Download as pdf
Download as pdf
You are on page 1of 12
2.0 3.0 4.0 5.0 6.0 GENERAL The Works comprise of the site preparation /grading and associated works of RIC Eastern area for the plots and utility corridors The Gontract consists of the following Work: © Site Grading/Preparation Soil Improvement © Demolition of éxisting Structures/Sheds LOCATION OF WORK AREA. ‘The Contract Site (03J-C01) is located in the Eastern area of RIC. SCOPE ‘The Work to be performed under this Procure and Construct Contract consists of furnishing all plant, material, labour, supervision, tools and equipment and technical services for the site preparation works, soil improvement and demolition of existing structures, INTERFACES The contractor is required to interface with contracts: - * —082-C07 — Road to Area A and Port © 21B-C0S —P&C of Road & Infrastructure to Maritime Yard © 09J-C06 ~ EPC of 115K Power Lines for Maritime Yard ‘© 20B-C03 ~ SWC Supply and Retum Yorks ~ Phase 2 —082-C09 hen and Bridges bear Area A S. Aramco @hgoing Developments MANPOWER REQUIREMEN It is estimated that 2,943 man-months and peak manpower of 182 men will be required. The Contractor is responsible for determination of actual requirements, DURATION OF CONTRACT The duration of the Contract is @ne hundred and four (104) weeks after the Notice to Proceed (NTP) is issued to the Contractor by the Royal Commission. 1 Contract No. 03J-COl FORM OF PROPOSAL BIDDER: SECTION 2-SCHEDULE OF QUANTITIES AND PRICES DATE: SIGNATURE PALITE NS. ESTIMATED UNIT PRICE (Re Ata D DESCRIPTION OF ITEMS fouawtiry. | UNIT oe AMOUNT (SR) | ABBREVIATIONS 1S- LUMP SUM sm - LINEAR METER sn?. SQUARE METER sn? CUBIC METER ‘Contact No. 031-C01 Issued for 30% Review FORM OF PROPOSAL SECTION 2 -SCHEDULE OF QUANTITIES AND PRICES PAY ITEM No. ESTIMATED UNIT PRICE (Ree tach "D* DESCRIPTION OF rrEMS Guerre | usr | UNTERICE | Amount sm ‘Artie 2.03) 2-0000 | SILEPREPARATION eS, Pe eee fin Lan Som Hom, flonse ee ee depore i Table G-1 om hq 242.00 |earthworks toll 2d haw Ahe foynent wil 2.02.01 Excavation bbe made ie 3,030,000 | m 2.0202 impor Fill session | a 2.03.0 |soitimprovement 203.01 [Band Drain a 100 mm wide band dain vais | om > Drainage ayer aan | om 2.03.02 | tae column, $00 mm diameter sia | om 2.03.03 [Geo Composite a | ceo-Grid laminated wit 450 GSM gee noon | om > Salt are; 7.8 mm thick asses | om . Granaaei ones | om Pa Contract No, 034-001 Issued for 30% Review FORM OF PROPOSAL, BIDDER: SECTION 2- SCHEDULE OF QUANTITIES AND MRC pare sioNATURE TV TTEMN ESTIMATED UNI PRICE te Ath -D* : ech DESCRIPTION OF FrEMS esrimaTeD | uygr | ENIEPRICE | aNounr sm) 2.0308 [Same Rocimat + |psvetrgi ivi 800 GSM some | » arte gry toed (10-40 isis | om «——_ |amerseakens0= 0) sie | jrorat estinaTeD CONTRACK PRICE FOR FAY ITEM NO. 2.0000 wx fx | ax |(TO BE CARRIED TO COMPOSITE SUMMARY) Ps Contract No. 031-001 Issued for 30% Review SPECIAL CONDITIONS 6. | Complete Soil Improvement Works 102 Complete all remaining works, Close Out Documentation, & Ready for sae Initial Acceptance 9. | Complete Demobilization ea el ww) y : ven Se oli * Delay penalty specified under Attachment “C” General Condition, Articles 39 and 40 shall“ apply to the Contract Milestone. SC-38 ROYAL COMMISSION-FURNISHED UTILITIES AND FACILITIES Utilities: The utilities listed below will be furnished by the Royal Commission without cost, as specified, below, to Contractor; provided that all such utilities will be furnished only at outlets existing at the Site; and Contractor shall, at its expense, extend such utilities from such existing outlets to the points of use and at completion of the Work shall remove all materials and equipment used for such extensions. Contractor shall also regulate its usage of such utilities to avoid overuse in accordance with the instructions of the Royal Commission. “NONE” Facilities The facilities listed below will be furnished by the Royal Commission, not later than the delivery dates indicated below. Such facilities may be used by Contractor without charge, provided that any such use will be subject to the prior written approval of the Royal Commission; and provided further that Contractor shall be responsible, at its expense, for maintenance and repair of such facilities to the extent specified in such written approval of the Royal Commission. Facility Delivery Date 1, Laydown Area and space for Two weeks after Contractor's material within Ras issuance of NTP Al Khair Industrial City 2. Disposal area for surplus NIP material is located approximately 40 kms from Ras Al Khair Industrial City 3. Borrow area for fill material is NTP located approximately 20 kms from Ras Al Khair Industrial City Except to the extent provided above, Contractor shall, at its expense, furnish and maintain all utilities and facilities required for the performance of the Work. 63.15 (1/12) B-4 Contract No. 035-CO1 Replaces: (3/10) SPECIAL CONDITIONS conform to the following specifications and shall be suitable for the designated maximum number of Royal Commission personnel who may use such premises. “NONE” Work Site Facilities: Contractor shall supply one (1) separate office, 120 square meters in a location designated by the Royal Commission, which includes conference room with table and twelve (12) chairs, toilet/bathroom, kitchen, an open area with eight (8) desks (2 