 90 SWING
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - SWING GATE 90 INSTALLATION 19

PORTA PEDESTRIAN 90 ISTRUZIONI DI INSTALLAZIONE


DOOR PEDESTRIAN 90 ASSEMBLY INSTRUCTIONS
3 1 2 2 1 3 4
1 1 2 2 3 3 4 4

PLEASE CHECK HERE BELOW GUARD RAIL - LM INSTALLATION GUARD RAIL - DOOR PEDESTRIAN 90
HOW THE SIZE OF THE DOOR IS TO BE MEASURED Ø12 mm 1 2 3
1
A A
A A
Ø12mm

uiG atnaS id ETTARF ,MPM alled 'ateirporp id 'e ,eggel id isnes a ,ongesid etneserp lI
Nr. Disegno
PEDESTRIAN 90
Nr. Dis
PEDESTRIAN 90
_ ESTRUSIONE MATERIE PLASTICHE
SCHEDA ORDINE PORTA SCHEDA ORDINE PORTA _____ _____ 2° Controllo
GUARD RAIL - DOOR PEDESTRIAN 90 INSTALLAT
ESTRUSIONE MATERIE PLASTICHE
Ø12mm
Denominazione Scala
Scala Denominazione 80mm

F Q.tà Materiale
Materiale Q.tà F 4 5 6
1° Controllo
Rev. n°. Data 17/01/2017 Data 17/01/2017 Rev. n°. Firma 2
19
19
B B
B B

Ø12m
mm................ ................mm Ø12 mm
................mm
................mm T=60Nm
................mm
80 mm
GUARD RAIL - SWING GATE 90 INSTALLATION
E 2 3 pag.1
1 2

itsautorizzazione.
3

ni anautorizzazione.

ella MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
E

2 3 2 3 19
1 2 3

C previa
PLEASE CHECK HERE BELOW

elloprevia
C C
C C

P(senza
WHICH DIRECTION OF OPENING YOU NEED

)Dsenza
a eterzi,
Ø12mm

sse 'oup naonterzi,


80mm

recomunicato
ecomunicato

87ml
1 42 5 3
1 2 4
D
irne'
2/3
ottodorpne'
WALL
D
Ø12mm
u ,utilizzato,
,otazzilitutilizzato,

Ø12mm

87ml
87ml
4 80mm
5 6
enriprodotto,
oc 'riprodotto,

2/3 2/3
D MIND200mm*
D D
4 4 5 5 6 6
essere

4 5 6 Ø12mm
cinessere

80mm
um

T=60Nm
tapuo'
opuo'
et anon

19
,izerenon

4 5 6
T=60Nm
pag.1 5
es(PD)
azn(PD)

A B
p Colle

C
Colle

C
tua aivinerin
iroGiustina
zazzGiustina

4 5 6
oiSanta
Santa

E E
E E
FRATTE
FRATTE endi
.di

pag.1
82 T=60Nm T=60Nm 83
MPM,

1 2 3
MPM,

................mm ................mm
della
'ella
06. DOORS 06. DOORS

DP 90 SWING DP 150 ONE WAY HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE PORTA PEDESTRIAN 150 FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS DOOR PEDESTRIAN 150

Ø12mm
0mm

GUARD RAIL - SWING GATE 90 INSTALLATION


GUARD RAIL - HAND RAIL6 INSTALLATION
7 6 8 109
VERTICAL POST 150

GR 90 HO

HINGE VERTICAL POST 150


Ø12mm
GUARD RAIL - DOOR PEDESTRIANNOT90 INSTALLATION 80mm
GUARD RAILINCLUDED
- SWING
20mm GATE 90 Ø12mm INSTALLATION
T=60Nm
7 8 9 HINGE DP 150
7 10 8 11 9 12
7 GUARD RAIL - SWING11
GATE 90 INSTALLATION
HINGE SUPPORT
7 8 9

19
GATE STOP 150

Ø12mm
80mm
20mm
GUARD RAIL - DOOR PEDESTRIAN 9020 mm INSTALLATION T=60Nm
Ø12mm
10 10 13 DOUBLE GATE 11 20mm
12 80mm
7 8 9
8 T=60Nm 12 WIDTH
MIN 600 - MAX 1000
10 11 12

90

420
20mm
T=60Nm

1187
13 DOUBLE GATE
10 T=60Nm

330
9 13 DOUBLE GATE 13

350
20mm
Ø12 mm
70

20mm
120

160
80 mm 20 mm

150 180
pag.2
84 85
06. DOORS 06. DOORS

GUARD RAIL - ROD 70 INSTALLATION

DP 150 ONE WAY DP 150 ONE WAY


GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION

PORTA PEDESTRIAN 150 ISTRUZIONI DI INSTALLAZIONE


DOOR
1 PEDESTRIAN 150 2 3 4 ASSEMBLY INSTRUCTIONS

PLEASE CHECK HERE BELOW GUARD RAIL - LM INSTALLATION


HOW THE SIZE OF THE DOOR IS TO BE MEASURED Ø12 mm 1 2
1

Ø12mm
80mm

19 2

................mm

lla MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
2 3
Ø12 mm
T
2 3 2 3 80 mm

PLEASE CHECK HERE BELOW pag.1


WHICH DIRECTION OF OPENING YOU NEED 3

87ml
1 2
WALL 2/3

87ml
87ml
4 5 6
GUARD RAIL - PEDESTRIAN 90 INSTAL
2/3 2/3
MIN 200mm*

4 5 4 6 5 6
4

A B C D

4 5 6

pag.1
86 87
Classe di tolleranza Scostamenti limite per dimensioni lineari *
0,5° 3 6 30 120 400 1000 2000
Desig. Denominazione. 3 6 30 120 400 1000 2000 4000
06. DOORS 06. DOORS
ESTRIAN 150 INSTALLATION

8 9

DP 150 ONE WAY DP 150 SWING HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE PORTA PEDESTRIAN 90 FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS DOOR PEDESTRIAN 90

GUARD RAIL - SWING GATE 150


Ø12mm
80mm

11 12
T=60Nm 5 9

HINGE

Ø12 mm
VERTICAL POST
80 mm
T=60Nm
M6 GR 90 HO
6 10 6.3 1 2 3
GRT 150

90
Ø12mm

240
80mm CON 150

90
4 5 6
VERTICAL POST

1162

240
GUARD RAIL - PEDESTRIAN 90 INSTALLATION

90
GUARD RAIL - DOOR PEDESTRIAN 150 INSTALLATION

327
7 11
7 8 9

12
MIN 600 - MAX 1000 T=60Nm
PEC 150

70
pag.1

160

120
GRT 150
180 150

GR 150 HV
15 mm
GUARD RAIL - DOOR PEDESTRIAN 90 INSTALLATION
Ø12mm

90
80mm
15mm

240
CON 150
7 8 9
10 11
8 12
T=60Nm 12

90
FIX P150

1162

240
90
M16

327

HINGE
12

00 Data

M6
MIN 600 - MAX 1000 MIN 1200 - MAX 2000
PEC 150 6.3
VERTICAL POST

70
Via Europa 2, Fratte (PADOV
www.mpmpvc.com E-mail: inf
* The distance of installation depends on speed and weight of vehicle Tel +39.049.9301773 Fax +39.0
160

120
10 T=60Nm
GR 90 HO

88 180 150 89
GR 150 HV
VE
06. DOORS 06. DOORS Ø12m

GUARD RAIL - ROD 70 INSTALLATION

DP 150 SWING DP 150 SWING


GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - SWING GATE 90 INSTALLATION 19

PORTA PEDESTRIAN 150 ISTRUZIONI DI INSTALLAZIONE


DOOR PEDESTRIAN 150 ASSEMBLY INSTRUCTIONS
3 1 2 2 1 3 4
1 1 2 2 3 3 4 4

GUARD RAIL - LM INSTALLATION GUARD RAIL - SWING GATE 150


PLEASE CHECK HERE BELOW
HOW THE SIZE OF THE DOOR IS TO BE MEASURED Ø12 mm 1 2
1
A A
A A
Ø12mm GUARD RAIL - SWING GATE 150 INSTALLAT

uiG atnaS id ETTARF ,MPM alled 'ateirporp id 'e ,eggel id isnes a ,ongesid etneserp lI
Nr. Disegno
PEDESTRIAN 90
Nr. Dis
PEDESTRIAN 90
_ ESTRUSIONE MATERIE PLASTICHE
SCHEDA ORDINE PORTA SCHEDA ORDINE PORTA
ESTRUSIONE MATERIE PLASTICHE _____ _____ 2° Controllo
Scala
Scala Denominazione
Denominazione Ø12mm
80mm
F Q.tà Materiale
Materiale Q.tà F
1° Controllo
Rev. n°. Data 17/01/2017 Data 17/01/2017 Rev. n°. Firma
4 25
19
19
B B
B B Ø12m

mm................ ................mm Ø12 mm


................mm
................mm
................mm GUARD RAIL - SWING GATE 150 80 mm INSTALLATION
T=60N
E 2 3 1 2

itsautorizzazione.
3

ni anautorizzazione.

