90 ° F +104 ° F
Sisi Shell = =97 ° F
2
140° F+113 ° F
Sisi Tube = =126.5° F
2
2. Sisi Shell
Mas Flow (M) Asumsi =11 (L/min)
16.19liter 60 menit 971.4 Kg 2.205 lb
× x 1= x =2142.857
menit 1 hr 1hr 1 Kg hr
2. Menentukan LMTD
t 2−t 1 104−90
= = =0.28
T 1−t 1 140−90
∆ T LMTD=29.02 x 0.97=28.145 ° F
Q 30000 BTU
A= = =24.7878
ud x ∆ t LMTD 43 x 28.145 hr ft 2 ❑0 F
Fluida dingin
c T 2−t 1 113−90
= = =0.51
h T 1−t 2 140−104
Kc = 0.26
D . C . B 8 x 0.25 x 4
= =0.0555556 f t 2
Pt .144 1 x 144
7. Menghitung Massa Velocity
a Shell b Tube
w = 35752.1 lb/hr w = 2364.006 lb/hr
As = 0.0555556 ft2 At = 0.0404444 ft2
W 2142.857 lb /hr W 2364.006 lb /hr
Gs = = Gt = =
As 0.0555556 F t 2 At 0.0404444 f t 2
= 38571.43 lb/hr ft2 = 58450.76 lb/hr. ft2
shell
Tube
D = 0.482 inch = 0.04 ft table 10 D. Q Kern
μ=14.036lb/ Ft hr fiq 14 D. Q Kern
0.04 Ft 7 Ft x 58450.76 lb /hr . Ft 2
Ret=De .> ¿ = =166.573 ¿
μ 14.036 lb / Ft hr
BTU BTU lb
ho
∅s
=21 x
0.361
hr Ft ° F
0.0079166667 Ft
x
1
hr Ft 2
x 1.8392
0.361 hr Ft ° F
(
Ft hr
) 1/3
b Tubu Side
hi k Cp x μ
∅t
=Jh x x
D k ( ) 1/3
BTU BTU
0.0748 0.47 x 14.036 lb/Ft hr
¿ 2.3 x
hr Ft ° F
0.040166667 Ft
x
(
hr Ft ° F
0.0748
btu
hr Ft ° F
)
1/3
BTU
= 19.0629 2
hr F t ° F
hio hi ID
= x
∅ t ∅t OD
BTU
¿ 1.021052
hr f t 2 ° F
× ( 125.69−96.72 ° F ) ° F
tw=125.51 ° F
lb
1.8392
∅s=
μ 0.14
μw ( )
¿
1.3794 (
ft hr
lb
ft hr
) 0.14
= 1.04109875
ho BTU
h o= ( ∅s )(
x ∅ s = 164.775
hr f t 2 o F )
x 1.04109875 = 171.5469 BTU/hr ft2 oF
b Tube side
tw = 125.51
μ=6.2centi Poise x 2.42
lb
4
ft hr
lb
14.036
∅t=
μ 0.14
μw( ) =
15.004 (
ft hr
lb
ft hr
) 0.14
= 0.990707
hio BTU
hio = ( ∅t )(
x ∅t = 1.021052 2
f t °F )
x 0.990707 =¿ 1.011563 BTU/hr ft2 oF