chairs each). Office shall be supplied with air conditioning/heating, power and lighting, two (2) desks, one (1) telephone, one (1) plan table, four (4) chairs, two (2) 4-drawer file cabinets, two (2) plan racks, one (1) black and white phgto,¢opy machine and one (1) electric water cooler, two (2) compatible computers cach with-Original Microsoft Windows 34 and Microsoft Office two (2) 24 inches flat screen nionitors, including voltage regulators. Provide one (I) color printer with switch connected to each computer, one (1) 120L refrigerator, intemet and local telephone line connection (to be paid for by Contractor). Each layout and all facilities to be approved by Royal Commission. The Contractor shall remove the above-mentioned office at the completion of construction. Contractor shall be responsible for the care and maintenance of such facilities and shall provide all required utilities, except utilities furnished by the Royal Commission pursuant to the Special Condition hereof entitled "Royal Commission-Furnished Utilities and Facilities" SC-49 INTERFACE WITH OTHER CONTRACTORS Further to the provisions of General Conditions Article entitled "Opportunities for other Contractors" and Special Conditions Article entitled "Cooperation with Others", Contractor shall note that the following Contracts will be active either in or adjacent to Contractor's worksites during the performance of the Work. This list is for information only and may not be complete. The Contractor will be responsible for interfacing its program of Works with these and other Royal Commission Contractor's that may be working in the area. Such program will be subject to review by the Royal Commission. Contract No. Contract Descriptions = 027-T10 Task Release No.04, Rev.2 - 211-C02 P&C Area ‘A’ Site Development = 08C-C09 Road and Bridgespilear Area A = 082-C07 Road to Area A and Port = 20B-C03 SWC Supply and Return\iorks ~ Phase 2 = 21B-COS P&C of Road & Infrastructure to Maritime Yard = 211-C03 P&C of Railway Pipeline Crossing & ARAMCO. Culverts = 099-002 EPC of Primary Electrical Substation #2 63.15 (1/12) B-6 Contract No. 031-COL Replaces: (3/10) = 099-C0S = 095-C06 63.15 (1/12) Replaces: (3/10) ‘SPECIAL CONDITIONS EPC of Primary Electrical Substation #3 EPC of 115kV Power Transmission Lines for Contract No, 03J-CO1 2.03 DESIGNATED PAY ITEMS This section defines the Scope of the designated pay items in table G-1, schedule of quantities and prices. 1-00.00 1-01.00 1-01.01 Wg ie a Sea AP 1-01.02 2: Bee. GENERAL ITEMS Mobilization and Demobilization Mobilization - (60%) Mobilization shall consist of, mobilization of portable offices, personnel, construction equipment, tools, supplies, sanitary facilities, erection of project description sign boards, and all other incidentals necessary to be performed prior to commencement of the Work. Mobilization shall also include furnishing the following submittals to the Royal Commission: Submittal Contract schedule; Organization chart and approval of key personnel resumes; Insurance certificates; Quality Control Plan; Security program; Procurement program including shipping and delivery schedule; Employment of Saudi Arabian citizens; Detailed quantity take-off of issued for Tender drawings in a format agreed with the Royal Commission; As-Built document program; 10. List of plant and equipment; 11. Technical submittal program; 12. Report for the pre-construction survey of existing conditions and site grades; 13. Plan of laydown areas; 14, Two boards project signs; 15. ES&H program; 16. Construction Phase ES&H Plan; and, 17. Inspection and Test Plan. Demobilization - (40 %) Demobilization shall consist of all Work in preparation for and removal from the Site, upon satisfactory completion of the Project, of all Contractor owned materials, equipment, facilities including trimming, shaping, cleaning, clearing, disposal of surplus materials and any other Work and labor necessary to leave the Site in a clean and safe condition in a manner D-17 Contract No. 03J-CO1 2-00.00 2-01.00 2-02.00 2-02.01 2-02.02 2-03.00 2-03.01 SITE PREPARAT! Demolition Shall include demolition and disposal of existing structures to Royal Commission designated disposal area as per Ehogiaser inguvatigny Contract drawing and Contract documents. Earth Works Excavation Shall include Gite clearing and excavating including transporting unacceptable material and excavated materials where required on site for using the material as fill material where such material meets specified criteria for intended use; depositing, spreading, grading and compacting in layers to finished grades or to sub-grade levels; and transporting surplus excavated material to the Royal Commission designated off-site disposal area and grading and compacting as required as per Contract drawing and as specified in the Contract documents.,The item shall also include making of temporary storm drainage ditches contract drawing and as specified in the Contract documents. TI shall also include the required field density testing, laboratory testitg-dfd settlement monitoring tests as per project specific specifications. The unit rate shall include an allowance for any further excavation due to settlement. Imported Fill Shall include Gite clearing and excavating from designated Royal Commission borrow