Brigada Eskwela School Accomplishment Report

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

BE Form 07

BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(To be accomplished by the School Head)
Division: ISABELA Region: 02
School: FUGARU INTEGRATED SCHOOL School ID: 500017
School Address: FUGARU, ANGADANAN, ISABELA

(Please check appropriate box)


Level: Type of School:
 Elementary  National High School
 Secondary  Annex
 Integrated School
School Head: Contact Number:
Mr. HERROS W. TORRES 09279838790
PTA President: Contact Number:
MR. ARLENE ALEJANDRO
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)

WHAT WAS DONE?

Others
Repaired Repainted Replaced (Brief Description)

1. Roofs on-going
2. Ceilings on-going
3. Walls / on-going
4. Windows And Doors on-going
5. Chairs/Desks, Tables and Blackboards / on-going
6. Comfort Rooms / / repaired
7. Leaking Pipes / on-going
8. School Grounds/ Landscaping on-going
9. School Signs on-going
10. Alternative gates/main gate / / on-going
11. Electric Fans / repaired
12. Lightings/wirings / / replaced, repaired
clearing/weeding
13. Areas /
B. DONATIONS/MATERIALS RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donation Source Estimated Cost (Peso)
cash Dra. Ulyrose T. Castillo 7000
cash Brgy. Esperanza 1300
cash Brgy. Ingud Sur 1300
cash Brgy. San Guillermo 1200
TOTAL 10,800
NO. OF VOLUNTEERS
Name of Individuals/
Organization
Type of Volunteer
(use separate sheet if necessary)
DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 TOTAL

1. PTA Member

2. Barangay Officials 2 15 9 9 35
3. Municipal/City Government

4. Provincial Government
Officials
5. NGOs/Civic Organizations 4 P’S 2 7 1 7 17
6. Private Citizens
7. Private Companies/ Corp.
8. Other Government Offices
96
9. Parents 42 18 22 13 1
10. Teachers 2 4 6 12
11. Pupils/Students 22 8 5 35
12. Others (specify) BARANGAY POLICE 5 12 7 7 31
13. Gardener, Landscaper 4 4

Total 79 33 53 30 35 230

D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED. Refer to Guide for Computing Labor Cost.
Type of Service Total Number of Volunteers Total Number of Hours Rendered Total Estimated Cost
Ordinary Labor 2(37.5) 40 3000
Masonry 2(37.5) 40 3000
Painting
Classroom Mural
Student Labor
Landscaping/Gardening 226(37.5) 4 33900
Additional Labor
Total 230 84 39900

E. SIGNIFICANT EVENTS/EXPERIENCES (use separate sheets if needed)


What is/are its important contribution to the
What Happened Who were involved When operation of the operation of the school or to
existing needs of the school?
Mr. Herros W. Torres, Principal - I of School Head, Faculty and August 16, 2021 Parents and other volunteers extended their
Fugaru I/S met the Faculty and Staff and Staff, and Parents support during the Brigada Eskwela 2021.
parents in the planning and information
drive.
This year’s BrigadaEskwela was Barangay Officials, PTA August 24-28, The Brigada Eskwela 2021 strengthened the ties
significantly different from the previous Officials, Teachers, Non- 2021 of partnership between the school and the
years because of the COVID-19 pandemic Government/Civic community.
that we are experiencing in the New Organization,Parents and
Normal.The different groups of volunteer Students
were divided into 5-day implementation of
Brigada Eskwela that started last August
24 to August 28, 2021. The said Activity
were participated by the Barangay
Officials, PTA Members, parents, students,
4 P’s and DOLE recipients and other
Non-Government/Civic organization. The
events focused on the maintenance of
school’s furnitures and fixtures, repair and
maintenance of water system, handwashing
area, comfort rooms, reproduction and
distribution of SLMs, Gulayan sa
Paaralan/Tahanan, and Disinfection of
School Perimeter and Classrooms.
Unity, cooperation and participation of
everyone is developed for the delivery of
the learning Modality in the New Normal
of Education.

F. ISSUES AND CONCERNS (Describe briefly problems encountered and how resolved)

So far, no problems were encountered during the Brigada Eskwela due to the smooth coordination of all working committee members
as well as internal and external stakeholders.
G. LESSONS LEARNED/BEST PRACTICES

The pronounced success of the BrigadaEskwela 2021 can be attributed to the strong partnership between the community and the school
combined with human touch of organized planning of working committees by the school administration, systematic information
dissemination (e.g. first hand information and invitation of teachers and school personnel to parents and students to attend Brigada
Eskwela during enrollment period), and well planned work of activities were the contributory factors for the excellent turn out of the
Brigada Eskwela participation of all stakeholders and making it a very successful endeavor.
H. SUGGESTIONS TO STRENGHTHEN THE BRIGADA ESKWELA PROJECT (include support needed from Central, Region
and Division Office that can increase the impact of BrigadaEskwela Project in your school)

Long range of planning should be done to improve the next Brigada Eskwela and eventually improve student performances, the ultimate
goal of this remarkable DepEd Program.
I. EVIDENCE/ATTACHMENTS
A. Photos (before, during and after)
B. Photocopy of all completed BE forms (check if attached)
 Form 01  Form 04
  Form 07

 Form 02  Form 05
 Form 03  Form 06
Prepared by: Date:
HERROS W. TORRES
Principal - I September 30, 2021

You might also like