Professional Documents
Culture Documents
Jakarta, 02 October 1997 179 CM - 60 KG: Skype
Jakarta, 02 October 1997 179 CM - 60 KG: Skype
Network Infrastucture
Server Management
SMK Telekomunikasi
Telesandi Bekasi
Telecommunication
Admin and Reporting
65
Speaking
55
Listening
Computer and Network Concept Design
Engineering Electrical
PT. Telkom Akses Joined with a specific team for installation and troubleshooting fiber optic and wireless networking in
Denpasar & Kuta region a specific location such as goverment, hospitality, bank, and tourist attractions.
PT. Mulia Tekhnik Bersama I become a multitasking person in my profession. I supported other team and learned a basic skill like
Cipali Toll Road as electrical, air condition, and mechanical. I also handled project admin section such as create
invoice, documentation, reporting, requestioning until safety management.
PT. Putra Mulia Become a support team for Troubleshoot U900 BTS Tower in the project Ericsson - XL. In this
Telecommunication Project, i worked for solve the problem in the BTS Ericsson Device (via Hardware and Software). I
Banten Province region also doing replace RRUS on the site tower and Jumper cable from shelter to RRUS.
PT. Alita Praya Mitra New install, dismantle, swape, and pointing transmission device (NEC) for the XL BTS Network and
Jabodetabek Commisioning Indor Device Unit and modem system until live.
Java Palace Hotel Serve guest requests and handle disturbances that occur in hotel operations such as computer network
Cikarang Jababeka problems, computer damage, pabx interference, wifi connectivity and problem with TV channels.
Holiday Inn Cikarang Serve in house guest and event, Maintaining all IT Asset of BOH until guest area (hardware and
Cikarang Jababeka software), Control Self Audit for hotel standard, server backup and Manage hotel system program.