Professional Documents
Culture Documents
Balance Civil Work WPT-DM CPU - 244
Balance Civil Work WPT-DM CPU - 244
Balance Civil Work WPT-DM CPU - 244
A1
IPS Flooring (40MM Thk) SQM YTS
A2
Skirting\Dado plaster 35 SQM YTS
A3
Tiles Fixing 100 SQM In progress
A4 Inside Painting Wall 1550 SQM final coat is balance
A5 Ceiling Painting 1650 SQM completed
A6
Out side Painting 1600 SQM In progress
A7 Flase Celing 70 SQM
A8 Roof Treatment 775 SQM
A9 Door Fixing 41 SQM
A10 Window fixing 47 SQM
A11 Rain Water Down take pipe 150 RM
A12 Sanitary Fixture 1 No YTS
A13 Hand Railing (Staire Case) 25 RM
B Transformer Yard
B1 Excavation 15 CUM
B2 Back filling 11 CUM
B3 Pebble filling 33 CUM
B4 P.C.C 10 CUM YTS
B5 R.C.C WORK 2.1 CUM
B6 Shuttering 16 SQM
B7 Chain link Fencing 62 SQM
B8 Entry Gate 15 SQM
C Local Control Room
C1 IPS Flooring (40MM Thk) 48 SQM
C2 Tiles Fixing 49 SQM
C3 Skirting\Dado plaster 5 SQM YTS
C4 Flase floor 128 SQM
C5 Flase celing 147 SQM
C6 Roof Treatment 250 SQM
C7 DoorFixing 21.91 SQM
C8 Window fixing 22.05 SQM
C9 Rain Water Down take pipe 33 RM
C10 Sanitary Fixture 2 NO YTS
D Chemical House
D1 IPS Flooring (40MM Thk) 300 SQM
D2 Skirting\Dado plaster 37 SQM YTS
D3 Roof Treatment 185 SQM
D4 Door Fixing 22.8 SQM
D5 Window fixing 15.48 SQM
D6 Rain Water Down take pipe 73 SQM YTS
D7 Hand Railing(Stair Case) 22 RM
E N-PIT
E1 Hand Railing 77 SQM
E2 Sludge Sump
E3 IPS Flooring(40 mm thk) 32 SQM YTS
E4 Hand Railing (Peripheral) 47 RM
F Flocculator/Tube Settler
F1 IPS Flooring(40 mm thk) 66 SQM YTS
F2 Leak test YTS
I DMF AREA
I1 IPS Flooring (40mm thk) 260 RM YTS
K Cable Trussle
K1 Excavation 1255 CUM 90 % COMPLETED
K2 P.C.C 6.5 CUM 90 % COMPLETED (83/95 Complted)
K3 R/F and Bolt Fixing 4 M.T 90 % COMPLETED (83/95 Complted)
K4 R.C.C 32 CUM 90 % COMPLETED
K5 Out side Backfilling 1220 CUM 90 % COMPLETED
K6 SHUTTERING 170 SQM N.A
L Paving Area
L1 Boluder Soling 1500 CUM
L2 P.C.C 563 CUM
L3 R.C.C 750 CUM YTS
L4 R/F STEEL 38 M.T
L5 SHUTTERING 750 SQM
M PERIPHERAL DRAIN
M1 Excavation 1800 CUM
M2 P.C.C 71 CUM
M3 R.C.C 300 CUM
M4 R/F STEEL 36 M.T YTS
M5 SHUTTERING 290 SQM
M6 BACKFILLING 700 CUM
M7 ANGLE FIXING(50X50X6mm) 9 M.T
1605
9630
385.2
4975.5