ella MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
E
19
2 3 2 3 pag.1
1 2 3

C previa
PLEASE CHECK HERE BELOW

elloprevia
C C
C C

P(senza
WHICH DIRECTION OF OPENING YOU NEED

)Dsenza
a eterzi,
Ø12mm

sse 'oup naonterzi,


80mm

recomunicato
ecomunicato
1 2 3

87ml
4 5
1 2 4
D
irne'
2/3 Ø12mm
ottodorpne'
WALL
D
u ,utilizzato,
,otazzilitutilizzato,

Ø12mm

87ml
87ml
4 80mm
5 6
enriprodotto,
oc 'riprodotto,

2/3 2/3
D MIND200mm*
D D
4 4 5 5 6 6
essere

Ø12mm
4 5 6
cinessere

80mm
um
tapuo'

T=60
opuo'
et anon

6 19
,izerenon

4 5 T=60Nm
5
es(PD)

pag.1
azn(PD)

A B
p Colle

C
Colle

C
tua aivinerin
iroGiustina
zazzGiustina

4 5 6
oiSanta
Santa

E E
E E
FRATTE
FRATTE endi
.di

pag.1
90 T=60Nm 91
MPM,

T=60Nm
MPM,

................mm
1 2 3
................mm
della
'ella
06. DOORS 06. DOORS

DP 150 SWING LIFT GATE 90 LIGHT LOAD /


ISTRUZIONI DI INSTALLAZIONE CANCELLO PEDESTRIAN 90 FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS GATE FOR PEDESTRIAN 90

Ø12mm
80mm

GUARD RAIL - HAND RAIL 6 GUARD RAIL - SWING GATE 150


INSTALLATION INSTALLATION CAP 60X20
6 10
7 8 9 ALUMINUM TUBE 60X20

SDPL 90

NUT M8

GUARD RAIL - SWING GATE 150 INSTALLATION Ø12mm GR 70 HO


NOT 80mm
GUARD RAIL - SWING GATE
20mm 90
INCLUDED Ø12mm INSTALLATION
7 T=60Nm 8 9
7 10 8 11 9 12
7 GUARD RAIL - SWING11
GATE 150 INSTALLATION SDPL 90 CORTA
GRT 70
7 8 9
19

B226
Ø12mm
80mm Ø12mm SDPL90 FERMO
GUARD RAIL -20mm
SWING GATE 150 INSTALLATION 80mm T=60Nm
20mm
20 mm RON 12
13 DOUBLE GATE
7 10 8 11 9 12 Ø12mm
10 11 12 80mm
20mm
L118
8 T=60Nm 12 THREADED ROD M8X80
10 11 12 THREADED ROD M8X77
B224

GR 70 HO HANDLE
GUARD RAIL - LIFT GATE 90 COMPL
SPDL90
Ø12mm
20mm
80mm
20mm

T=60Nm T=60Nm
10 11 12
13 DOUBLE GATE 13 DOUBLE GATE
T=60Nm

13 DOUBLE GATE
9 13

T=60Nm
20mm
Ø12 mm
13 DOUBLE GATE20mm
pag.2 20mm
20 mm
80 mm

92 93

1 2 3
06. DOORS 06. DOORS

LIFT GATE 90 LIFT GATE 90


GUARD RAIL - LIFT GATE 90
GUARD GUARD
RAIL - LIFT GATE
RAIL 90GATE 90
- LIFT
COMPLETE INSTALLATION
COMPLETE INSTALLATION
COMPLETE INSTALLATION

CANCELLO PEDESTRIAN 90 ISTRUZIONI


GUARDDI INSTALLAZIONE
RAIL - LIFTRAIL
GUARD GATE 90 GATE 90
- LIFT COMPLETE INSTALLATION
COMPLETE INSTALLATION
GATE FOR PEDESTRIAN 90 GUARD RAIL INSTRUCTIONS
ASSEMBLY - LIFT GATE 90 WARNING
COMPLETE INSTALLATION
The distance of installation depends
1 2 3 4 5 7 on speed and weight of vehicle

Ø12mm
Ø12mm Ø12mm
A
19
19
TUBO ALLUMINIO 60X20
TAPPO 60X20 Ø12mm Ø12mm
Ø12mm
SDPL90
70
19
70

DADO CIECO M8
19 19
65

Ø12mm
70

Ø12 mm
19 19
GR 70 TRAVERSO GAMBA 60X20 19

GRT 70
630

SDPL90_FERMO 1 2 3
1 2 3
1115

1 2 3
1D 6 D6
2 3
70mm D6
7070mm
mm
70

1 1 2 2 70mm 3 3
1 2 630mm 3
B226 D6 D6
mm
630mm
630 630mm
345

D6 70mm 70mm
70mm
RON 12 70mm
7070mm
mm 70mm
335mm
630mm
335mm
355 mm 630mm
335mm
BARRA M8X80 630mm
10

MIN 1050 - MAX 1600 70mm 70mm


211
70mm 335mm 335mm
4 5 6
45

335mm
4 4 5
I118 5 CORTA
SDPL90 6 6
D B224

4 4 5BARRA FIL. M8X77


5 6 6
4 5
GR 70 TRAVERSO MANIGLIA 4 6 5 6

SDPL90

Ø12mm
80mm Ø12mm Ø12mm
80mm 80mm

E
Ø12mm Ø12mm
80mm
Ø12mm 80mm
80mm
Ø12 mm
pag.1
pag.1
80 mm pag.1

pag.1 pag.1
pag.1
... Data 17/05/2018 ... Firma

F ...
...
1:15
MIN 2100 - MAX 3200 Via Europa 2, Fratte (PADOVA) Italy LIFT GATE 90
www.mpmpvc.com E-mail: info@mpmpvc.com
Tel +39.049.9301773 Fax +39.049.9300427 ...
94 95
1 2 3 4
GUARD RAIL - LIFT GATE 90 COMPLETE INSTALLATION
GUARD RAIL - LIFT GATE 90 COMPLETE INSTALLATION

06. DOORS 06. DOORS

LIFT GATE 90 Ø12mm


LIFT GATE 150 HEAVY LOAD /
ISTRUZIONI DI INSTALLAZIONE Ø12mm CANCELLO PEDESTRIAN 150 FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS GATE FOR PEDESTRIAN 150

19 CAP 80X20
19
ALUMINUM TUBE 80X20
GUARD RAIL - LIFT GATE 90 COMPLETE INSTALLATION
GUARD RAIL - LIFT GATE 90 COMPLETE INSTALLATION SDPL 150
GUARD RAIL - LIFT GATE 90 COMPLETE INSTALLATION
7 7 9
7
GUARD RAIL - LIFT 7 790
7 GATE 7
9
8
COMPLETE INSTALLATION
9 9 GRT90

1 2 3 GR90 HO
7 7 1 9 2 3
D6
SDPL150 FERMO
GUARD RAIL - LIFT GATE 90 D6 COMPLETE
70mm INSTALLATION
70mm
NUT M8
SDPL 150 CORTA
7 7 9
630mm
630mm
5mm
70mm
NOT 5mm
T=60Nm T=60Nm 70mm 335mm 55mm
mm THREADED ROD M8X102
T=60Nm INCLUDED
T=60Nm 335mm
10 11 12
10 11 12 B226
10 11 5mm 12
T=60Nm
4 5 6
10 11 4 12 5 6
10 11 5mm
12 SDPL 150
T=60Nm L118

10 11 12 RON 12
B224
Ø12mm
Ø12mm
80mm
80mm Ø12mm GR 90 HO HANG
80mm
Ø12mm THREADED ROD M8X105
13 14 Ø12mm
80mm 15 DOUBLE GATE GUARD RAIL - LIFT GATE 150 COM
13 14 80mm Ø12 mm 15 DOUBLE GATE
Ø12mm
13 80mm 14 15 DOUBLE GATE
80 mm Ø12mm
80mm
13 14 15 DOUBLE GATE
pag.1
13 pag.1 14 15 DOUBLE GATE
13 14 DOUBLE GATE 15
10mm
10mm
T=60Nm 10mm
T=60Nm
T=60Nm

