task_code status_codewbs_id task_name start_date

Activity ID Activity Sta WBS Code Activity Name (*)Start


A1030 Not Started IIUI.Lab.1.3ELECTRICAL CONDUITIN 5/20/2021 07:00
A1230 Not Started IIUI.Lab.8.1TERMITE PROOFING 5/17/2021 14:00
A1680 Not Started IIUI.Lab.1.5UPVC PIPING 5/1/2021 08:00
IUI 1000 Not Started IIUI.1 LOA 5/1/2021 08:00
IUI 1010 Not Started IIUI.1 CONTRACT AGGREMENT 5/1/2021 08:00
IUI 1020 Not Started IIUI.2 LIBRARY BUILDING 5/1/2021 08:00
IUI 1030 Not Started IIUI.2 SHARIA HOSTEL 5/1/2021 08:00
IUI 1040 Not Started IIUI.2 MEDICAL CENTER 5/1/2021 08:00
IUI 1060 Not Started IIUI.2 LIBRARY BUILDING 5/1/2021 08:00
IUI 1070 Not Started IIUI.2 SHARIA HOSTEL 5/1/2021 08:00
IUI 1080 Not Started IIUI.2 MEDICAL CENTER 5/1/2021 08:00
IUI 1090 Not Started IIUI.3 SITE SETTING LAYOUT 5/1/2021 08:00
IUI 1100 Not Started IIUI.3 MOBILIZATION OF INDI 5/1/2021 08:00
IUI 1110 Not Started IIUI.3 MOBILIZATION OF DIRE 5/1/2021 08:00
IUI 1120 Not Started IIUI.3 MOBILIZATION OF MACH 5/1/2021 08:00
IUI 1130 Not Started IIUI.3 CONSTRUCTIOIN OF SITE 5/1/2021 08:00
IUI 1140 Not Started IIUI.Lab.8.2Excavation 5/1/2021 08:00
IUI 1150 Not Started IIUI.Lab.8.2Earth Filling 5/1/2021 08:00
IUI 1160 Not Started IIUI.Lab.8.1CRUSH STONE 5/1/2021 08:00
IUI 1170 Not Started IIUI.Lab.8.1PCC 1:4:8 5/1/2021 08:00
IUI 1180 Not Started IIUI.Lab.8.1REBAR WORK 5/1/2021 08:00
IUI 1190 Not Started IIUI.Lab.8.1RCC CONCRETE 5/1/2021 08:00
IUI 1200 Not Started IIUI.Lab.1.3COLUMN REBAR WORK 5/1/2021 08:00
IUI 1210 Not Started IIUI.Lab.1.3COLUMN CONCRETE 5/1/2021 08:00
IUI 1220 Not Started IIUI.Lab.1.3BEAM & SLAB REBAR WO 5/1/2021 08:00
IUI 1230 Not Started IIUI.Lab.1.3BEAM & SLAB CONCRETE 5/1/2021 08:00
IUI 1240 Not Started IIUI.Lab.1.3PLASTER WORK 5/1/2021 08:00
IUI 1250 Not Started IIUI.Lab.1.3PAINT WORKS 5/1/2021 08:00
IUI 1260 Not Started IIUI.Lab.1.3FLOOR SCREEDING 5/1/2021 08:00
IUI 1270 Not Started IIUI.Lab.1.3MARBLE & TILES WORKS 5/1/2021 08:00
IUI 1280 Not Started IIUI.Lab.1.3BRICK WORK 5/1/2021 08:00
IUI 1290 Not Started IIUI.Lab.1.3PLASTER WORK 5/1/2021 08:00
IUI 1300 Not Started IIUI.Lab.1.3PAINT WORKS 5/1/2021 08:00
IUI 1310 Not Started IIUI.Lab.1.3FLOOR SCREEDING 5/1/2021 08:00
IUI 1320 Not Started IIUI.Lab.1.3MARBLE & TILES WORKS 5/1/2021 08:00
IUI 1330 Not Started IIUI.Lab.1.3PPRC WORKS 5/1/2021 08:00
IUI 1340 Not Started IIUI.Lab.1.3UPVC WORKS 5/1/2021 08:00
