DAFTAR HARGA SATUAN DASAR UPAH, BAHAN DAN ALAT

NO. URAIAN SATUAN HARGA SATUAN


(Rp.)

I. U P A H

1 Pekerja OH 60,000.00
2 Tukang OH 65,000.00
3 Kepala Tukang OH 70,000.00
4 Mandor OH 75,000.00
5 Operator OH 75,000.00
6 Pembantu Operator OH 60,000.00

II. BAHAN

1 Tanah Timbunan M³ 155,000.00


2 Batu M³ 230,000.00
3 Pasir Pasangan M³ 185,000.00
4 Semen Zak 85,000.00
5 Bensin Liter 7,500.00
6 Solar Liter 7,500.00
7 Oli Liter 35,000.00

III. A L A T

1 Dump Truck Jam 193,768.48


2 Stamper Jam 32,805.72
3 Concrete Mixer Jam 26,872.46
ANALISA HARGA SATUAN

JENIS PEKERJAAN : Galian Tanah


HARGA SATUAN : 48,565.00 / M3

HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)

A. TENAGA
1 Pekerja OH 0.6250 60,000.00 37,500.00
2 Mandor OH 0.0620 75,000.00 4,650.00

B. BAHAN - - - -

C. ALAT
Alat Bantu Ls 1.0000 2,000.00 2,000.00

Jumlah 44,150.00
Biaya Umum dan Keuntungan 10 % 4,415.00
Harga Satuan Pekerjaan (per m³) 48,565.00

ANALISA HARGA SATUAN

JENIS PEKERJAAN : Pasangan Batu Kali 1PC : 3PS


HARGA SATUAN : 908,765.00 / M3

HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)

A. TENAGA
1 Pekerja OH 1.5000 60,000.00 90,000.00
2 Tukang OH 0.6000 65,000.00 39,000.00
3 Kepala Tukang OH 0.0600 70,000.00 4,200.00
4 Mandor OH 0.0750 75,000.00 5,625.00

B. BAHAN
1 Batu Kali M³ 1.1000 230,000.00 253,000.00
2 Zak Semen Zak 4.0400 85,000.00 343,400.00
3 Pasir M³ 0.4850 185,000.00 89,725.00

C. ALAT
2 Alat Bantu Ls 1.0000 1,200.00 1,200.00

Jumlah 826,150.00
Biaya Umum dan Keuntungan 10 % 82,615.00
Harga Satuan Pekerjaan (per m³) 908,765.00
ANALISA HARGA SATUAN

JENIS PEKERJAAN : Plesteran 1PC : 3PS


HARGA SATUAN : 52,175.75 / M2

HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)

I TENAGA
1 Pekerja OH 0.2500 60,000.00 15,000.00
2 Mandor OH 0.0215 75,000.00 1,612.50
3 Tukang Batu OH 0.1000 65,000.00 6,500.00
4 Kepala Tukang OH 0.0200 70,000.00 1,400.00

II BAHAN
1 Semen Zak 0.2060 85,000.00 17,510.00
2 Pasir M³ 0.0260 185,000.00 4,810.00

III ALAT
1 Alat Bantu Ls 1.0000 600.00 600.00

Jumlah 47,432.50
Biaya Umum dan Keuntungan 10 % 4,743.25
Harga Satuan Pekerjaan (per m2) 52,175.75

ANALISA HARGA SATUAN

JENIS PEKERJAAN : Timbunan Tanah


HARGA SATUAN : 316,508.40 / M3

HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)

A. TENAGA
1 Pekerja OH 0.5000 60,000.00 30,000.00
2 Mandor OH 0.0500 75,000.00 3,750.00

B. BAHAN
1 Tanah Timbunan M³ 1.2000 155,000.00 186,000.00

C. ALAT
1 Stamper Jam 0.2410 32,805.72 7,904.99
2 Dump Truck Jam 0.3075 193,768.48 59,579.92
3 Alat Bantu Ls 1.0000 500.00 500.00

Jumlah 287,734.91
Biaya Umum dan Keuntungan 10 % 28,773.49
Harga Satuan Pekerjaan (per m³) 316,508.40
ANALISA HARGA SATUAN

JENIS PEKERJAAN : Pembersihan Lapangan


HARGA SATUAN : 12,045.00 / M2

HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)

A. TENAGA
1 Pekerja OH 0.1000 60,000.00 6,000.00
2 Mandor OH 0.0500 75,000.00 3,750.00

B. BAHAN - - - -

C. ALAT
Alat Bantu Ls 1.0000 1,200.00 1,200.00

Jumlah 10,950.00
Biaya Umum dan Keuntungan 10 % 1,095.00
Harga Satuan Pekerjaan (per m2) 12,045.00

ANALISA HARGA SATUAN

JENIS PEKERJAAN : Mobilisasi & Demobilisasi


HARGA SATUAN : 6,800,000.00 / Ls

HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)

