b) Verify the same above to form (YBUS) using bus incidence matrix and
primitive admittance matrix.
2. a) Form the YBUS by using singular transformation for the network shown in
Fig. including the generator buses
b) Verify the same above to form (YBUS) using direct inspection method.
3. a) Explain the steady state analysis of load frequency control of a single area
system with free governor operation.
b) Explain the operation of a speed governing system with a neat sketch and
also draw the block diagram.
5. a) Derive the complete block diagram of a two area LF control with a neat
sketch.
b) Explain the concept of Area control error (ACE).
b) Draw the complete block diagram of a two area LF control with a neat
sketch.
c) Draw the combined block diagram of economic despatch and load
frequency controls.