As Built Smartfren Hard Split and Soft Split Project Site As Built

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Doc. Name: Exhibit B.2.

[Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

AS BUILT
Smartfren Hard Split and Soft Split Project
Site As Built

Site ID ZSBY_0346
Site Name Dupak
Site Type Indoor&GF
Tower Type Angular Tower

Document NO. Ed. Date Page

SE EJ 1 on 10-10-19 Himawan on 14-10-19

This material is proprietary to PT SMART TELECOM and is strictly confidential. No information contained herein may be copied,
translated, transcribed or duplicated for any commercial purposes or disclosed to third parties.
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

PROJECT: SMARTFREN Hard Split and Soft Split Project

THE EAST BUILDING 26-27th FLOOR PT. SMART Telecom


JL. LINGKAR MEGA KUNINGAN JL. H. AGUS SALIM 45
KAV. E3-2. NO.1 KEBON SIRIH – MENTENG
JAKARTA 12950 JAKARTA PUSAT
TEL:021-2994 2000 TEL:021-31922255
FAX:021-2994 2002 FAX:021-3162519

CONTRACT NO:
Documentation Identification: Document No.
AS BUILT

Company Title Name Signature Date


Prepared by ZTE Project Manager Nurdiana

Checked by Smartfren Field Engineer Syafrial. Wahyu

Approved by Smartfren ITC Manager Johan. S

Site Name : Dupak Total Pages:


Site ID : ZSBY_0346 Edition:

This document is exclusively property of ZTE and shall not be used copied or
communicated to the third party without its prior authorization.

Document NO. Ed. Date Page

This material is proprietary to PT SMART TELECOM and is strictly confidential. No information contained herein may be copied,
translated, transcribed or duplicated for any commercial purposes or disclosed to third parties.
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

TABLE OF CONTENT

AS BUILT

1. AS BUILT INFORMATION

1.1 Site Information


1.2 Site Model Summary
1.3 RAN Solution
1.4 LTE Antenna&Feeder System
1.5 Infran & Power Equipment Information
1.6 Mini CME

2. AS BUILT DRAWING

This material is proprietary to PT SMART TELECOM and is strictly confidential. No information contained herein may be copied,
translated, transcribed or duplicated for any commercial purposes or disclosed to third parties.
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

1. AS BUILT INFORMATION
Site ID: ZSBY_0346
Site Name: Dupak
Location: Gedung Sucofindo, Jl. Tembok Dukuh-Surabaya
1.1 Site Information
No. Items Information Tips
1 Site ID ZSBY_0346
2 Site Name Dupak
Gedung Sucofindo, Jl. Tembok Dukuh-Surabaya
3 Site Address

4 Site Ownership PT. IBS Smartfren,Tower provider, Others


5 Region East Java
6 Morphology Class Rural Denseurban,Urban,Suburban, Rural
7 Longitude(E): 112.717 With(xx.xxx°) format
8 Latitude(N): -7.2549 With(xx.xxx°) format
9 Site Type Indoor Linked to cover page, automatically generate
10 Building Height 46 Fill with building height if it is Rooftop site
11 Tower/Pole Type Angular Tower Linked to cover page, automatically generate
12 Equipment Room Type Outdoor Shelter,Concrete room, Outdoor
13 Room Demension 3000 x 2650 x 3150 (mm) (HxWxD)
14 Existing BTS Equipment/Type BS8300 BS8800,BS8900,BS8906E,CBTS12,SAMSUNG
15 Existing Power Equipment ZXDU68 S301
16 PLN Connection Capacity 16.5 Kva
17 Generator Set Capacity
18 Air Conditioner Qty and capacity 2x1.5 pk
19 Environment Alarm System Reuse

1.2 Site Model Summary


No. Site Model Description
1 M01: 8 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----Replace the battery with 1*100AH
2 M02: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----Add DCPD6 for W201
3 M03: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (S301)
4 M04: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----ZXDU68 W201(3Re)-2*100AH with monitoring
5 M05: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----ZXDU68 S301(3Re)-3*100AH with monitoring and Add DCPD6
6 M06: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----Replace the battery with 1*100AH
7 M07: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----Replace the battery with 2 banks lithium battery for B201
8 M08: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----Add DCPD6 for W201
9 M09: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (W201)
10 M10: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (S301)
11 M11: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----ZXDU68 W201(3Re)-2*100AH with monitoring
12 M12: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----ZXDU68 S301(3Re)-2*100AH with monitoring
13 M13: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----Replace the battery with 1*100AH
14 M14: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization----Replace the battery with 2 banks lithium battery for B201
15 M15: 10 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization----Add DCPD6 for W201
16 M16: 10 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization----ZXDU68 W201(3Re)-2*100AH with monitoring
17 M17: 10 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (S301)
18 M18: 10 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization----Replace the battery with 1*100AH
19 M19: 10 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization----Replace the battery with 2 banks lithium battery for B201
20 M20: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 1 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (S301)
21 M21: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 1 sector TDD sectorization----Add DCPD6 for W201
22 M22: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 2 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (S301)
23 M23: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 2 sector TDD sectorization----Replace the battery with 2 banks lithium battery for B201
24 M24: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 3 sector TDD sectorization----Add DCPD6 and replace 1*25A with 63A (S301)
25 M25: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization----Add DCPD6 for WR05
26
27
28
29
30
31
32
33
34
35
36
37
38
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

