BARH
Date:
Ref:Barh/OPERATION/2020-21/OPRNLMI/811012
30/01/2021(16:32:24)
Subject:Approval of 03 nos Reviewed LMI of Main Plant Operation
Department
The following LMI reviewed with respect to LMI audit observations for mentioning responsibility
Submitted by:
Shambhu Kumar Suman - 005007 (ADDL. GENERAL MANAGER ,OPERATION) ,Barh
On:30/01/2021(16:32:24) Ref:Barh/OPERATION/2020-21/OPRNLMI/811012
Submitted by:
Debasis Sahu - 003976 (GENERAL MANAGER ,O & M) ,Barh
On:30/01/2021(16:52:38) Ref:Barh/OPERATION/2020-21/OPRNLMI/811012
Approved for
Implementation by: ……………………………………………………..
( Praveen Saxena )
Executive Director
Director-BARH STPP
Date:
CONTENTS
Page Nos.
1.0 Introduction 4
3.0 Scope 4
5.0 Operation
eration of Technical Compliance 6
7.0 Review 8
9.0 Appendix-A 9
LMI
Main Plant Barh
Operation
TITLE: Technical Compliance within Operation Division
DOC NO: LMI08/BARH/OPRN/OGN/GEN/001
OGN/GEN/001
1.0 INTRODUCTION
This LMI describes the technical compliance procedure provided within Operation Division to
examine compliance with statutory obligations, the company's mandatory requirements, and any
Procedures and Instruction approved by the Operations Executive for implementation
implementat within
Operation Division.
This LMI also sets out the System of Audit to be implemented to monitor and report on the extent
of compliance at all locations within the Operation Division and details the purpose, scope,
method of working and the reporting
reportin procedure. Technical compliance audits are carried out at
the direction and on behalf of the Director (Operation).
3.0 SCOPE
Technical Compliance audits will be carried out by Operation Services and will monitor compliance
with the following:-
Technical Compliance audits will not seek to duplicate audits already established within Operation
Division by other Functions, e.g. Finance
Fin Audit.
A Technical Compliance audit will concentrate on compliance with relevant policy but where
problems are indentified with the policy Contained in the Company mandatory documents these
will be addressed in conjunction with the responsible departments.
departments. The Technical Compliance
Unit will maintain a comprehensive Register / soft copy of relevant technical documents and these
will be used as the basis of the audit system. The responsibility for the maintenance of the
Register/soft copy will rest with the Incharge/Head of Technical Compliance.
The existence of an Audit Service does not however negate the responsibility of a Station Manager
to manage his location nor his authority to establish systems for the internal monitoring of the
implementation off the locations procedures.
5.1 The Technical Compliance Unit will carry out audits, using the relevant documentation listed in its
Technical Compliance Unit Register that apply to the plant areas indentified in Appendix A.
5.3 Before the commencement of a section of audits, the Head of Technical Compliance will prepare
and issue a programme of audits. Following agreement with the StationStation manager on suitable
dates to carry out an audit, his representative will be contacted at least two weeks prior to the
audit, to discuss the audit objectives to be investigated.
LMI
Main Plant Barh
Operation
TITLE: Technical Compliance within Operation Division
DOC NO: LMI08/BARH/OPRN/OGN/GEN/001
OGN/GEN/001
5.4 The Station Manager shall nominate a senior member of staff to liaise with the auditor(s) during
the period of the audit and provide suitable on
on-site
site facilities and access to all relevant documents
and records.
6.1 At the completion of an audit, the auditor(s) will discuss the results of the audit wi
with the Station
Manager or his nominee. In particular, those areas where non-compliance
non compliance has been discovered.
6.2 The Final Report will be authorised for release by the Head of Technical Compliance, registered in
the Technical Compliance Unit files and sent to the Station Manager and the director (Operation).
6.3 The Final Report will not be made available to any other party, though Operation Services will
liaise with other functions, as appropriate, where general aspects of procedures are seen to be a
cause for concern.
6.4 The Executive Director (Operation Services), will routinely report to the Director (Operation)
( on
the general state of compliance in the plant areas indentified in Appendix A. A report will be
produced highlighting the common findings and problem areas following completion of a subject
audit.
7.0 REVIEW
The document shall be reviewed on 02 year basis or earlier as on required basis as per the
guidelines given in LMI10/BARH/EEMG/OIN/GEN/002
LMI10/BARH/EEMG/OIN/GEN/002-Rev02.
8.0 DISTRIBUTION
I. EEMG DEPT
II. OPERATION DEPT
III. MAINTENANCE DEPT
IV. CHP DEPT
V. CHEMISTRY DEPT
VI. BARH INTRANET(EEMG).
LMI
Main Plant Barh
Operation
TITLE: Technical Compliance within Operation Division
DOC NO: LMI08/BARH/OPRN/OGN/GEN/001
OGN/GEN/001
APPENDIX - A
PLANT AREAS
1.0 TURBINE
1.1 Main Turbine
1.1.1 TG Lubricating Oil System/Bearings
1.1.2 TG Rotors/Cylinders
1.1.3 Steam Chests/Valve gear/Governors
1.1.4 Turbine Supervisory Equipment
1.1.5 HP Steam Pipe work
1.1.6 Fire Fighting
2.0 GENERATORS
2.1 Electrical Generation
2.2 Stators and Rotors/Exciters
2.3 Stator Cooling system
2.4 Hydrogen System
3.0 CONDENSER
3.1 Main Condenser
3.2 Condensate System
4.0 FEED SYSTEM
4.1 Feed Heating System
4.2 Boiler Feed Pump
5.0 GENERAL
1.0 CW PLANT
1.1 CW Systems
1.2 CW Dosing Equipment
2.0 CHEMICAL PLANT
2.1 Water Treatment Plant
2.2 Hydrogen Generation Plant
3.0 STORAGE OF CHEMICALS AND GASES
3.1 Hydrogen Storage System
4.0 GENERAL