10mm
T=60Nm
10mm
10mm
T=60Nm
T=60Nm

96 97
pag.2
pag.2 1 2 3
pag.2
06. DOORS 06. DOORS

LIFT GATE 150 LIFT GATE 150


GUARD RAIL - LIFT GATE 90 COMPLETE INSTALLATION

CANCELLO PEDESTRIAN 150 ISTRUZIONI


GUARDDI INSTALLAZIONE
RAIL - LIFT GATE 90 COMPLETE INSTALLATION
GATE FOR PEDESTRIAN 150 GUARD RAIL INSTRUCTIONS
ASSEMBLY - LIFT GATE 90 COMPLETE INSTALLATION

1 2 3 4 5 7
GUARD RAIL - LIFT GATE 150 COMPLETE INSTALLATION

Ø12mm
19
A 19

Ø12mm
Ø12mm
TAPPO 80X20
Ø12mm

SDPL150 19
87

Ø12mm
Ø12 mm
90

19
GRT 90 19
19
GR 90 TRAVERSO TUBO ALLUMINIO 80X20
570

SDPL150_FERMO

1 2 3
1100

1 2 3
DADO CIECO M8
D 66
D
1 2 3
90

70mm
1 B226 2 90mm 3
1 D6 2 3
RON 12 D6 630mm
70mm
350

570mm
D6
70mm
90mm
70mm 90mm
630mm
BARRA FILETTATA M8X105 630mm 338mm
335mm 570mm
MIN 1100 - MAX 2000
70mm
12

261 90mm
70mm 335mm
338mm
I118335mm
4 5 SDPL150 CORTA 6
D B224
70

BARRA FILETTATA M8X102


4 5 6
4 5 6
4 45 6 5 6
SDPL150 GR 90 TRAVERSO MANIGLIA

Ø12mm
80mm
Ø12mm
E Ø12mm
80mm
80mm
Ø12mm
80mm
Ø12 mm
80 mm
pag.1
pag.1
pag.1
pag.1
... Data 17/05/2018 ... Firma

F ...
...
1:15
MIN 2200 - MAX 4000 LIFT GATE 150
Via Europa 2, Fratte (PADOVA) Italy
www.mpmpvc.com E-mail: info@mpmpvc.com
98
Tel +39.049.9301773 Fax +39.049.9300427 ... 99
1 2 3 4
06. DOORS 07. LINK

Ø12mm

LIFT GATE 150 LINK SINGLE


Ø12mm

HEAVY LOAD /
ISTRUZIONI DI INSTALLAZIONE GUARD RAIL A SINGOLA BARRIERA REGOLABILE FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS ADJUSTABLE SINGLE RAIL BARRIER


19
19

GRT 150
GUARDGUARD RAIL
RAIL - LIFT - LIFT150
GATE
GUARD
GATE 150
RAIL - LIFT GATE 150
COMPLETE
COMPLETE INSTALLATION
INSTALLATION
COMPLETE INSTALLATION
LINK 150/150 DX
7 7 8 9
7 78 8 9
8 9 9
1 2 3
1 2 3
D6 GRD 150
GR 150 HO LINK
D6 70mm
70mm

630mm
630mm LINKO 150/150
FIX P 150
5mm
70mm
T=60Nm NOT 5mm 5mm
T=60Nm
T=60Nm INCLUDED 70mm 335mm 5 mm
T=60Nm
335mm
10 10 11 11 12 12 M12
10 11 12

4 5 6
10 4 5
11 6 12
LINK 150/150 SX

Ø12mm
Ø12mm
80mm Ø12mm
80mm
80mm
T=60Nm
T=60Nm T=60Nm
Ø12mm
13 13 14 14 80mm 15 DOUBLE GATE
14 mm 15 DOUBLE GATE
Ø12mm
13 80mm
Ø12 15 DOUBLE GATE
80 mm
1 2 3 4

pag.1
pag.1
13 14 DOUBLE GATE 15 120

150
10mm
10mm A
T=60Nm 10mm
T=60Nm T=60Nm

547

otto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.


10mm
71 CENTER TO CENTER -171 CENTER TO CENTER -171
CENTER TO CENTER CENTER TO CENTER

120

160
B

150
120

pag.2
180
pag.2 pag.2

100 101

GRT 150
07. LINK 07. LINK

LINK SINGLE LINK SINGLE


ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

WARNING The distance of installation depends on speed and weight of vehicle

The product is equipped with screws M8

10 11 12

19

13 14 15
Ø12mm

1 Ø6mm 2 3 16 17 18
70mm

T=60Nm

4 5 6 19 20 21

S8

7 8 9 22 23

T=60Nm
T=60Nm

102 103
07. LINK 07. LINK

LINK LM HEAVY LOAD /


LINK LM
GUARD RAIL A DOPPIA BARRIERA REGOLABILE FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE
ADJUSTABLE DOUBLE RAIL BARRIER ASSEMBLY INSTRUCTIONS

GRT 150 WARNING The distance of installation depends on speed and weight of vehicle

The product is equipped with screws M8

LINK 150/150 DX

GR 150 HO LINK GRD 150


19

LINKO 150/150 FIX P 150

LINK 150/150 SX
M12 Ø12mm

1 2 3
Ø6mm

4 5 6

A
S8

7 8 9
e' comunicato a terzi, senza previa autorizzazione.

CEN

T=60Nm

104 105
07. LINK 07. LINK

LINK LM LINK 150/1 HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE BARRIERA DI SICUREZZA REGOLABILE FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS ADJUSTABLE SAFETY BARRIER

GRT 150

10 11 12 CON 150

GR 90 HO
LINK 150/150 DX

PEC 150

13 14 15
GR 150 HV LINK 150/1

LINKO 150/150

FIX P 150
LINK 150/150 SX

16 17 18 M12

GR 150 HO LINK

T=60Nm

19 20 21

120

240
A

22 23

1100
150
120

106 107
120
150
07. LINK 07. LINK

LINK 150/1 LINK 150/1


ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

WARNING The distance of installation depends on speed and weight of vehicle

The product is equipped with screws M8

7 8 9

19

T=60Nm

Ø12mm 10 11 12

1 Ø6mm 2 3 13 14 15
70mm

20mm(IMPORTANT)

4 5 6 16 17 18

S8

T=60Nm

108 109
07. LINK 07. LINK

LINK 150/1 LINK 150/2 HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE BARRIERA DI SICUREZZA REGOLABILE FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS ADJUSTABLE SAFETY BARRIER

GRT 150

19 20 21 CON 150

GR 90 HO

LINK 150/150 DX

PEC 150
20mm(IMPORTANT)

GR 150 HV LINK 150/2

22 23 24 LINKO 150/150

FIX P 150

LINK 150/150 SX
M12

GR 150 HO LINK

25 26 27

GUARD RAIL - LINK 150/1+S12


T=60Nm INSTALLATION

19 20 21

28 29 INSTALLATION TIP A

22 23 24

110 111
07. LINK 07. LINK

LINK 150/2 LINK 150/2


ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

WARNING The distance of installation depends on speed and weight of vehicle

The product is equipped with screws M8

7 8 9

19

T=60Nm

Ø12mm 10 11 12

1 Ø6mm 2 3 13 14 15
70mm

20mm(IMPORTANT)

4 5 6 16 17 18

S8

T=60Nm

112 113
07. LINK 07. LINK

LINK 150/2 LINK 150/3 HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE BARRIERA DI SICUREZZA REGOLABILE FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS ADJUSTABLE SAFETY BARRIER

GRT 150

LINK 150/150 DX
GR 150 HO LINK
19 20 21

GRD 150

20mm(IMPORTANT)
LINKo 150/150

22 23 24 FIX P 150
LINK 150/150 SX

M12

25 26 27

GUARD RAIL - LINK 150/1+S12


T=60Nm INSTALLATION
A
19 20 21

28 29 INSTALLATION TIP

ato, ne' comunicato a terzi, senza previa autorizzazione.