1.3 New RAN Solution


No. Proposed Items Proposed Information Tips
1 New Solution M03
2 New Rack Reused PS
3 New / Existing BBU type BPQ2 If existing, just mention the product name
4 New BBU Installation In Existing 19"Rack ZXDU68 Outdoor Rack
5 RRU Type For TDD R8984E Mention the product name
6 RRU Qty For TDD 1
7 RRU Type For FDD / Mention the product name
8 RRU Qty For FDD /
9 New ANT type MB-G64O9X65V-00 Mention the product code
10 New DCPD6 Yes Yes/No

1.4 New LTE Antenna&Feeder System


Item Sector-1 Sector-2 Sector-3 Sector-4
(810-890)M&4x(2300-
1 Antenna Type 2400)MHZ Dual-Band

2 Qty of Antennas 1
3 Port of Antenna 10
4 Height (m,AGL) 46+19
5 Azimuth 300
6 Machanical Tilt 4
7 Electrical Tilt 0
8 Antenna Jumper Length(m) for TDD 5
9 Antenna Jumper Length(m) for FDD 5
10 Feeder Type Fiber
11 Feeder/Fiber Length 40
12 RRU Type R8984E(TDD)
13 Qty. of RRU 1
14 DC Power Cable Length(m)for TDD 40
15 DC Power Cable Length(m)for FDD

1.5 Infra & Power Equipment Information


No. Items Information Tips
1 Tower structural analysis No need Need, No need,
Tower structural statement from
2 No need
Consultant
3 Pole structural analysis/design No need Need, No need,
4 Building structural analysis No need Need, No need,
5 Power System Solution No need
6 New DC System Type No need
7 Add Rectifier Moudle No need
8 New battery for new PS No need
9 Battery replacement No Need
10 New DCPD Box or Subrack No need
11 Transmission Solution Reuse Existing Transmission IPRAN,MW,LL,Dark Fiber, Existing 5928
12 New IPRAN Installation
13 New added Power Loading(MAX) Automatically generate according to Model

1.6 New Mini CME


No. Proposed Items Proposed Information Tips
1 New equipment foundation No
2 New Fence & Gate No
3 New Sunshade No
4 AC MCB replacement No Need to replace or add AC MCB or not?
5 DC MCB replacement Yes Need to replace or add DC MCB or not?
6 New PLN? No If Upgrade; see the Mini CME BOQ
7 New Antenna mounting Type
8 New Antenna mounting Qty
9 New RRU mounting Type
10 New RRU mounting Qty
11 New Cable Tray-Type1 8 types of cab tray
12 Length of cable tray type1 m
13 New Cable Tray-Type2 8 types of cab tray
14 Length of cable tray type2 m
15 Power Cabinet installation type
16 New Grounding Bar Qty Including tower grounding bar and main grouding bar
17 New new feeder window
Doc. Name: Exhibit B.2. MA-LTE NETWORK-01/ZTE/XI/2014
[Detail Design]
2. AS BUILT DRAWINGS
Site ID: ZSBY_0346
Site Name: Dupak
Location: Gedung Sucofindo, Jl. Tembok Dukuh-Surabaya
SN DRAWING LIST REVISIONS
1 Site Map(detail address,grs,siteidsite name) 1.0
2 Site Layout 1.0
3 Tower/Pole foundation drawing 1.0 NA
4 Pole drawing 1.0 NA
5 Tower strengthening drawing 1.0 NA
6 Antenna bracket and mounting drawing 1.0
7 Shelter/outdoor BTS foundation drawing 1.0 NA
8 Shelter/outdoor BTS canopy-cage view (front, back, side) 1.0 NA
9 Outdoor BTS canopy-cage drawing 1.0 NA
10 Fence detail drawing 1.0 NA
11 Electrical layout 1.0
12 Equipments layout 1.0
13 Indoor cable tray layout 1.0
14 External Grounding system layout 1.0
15 Detail grounding pit and grounding bar drawing 1.0
16 Internal Grounding system 1.0
17 Electrical and Equipment grounding connectivity 1.0
18 Internal shelter/outdoor BTS canopy section drawing 1.0
19 KWH meter pole and foundation drawing 1.0
20 KWH meter internal front view and SLD 1.0
21 ACPDB internal front view 1.0
22 ACPDB SLD 1.0
23 DC Fan front, side and back view 1.0
24 Air conditioner position lay out 1.0
25 EAS/E-Guard front view 1.0
26 EAS/E-Guard connectivity 1.0
27 Block Diagram 1.0
28 AC and DC Power Cable route drawing and table 1.0
Feeder cable, IF cable, PCM cable and other cables route drawing and
29 1.0
table
30 Rectifier and battery system front view 1.0
31 DCPDB front view 1.0
32 Rectifier and DCPDB MCB allocation 1.0
33 BTS front view 1.0
34 Transmission rack front view 1.0 NA
35 Mux front view 1.0 NA
36 DDF,E1 and IP port connection 1.0 NA
37 Transport Equipment(Switch,Router,PTN,etc) front view 1.0 NA
38 ODF (Optical Distribution Frame) view 1.0 NA
39 Fiber Optical Entry Port View 1.0 NA
40 EAS/E-Guard-DDF-BTS/MW Connection sketch map 1.0 NA
41 FEP view 1.0
42 Antenna placement Information 1.0
43 RRU placement information 1.0

Note:For new site,just provide had confirmed with smartfren CME team;for existing
site,if no need,put N/A

You might also like