Research paper
Abstract
Building Construction materials adopted 50% of cost from the total estimation of the project. Estimated Cost and planned schedule can
be achieved by effective material management. The project team must be understood the goals and efficient material management
techniques for successful project execution. A well planned material management possible by on time delivery and equipment to the job
site and improved workforce planning increased labor productivity, planned schedules and minimum cost. Questionnaire were prepared
for data analysis based on Likert’s scale 25 respondents were answered the questionnaire. Collected data analyzed using SPSS.To reveal
the respondents responses for enhance the analysis results used there are Frequency analysis, Factor analysis, and reliability analysis.
Results will be obtained and also recommendations will be suggested.
1. Introduction
6.2.1. Frequently Used Material Management Technique Fig.7 shows the inputs for factor analysis.
Fig.4 shows the pie chart of material management techniques. Fig.7: Inputs for factor analysis
Table 3 shows the analysis results for material takeoff. Fig.8: Inputs for factor analysis
Table 3: Analysis results for material takeoff Table 4 shows the correlation matrix.
References
[1] T.Subramani., ”Cost Estimation and Identification of Transport
Infrastructure facility Projects in Salem”, International Journal of
Engineering and Technology, Vol.2, No.5, Pp 859 – 867,2012.
[2] T.Subramani., P.Anitha., S.Sekar., “Health-Care Waste
Management System”, International Journal of Engineering
Research and Applications, Vol. 4, Issue 6( Version 2), pp.255-258,
2014.
[3] T.Subramani., N.Kanthasamy., “High End Solution For Advanced
Civil Engineering Projects”, International Journal of Modern
Engineering Research, Volume. 4, Issue. 6 (Version 3), pp 49-53,
2014.