CTW-130-SYS-FD-MGT-PLN-0029-A0 - List of Input Data For Final Design - Package 8
CTW-130-SYS-FD-MGT-PLN-0029-A0 - List of Input Data For Final Design - Package 8
CTW-130-SYS-FD-MGT-PLN-0029-A0
List of input data for Final Design -Package 8
APPROVAL
Deputy
Approved RCH Project 05/04/16
Manager
Written
B Checked
Approved
Written
C Checked
Approved
Trackworks
Alignment
Drainage
Discipline Input Data Considered
P8
Topographic data and utilities
Topographic data x x x x SNC Lavalin Design
Utilities data x x x x SNC Lavalin Design
Geotechnical data
Report from Gulf Consult
Earthworks x x TYPSA comments
SNC Lavalin Design
Structures No structures in P8
Alignment
Preliminary alignment as sent to YM on 19/02/16( see MoM CTW-
x x x x x
130-SYS-FD-MGT-MOM-2007)
Earthworks
x See Design Criteria - Annexe 1 Calculations report
x x No sand mitigation measures considered
Road works
Traffic train as per indicated in MoM CTW-130-SYS-FD-MGT-
x
MOM-2007 (4 trains per day in KFIP Line)
x Road traffic as SNC Lavalin
Drainage
x SNC Lavalin Design
Minor structures
-
Major structures
-
Trackworks
x Ballast and ballast slope corrected as in french standards