IUI 1350 Not Started IIUI.Lab.1.4COLUMN REBAR WORK 5/1/2021 08:00
IUI 1360 Not Started IIUI.Lab.1.4COLUMN CONCRETE 5/1/2021 08:00
IUI 1370 Not Started IIUI.Lab.1.4BEAM & SLAB REBAR WO 5/1/2021 08:00
IUI 1380 Not Started IIUI.Lab.1.4BEAM & SLAB CONCRETE 5/1/2021 08:00
IUI 1390 Not Started IIUI.Lab.1.4BRICK WORK 5/1/2021 08:00
IUI 1400 Not Started IIUI.Lab.1.4PLASTER WORK 5/1/2021 08:00
IUI 1410 Not Started IIUI.Lab.1.4PAINT WORKS 5/1/2021 08:00
IUI 1420 Not Started IIUI.Lab.1.4MARBLE & TILES WORKS 5/1/2021 08:00
IUI 1430 Not Started IIUI.Lab.1.4BRICK WORK 5/1/2021 08:00
IUI 1440 Not Started IIUI.Lab.1.4PLASTER WORK 5/1/2021 08:00
IUI 1450 Not Started IIUI.Lab.1.4PAINT WORKS 5/1/2021 08:00
IUI 1460 Not Started IIUI.Lab.1.4FLOOR SCREEDING 5/1/2021 08:00
IUI 1470 Not Started IIUI.Lab.1.4MARBLE & TILES WORKS 5/1/2021 08:00
IUI 1480 Not Started IIUI.Lab.1.4ELECTRICAL CONDUITIN 5/1/2021 08:00
IUI 1490 Not Started IIUI.Lab.1.4PPRC WORKS 5/1/2021 08:00
IUI 1500 Not Started IIUI.Lab.1.4UPVC WORKS 5/1/2021 08:00
IUI 1510 Not Started IIUI.Lab.1.5REBAR WORK FOR MUMT 5/1/2021 08:00
IUI 1520 Not Started IIUI.Lab.1.5ELECTRICAL AND PPRC 5/1/2021 08:00
IUI 1530 Not Started IIUI.Lab.1.5RCC CONCRETE 5/1/2021 08:00
IUI 1540 Not Started IIUI.Lab.1.5PARAPET WALL 5/1/2021 08:00
IUI 1550 Not Started IIUI.Lab.1.5ROOF WALL PROOFING 5/1/2021 08:00
IUI 1560 Not Started IIUI.Lab.1.5PLASTER WORK 5/1/2021 08:00
IUI 1570 Not Started IIUI.Lab.1.5FINAL FINISH 5/1/2021 08:00
IUI 1580 Not Started IIUI.Lab.1.5ELECTRICAL CONDUITIN 5/1/2021 08:00
IUI 1590 Not Started IIUI.Lab.1.5PPR PIPPING WORKS 5/1/2021 08:00
IUI 1600 Not Started IIUI.Lab.1.1REBAR AND FORM WORK 5/1/2021 08:00
IUI 1610 Not Started IIUI.Lab.1.1RCC CONCRETE 5/1/2021 08:00
end_date target_drtn_hr_cnt delete_record_flag
(*)Finish Original Duration(d) Delete This Row
5/24/2021 10:00 3
5/21/2021 14:00 4
5/6/2021 10:00 4
5/1/2021 08:00 0
5/1/2021 08:00 0
5/1/2021 08:00 0
5/1/2021 08:00 0
5/1/2021 08:00 0
5/1/2021 08:00 0
5/1/2021 08:00 0
5/1/2021 08:00 0
5/13/2021 14:00 10
5/13/2021 14:00 10
5/13/2021 14:00 10
5/13/2021 14:00 10
5/13/2021 14:00 10
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
5/5/2021 10:00 3
user_data
UserSettings Do Not Edit
DurationQtyType=QT_DayShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=M/d/yyyyCurrencyFormat=PAKIS
ourDateFormat=M/d/yyyyCurrencyFormat=PAKISTANI RUPEE