RENCANA ANGGARAN BIAYA ( RAB )

PROYEK : PEMBANGUNAN APARTEMEN PANORAMA PARAHYANGAN


PEKERJAAN : ELEKTRIKAL
LOKASI : JL. CIGADUNG RAYA BARAT, CIBEUNYING KALER - BANDUNG
BID. PEKERJAAN : PEKERJAAN TATA SUARA

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6
VII. TATA SUARA
Instalasi peralatan Tata Suara / Sound System lengkap dengan
pengkabelan, Speaker, Panel Speaker, Assesorries, Galia, dan
bobokan.
VII.I.1. Lantai Basement 2
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 13.0 titik 633,496.50 8,235,454.50
2. Ceilling Speaker 3 W TOA 4.0 bh 565,621.88 2,262,487.50
3. Horn Speaker 15W TOA 9.0 bh 548,440.73 4,935,966.53
4. Volume Control & Instalasi 1.0 bh 672,945.00 672,945.00
Terminal Box

1. Sound System Terminal Box Lantai Basement 2 (SSTB B2) 1.0 unit 228,337.20 228,337.20

2. Kabel NYAMHY 2 x 1.5 mm2 (MDF SS – STB B2) 48.0 m2 41,986.70 2,015,361.60
VII.I.2. Lantai Basement 1
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 13.0 titik 487,305.00 6,334,965.00
2. Ceilling Speaker 3 W TOA 4.0 bh 565,621.88 2,262,487.50
3. Horn Speaker 15W TOA 9.0 bh 548,218.13 4,933,963.13
4. Volume Control & Instalasi 1.0 bh 672,945.00 672,945.00
Terminal Box

1. Sound System Terminal Box Lantai Basement 1 (SSTB B1) 1.0 unit 228,337.20 228,337.20

2. Kabel NYAMHY 2 x 1.5 mm2 (MDF SS – STB B1) 44.0 m2 41,986.70 1,847,414.80
VII.I.3. Lantai Dasar
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 25.0 titik 487,305.00 12,182,625.00
2. Ceilling Speaker 3 W TOA 25.0 bh 565,621.88 14,140,546.88
3. Volume Control & Instalasi 5.0 bh 672,945.00 3,364,725.00
Emergency Sound System
Kabel FRC 2 x 2.5 mm2 dalam High Impact Counduit diam. 20
mm.
1. Instalasi Wall Speaker 6.0 unit 835,380.00 5,012,280.00
2. Wall Speaker 10W TOA 6.0 m2 906,387.30 5,438,323.80
Terminal Box 228,337.20 0.00
1. Sound System Terminal Box Lantai Dasar (SSTB LD) 1.0 unit 41,986.70 41,986.70
2. Kabel NYAMHY 2 x 1.5 mm2 (MDF SS – STB LD) 4.0 m2 217,280.02 869,120.08
Peralatan Utama
1. Speaker Selector 10 Zone 1.0 bh 2,146,462.50 2,146,462.50
2 MDF SS (Main Distribution Frame Sound System) 1.0 unit 1,160,250.00 1,160,250.00
3. Power Amplifier 120W 1.0 bh 3,393,731.25 3,393,731.25
4. Power Amplifier 120W 1.0 bh 2,552,550.00 2,552,550.00
5. Paging Microphone 1.0 bh 1,559,376.00 1,559,376.00
6. Matrix System c.w System Manager & Surveilance : 1.0 bh 29,187,249.00 29,187,249.00
- Mixer Yamaha 2.0 unit 8,882,874.00 17,765,748.00
- Radio 1.0 bh 1,740,375.00 1,740,375.00
- DVD Player 1.0 bh 2,320,500.00 2,320,500.00
- Equalizer 1.0 bh 5,801,250.00 5,801,250.00
- Paginig Microphone 1.0 bh 1,559,376.00 1,559,376.00
7. Instalasi Paging Microphone di Receptionist 1.0 bh 2,900,625.00 2,900,625.00
8. UPS 2000 VA 1.0 bh 7,831,687.50 7,831,687.50
9. Power Surge Arrester 40 kA 1.0 bh 1,740,375.00 1,740,375.00
10. Cabinet Rack 1.0 unit 9,049,950.00 9,049,950.00
Peralatan Utama Car Call
1. Speaker Selector 10 zone 1.0 bh 3,219,693.75 3,219,693.75
2. MDF SS (Main Distribution Frame Sound System) 1.0 unit 1,160,250.00 1,160,250.00
3. Mixer Amplifier 120W TOA 1.0 bh 3,393,731.25 3,393,731.25
4. Mixer Amplifier 30W TOA 1.0 bh 1,696,865.63 1,696,865.63
5. Microphone Car Call 1.0 bh 6,816,468.75 6,816,468.75
6. Instalasi Microphone Car Call di Receptionis 1.0 bh 2,900,625.00 2,900,625.00
7. Chime Module 1.0 bh
8. Microphone Pre Amplifier Module 1.0 unit 2,320,500.00 2,320,500.00
Peralatan Utama Emergency
1. Speaker Selector 10 zone 1.0 bh 3,219,693.75 3,219,693.75
2. Emergency Power Amplifier 120W 1.0 bh 3,376,327.50 3,376,327.50
3. Relay 1.0 bh 54,531.75 54,531.75
4. UPS 2000VA Matzuyama 1.0 bh 7,831,687.50 7,831,687.50
5. Power Surge Arrester 40 kA Schneider 1.0 bh 1,740,375.00 1,740,375.00
6. Microphone Emergency 1.0 bh 823,777.50 823,777.50
7. Instalasi Microphone Emergency di Receptionis 1.0 bh 2,900,625.00 2,900,625.00

