EARTH WORK (Prior to construction) EARTH WORK (During construction)

Efficency = 80 cubic meter per hour using one roller Efficency = 80 cubic meter per hour using one roller
(i.e, 80 X8 =640 m3 per day) (i.e, 80 X8 =640 m3 per day)
A - Embakment A - Embakment
Frequency as per QAH of rural Frequency as per QAH of
sl.no Name of tests sl.no Name of tests
roads rural roads
1 Soil classification (sieve) 1 test/Km or part from each source Moisture content at the time of 3 Tests daily and spreading over
1
LL,Pland PI 1 test/Km or part from each source compaction the days work
2
3 Proctor compaction test 1 test/Km or part from each source 3 Tests daily and spreading over
2 Field Density test
Free swell index 1 test/Km or part from each source the days work
4
5 Deleterious content 1 test/Km or part from each source 3 Thickness of subgrade At Random
6 Organic matter 1 test/Km or part from each source
Surface Regularity/Transvese
7 Soluble sulphate cont 1 test/Km or part from each source 4 At Random
profile/Camber/Super elevation

B - Subgrade (cutting or filling) B - Subgrade (cutting or filling)


Efficency = 80 cubic meter per hour using one roller Efficency = 80 cubic meter per hour using one roller
(i.e, 80 X8 =640 m3 per day) (i.e, 80 X8 =640 m3 per day)

Frequency as per QAH of rural Frequency as per QAH of


si.no Name of tests sl.no Name of tests
roads rural roads
1 Soil classification (sieve) 1 test/Km or part from each source Moisture content at the time of 3 Tests daily and spreading over
1
2 LL,Pland PI 1 test/Km or part from each source compaction the days work
3 Proctor compaction test 1 test/Km or part from each source 3 Tests daily and spreading over
2 Field Density test
4 Free swell index 1 test/Km or part from each source the days work
5 Deleterious content 1 test/Km or part from each source 3 Thickness of subgrade At Random
6 Organic matter 1 test/Km or part from each source
Surface Regularity/Transvese
7 Soluble sulphate cont 1 test/Km or part from each source 4 At Random
profile/Camber/Super elevation
8 CBR Test Avg value of 3 test/Km
DRAINAGE LAYER ( Prior to construction) DRAINAGE LAYER (During construction)
Efficency = 10 cubic meter per hour using one roller Efficency = 10 cubic meter per hour using one roller
(i.e, 10 X8 =80 m3 per day) (i.e, 10 X8 =80 m3 per day)
Frequency as per QAH of rural Frequency as per QAH of
si.no Name of tests sl.no Name of tests
roads rural roads
Moisture content at the time of 3 Tests daily and spreading over
1 Gradation 1 test/Km or part from each source 1
compaction the days work
3 Tests daily and spreading over
2 LL,Pland PI 1 test/Km or part from each source 2 Field Density test
the days work
3 Thickness of subgrade At Random
3 Proctor compaction test 1 test/Km or part from each source
Surface Regularity/Transvese
4 At Random
profile/Camber/Super elevation

GRANULAR SUB BASE (GSB) ( Prior to construction) GRANULAR SUB BASE (GSB) (During construction)
Efficency = 10 cubic meter per hour using one roller Efficency = 10 cubic meter per hour using one roller
(i.e, 10 X8 =80 m3 per day) (i.e, 10 X8 =80 m3 per day)
Frequency as per QAH of rural Frequency as per QAH of
sl.no Name of tests sl.no Name of tests
roads rural roads
Soil classification (sieve) Avg of 3 test per source 1 Gradation(Wet analysis) 1 Test per day
1
LL,Pland PI Avg of 3 test per source 2 LL,Pland PI 1 Test per day
Gradation 1 test per 500m or part Moisture content at the time of 3 Tests daily and spreading over
2 3
LL,Pland PI 1 test per 500m or part compaction the days work
3 Proctor compaction test 1 testpersource/per combination Field Density test - do -
4 Wet aggregate impact 4 Thickness of subgrade At Random
1 test per source
value (AIV) Surface Regularity/Transvese
5 At Random
5 CBR Avg value of 3 test/Km profile/Camber/Super elevation
BASE COURSE (WBM Gr - II ) ( Prior to construction) BASE COURSE (WBM Gr - II ) (During construction)
Efficency = 8 cubic meter per hour using one roller Efficency = 8 cubic meter per hour using one roller
(i.e, 8 X8 =64 m3 per day) (i.e, 8 X8 =64 m3 per day)
Frequency as per QAH of rural Frequency as per QAH of
sl.no Name of tests sl.no Name of tests
roads rural roads
1 Aggregate impact value 1 Test per source 1 Aggregate Grading 2 Test per day
2 Water absorption 1 Test per source 2 Screening Grading 2 Test per day
soundness test where 1 Test per source 3 Flakiness Index 2 Test per day
3 water absorption is more
than 2% 1 Test per source 4 PI of crushable screenings 2 Test per day
4 Grading of screenings 1 Test per source 5 PI of binding material 2 Test per day
LL & PI of crushable 6 Aggregate impact value 1 Test per Km
5 1 Test per source
screenings 7 Thickness (compacted) At Random
1 Test per 200 & 500m by AE &
LL & PI of crushable 8 Volumetric Analysis
6 1 Test per source EE
screenings 9 Plasticity index AE - Avg of 2 test/500m