22 23 24

114 115
07. LINK 07. LINK

LINK 150/3 LINK 150/3


ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

WARNING The distance of installation depends on speed and weight of vehicle

The product is equipped with screws M8

10 11 12

19

13 14 15
Ø12mm

1 Ø6mm 2 3 16 17 18
70mm

T=60Nm

4 5 6 19 20 21

S8 GUARD RAIL - LINK 150/1+S12

19 20 21

7 8 9 22 23 INSTALLATION TIP

T=60Nm T=60Nm

116 22 23 117
24
REMOVABLE
REMOVABLE SAFETY
SAFETY BARRIERS
BARRIERS 90 90 INSTALLATION
INSTALLATION
08. REMOVABLE SAFETY BARRIERS 08. REMOVABLE SAFETY BARRIERS

REMOVABLE SAFETY BARRIERS REMOVABLE SAFETY BARRIERS


90 90
REMOVABLE SAFETY BARRIERS 90
REMOVABLE SAFETY90BARRIERS 90 INSTALLATION INSTALLATION
PIASTRA REMOVIBILE PER SISTEMI 90 REMOVABLE
ISTRUZIONI SAFETY BARRIERS
DI INSTALLAZIONE INSTALLATION
REMOVABLE PLATES FOR 90 SYSTEMS ASSEMBLY
REMOVABLEINSTRUCTIONS
SAFETY BARRIERS 90 INSTALLATION
REMOVABLE SAFETY BARRIERS 90 INSTALLATION
REMOVABLE SAFETY BARRIERS 90 INSTALLATION
REMOVABLE SAFETY BARRIERS 90 INSTALLATION
REMOVABLE SAFETY BARRIERS 90 INSTALLATION Ø20mm Ø20mm
REMOVABLE SAFETY BARRIERS 90 INSTALLATION

Ø20mm Ø20mm
Ø20mm
Ø20mm
Ø20mm

Ø20mm
Ø20mm

REMOVABLE PLATE 90
Ø20mm
Ø20 mm
Ø20mm
1 2 3 4 5 7
M10

1 1 2 2 3 3
1
1 2 3 1 1 12 2 2 3
23 3 3
22

1 2 3
1 2 3
1 2 3

Ø20mm
85mm
Ø20mm Ø20mm
Ø20mm
85mm Ø20 mm
85mm
85mm Ø20mm
Ø20mm
100

136

Ø20mm
4 5 6 85mm 85mm
85mm 85 mm
4 4 5 5 Ø20mm6 6
4 5 6
Ø20mm
1 2 3 85mm
85mm
1 2 4 3 5 6
4 4 5 5 6 6
M12 R 4 5 6
4 5 6
150
4 5 6
182

pag.1
WARNING Ø20mm
85mm Ø20mmpag.1
The removable plate is supplied 3 3 85mm
30 120 400 1000 2000 pag.1 pag.1
30 120 400 1000 2000 4000

with special removable fixing


f fine -
m
c pag.1
accessories
4 FIX RE v -
5 pag.1 6
01 4
Data 05/04/2019 5 Firma 6 pag.1
Materiale
...
1:2
Via Europa 2, Fratte (PADOVA) Italy
www.mpmpvc.com E-mail: info@mpmpvc.com
Tel +39.049.9301773 Fax +39.049.9300427
REMOVABLE PLATE 90
AN-09-0075-00
pag.1pag.1
1 2 3 4
118 119
REMOVABLE
REMOVABLE SAFETY
SAFETY BARRIERS
BARRIERS 90 90 INSTALLATION
INSTALLATION
08. REMOVABLE SAFETY BARRIERS 08. REMOVABLE SAFETY BARRIERS

REMOVABLE SAFETY BARRIERS REMOVABLE SAFETY BARRIERS


REMOVABLE SAFETY BARRIERS 150 INSTALLATION

150 150
PIASTRA REMOVIBILE PER SISTEMI 150 REMOVABLE
ISTRUZIONI REMOVABLE SAFETY150
SAFETY BARRIERS
DI INSTALLAZIONE BARRIERS 150 INSTALLATION
INSTALLATION
REMOVABLE PLATES FOR 150 SYSTEMS ASSEMBLY INSTRUCTIONS
REMOVABLE SAFETY BARRIERS 150 INSTALLATION REMOVABLE SAFETY BARRIERS 150 INSTALLATION
REMOVABLE SAFETY BARRIERS 150 INSTALLATION
REMOVABLE SAFETY BARRIERS 150 INSTALLATION
REMOVABLE SAFETY BARRIERS 90 INSTALLATION Ø20mm Ø20mm
REMOVABLE SAFETY BARRIERS 90 INSTALLATION

Ø20mm

Ø20mm Ø20mm
Ø20mm

Ø20mm
Ø20mm
Ø20mm

Ø20mm
Ø20 mm
Ø20mm
REMOVABLE PLATE 150

M10

1 2 3 4 5 7
1 1 1 2 22 33 3
1 2 3
1 1 1 2 2 23 3 3
A
24

1 2 3
1 2 3
1 2 3

B Ø20mm
85mm
Ø20mm
85mm
REMOVABLE PLATE 150
M10
Ø20mm Ø20mm
Ø20 mm
85mm
4 5 5 85mm Ø20mm
Ø20mm
4 5 5
140

176

85mm 85mm 85 mm
Ø20mm
85mm Ø20mm
4 4 5 5 5
Ø20mm 5
1 2 3 85mm
85mm
1 2 3
M12 R
4 4 4 5 5 5 56 6
4 5 5
4 5 5
210
4 5 6
242
D

pag.1
E

M12 R WARNING Ø20mm


pag.1
3
3
30
30
120
120
400
400
1000
1000
2000
2000
4000 85mm Ø20mm
The removable plate is supplied
f
m
fine -
85mm pag.1 pag.1
c
v -
with special removable fixing
accessories FIX RE pag.1
4 5 6
02 Data 05/04/2019 Firma

F pag.1
4 5 6
Materiale
...
1:2
pag.1
Via Europa 2, Fratte (PADOVA) Italy REMOVABLE PLATE 150
www.mpmpvc.com E-mail: info@mpmpvc.com
Tel +39.049.9301773 Fax +39.049.9300427 AN-09-0077-00
1 2 3 4

pag.1pag.1
120 121
09. COLUMN PROTECTIONS 09. COLUMN PROTECTIONS
GUARD RAIL - ROD 70 INSTALLATION GUARD RAIL - COLUMN PROTECTION 90 INSTALLAT
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
COPRO 90 LIGHT LOAD /
COPRO 90
PROTEZIONE COLONNA FOR HANDPALLET
TRUCKS
ISTRUZIONI DI INSTALLAZIONE
COLUMN PROTECTION ASSEMBLY INSTRUCTIONS

GUARD RAIL - LM INSTALLATION Ø16

GUARD RAIL - COLUMN PROTECTION 90


Ø16 mm
GR90 GRC 90 1
GUARD RAIL - COLUMN PROTECTION 90 INSTALLATION
NUT
WASHER
2

GRS 90

Ø16mm 5

24 2
GRA 90
90

140

24
M16 GUARD RAIL - COLUMN PROTECTION 90 INSTALLATION
77

2 3
GUARD RAIL - COLUMN PROTECTION 90 INSTALLATION

2 3 2 3
5 6
pag.1
3

87ml
Ø16mm Ø16mm

1 2
CLEAR OPENING + 140mm

CLEAR OPENING + 140mm

WALL 2/3

87ml
87ml
4 5 6
75
2/3 24
MIN 200mm* 2/3 5 6
pag.1
24 5
4 5 4 6 5 6
4

WARNING*
The distance of installation depends
90

on speed and weight of vehicle


140

1 2 3
COLUMN
Ø16 mm
CLEAR OPENING + 140mm
4 5 6
77

CLEAR OPENING + 140mm MIN 75mm* 95 mm

pag.1
pag.1
pag.1
122 123

4 5 6
09. COLUMN PROTECTIONS 09. COLUMN PROTECTIONS

COPRO 90 COPRO 150 HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE PROTEZIONE COLONNA FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS COLUMN PROTECTION

GUARD RAIL - COLUMN PROTECTION 90 INSTALLATION

7 8 GUARD RAIL - COLUMN PROTECTION 90 INSTALLATION GRC 150


5 9 GR 150
7 8 NUT M20

WASHER M20

GRS 150

12 12
GUARD RAIL
6 - COLUMN PROTECTION 90 10 INSTALLATION
GRA 150
7 8

90

140
1 THREADED
2 ROD M20 3

77
T=120Nm

T=120Nm A

T=120Nm
7 1112

CLEAR OPENING +140 mm

CLEAR OPENING +140 mm


75
T=120Nm

1 2 3 4
8 12

CLEAR OPENING +140 mm

CLEAR OPENING +140 mm


pag.2

D
124 125

pag.2
CHEMICAL
ANCHOR

09. COLUMN PROTECTIONS Ø24mm


09. COLUMN PROTECTIONS
GUARD RAIL - COLUMN PROTECTION 150
INSTALLATION
GUARD RAIL - COLUMN PROTECTION 150 INSTALLATION

COPRO 150 COPRO 150


1
GUARD RAIL - COLUMN PROTECTION 150 INSTALLATION
70 INSTALLATION COLUMN

30
ISTRUZIONI DI INSTALLAZIONE CHEMICAL
MIN 150mm* ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ANCHOR ASSEMBLY INSTRUCTIONS

100mm

35ml
INSTALLATION Ø24mm

INSTALLATION Ø24mm
2/3

CHEMICAL Ø24 mm 1
ANCHOR COLUMN 1 5 RAIL - COLUMN PROTECTION 150
GUARD 9 INSTALLATION
GUARD RAIL - COLUMN PROTECTION 150 INSTALLATION