8. Kabel Grounding NYA 10mm dalam cond. Diam. 20 mm 70.0 m2 24,365.25 1,705,567.50

VII.I.4. Lantai 1
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box 0.00 0.00
1. Sound System Terminal Box Lantai 1 (SSTB L1) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L1) 44.0 m2 62,980.05 2,771,122.20
VII.I.5. Lantai 2
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box 0.00 0.00
1. Sound System Terminal Box Lantai 2 (SSTB L2) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L2) 48.0 m2 62,980.05 3,023,042.40
VII.I.6. Lantai 3
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box
1. Sound System Terminal Box Lantai 3 (SSTB L3) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L3) 56.0 m2 62,980.05 3,526,882.80
VII.I.7. Lantai 4
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box
1. Sound System Terminal Box Lantai 4 (SSTB L4) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L4) 60.0 m2 62,980.05 3,778,803.00
VII.I.8. Lantai 5
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box
1. Sound System Terminal Box Lantai 5 (SSTB L5) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L5) 64.0 m2 62,980.05 4,030,723.20
VII.I.9. Lantai 6
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box
1. Sound System Terminal Box Lantai 6 (SSTB L6) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L6) 68.0 m2 62,980.05 4,282,643.40
VII.I.10. Lantai 7
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 9.0 titik 730,957.50 6,578,617.50
2. Ceilling Speaker 3 W TOA 9.0 bh 848,432.82 7,635,895.34
Terminal Box
1. Sound System Terminal Box Lantai 7 (SSTB L7) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L7) 68.0 m2 62,980.05 4,282,643.40
VII.I.11. Lantai 8
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 11.0 titik 730,957.50 8,040,532.50
2. Ceilling Speaker 3 W TOA 11.0 bh 848,432.82 9,332,760.98
Terminal Box
1. Sound System Terminal Box Lantai 7 (SSTB L7) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L7) 68.0 m2 62,980.05 4,282,643.40
VII.I.12. Lantai 9
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 11.0 titik 730,957.50 8,040,532.50
2. Ceilling Speaker 3 W TOA 11.0 bh 848,432.82 9,332,760.98
Terminal Box
1. Sound System Terminal Box Lantai 7 (SSTB L7) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB L7) 68.0 m2 62,980.05 4,282,643.40
VII.I.13. Lantai Attic
Kabel NYAMHY 2 x 1.5 mm2 dalam High Impact Counduit
diam. 20 mm.
1. Instalasi Ceiling Speakerl 15.0 titik 730,957.50 10,964,362.50
2. Ceilling Speaker 3 W TOA 15.0 bh 848,432.82 12,726,492.24
Terminal Box
1. Sound System Terminal Box Lantai 8 (SSTB Attic) 1.0 unit 342,505.80 342,505.80
2. Kabel NYAMHY 3 x 1.5 mm2 (MDF SS – STB Attic) 72.0 m2 62,980.05 4,534,563.60
TOTAL PEKERJAAN TATA SUARA 409,710,297.93
PEMBULATAN 409,710,000.00