Level 0 Level 1
Level 0 Level 1
Level 1 Tractor
At week 3rd, we have 100,000+100,000=200,000 (wheels) , it will meet the demand for the first lot
After that, we have 200,000-180,000=20,000 (wheels) on hand
At week 4th, we have 20,000+100,000=120,000 (wheels)
Obviously, we need more: 180,000-120,000=60,000 (wheels) on hand at week 4 to meet the second lot
The number of set to be ordered 9.375
Because 9.375 is not feasible, we round up to 10. So the manager should order 10 sets of wheels
The lead time for delivery is expected to be 2 or 3 weeks so the manager should order 10 sets of wheels at week 2nd
actor-trailer
trailor
Wheel Body
assembly
Bracket
4 5 6 7 8
10,000 10,000
10,000 10,000
- - - - -
10,000 10,000
10,000 10,000
10,000 10,000
10,000 10,000
- - - - -
10,000 10,000
10,000 10,000
10,000 10,000
10,000 10,000
- - - - -
10,000 10,000
10,000 10,000
10,000 10,000
20,000 20,000
- - - - -
20,000 20,000
20,000 20,000
20,000 20,000
4 5 6 7 8
180,000 180,000