10 Surface Regularity/Transvese At Random


profile/Camber/Super elevation

20mm THICK PREMIX CARPET ( Prior to construction) 20mm THICK PREMIX CARPET (During construction)
Efficency 200 to 250 per day using one roller Efficency 200 to 250 per day using one roller
Frequency as per QAH of rural Frequency as per QAH of
sl.no Name of tests sl.no Name of tests
roads rural roads

Quality of binder 1 test per lot 1 Aggregate Grading 2 Test per day
1
2 Aggregate impact value 1 test per Km Binder content (before seal) 2 Test per day
3 Flakiness Index 1 test per Km 2 Temperature of binder Regular at close intervals
4 Bitumen stripping 1 test per Km Thickness of layer Regular at close intervals
5 Water absorption 1 test per Km 3 Aggregate impact value 1 Test per Km
Surface Regularity/Transvese At Random
4 profile/Camber/Super elevation
Visual inspection of finished Full length by EE
surface
BASE COURSE (WBM Gr - III) ( Prior to construction) BASE COURSE (WBM Gr - III ) (During construction)
Efficency = 8 cubic meter per hour using one roller Efficency = 8 cubic meter per hour using one roller
(i.e, 8 X8 =64 m3 per day) (i.e, 8 X8 =64 m3 per day)
Frequency as per QAH of rural Frequency as per QAH of
sl.no Name of tests sl.no Name of tests
roads rural roads
1 Aggregate impact value 1 Test per source 1 Aggregate Grading 2 Test per day
2 Water absorption 1 Test per source 2 Screening Grading 2 Test per day
soundness test where 1 Test per source 3 Flakiness Index 2 Test per day
3 water absorption is more
than 2% 1 Test per source 4 PI of crushable screenings 2 Test per day
4 Grading of screenings 1 Test per source 5 PI of binding material 2 Test per day
LL & PI of crushable 6 Aggregate impact value 1 Test per Km
5 1 Test per source
screenings 7 Thickness (compacted) At Random
1 Test per 200 & 500m by AE &
LL & PI of crushable 8 Volumetric Analysis
6 1 Test per source EE
screenings 9 Plasticity index AE - Avg of 2 test/500m

10 Surface Regularity/Transvese At Random


profile/Camber/Super elevation

SEALCOAT (B or C) ( Prior to construction) SEALCOAT (B or C) (During construction)


Efficency 200 to 250 per day using one roller Efficency 200 to 250 per day using one roller
Frequency as per QAH of rural Frequency as per QAH of
sl.no Name of tests sl.no Name of tests
roads rural roads
1 Quality of binder 1 test per lot 1 Aggregate Grading 2 Test per day
2 Aggregate impact value 1 test per Km Binder content (before seal) 2 Test per day
3 Flakiness Index 1 test per Km 2 Temperature of binder Regular at close intervals
4 Bitumen stripping 1 test per Km Thickness of layer Regular at close intervals
5 Water absorption 1 test per Km 3 Aggregate impact value 1 Test per Km
Surface Regularity/Transvese At Random
4 profile/Camber/Super elevation
Visual inspection of finished Full length by EE
surface
Visual inspection of finished Full length by EE
surface