30
MIN 150mm*
CHEMICAL
ANCHOR 30
CHEMICAL
INSTALLATION ANCHOR

100mm
GUARD RAIL - COLUMN PROTECTION 150 INSTALLATION

35ml
Ø24mm 2/3
1
30 GUARD
COLUMN RAIL - COLUMN PROTECTION 150 pag.12 INSTALLATION 6 150 10
1 GUARD RAIL - COLUMN PROTECTION INSTALLATION
COLUMN GUARD RAIL - COLUMN PROTECTION 150
GUARD RAIL - COLUMN PROTECTION 150
MIN 150mm* INSTALLATION
MIN 150mm* 30
100mm
CHEMICAL
2 3

35ml
ANCHOR

T=120Nm
2/3
100mm
GUARD RAIL - COLUMN PROTECTION 150 INSTALLATION

35ml
100mm
Ø24mm

35ml
pag.1 2/3
T=120Nm
1 3 7 2/3 11
COLUMN
Ø24mm
87ml

MIN 150mm*

30
3 2/3 100mm
T=120Nm
CHEMICAL

35ml
87ml

5 6 ANCHOR
2/3 T=120Nm
30 GUARD RAIL - COLUMN PROTECTION 150 INSTALLATION pag.2
2/3
pag.1
CHEMICAL
ANCHOR
pag.1 4 8 12
WARNING*
2 1 The distance of installation depends 2 3
on speed and weight of vehicle
COLUMN
87ml

COLUMN

pag.2
Ø24 mm 100mm
1 2/3 MIN 75mm*
35ml

6 COLUMN
T=120Nm
150 mm
6 2/3

MIN 150mm*
126 pag.1 127
09. COLUMN PROTECTIONS 09. COLUMN PROTECTIONS

HUG TOWER HEAVY LOAD /


HUG TOWER 1 2

PROTEZIONE COLONNA FOR FORKLIFTS ISTRUZIONI DI INSTALLAZIONE


COLUMN PROTECTION ASSEMBLY INSTRUCTIONS

HUG TOW CAP

1 1 22 1 33 2 4 3 5
11 22 33

HUG TOWER HO CON 150

1 2 3 4
GUARD RAIL - HUG TOWER
4 5 6 GUARD RAIL - HUG TOWER
4 5 6
44 55 4 66 5 7pag.1 6 8
7 8
75

HUG TOW HV
850
130

1165

HUG TOW CAP


GUARDGUARD
RAIL - RAIL
HUG- HUG
TOWER
TOWER INSTALLATION
INSTALLATION
pag.1 10 10 11
7 7 8 8 99 11
240

ta Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.

pag.1
pag.1 7 8 9
pag.1
COLUMN570
SIZE + 170
CON 150

HUG TOW HO

68

10 11 12
13 14
COLUMN SIZE 13 14
10 11 12

128 129
WER INSTALLATION
OWER INSTALLATION
TOWER 09. COLUMN PROTECTIONS INSTALLATION 09. COLUMN PROTECTIONS
HUG8TOWER
8
9
9 INSTALLATION
G TOWER8 9 INSTALLATION 10 11 12

HUG TOWER TOWER


8 9 10 11 12
8 9
HEAVY LOAD /
ISTRUZIONI DI INSTALLAZIONE PROTEZIONE COLONNA FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS COLUMN PROTECTION

GRT 150

11 11 11 12
1212 13
13 14 15
11 10 12 11 12 14 15
11 12
CON 150

GR 150 HV TOWER DX/SX

14 15 16 17
14 15
16 17 GR 90 HO
141414 13 1515
15 14 15

FIX P150

M12

17 CENTER TO CENTER 1 CENTER TO CENTER 2 3 4


CENTER TO CENTER CENTER TO CENTER + 300
17 CENTER TO CENTER CENTER TO CENTER + 304
17 pag.2

1717 16 pag.2
A

100

CLEAR OPENING CLEAR OPENING

CLEAR OPENING + 240 CLEAR OPENING + 300

CLEAR OPENING + 300 CLEAR OPENING + 304

130 131
09. COLUMN PROTECTIONS 09. COLUMN PROTECTIONS

GUARD RAIL - ROD 70 INSTALLATION

TOWER TOWER
GUARD RAIL - ROD 70 INSTALLATION
GUARD RAIL - ROD 70 INSTALLATION
1 2 3 4

PROTEZIONE COLONNA ISTRUZIONI DI INSTALLAZIONE


COLUMN PROTECTION ASSEMBLY INSTRUCTIONS
1 2 3 4

A GUARD RAIL - LM INSTALLATION


PLEASE CHECK HERE BELOW
OTHER OPTIONS FOR ASSEMBLY Ø12 mm
A
1
GUARD RAIL - TOWER PROTECTION INSTALLATION
TWO SIDES OPEN

A B

.............mm
.............mm

Ø12mm

.............mm
.............mm

B 19 2

senza previa autorizzazione.


.............mm
19 25 mm
(IMPORTANT)
.............mm

autorizzazione.
C .............mm 2 3

.............mm 2 3 GUARD RAIL - TOWER PROTECTION INSTALLATION

a terzi,
2 3

senza previa
25 mm
(IMPORTANT)

comunicato
C
1 2 3
ONE SIDE OPEN 3

25mm(IMPORTANT)
terzi,
utilizzato,ane'
ne' comunicato

87ml
riprodotto,
.............mm

.............mm
.............mm

.............mm

1 2 Ø12mm
D
utilizzato,
WALL 2/3
non puo' essere

87ml
87ml
4 5 6
(PD) e riprodotto,
.............mm

.............mm
.............mm

.............mm

25mm(IMPORTANT)
D 2/3
MIN 200mm* 42/3 5 6 19
Colleessere

4 5 4 6 5 6
4
in puo'

.............mm .............mm
(PD) e non
Colle Giustina

WARNING
FRATTE diinSanta

The distance of installation depends


E .............mm .............mm on speed and weight of vehicle
1 2 3
MPM, Giustina

Ø12mm

25mm(IMPORTANT)
COLUMN 80mm

4 5 6
di Santa

E C D MIN 100mm*
FRATTE della

pag.1
proprieta'

pag.1
e' diMPM,

132 133
eta' della
egge,

25mm(IMPORTANT)
Rev. n°. Data 17/01/2017 Firma
09. COLUMN PROTECTIONS 10. LOADING BAYS PROTECTIONS

TOWER DOCK GATE


ISTRUZIONI DI INSTALLAZIONE PROTEZIONE BAIE DI CARICO
ASSEMBLY INSTRUCTIONS LOADING BAYS PROTECTIONS

5 8

PIN
GRT 150 WASHER

CON 150

HANDLE
6 T= 60Nm 9
GR 150 GR150
GAS
SPRING
1 2 3 4
PIN WASHER
GRT 150
Ø12 mm METAL PLATE
CON 150
A
80 mm HANDLE
M12
GR150 GR 150
FIXP 150

7 METAL PLATE
FIXP 150
B GAS SPRING

M12

i legge, e' di proprieta' della MPM, FRATTE di Santa Giustina in Colle (PD) e non puo' essere riprodotto, utilizzato, ne' comunicato a terzi, senza previa autorizzazione.
C

150 90
640
150

400
D
CENTER TO CENTER - 180mm
CENTER TO CENTER
TOTAL LENGTH = CENTER TO CENTER + 500mm
120 172 120

120

452
150 180
134 135

Data 02/01/2020 Firma


10. LOADING BAYS PROTECTIONS 10. LOADING BAYS PROTECTIONS

GUARD RAIL - ROD 70 INSTALLATION

DOCK GATE DOCK GATE


INSTALLATION
ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS

T=60Nm
INSTALLATION NOITALLATSNI 1 07 DOR - LIAR DRAUG 5
Ø12 mm

19

22 3
6
2 3
2 3

Ø12 mm

87ml
80 mm
3 2/3

4 5 6
3 32 7
87ml
87ml

2/3

5 6
2/3
87ml

5 6 lm78
2/3
3/2
6 6 5 4
pag.1
4 8
87ml

2/3

136 1.gap 137


10. LOADING BAYS PROTECTIONS 11. CORNER PROTECTION

DOCK GATE CP 100/200 LIGHT LOAD /


ISTRUZIONI DI INSTALLAZIONE PROTEZIONE PER PARETI FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS CORNER PROTECTION

9 13

10 14

50
/9
6
65
/1
30
11 15

12 16

WARNING
The product is not equipped with fixing accessories for the wall.
Use self-drilling button head cap screw Ø3.9 if mounted to panel or wood walls.
Use plastic plugs Ø3.9 if mounted to concrete walls.

