1.1 THIS DOCUMENT IS Alstom Hydro France SOLE PROPERTY.

IT CANNOT BE REPRODUCED
OR PASSED TO THIRD PARTIES WITHOUT A PREVIOUS AND WRITTEN AUTHORISATION.

COMMENTS:

This document includes information provided to Alstom Hydro France by COMELEX and covering COMELEX
part of the Contract. Such information has been integrated to this document at the request of COMELEX and
under COMELEX responsibility.

36 JULY / AUGUST 2016 2016-09-09 S.Gessay M.Louet M.de Noray


35 JUNE 2016 2016-07-18 S.Gessay M.Louet M.de Noray
34 MAY 2016 2016-06-14 S.Gessay M.Louet M.de Noray
33 APRIL 2016 2016-05-10 S.Gessay M.Louet M.de Noray
32 MARCH 2016 2016-04-11 S.Gessay M.Louet M.de Noray
31 FEBRUARY 2016 2016-03-10 S.Gessay M. Louet M.de Noray
30 JANUARY 2016 2016-02-09 S. Gessay M. Louet M.de Noray
29 DECEMBER 2015 2016-01-14 S. Gessay M. Louet M.de Noray
28 NOVEMBER 2015 2015-12-10 S. Gessay M. Louet M.de Noray
27 OCTOBER 2015 2015-11-10 S. Gessay M. Louet M.de Noray
26 SEPTEMBER 2015 2015-10-08 S. Gessay M. Louet M.de Noray
25 AUGUST 2015 2015-09-14 S.Gessay M. Louet F. Paris
24 JULY 2015 2015-08-07 S.Gessay M. Louet F. Paris
23 JUNE 2015 2015-07-03 S.Gessay M. Louet F. Paris
22 MAY 2015 2015-06-09 S.Gessay M. Louet F. Paris
21 APRIL 2015 2015-05-07 S.Gessay M. Louet F. Paris
20 MARCH 2015 2015-04-10 S.Gessay M. Louet F. Paris
19 FEBRUARY 2015 2015-03-12 S.Gessay M. Louet F. Paris
18 JANUARY 2015 2015-02-12 S.Gessay M. Louet F. Paris
17 DECEMBER 2014 2015-01-15 S.Gessay M. Louet F. Paris
16 NOVEMBER 2014 2014-12-09 S.Gessay M. Louet F. Paris
15 OCTOBER 2014 2014-11-13 S.Gessay M. Louet F. Paris
14 SEPTEMBER 2014 2014-10-10 S. Gessay M. Louet F. Paris
13 AUGUST 2014 2014-09-12 S. Gessay M. Louet F. Paris
12 JULY 2014 2014-08-11 S. Gessay M. Louet F. Paris
11 JUNE 2014 2014-07-09 S. Gessay M. Louet F. Paris
10 MAY 2014 2014-06-09 S. Gessay M. Louet F. Paris
9 APRIL 2014 2014-05-13 S. Gessay M. Louet F. Paris
8 MARCH 2014 2014-04-09 S. Gessay M. Louet F. Paris
7 FEBRUARY 2014 2014-03-07 S. Gessay M. Louet F. Paris
6 JANUARY 2014 2014-02-09 S. Bouye G. Guignier F. Paris
5 DECEMBER 2013 2014-01-15 S. Bouye G. Guignier F. Paris
4 NOVEMBER 2013 2013-12-09 S. Bouye G. Guignier F. Paris
3 OCTOBER 2013 2013-11-08 S. Bouye G. Guignier F. Paris
2 SEPTEMBER 2013 2013-10-07 S. Bouye G. Guignier F. Paris
1 First issue – AUGUST 2013 2013-09-06 S. Bouye S. Bouye F.Paris
REV. MODIFICATIONS DATE ESTABLISHED CHECKED APPROVED STATUS

Page 1 sur 34
Employer:
ETHIOPIAN ELECTRIC
EEPCO
POWER CORPORATION
Contractor:
GRAND RENAISSANCE
8 VERTICAL GENERATORS 417 MVA
8 VERTICAL FRANCIS TURBINES 125 rpm
METALS AND ENGINEERING CO.

NAME VISA

ESTABLISHED S. GESSAY DOCUMENT


CHECKED M. LOUET

APPROVED F. PARIS
MONTHLY PROGRESS REPORT
DATE 2013-09-06
SCALE 1/1
NUMBER SIZE: A4
GE Renewable Energy H-6235000AA00-0000BB-36 PAGE: 2/34
XXXXXXXXXXXXXXX

THIS DOCUMENT IS Alstom Hydro France SOLE PROPERTY. IT CANNOT BE REPRODUCED OR PASSED
TO THIRD PARTIES WITHOUT A PREVIOUS AND WRITTEN AUTHORISATION.