pits, transporting, spreading, leveling, grading, compacting and stabilizing to finished grade levels and formation of slopes in layers as per Contract drawing and as specified in the Contract document ‘The item shall also include making of temporary storm drainage dj per Contract drawing and as specified in the Contract documents. The! shall also include the required field density testing, laboratory testing and settlement monitoring tests as per project specific specifications. The unit rate shall include an allowance for any further imported fill due to settlement. Soil Improvement Band Drain 100 mm wide; band drain Shall include supply and installation of band drains to the specified depths including plant, machineries and equipment necessary for the D-1-9 Contract No. 031-CO1 pa eke aed uerigy wih sd. 2-03.02 2-03.03 & drawings and Contract documents. T shall be carried out by specialist subcontractor and shall be approved byRC. The contractor shall submit their to RC and obtain approval prior to execution of yybrk. complete installation with all song complete as per the Contract Drainage layer Shall include supply and laying of drainage layer with well graded aggregates for the specified thickness including machinery, labor and equipment and all associated works complete as shown on the Contract drawings and specified in the Contract documents. Stone Column, 800 mm diameter Shall include design; supply and installation of stone columns including filling the columns with aggregates to the specified depths including plant, machineries and equipment necessary for the complete installation with all associated works complete aseP the Contract drawings and specified in the Contract documents. The/ Work shall be carried out by specialis subcontractor and shall be fed by RC. The contractor shall submit their {GSign to RC and obtain approval prior to execution ofWhrk Geo Composite Geo-Grid laminated with 450 GSM geotextile Shall include supply and installation of geo-grids of specified class and strength laminated with geotextile layer of specified strength and characteristics to the extents as shown on Gontfct drawings including plant, ‘machineries and equipment necessary for the complete installation with all associated works complete as per the Contract drawings and specifications. Salt barrier; 7.8 mm thick Shall include supply and installation of salt barrier of specified thickness and strengths including laminated with HDPE on both sides as shown on contact Grawings including plant, machineries and equipment necessary for the complete installation with all associated works complete as per the Contract drawings and specificati Granular fill Shall include supply and laying of well graded granular fill for specified thickness including machinery, labor and equipment and all associated works complete as shown on the Contract drawings and specified in the Contract documents. D-1-10 Contract No, 03J-CO1 2-03.04 Stone Revetment Polyester geg@extile fabric; 800 GSM Shall include supply and installation of polyester geo-textile fabric of specified strength and characteristics to the extents as shown on contact drawings including plant, machineries and equipment necessary for the complete installation with all associated works complete as per the Contract drawings and specifications. Filter layer of quarry stone and gravel (10-400kg) Shall include supply and placement of quarry stone and gravel including earthwork and all associated works for a complete construction as shown on the Contract drawings and specified in the Contract documents. This also includes all labor, plants, machineries and equipment necessary for the construction, conducting all necessary tests and all associated works complete as per Contract drawings and Contract documents. Item also includes temporary works and necessary operations and obtaining approval for all works from Royal commission, coast guard and relevant authorities. Armour Rock (WS0 = 1000 Kg) Shall include supply and placement of armor rocks including earthwork and all associated works for a complete construction as shown on the Contract drawings and specified in the Contract documents. This also includes all labor, plants, machineries and equipment necessary for the construetion, conducting all necessary tests and all associated works complete as per Contract drawings and Contract documents. Item also includes temporary works and necessary operations and obtaining approval for all works from Royal commission, coast guard and relevant authorities. D-l-Il Contract No. 03J-CO1 LIST OF ROYAL COMMISSION GUIDELINE SPECIFICATIONS ORIGINAL earrix Non [eit No. DESCRIPTION Rev. No. %naeatos those Speciation applicable to this Contact PARTE ROVAL COMMISSION GUDELNE SPECRCATIONS 004 Ch-4 [Roads o 005 | ons Warr Wass Wate ° a cis eee 5 oor | Grr even 0 so; | a8 fa 0 ora | 2 [ooronen one 0 : ove | creo [Cowra Roqurones or Tecincal vee Contec ; x o18 | 0130 [Pet erogrent an Coordnaon 3 x 019 | 0120 [onaucon Progress Doane 0 : oze_ | 0120 [raters 0 : cca 0160 fries any Cove 2 x ozs | 01610 fonewary Utes ° : cas_| 61620 fraction Fane 6 x ozs | 0189 [ee Acces nd Pig ° x o2a_ | 0150 [Foner Corts 3 x ozo 0180 [Pj eteaton ° 020 | o160 [eeee Peuc Roquonerts 0 021 | 01640 Jomer Frise Pict 0 caz_| 0160" [ru eter Pesurerent 0 De21 Contract No, 03-CO1

You might also like