138 139
11. CORNER PROTECTION 12. KERB

INSTALLATION

CP 100/200 KERB 200/300 LIGHT LOAD /


ISTRUZIONI DI INSTALLAZIONE PROFILO KERB FOR HANDPALLET
TRUCKS
ASSEMBLY INSTRUCTIONS KERB PROFILE

50mm
1
GUARD RAIL - CORNER PROTECTION INSTALLATION

500mm

200/300
3

1 2
3
50mm

500mm
mm
80

m
5m

30/45
5B

WARNING
The product is not equipped with fixing accessories for the wall.
Use self-drilling button head cap screw Ø3.9 if mounted to panel or wood walls.
Use plastic plugs Ø3.9 if mounted to concrete walls.

140 141
12. KERB 12. KERB
GUARD RAIL - KERB 200 INSTALLATION
GUARD RAIL - KERB 200 INSTALLATION
INSTALLATIONINSTALLATION
8 9A

KERB 200 KERB 200


1 2 8 3 9A 9B
6 7A 7B

GUARD RAIL - KERB 300 INS


ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE
m
ASSEMBLY INSTRUCTIONS mm 12
0m ASSEMBLY INSTRUCTIONS 6 7A 7B
50
0 mm
80
m
50
0m GUARD RAIL - KERB 200 INSTALLATION
1 2 3 mm
INSTALLATION 1 2 3
6
5
7A 7B
10 Hard 11
GUARD RAIL - KERB 200 INSTALLATION 4 5A 5B
10 Hard 11 12A
8 9A 9B
1 5A 8 12A
GUARD RAIL - KERB 200mm 0mm INSTALLATION
12
0
50m mm
m 1 20
m 80
0m mm
50 0mm 80
5 0
mm 8 9A 9B
50
0 mm
GUARD RAIL - KERB5 200 INSTALLATION
m
4 5A 5m
5B 8 GUARD
9A RAIL - KERB 300 9B INSTALLATION
6 7A 7B 12B 10 Soft
4 5A 5B
5B
12B 6 10 Soft 9A
7A 7B 12B
pag.1 10 Hard 11 12A
1 2 3

m
m 12
0m GUARD RAIL - KERB 200 INSTALLATION
TB14 TF14 50
0m mm 10 Hard 11 10 Hard 12A 11 12A
80 GUARD RAIL - KERB 200 INSTALLATION
PLEASE SEE PLEASE
m
0mSEE
8 6 9A 7A 9B 7B
50 8 9A 9B
GUARD RAIL - KERB 200 IN 5A / 7A IN 5B / 7B INSTALLATION
pag.1 6 7A 7B
9A / 12A 9B / 12B 5m
m
6 12B 9B
10 Soft pag.2
pag.1 pag.2
4 5A 5B
3 3
1 2 3
1 32 3
* PLEASE ALSO CHECK
GUARD RAIL - KERB 200 INSTALLATION THIS ALTERNATIVE
12B 10 Soft
FOR INSTALLATION
6 10 Hard 8 7A 11 9A7B 10 12B
12A Hard 9B 11
WITH NEW
10 Soft KSJ 200 LT
12A
mm 8 9A 9B
mm
7A 10* 10*
0
m 12
0
0m
m 12 HARD SOFT
0m m mm
50m
50 m
3 m 0m 0m 80
80 8 m
8
pag.2
m 0m
0m 50
50 m
5m
m
pag.1 5m
m m 4 5A 5B
5m 5m
4 5A 5B GUARD RAIL - KERB 300 INSTALLATION
4
5B 5B 6 7A 7BHard 12B 10 Soft
8 12B 109A 10 pag.2
Soft 119B 12A
10 Hard 11 12A
m m 7B 11
80
pag.2

m
5m
1 2 3

5B pag.1
8 9A 9B
10 Hard 12B11 1012A
Soft
142 pag.2 143
pag.1 pag.2
12B 10 Soft
mm
m 20
12. KERB 12. KERB
GUARD RAIL - KERB 300 INSTALLATION
GUARD RAIL - KERB 200 INSTALLATION
INSTALLATION INSTALLATION
8 9A

KERB 300 KERB 300


1 2 8 3 9A 9B
6 7A 7B

ISTRUZIONI DI INSTALLAZIONE ISTRUZIONI DI INSTALLAZIONE


m
ASSEMBLY INSTRUCTIONS mm 12
0m ASSEMBLY INSTRUCTIONS
50
0 mm
80
m
50
0m GUARD RAIL - KERB 200 INSTALLATION
1 2 3 mm
INSTALLATION 1 2 3
6
5
7A 7B
10 Hard 11
GUARD RAIL - KERB 300 INSTALLATION 4 5A 5B
10 Hard 11 12A
8 9A 9B
1 5A 8 12A
GUARD RAIL - KERB 300mm 0mm INSTALLATION
12
0
50m
m mm
m 1 70 80
0m
75 0mm 0 mm
5 0 14
m m
750 mm
GUARD RAIL - KERB5 200 INSTALLATION
m
5m GUARD RAIL - KERB 300 INSTALLATION
4 5A 5B 8 9A 9B
6 7A 7B 12B 10 Soft
4 5A 5B
5B
12B 6 10 Soft 9A
7A 7B 12B
pag.1 10 Hard 11 12A
1 2 3

m
m 17
0m GUARD RAIL - KERB 200 INSTALLATION
TB20 TF20 0m m
75 m 10 Hard
GUARD RAIL - KERB 200 11 12A INSTALLATION
140
m 8 6 9A 7A 9B 7B
PLEASE SEE PLEASE 0mSEE 8 9A 9B
75
GUARD RAIL - KERB 300 IN 5A / 7A IN 5B / 7B INSTALLATION
pag.1 6 7A 7B
9A / 12A 9B / 12B 5m
m
6 12B 9B
10 Soft pag.2
pag.1 pag.2
4 5A 5B
3 3
1 2 3
1 32 3

GUARD RAIL - KERB 200 INSTALLATION


12B 10 Soft

6 10 Hard 8 7A 11 9A7B 12A


10 Hard 9B 11 12A
mm 8 9A 9B
mm 0
m 17
0
0m
m 17
m 7A HARD 10
mm
0m 75
75m
m mm 0m
3 80 14
0
0m
m 140 14
pag.2
m 75
0m
75 m
5m
m
pag.1 5m
m m 4 5A 5B
5m 5m
4 5A 5B GUARD RAIL - KERB 300 INSTALLATION
4
5B 5B 6 7A 7BHard 12B 10 Soft
8 12B 109A 10pag.2
Soft 119B 12A
10 Hard 11 12A
m 7B 11
0m
14

m
5m
1 2 3

5B pag.1
8 9A 9B
10 Hard 12B11 1012A
Soft
144 pag.2 145
pag.1 pag.2
12B 10 Soft
mm
m 70
13. WALL PROTECTION WALL BUMPERS 13. WALL PROTECTION WALL BUMPERS
GUARD RAIL - KERB 200 INSTALLATION

WP 100/150 LIGHT LOAD /


WP 100
PROTEZIONE PER PARETI FOR HANDPALLET
TRUCKS
ISTRUZIONI DI INSTALLAZIONE
WALLS PROTECTION ASSEMBLY INSTRUCTIONS

WP 100 WP 150

Ø6 mm

1 4
150

150
100

100

1 2 3

m
2 5
0m
mm 12
50
0 mm
80
21 42 21 42 m
0m
50
m
5m
*WITH WPC *WITH WPCS *WITH WPC *WITH WPCS
4 5A 5B

3 7
WARNING
The product is not equipped with fixing accessories for the wall.
Use self-drilling button head cap screw Ø3.9 if mounted to panel or wood walls.
Use plastic plugs Ø3.9 if mounted to concrete walls.

146 147
13. WALL PROTECTION WALL BUMPERS 13. WALL PROTECTION ANTISHOCK SYSTEM
GUARD RAIL - KERB 200 INSTALLATION

WP 150 ASP 200 HEAVY LOAD /


ISTRUZIONI DI INSTALLAZIONE SISTEMA ANTISHOCK FOR FORKLIFTS

ASSEMBLY INSTRUCTIONS ANTISHOCK SYSTEM

ASP

Ø6 mm

1 4

200
1 2 3

m
2 5
0m
mm 12
50
0 mm
80
m
0m
50
m
5m

4 5A 5B

3 7 25

WARNING
The product is not equipped with fixing accessories for the wall.
Use self-drilling button head cap screw Ø3.9 if mounted to panel or wood walls.
Use plastic plugs Ø3.9 if mounted to concrete walls.

