Perhitungan 

Kebutuhan Air Panas
All Season Hotel
Pangkal Pinang

PERHITUNGAN KEBUTUHAN AIR PANAS

1. DATA DATA PROYEK
Jumlah kamar = 170 Kamar
Kamar mandi shower = 170 Kamar
Kamar mandi wastafel = 170 Kamar
Jumlah penghuni / kamar = 2 Orang
Volume mandi / hari = 2 Orang
Volume mandi shower (40º C) = 50 Liter
Volume mandi wastafel (40º C) = 10 Liter

2. ASUMSI PERENCANAAN AIR PANAS
Temperatur air panas = 60 º C
Temperatur air dingin = 30 º C
Temperatur air hangat = 38 º C
Perubahan temperatur air panas = 32 º C
Tingkat hunian = 80 %
Loses pipa sirkulasi  = 20 %
Peak Periode = 20 %

Page 1 of 2
3. PERHITUNGAN KEBUTUHAN AIR PANAS

‐ Shower = 170 Liter x 50 Liter x 2 Orang x 2 Kali mandi


=        34,000 Liter

‐ Wastafel = 170 Kamar x 10 Liter x 2 Orang x 2 Kali mandi


=          6,800 Liter

‐ Laundry = 2 Unit x 150 Liter x 8 Jam


=          2,400 Liter

TOTAL KEBUTUHAN AIR HANGAT (38 °C) =                    43,200 Liter

TOTAL KEBUTUHAN AIR PANAS (60 ºC) = 38 ºC ‐ 30 ºC         43,200
__________________ x
60 ºC ‐ 30 ºC

=        11,520 Liter
TINGKAT HUNIAN 80% =          9,216 Liter

4. KEBUTUHAN TANGKI
Kebutuhan Air Panas =          9.216 m3/day
Peak Periode = 2 Jam
Total Air Panas / Peak = 4.608 Liter
Kapasitas Tangki WIKA = 1,000 Liter
Jumlah Tangki WIKA = 4 Unit

5. HEAT PUMP
Input = 4.11 kW
Output = 14.8 kW
Rate Hot Water = 398 Liter / Jam
Jumlah Unit = 4 Unit

Total Input = 16 kW
Total Output = 59 kW
Total Rate Water = 1592 Liter / Jam

Waktu Pemanasan Tangki = 2.5 Jam


Total Vol. Air Panas Selama Peak Periode = (1000 liter x 4 unit) + (1592 liter x 2 jam)
=          8,000 Liter (60 ºC)