EE-320-3:2012 ELECTRICAL POWER, INSTALLATION & MAINTENANCE THREE PHASE
EE-320-3:2012-C02 THREE PHASE WIRING Work Activities Information Sheet (Tajuk) Assignment Sheet (Tajuk)
1. identify three phase wiring specifications and EE-320-3:2012-C02/P(1/24)PM EE-320-3:2012-C02/K(1/24) procedure. (PROSEDURE LAWATAN DAN (KENDALI PROSEDURE PENILAIAN TINJAUAN) LAWATAN DAN PENILAIAN TINJAUAN) EE-320-3:2012-C02/P(2/24)PM EE-320-3:2012-C02/K(2/24) (TEKNIK SUSUN ATUR (SUSUN ATUR HASIL LUKISAN) MENGHASILKAN LUKISAN) EE-320-3:2012-C02/P(3/24)PM EE-320-3:2012-C02/K(3/24) (KEPELBAGAIAN JENIS (JENIS KONDUKTOR) KONDUKTOR) 2. Identify three phase wiring tools, equipment EE-320-3:2012-C02/P(4/24)PM EE-320-3:2012-C02/K(4/24) and materials. (PROSEDUR PENDAWAIAN) (KENDALI PROSEDUR TIGA FASA) PENDAWAIAN TIGA FASA) EE-320-3:2012-C02/P(5/24)PM EE-320-3:2012-C02/K(5/24) (PENYEDIAAN PENDAWAIAN (SEDIA PENDAWAIAN TIGA FASA) TIGA FASA) EE-320-3:2012-C02/P(6/24)PM EE-320-3:2012-C02/K(6/24) (PEMERIKSAAN PENDAWAIAN (PENGUJIAN PENDAWAIAN TIGA FASA) TIGA FASA) 3.Carry out wiring activities EE-320-3:2012-C02/P(7/24)PM EE-320-3:2012-C02/K(7/24) (PERALATAN ELEKTRIK) (PERKAKASAN ELEKTRIK) EE-320-3:2012-C02/P(8/24)PM EE-320-3:2012-C02/K(8/24) (JENIS PERALATAN DAN (JENIS PERKAKAS DAN BAHAN BAHAN ELEKTRIK) ELEKTRIK) EE-320-3:2012-C02/P(9/24)PM EE-320-3:2012-C02/K(9/24) (PROSEDUR OPERASI (KENDALI PROSEDUR STANDARD PENDAWAIAN TIGA OPERASI STANDARD FASA) PENDAWAIAN TIGA FASA) 4. Carry out three phase earthing system EE-320-3:2012-C02/P(10/24)PM EE-320-3:2012-C02/K(10/24) installation (SISTEM PEMBUMIAN) (ALAT UJI KAJI PEMBUMIAN) EE-320-3:2012-C02/P(11/24)PM EE-320-3:2012-C02/K(11/24) (PENGENDALIAN PEMBUMIAN) (PERALATAN PEMBUMIAN) EE-320-3:2012-C02/P(12/24)PM EE-320-3:2012-C02/K(12/24) (PROSEDUR PEMBUMIAN) (PEMASANGAN PEMBUMIAN) 5. Carry out three phase Distribution Board EE-320-3:2012-C02/P(13/24)PM EE-320-3:2012-C02/K(13/24) (DB) installation (PAPAN AGIHAN FIUS) (KEGUNAAN PENDAWAIAN) EE-320-3:2012-C02/P(14/24)PM EE-320-3:2012-C02/K(14/24) (PERALATAN PEMASANGAN (KEPERLUAN PERALATAN LEMBAGA PENGEDARAN PENDAWAIAN TIGA FASA) TIGA FASA) EE-320-3:2012-C02/P(15/24)PM EE-320-3:2012-C02/K(15/24) (LUKISAN PENDAWAIAN) (KERJA PENDAWAIAN MENGIKUT LUKISAN) 6. Carry out fitting and accessories EE-320-3:2012-C02/P(16/24)PM EE-320-3:2012-C02/K(16/24) installation (LUKISAN PENDAWAIAN (PENENTUAN PEMASANGAN TIGA FASA) LOKASI DAN AKSESORI) EE-320-3:2012-C02/P(17/24)PM EE-320-3:2012-C02/K(17/24) (JENIS AKSESORI ELEKTRIK) (MEMPERBAIKI AKSESORI ELEKTRIK) EE-320-3:2012-C02/P(18/24)PM EE-320-3:2012-C02/K(18/24) (JENIS KELENGKAPAN (MEMPERBAIKI ELEKTRIK) KELENGKAPAN ELEKTRIK) 7. Carry out wiring system visual inspection EE-320-3:2012-C02/P(19/24)PM EE-320-3:2012-C02/K(19/24) (PEMERIKSAAN VISUAL) (PEMERIKSAAN VISUAL PADA SISTEM PENDAWAIAN) EE-320-3:2012-C02/P(20/24)PM EE-320-3:2012-C02/K(20/24) (SAMBUNGAN PENDAWAIAN) (MENJALANKAN AKTIVITI KEKEMASAN) 8. Carry out dead circuit test EE-320-3:2012-C02/P(21/24)PM EE-320-3:2012-C02/K(21/24) (JENIS LITAR ATAU (PENENTUAN LITAR ATAU SAMBUNGAN) SAMBUNGAN) 9. Carry out life circuit test EE-320-3:2012-C02/P(22/24)PM EE-320-3:2012-C02/K(22/24) (UJIAN FUNGSI ELCB/RCB) (PENENTUAN UJIAN BERFUNGSI ELCB/RCB) 10. Prepare single phase work activities EE-320-3:2012-C02/P(23/24)PM EE-320-3:2012-C02/K(23/24) report (PENGHASILAN PENDAWAIAN (MELAKSANAKAN TIGA FASA) PENDAWAIAN TIGA FASA) EE-320-3:2012-C02/P(24/24)PM EE-320-3:2012-C02/K(24/24) (KELULUSAN PENDAWAIAN (PERSIAPAN LUKISAN TIGA FASA) TIGA FASA)