Kecamatan : Ligung

ANALISA PEKERJAAN - KEBUTUHAN Desa : Buntu


BAHAN & UPAH Lokasi : Depan Bpk Sardi
Gorong-Gorong
Gorong 2 Plat Beton Volume : 2x3

1. Pek. Galian Tanah = 4,50 m3


* Upah Pekerja = 0,7500 x 4,5 = 3,38 = hok = 3,00 Hok
Mandor = 0,0250 x 4,50 = 0,11 = hok = 1,00 Hok

2. Pekerjaan Urugan Pasir

Volume Pasir Urug = 2,52 m3


* Bahan Pasir Urug = 1,2000 x 2,520 = 3,02 = 4,00 m3
-
* Upah Pekerja = 0,3000 x 2,520 = 0,76 hok = 0,76 Hok
Mandor = 0,0100 x 2,520 = 0,03 hok = 0,10 Hok

3. Pekerjaan Pasangan Batu Belah (1:4

Volume Pas.Batu = 8,86 m3


* Bahan Batu Belah = 1,200 x 8,86 = 10,632 m3 = 11,00 m3
Pasir Pasang = 0,600 x 8,86 = 5,316 m3 = 6,00 m3
Semen ( PC 50 Kg ) = 3,260 x 8,86 = 28,884 sak = 29,00 sak
* Upah Pekerja = 1,500 x 8,86 = 13,290 hok = 14,00 Hok
Tukang = 0,750 x 8,86 = 6,645 hok = 7,00 Hok
25,57 Mandor = 0,075 x 8,86 = 0,665 hok = 1,00 Hok

4. Pekerjaan Bekisting Papan 2 x pakai


Bekisting Plat Duiker
Volume = 4,000 m2
* Bahan Kaso 5/7 albasia panjang 3 m = 1,0000 x 4,000 = 4,000 btg = 12,00 btg
Papan 3/20 albasia panjang 2 m = 0,9000 x 4,000 = 3,600 lbr = 6,00 lbr
Paku Biasa 5 - 7 cm = 0,3000 x 4,000 = 1,200 kg = 4,00 kg
Triplex/Multiplex5 mm = 0,3800 x 4,000 = 1,520 kg = 5,00 Lbr
* Upah Pekerja = 0,5200 x 4,000 = 2,08 Hok = 3,00 Hok
Tukang = 0,2600 x 4,000 = 1,04 Hok = 2,00 Hok
Mandor = 0,0260 x 4,00 = 0,10 Hok = 1,00 Hok

5. Pekerjaan Pembesian
Besi Beton Ø 10 mm
Volume = 266,54 Kg
* Bahan Besi beton Ø 10 mm = 1,0500 x 266,54 = 279,87 kg : 7,7 = 37,00 Btg
Kawat Beton = 0,0150 x 266,54 = 4,00 kg : = 4,00 kg

* Upah Pekerja = 0,0070 x 266,54 = 1,87 hok = 2,00 Hok


Tukang = 0,0070 x 266,54 = 1,87 hok = 2,00 Hok
Mandor = 0,0004 x 266,54 = 0,11 hok = 1,00 Hok

6, Pekerjaan Beton (

Volume cor beton = 1,50 m3


* Bahan Semen ( PC 50 Kg ) = 6,8000 x 1,50 = 10,20 sak = 10,20 sak
Batu pecah 2/3 = 0,5400 x 1,50 = 0,81 m3 = 0,81 m3
Pasir = 0,8200 x 1,50 = 1,23 m3 = 1,23 m3
* Upah Pekerja = 2,100 x 1,50 = 3,15 hok = 3,15 Hok
Tukang = 0,350 x 1,50 = 0,53 hok = 0,53 Hok
Mandor = 0,105 x 1,50 = 0,16 hok = 0,16 Hok

* Alat Sewa Mesin Molen = 0,350 x 1,50 = 0,53 hr = 1,00 Hari

7. Pekerjaan Plesteran 2,72


Bahan Semen (PC 50 Kg) = 0,156 x 2,72 = 0,42 Sak
Pasir = 0,230 x 2,72 = 0,63 M3
Pekerja = 0,300 x 2,72 = 0,82 OH
Tukang = 0,165 x 2,72 = 0,45 OH
Mandor = 0,015 x 2,72 = 0,04 OH

8. Pekerjaan Acian
Semen (pc 50 Kg) = 0,065 x 2,72 = 0,18 SAK
=
Pekerja = 0,200 x 2,72 = 0,54 OH
Tukang = 0,110 x 2,72 = 0,30 OH
Mandor = 0,010 x 2,72 = 0,03 OH
9. Pekerjaan Pasang Prasasti

Volume = 1 bh

* Bahan Prasati Batu = 1,000 x 1,00 = 1,000 = 1,00 bh

* Upah Pekerja = 0,2500 x 1,00 = 0,250 = 0,30 Hok


Tukang = 0,2500 x 1,00 = 0,250 = 0,30 Hok
Mandor = 0,0250 x 1,00 = 0,025 = 0,10 Hok

Diketahui Oleh :
Kepala Desa Buntu Diverifikasi Oleh Kasi Kesejahteraan

H.MAMAT RAHMAT HIDAYAT, S.SI (............................................) SAEDI