JADUAL PEMBAHAGIAN WIM (AMALI)

EE-320-3:2012 ELECTRICAL POWER, INSTALLATION & MAINTENANCE THREE PHASE


EE-320-3:2012-C02 THREE PHASE WIRING
Work Activities Information Sheet (Tajuk) Assignment Sheet (Tajuk)
     
1. identify three phase wiring specifications and EE-320-3:2012-C02/P(1/24)PM EE-320-3:2012-C02/K(1/24)
procedure. (PROSEDURE LAWATAN DAN (KENDALI PROSEDURE
  PENILAIAN TINJAUAN) LAWATAN DAN PENILAIAN
    TINJAUAN)
  EE-320-3:2012-C02/P(2/24)PM EE-320-3:2012-C02/K(2/24)
  (TEKNIK SUSUN ATUR (SUSUN ATUR HASIL LUKISAN)
  MENGHASILKAN LUKISAN)  
  EE-320-3:2012-C02/P(3/24)PM EE-320-3:2012-C02/K(3/24)
  (KEPELBAGAIAN JENIS (JENIS KONDUKTOR)
  KONDUKTOR)  
2. Identify three phase wiring tools, equipment EE-320-3:2012-C02/P(4/24)PM EE-320-3:2012-C02/K(4/24)
and materials. (PROSEDUR PENDAWAIAN) (KENDALI PROSEDUR
  TIGA FASA) PENDAWAIAN TIGA FASA)
  EE-320-3:2012-C02/P(5/24)PM EE-320-3:2012-C02/K(5/24)
  (PENYEDIAAN PENDAWAIAN (SEDIA PENDAWAIAN
  TIGA FASA) TIGA FASA)
  EE-320-3:2012-C02/P(6/24)PM EE-320-3:2012-C02/K(6/24)
  (PEMERIKSAAN PENDAWAIAN (PENGUJIAN PENDAWAIAN
  TIGA FASA) TIGA FASA)
3.Carry out wiring activities EE-320-3:2012-C02/P(7/24)PM EE-320-3:2012-C02/K(7/24)
  (PERALATAN ELEKTRIK) (PERKAKASAN ELEKTRIK)
  EE-320-3:2012-C02/P(8/24)PM EE-320-3:2012-C02/K(8/24)
  (JENIS PERALATAN DAN (JENIS PERKAKAS DAN BAHAN
  BAHAN ELEKTRIK) ELEKTRIK)
  EE-320-3:2012-C02/P(9/24)PM EE-320-3:2012-C02/K(9/24)
  (PROSEDUR OPERASI (KENDALI PROSEDUR
  STANDARD PENDAWAIAN TIGA OPERASI STANDARD
  FASA) PENDAWAIAN TIGA FASA)
4. Carry out three phase earthing system EE-320-3:2012-C02/P(10/24)PM EE-320-3:2012-C02/K(10/24)
installation (SISTEM PEMBUMIAN) (ALAT UJI KAJI PEMBUMIAN)
  EE-320-3:2012-C02/P(11/24)PM EE-320-3:2012-C02/K(11/24)
  (PENGENDALIAN PEMBUMIAN) (PERALATAN PEMBUMIAN)
  EE-320-3:2012-C02/P(12/24)PM EE-320-3:2012-C02/K(12/24)
  (PROSEDUR PEMBUMIAN) (PEMASANGAN PEMBUMIAN)
5. Carry out three phase Distribution Board EE-320-3:2012-C02/P(13/24)PM EE-320-3:2012-C02/K(13/24)
(DB) installation (PAPAN AGIHAN FIUS) (KEGUNAAN PENDAWAIAN)
  EE-320-3:2012-C02/P(14/24)PM EE-320-3:2012-C02/K(14/24)
  (PERALATAN PEMASANGAN (KEPERLUAN PERALATAN
  LEMBAGA PENGEDARAN PENDAWAIAN TIGA FASA)
  TIGA FASA)  
  EE-320-3:2012-C02/P(15/24)PM EE-320-3:2012-C02/K(15/24)
  (LUKISAN PENDAWAIAN) (KERJA PENDAWAIAN
    MENGIKUT LUKISAN)
6. Carry out fitting and accessories EE-320-3:2012-C02/P(16/24)PM EE-320-3:2012-C02/K(16/24)
installation (LUKISAN PENDAWAIAN (PENENTUAN PEMASANGAN
  TIGA FASA) LOKASI DAN AKSESORI)
  EE-320-3:2012-C02/P(17/24)PM EE-320-3:2012-C02/K(17/24)
  (JENIS AKSESORI ELEKTRIK) (MEMPERBAIKI AKSESORI
    ELEKTRIK)
  EE-320-3:2012-C02/P(18/24)PM EE-320-3:2012-C02/K(18/24)
  (JENIS KELENGKAPAN (MEMPERBAIKI
  ELEKTRIK) KELENGKAPAN ELEKTRIK)
7. Carry out wiring system visual inspection EE-320-3:2012-C02/P(19/24)PM EE-320-3:2012-C02/K(19/24)
  (PEMERIKSAAN VISUAL) (PEMERIKSAAN VISUAL PADA
    SISTEM PENDAWAIAN)
  EE-320-3:2012-C02/P(20/24)PM EE-320-3:2012-C02/K(20/24)
  (SAMBUNGAN PENDAWAIAN) (MENJALANKAN AKTIVITI
    KEKEMASAN)
8. Carry out dead circuit test EE-320-3:2012-C02/P(21/24)PM EE-320-3:2012-C02/K(21/24)
  (JENIS LITAR ATAU (PENENTUAN LITAR ATAU
  SAMBUNGAN) SAMBUNGAN)
9. Carry out life circuit test EE-320-3:2012-C02/P(22/24)PM EE-320-3:2012-C02/K(22/24)
  (UJIAN FUNGSI ELCB/RCB) (PENENTUAN UJIAN
    BERFUNGSI ELCB/RCB)
10. Prepare single phase work activities EE-320-3:2012-C02/P(23/24)PM EE-320-3:2012-C02/K(23/24)
report (PENGHASILAN PENDAWAIAN (MELAKSANAKAN
  TIGA FASA) PENDAWAIAN TIGA FASA)
  EE-320-3:2012-C02/P(24/24)PM EE-320-3:2012-C02/K(24/24)
  (KELULUSAN PENDAWAIAN (PERSIAPAN LUKISAN
  TIGA FASA) TIGA FASA)