1 Dump Truck Unit 2.0000 2,500,000.00 5,000,000.00


2 Concrete Mixer Unit 1.0000 800,000.00 800,000.00
3 Stamper Unit 1.0000 500,000.00 500,000.00
4 Alat Ukur Set 1.0000 500,000.00 500,000.00

Jumlah 6,800,000.00
0.50
0.10

0.10
0.60

0.2

Plesteran

0.25

GELOMBANG RENCANA

2.00
0.40

1.45

Muka Tanah
Muka Tanah

1.45 0.15

1.00

1.35

0.35

1.40

0.25
0.35

2.00

PEMBANGUNAN TALUD PENGAMAN PANTAI


DESA AMAHEI, KAB. MALUKU TENGAH

Desain By : Sie. SRDP PSDA MALUKU


Perhitungan Volume

Pasangan Batu

I 0.5 + 0.60 x 0.10 x 400 = 22.00


2

II 0.60 x 0.2 x 400 = 48.00

III 0.40 x 0.25 x 400 = 40.00

IV 0.60 + 1.45 x 1.45 x 400 = 594.50


2

V 1.45 + 2.00 x 0.15 x 400 = 103.50


2

VI 2.00 x 1.00 x 400 = 800.00

VII 0.60 + 0.35 x 0.35 x 400 = 66.50


2

Total Volume Pas. Batu = 1,674.50 M3

Plesteran

3.35 x 400 = 1340.00 M2 0.80

Galian Tanah

2.50 X 1.50 x 400 = 1,500.00 M3 0.89579

Timbunan Tanah

* untuk volume timbunan tanah disesuaikan sesuai dengan hasil pengukuran di lapangan
0.5

1 0.055 0.6
2 0.12
3 0.100 1
4 1.341
5 0.259
6 2.400
7 0.149
SUB TOT 4.424 200 884.75 2

0.4

GALIAN 3.1 620 1.45


4

5
#REF!
#REF!
#REF!

1.4
OKE
2.65 847

0.1
0.20
2.65 PLESTERAN
530

0.25

1.45

1.45
0.15
2

1.20

0.35

4 0.25 0.35
OWNER'S ESTIMATE ( O E )

KEGIATAN : PEMBANGUNAN PENGAMAN PANTAI


PEKERJAAN : PEMBANGUNAN TALUD PENGAMAN PANTAI DESA YAMTEL
LOKASI : DESA YAMTEL, KAB. MARLA
THN ANGGARAN : 2012

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME (Rp.) (Rp.)

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan M2 417.50 12,045.00 5,028,787.50
2 Mobilisasi Ls 1.00 6,800,000.00 6,800,000.00

B. PEKERJAAN KONSTRUKSI
1 Galian Tanah M³ 372.60 48,565.00 18,095,319.00
2 Pekerjaan Kisdam Ls 1.00 4,365,000.00 4,365,000.00
3 Pasangan Batu Kali Camp. 1 : 3 M³ 779.10 908,765.00 708,022,446.56
4 Pekerjaan Plesteran Camp 1 : 3 M² 768.00 52,175.75 40,070,976.00
5 Timbunan Tanah M³ 342.89 316,508.40 108,526,931.81

TOTAL 890,909,460.87
PPn 10% 89,090,946.09
JUMLAH 980,000,406.96
DIBULATKAN 980,000,000.00

TERBILANG : SEMBILAN RATUS DELAPAN PULUH JUTA RUPIAH

Ambon, 24 Maret 2011


MENYETUJUI
PPTK PEMBANGUNAN PRASARANA PANITIA PENGADAAN BARANG DAN JASA
PENGAMAN PANTAI MALUKU KETUA
(KAB. SERAM BAGIAN BARAT)

Ir. ANDRIANITA. S. MT. A. Y. H. APONNO, ST. MT.


NIP. 19661007 199303 2 012 NIP. 19731227 200604 1 003
BILL OF QUANTITY (BOQ)

KEGIATAN : PEMBANGUNAN PENGAMAN PANTAI


PEKERJAAN : PEMBANGUNAN TALUD PENGAMAN PANTAI DESA YAMTEL
LOKASI : DESA YAMTEL, KAB. MARLA
THN ANGGARAN : 2012

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME (Rp.) (Rp.)