148 149
13. WALL PROTECTION ANTISHOCK SYSTEMANTISHOCK SYSTEM
GUARD RAIL - BUMPER INSTALLATION
INSTALLATION
MPM PROTECTION’S
MPM PROTECTION’S
ASP 200 IMPACT RESISTANCE
IMPACT RESISTANCE
ISTRUZIONI DI INSTALLAZIONE
ASSEMBLY INSTRUCTIONS
ULTIMATE LOAD (JOULES)
FOR IMPACT ANGLE DEGREES BELOW
ULTIMATE LOAD (JOULES)
PRODUCT MODEL RAIL LENGTH LOAD TYPE 10 FOR15
IMPACT 30
ANGLE DEGREES
45 BELOW
60 90

1 2 3 PRODUCT MODEL RAIL LENGTH LOAD TYPE 10 15 30 45 60 90


GUARD RAIL - BUMPER ANTISHOCK SYSTEM INSTALLATION
GUARD RAIL - BUMPER ANTISHOCK SYSTEM INSTALLATION
1 RP ANY 1.280,00
m
500m RACK PROTECTOR
RP ANY 1.280,00
RACK PROTECTOR

GUARD RAIL - BUMPER ANTISHOCK SYSTEM INSTALLATION


RC ANY 2.800,00
RACK PROTECTOR
RC ANY 2.800,00
RACK PROTECTOR

4
1 2 3 70 2.000,00
2 ROD
70 2.000,00
BOLLARDS
m ROD 120 3.600,00
500m
BOLLARDS
120 3.600,00

90 1.600,00
GRD
90 1.600,00
3 BOLLARDS
GRD 150 2.800,00
BOLLARDS
150 2.800,00

4 1 2 3
1 2 3
3
m 90 13.827,98 9.277,48 4.802,21 3.395,46 2772,13 2.400,00
500m GR
500mm 90 13.827,98 9.277,48 4.802,21 3.395,46 2772,13 2.400,00
1 2 3 GUARD RAIL
GR 150 31.112,97 20.874,33 10.804,96 7.639,79 6.237,29 5.400,00
GUARD RAIL
500m
m
m
m 150 31.112,97 20.874,33 10.804,96 7.639,79 6.237,29 5.400,00
80

90 1.500 16.132,65 10.823,73 5.602,57 3.961,37 3.234,15 2.800,00

5mm GRIN
90 1.500 16.132,65 10.823,73 5.602,57 3.961,37 3.234,15 2.800,00
GUARD RAIL
4 GRIN 150 2.000 45.378,84 30.445,60 15.759,24 11.142,78 9.097,21 7.876,00
4
5B GUARD RAIL
150 2.000 45.378,84 30.445,60 15.759,24 11.142,78 9.097,21 7.876,00
4 4
SM 1.500 4.762,50 3.195,00 1.654,00 1.170,00 954,94 827,00
GUARD RAIL
SM 1.500 4.762,50 3.195,00 1.654,00 1.170,00 954,94 827,00
GUARD RAIL

LM 1.500 19.589,64 13.143,10 6.803,12 4.810,24 3.927,18 3.400,00


GUARD RAIL
LM 1.500 19.589,64 13.143,10 6.803,12 4.810,24 3.927,18 3.400,00
GUARD RAIL

150 151
LINK
90150/1
REF 2.000
2.000 50.101,30
45.378,84 33.614,22
30.445,60 17.400,00
15.759,24 12.303,66
11.142,78 10.045,89
9.097,21 8.700,00
7.876,00
MODULAR

150/2
150 2.000
1.500 100.202,61*
36.298,46* 67.228,44*
24.353,39* 34.800,00*
12.605,79* 24.607,32*
8.913,09* 20.091,79*
7.276,84* 17.400,00*
6.300,00*
PEDESTRIAN
GUARD RAIL
150/3
90 4 PE 2.000
1.500 150.303,91*
23.046,64* 100.842,66*
15.462,47* 52.200,00*
8.003,68* 36.910,97*
5.659,10* 30.137,68*
4.620,21* 26.100,00*
4.000,00*

150 4 PE 2.000 48.397,95* ULTIMATE


32.471,19* LOAD
16.807,72* (JOULES)
11.884,12* 9.702,45* 8.400,00*
ULTIMATE LOAD (JOULES) ULTIMATE LOAD (JOULES)
FOR IMPACT ANGLE DEGREES BELOW
FOR IMPACT ANGLE DEGREES BELOW FOR IMPACT ANGLE DEGREES BELOW
HR 90 PRODUCT MODEL
150 REF LINK RAIL2.000
LENGTH
1.500 LOAD TYPE 10
50.101,30
9.501,90* 15
33.614,22
6375,00* 30
17.400,00
3300,00* 45
12.303,66
2333,40* 60
10.045,89
1905,27* 90
8.700,00
1650,00*
PRODUCT MODEL RAIL LENGTH LOAD TYPE 10 15 30 45 60 90 PRODUCT
GUARD RAIL MODEL RAIL LENGTH LOAD TYPE 10 15 30 45 60 90

90 13.827,98 9.277,48 4.802,21 3.395,46 2772,13 2.400,00


90 1.500 4.609,32 3.092,49 1.600,73 1.131,82 924,04 800,00 90 13.827,98 ULTIMATE
9.277,48 LOAD
4.802,21 (JOULES)
3.395,46 2772,13 2.400,00
COPRO
TOWER
COPRO 90 1.500 17.284,98* FOR
36.298,46* 11.596,85*
24.353,39*
IMPACT 6.002,76*
12.605,79* 4.244,33*
ANGLE8.913,09* 3.465,16*
DEGREES7.276,84* 3.000,00*
BELOW 6.300,00*
GUARD RAIL
GUARD RAIL
GUARD RAIL 150 31.112,97 20.874,33 10.804,96 7.639,79 6.237,29 5.400,00
150 1.500 18.140,00 12.171,00 6.300,00 4.455,00 3.637,3 3.150,00 150 31.112,97 ULTIMATE
20.874,33 LOAD
10.804,96 (JOULES)
7.639,79 6.237,29 5.400,00
FENCE PRODUCT MODEL RAIL LENGTH LOAD TYPE 10 15 30 45 60 90
90 REF 2.000 45.378,84 FOR IMPACT
30.445,60 ANGLE11.142,78
15.759,24 DEGREES9.097,21
BELOW 7.876,00
GUARD RAIL
150 REF 1.500 18.140,00 12.171,00 6.300,00 4.455,00 3.637,3 3.150,00 PRODUCT MODEL RAIL LENGTH LOAD TYPE 10 15 30 45 60 90
MPM specifies that such values are the result of a150
multiplication of the unit data for the number of rails.
* The unit data is proved by tests, stored in MPM, on
1.500 36.298,46* 24.353,39* 12.605,79* 8.913,09*
excellent conditions goods. Such tests cannot take note of particular situations, installation3.395,46
7.276,84*
or bad maintenance.
6.300,00*
PEDESTRIAN 90
100 13.827,98
2.649,00 9.277,48
1.777,00 4.802,21
920,00 650,50 2772,13
531,16 2.400,00
460,00
150 LINK 2.000 50.101,30 33.614,22 17.400,00 12.303,66 10.045,89 8.700,00 COPRO
CP 100 2.649,00 1.777,00 920,00 650,50 531,16 460,00
CPRAIL
GUARD
GUARD
CORNER RAIL
PROTECTION 9090
4 PE 1.500 23.046,64* 15.462,47* 8.003,68* 5.659,10* 4.620,21* 4.000,00*
CORNER PROTECTION 13.827,98 9.277,48 4.802,21 3.395,46 2772,13 2.400,00
150
200 31.112,97
3.743,20 20.874,33
2.511,00 10.804,96
1.300,00 7.639,79
919,20 6.237,29
750,56 5.400,00
650,00
COPRO 200 3.743,20 2.511,00 1.300,00 919,20 750,56 650,00
GUARD RAIL M.P.M. s.r.l.
150
Via 4 PE
Europa
150 2.000 Fratte
2 35010 48.397,95*
T +39 32.471,19*
049 9301773
31.112,97 20.874,33 16.807,72*
10.804,96 11.884,12*
info@mpmpvc.com
7.639,79 9.702,45*
6.237,29 8.400,00*
5.400,00
SINGLE 2.000 50.101,30 33.614,22 17.400,00 12.303,66 10.045,89 8.700,00 di S. Giustina in Colle · PD · Italy F +39 049 9300427 mpmpvc.com
150 REF
100 LINK 2.000 50.101,30
2.649,00 33.614,22
1.777,00 17.400,00
920,00 12.303,66
650,50 10.045,89
531,16 8.700,00
460,00
CP
LM 2.000 100.202,61* 67.228,44* 34.800,00* 24.607,32* 20.091,79* 17.400,00*
CORNER PROTECTION
100 2.649,00 1.777,00 920,00 650,50 531,16 460,00
200 3.743,20 2.511,00 1.300,00 919,20 750,56 650,00
LINK CP
150/1 2.000 50.101,30 33.614,22 17.400,00 12.303,66 10.045,89 8.700,00 CORNER PROTECTION
MODULAR
TOWER 200 3.743,20 2.511,00 1.300,00 919,20 750,56 650,00
36.298,46* 24.353,39* 12.605,79* 8.913,09* 7.276,84* 6.300,00*
GUARD RAIL
150/2 2.000 100.202,61* 67.228,44* 34.800,00* 24.607,32* 20.091,79* 17.400,00*

150/3 2.000 150.303,91* 100.842,66* 52.200,00* 36.910,97* 30.137,68* 26.100,00*


MPM LEGEND
specifies thatSYMBOLS
such values are the resultVEHICLE LOAD of the
of a multiplication VEHICLE TYPE
unit data LEGEND
for the number of rails. SYMBOLS VEHICLE LOAD VEHICLE TYPE
* LEGEND
The unit SYMBOLS
data is proved VEHICLE
by tests, stored in MPM, LOADconditions
on excellent VEHICLE Such tests cannotLEGEND
goods.TYPE take note ofSYMBOLS VEHICLE
particular situations, installation LOAD
or bad VEHICLE TYPE
maintenance.