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan M2 417.50
2 Mobilisasi Ls 1.00

B. PEKERJAAN KONSTRUKSI
1 Galian Tanah M³ 372.60
2 Pekerjaan Kisdam Ls 1.00
3 Pasangan Batu Kali Camp. 1 : 3 M³ 779.10
4 Pekerjaan Plesteran Camp 1 : 3 M² 768.00
5 Timbunan Tanah M³ 342.89

TOTAL
PPn 10%
JUMLAH
DIBULATKAN 980,000,000.00

TERBILANG : SEMBILAN RATUS DELAPAN PULUH JUTA RUPIAH

Ambon, …………………………. 2012

CV. / PT. / Fa …………………………….

NAMA JELAS
JABATAN
BIAYA OPERASI ALAT BERAT
(PER JAM)

NO. URAIAN B I A Y A BIAYA / JAM

1 2 3 4

JENIS ALAT DUMP TRUCK

A. URAIAN PERALATAN

1 Tenaga (Pw) 100 Hp


2 Kapasitas (Cp) 6 Ton
3 Umur Ekonomis (A) 5 Tahun
4 Jam Operasi Dalam 1 Tahun (W) 2000 Jam
5 Harga Alat (B) Rp. 225,000,000.00

B. BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat 10 % x Harga Alat (C) Rp. 22,500,000.00

2 Faktor Angsuran Modal 0.33438 (D)

3 Biaya Pasti per Jam :


a. Biaya Pengembalian Modal = (B-C) xD (E) Rp. 33,855.98
W

b. Asuransi, dll = 0.002 x B (F) Rp. 225


W

Biaya Pasti per Jam ( E + F ) Rp. 34,080.98

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = 0.125 x Tenaga x Harga Solar Rp. 93,750.00

2 Pelumas = 0.01 x Pw x Minyak Pelumas Rp. 35,000.00

3 Perawatan dan Perbaikan = ( 12.5 % x B ) Rp. 14,062.50


W

4 Operator = 1 Org / jam x Upah operator Rp. 9,375.00

5 Pembantu Operator = 1 Org / jam x Upah pembantu operatorSopir Rp. 7,500.00

Biaya Operasi per Jam Rp. 159,687.50

D. TOTAL BIAYA ALAT / JAM Rp. 193,768.48


BIAYA OPERASI ALAT BERAT
(PER JAM)

NO. URAIAN B I A Y A BIAYA / JAM

1 2 3 4

JENIS ALAT CONCRETE MIXER

A. URAIAN PERALATAN

1 Tenaga (Pw) 5 Hp
2 Kapasitas (Cp) 500 Liter
3 Umur Ekonomis (A) 4 Tahun
4 Jam Operasi Dalam 1 Tahun (W) 2000 Jam
5 Harga Alat (B) Rp. 15,000,000.00

B. BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat 10 % x Harga Alat (C) Rp. 1,500,000.00

2 Faktor Angsuran Modal 0.38629 (D)

3 Biaya Pasti per Jam :


a. Biaya Pengembalian Modal = (B-C) xD (E) Rp. 2,607.46
W

b. Asuransi, dll = 0.002 x B (F) Rp. 15


W

Biaya Pasti per Jam ( E + F ) Rp. 2,622.46

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = 0.125 x Tenaga x Harga Solar Rp. 4,687.50

2 Pelumas = 0.01 x Pw x Minyak Pelumas Rp. 1,750.00

3 Perawatan dan Perbaikan = ( 12.5 % x B ) Rp. 937.50


W

4 Operator = 1 Org / jam x Upah operator Rp. 9,375.00

5 Pembantu Operator = 1 Org / jam x Upah pembantu operatorSopir Rp. 7,500.00

Biaya Operasi per Jam Rp. 24,250.00

D. TOTAL BIAYA ALAT / JAM Rp. 26,872.46


BIAYA OPERASI ALAT BERAT
(PER JAM)

NO. URAIAN B I A Y A BIAYA / JAM

1 2 3 4

JENIS ALAT STAMPER

A. URAIAN PERALATAN

1 Tenaga (Pw) 5 Hp
2 Kapasitas (Cp) 0.170 Ton
3 Umur Ekonomis (A) 4 Tahun
4 Jam Operasi Dalam 1 Tahun (W) 1000 Jam
5 Harga Alat (B) Rp. 20,000,000.00

B. BIAYA PASTI PER JAM KERJA

1 Nilai Sisa Alat 10 % x Harga Alat (C) Rp. 2,000,000.00

2 Faktor Angsuran Modal 0.38629 (D)

3 Biaya Pasti per Jam :


a. Biaya Pengembalian Modal = (B-C) xD (E) Rp. 6,953.22
W

b. Asuransi, dll = 0.002 x B (F) Rp. 40.00


W

Biaya Pasti per Jam ( E + F ) Rp. 6,993.22

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = 0.125 x Pw x Harga Solar Rp. 4,687.50

2 Pelumas = 0.01 x Pw x Minyak Pelumas Rp. 1,750.00

3 Perawatan dan Perbaikan = ( 12.5 % x B ) Rp. 2,500.00


W

4 Operator = 1 Org / jam x Upah operator Rp. 9,375.00

5 Pembantu Operator = 1 Org / jam x Upah pembantu operator Rp. 7,500.00

Biaya Operasi per Jam Rp. 25,812.50

D. TOTAL BIAYA ALAT / JAM Rp. 32,805.72