ELECTRIC LIGHTWEIGHT
HR 90 ELECTRIC
PEDESTRIAN LIGHTWEIGHT
COUNTERBALANCE
1.500 9.501,90* 6375,00* 3300,00* 2333,40* 1905,27* 1650,00* M.P.M. s.r.l. PEDESTRIAN
TRUCK COUNTERBALANCE
FORKLIFT TRUCK
GUARD RAIL
Via Europa 2 35010 Fratte
TRUCK T +39 049 9301773 info@mpmpvc.com
FORKLIFT TRUCK
di S. Giustina in Colle · PD · Italy F +39 049 9300427 mpmpvc.com
LEGEND SYMBOLS VEHICLE LOAD VEHICLE TYPE LEGEND SYMBOLS VEHICLE LOAD VEHICLE TYPE
ELECTRIC ENGINE HEAVY
ELECTRIC
PEDESTRIAN ENGINE HEAVY
DUTY FORKLIFT
PEDESTRIAN DUTY FORKLIFT
90 1.500 17.284,98* 11.596,85* 6.002,76* 4.244,33* 3.465,16* 3.000,00* LEGEND SYMBOLS VEHICLE LOAD VEHICLE TYPE
STACKER LEGEND SYMBOLS VEHICLE LOAD VEHICLE
TRUCKTYPE
STACKER TRUCK
LIGHT LOAD ELECTRIC HEAVY LOAD LIGHTWEIGHT
LIGHT LOAD HEAVY LOAD
FOR HANDPALLET TRUCKS PEDESTRIAN FOR FORKLIFTS COUNTERBALANCE
ELECTRIC
90 REF 2.000 45.378,84 30.445,60 15.759,24 11.142,78 9.097,21 7.876,00 FOR HANDPALLET TRUCKS MANUAL
TRUCK FOR FORKLIFTS FORKLIFT TRUCK
ELECTRIC
PALLET TRUCK
MANUAL
ELECTRIC
PALLET LIGHTWEIGHT
PALLET TRUCK
WITH RIDER
PALLET
PEDESTRIAN
TRUCK COUNTERBALANCE
WITH RIDER
PLATFORM
150 1.500 36.298,46* 24.353,39* 12.605,79* 8.913,09* 7.276,84* 6.300,00* TRUCK FORKLIFT TRUCK
ELECTRIC PLATFORM
ENGINE HEAVY
PEDESTRIAN PEDESTRIAN DUTY FORKLIFT
GUARD RAIL STACKER TRUCK
90 4 PE 1.500 23.046,64* 15.462,47* 8.003,68* 5.659,10* 4.620,21* 4.000,00* ELECTRIC ENGINE HEAVY
LIGHT LOAD HEAVY LOAD
PEDESTRIAN DUTY FORKLIFT
FOR HANDPALLET TRUCKS STACKER FOR FORKLIFTS TRUCK
ELECTRIC
MANUAL
150 4 PE 2.000 48.397,95* 32.471,19* 16.807,72* 11.884,12* 9.702,45* 8.400,00* LIGHT LOAD PALLET
HEAVY LOAD PALLET TRUCK
WITH RIDER
FOR HANDPALLET TRUCKS TRUCK FOR FORKLIFTS
ELECTRIC
PLATFORM
MANUAL
PALLET TRUCK
150 REF LINK 2.000 50.101,30 33.614,22 17.400,00 12.303,66 10.045,89 8.700,00 PALLET
WITH RIDER
TRUCK
PLATFORM

TOWER
36.298,46* 24.353,39* 12.605,79* 8.913,09* 7.276,84* 6.300,00*
GUARD RAIL

MPM specifies that such values are the result of a multiplication of the unit data for the number of rails.
* The unit data is proved by tests, stored in MPM, on excellent conditions goods. Such tests cannot take note of particular situations, installation or bad maintenance.

152 153

M.P.M. s.r.l.
NEW. GRD 200 NEW. BFLEX

SHOCK ABSORBING
INSIDE
HEAVY LOAD /
FOR FORKLIFTS NEW HEAVY LOAD /
FOR FORKLIFTS NEW
1200/2000
GRD 200 BFLEX

100
20

300

467
230

190

150
190
INT. MAX 2400 mm
195
230 INT. + 200 mm

154 155
MPM PRODUCT WARRANTY

MPM provides a warranty for the product supplied, in accordance with Impact resistance and production tolerances
articles 1490 et seq. of the Italian Civil Code. Impact forces indicated in the brochure, or in other documents, refer
to laboratory tests and cannot take account for consequences
The warranty lasts for one year and shall begin from the product delivery determined by installation modes or peculiarities of the place where
date. The warranty shall cover the free repair and/or replacement of the products are installed (in an operational environment vehicle type,
the defective piece. Product transport costs are payable by the buyer. speed and mass, routes, angles of impact, ground and anchorage are
variable and uncontrolled conditions that no test can replicate); the
The warranty shall be void if the buyer fails to report the defect(s) within data refers to an intact product that can be affected by alterations
eight days after discovering them; the deadline for reporting obvious from incorrect maintenance and old age, as well as the methods
visible defects shall be calculated from the delivery date. Defects must and characteristics of installation (with specific reference to floor-
be reported in writing (by registered post or via certified email). mounted products like the latter); the weight, dimensions, colours and
characteristics of the material refer to the sample and the conformity
MPM reserves the right to verify whether the defect exists. MPM reserves with the latter of the product supplied will be subject to normal
the right to replace the entire product. production tolerance. The product may be affected by environmental
installation conditions.
The warranty does not cover parts damaged during transport, parts
that are subject to normal wear and tear and deterioration caused by Limit of liability
weather and environmental conditions or parts that are damaged as a The maximum liability under this warranty shall not exceed the amount
result of accident, impact, inexperience or improper use or unauthorised paid by the purchaser for the product. MPM shall not be liable for
use, damaged as a result of unauthorized repairs or modifications or damages to reputation, loss of business, loss of contracts, loss of
tampering. revenues, etc..

The warranty will be considered valid only if, according to MPM’s Heating
discretionary assessment, all rules of installation and use of the supplied Protections performances can be affected in environments with
product as defined in the technical catalogue on the corporate temperatures below 0°C or higher than 50°C.
website (www.mpmpvc.com), have been complied with. The warranty
will be invalidated if it turns out that the correct maintenance was not Colour
carried out and/or if the supplied product has been tampered with The fastness of the colour and its brightness depend on wear and tear
or interventions were performed by individuals not authorized by the and climatic conditions that can affect its intensity over time.
supplier; if MPM has performed the installation, the warranty will be
invalidated if unauthorized work is carried out by third parties after
the installation. MPM shall accept no responsibility if the product has
not been installed correctly or if the due maintenance has not been
carried out.

The safety coefficient and consequent use of the product requires


preliminary screening by a designer who will necessarily have to
take account of the actual installation conditions, considering that
instructions contained in catalogues, orders, transport documents
invoices or any other documentation showing the product
characteristics, should not be considered suitable to compensate for
any lack of design or technical testing required for installation of the
product. In any case, it is necessary to comply with the appropriate
assembling and installation instructions. MPM will accept no liability for
the use of products in situations that have not been preceded by the
above-mentioned checks.

Images in the brochure are for advertising purposes only and do not in
any way represent how the products should be used.
MADE IN
ITALY

M.P.M. s.r.l.
Via Europa 2 T +39 049 9301773
35010 Fratte F +39 049 9300427
di S. Giustina in Colle info@mpmpvc.com
Padova · Italy www.mpmpvc.com
www.mpmprotections.com

You might also like