Page 2 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

INDEX

1.1 THIS DOCUMENT IS Alstom Hydro France SOLE PROPERTY. IT CANNOT BE REPRODUCED
OR PASSED TO THIRD PARTIES WITHOUT A PREVIOUS AND WRITTEN AUTHORISATION. 1
1 Summary and Key Events 4
1.1 General Progress 4
1.2 Achievements 4
1.3 Forecast 4
1.4 Issues – Areas of Concern 5
2 Design, Procurement and Manufacturing 5
2.1 Turbine – Mechanical 5
2.2 Turbine – Governing System 7
2.3 Generator 8
2.4 Excitation 9
2.5 METEC Scope 10
3 Delivery 13
3.1 Turbine – Mechanical 13
3.2 Turbine – Governing System 14
3.3 Generator 14
3.4 Excitation 16
3.5 METEC Scope 16
4 Site Supervision 16
4.1 GENERAL 16
4.2 TURBINE 17
4.3 GENERATOR 19
5 Commissioning 19
5.1 Pre-commissioning 19
5.2 Commissioning 19
6 Industrial Transfer
7 Commercial and Financial 21
7.1 Contract Price 21
7.2 Contract Key Dates 22
7.3 Commercial Issues 22
7.4 Invoices & Payment Status 22
7.5 Correspondence Status 24
8 Attachments 25
Annex 1 - Pictures
Annex 2 - Document Release Schedule
Annex 3 - Schedule of Planned Inspections
Annex 4 - Correspondence Register

Page 3 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

1 SUMMARY AND KEY EVENTS

1.1 General Progress

Phase 1 (Early Generation)


Turbine 99%
Generator 99%
Total Phase 1 99%

Phase 2a
Turbine 67.56%
Generator 77.13%
Total Phase 2a 71.52%

Phase 2b
Turbine 3%
Generator 3%
Total Phase 2b 3%

Total Progress 52.7%

1.2 Achievements
Early Generation
- Site Expert Supervision of installation of Unit 09 and 10 Drainage Box and Pier Nose.
- Site Expert Supervision of installation of Unit 09 and 10 Draft Tube Elbows.
- Site Expert Supervision of installation of Unit 09 and 10 Draft Tube Cones
- Site Expert Supervision of installation of Unit 09 and 10 Stay Ring base plates.
- Site Expert Supervision of installation of Unit 09 and 10 Upper Cone.

Phase 2A:
- Site Expert Supervision of installation of Unit 08 and 07 Pier Noses and Drainage boxes.

Amendment 4 of the Contract has been signed on June 08th 2016. Purchase orders for equipment
provided by Metec for Comelex will be cancelled as the Supply scope of Comelex has been extracted
from the Contract Scope. Comelex expert supervision and support towards Metec remains the same.
Comelex has accepted that the payment of On Shore new portion of the Contract will be done 100% in
Ethiopian Birrs.

1.3 Forecast
- Submission by Metec and analysis by Comelex of quality documentation for embedded pipes and other
Metec parts ordered by Comelex.
- Submission by Metec of Spiral Case and Stay Ring welding books
- Early generation: Preparation by Metec of Stay Ring Lifting.
- Phase 2a :
. Supervision of installation of embedded piping on Unit 06 (in progress).
. Supervision of installation of Draft Tube anchor plates &pins (to be manufactured by Metec) on Units 7&8

Supervision of Shaft U10 (repaired) unloading in Djibouti as per Comelex proposal (see GRR-CXE-MET-
16-011- L dated Apr 5, 2016). The Shaft U10 was shipped from China on June 15th, but on 31 August
2016, unloading had not yet been possible for technical reasons (lifting means availability).

Page 4 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

1.4 Issues – Areas of Concern

1.4.1 Phase 1 Early Generation:

Next Steps of erection depend on the supply by Metec of tools and equipment, as described in our letters
GRR-CXE-MET-16-001-L and GRR-CXE-MET-16-012-L. Erection might soon be stopped until all the
necessary equipment and approved documentation is available at Site.
Lifting procedure for Stay Ring for installation has not been indicated by Metec yet. We don’t know if
suitable lifting means are or will soon be available. If not, site activities will be impacted.

Some packages were found damaged in the site storage area. There is a risk that equipment inside is
damaged, which would impact the project in terms of costs and time schedule.

Comelex has realized a Site Visit between August 17th and 28th 2016 (Etienne Germain) to assess the
situation of Site preparedness for the coming operations. Report to be issued. Areas where a necessary
improvement has been detected are:
. Tools at site
. Storage Management
. Reinforcement of Metec’s Site organization (team leaders,…)
. Qualification and quantity of Workers (welders…)
. Life Camp (water supply…) and offices facilities
. Site documentation (Site policies…)

Equipment provided by Metec (initially for Comelex through Purchase Orders) can only be approved once
Quality documentation is provided in accordance with Alstom Hydro Francerequirements which remains
valid.
Comelex is not being provided any information regarding the progress of fabrication of Metec for these
equipment, despite intents to give support.

BOP and control system contractors are not known yet, therefore detail interfaces have not been defined
and completed with them. In any cases no modification of Alstom supplies is possible anymore.

Execution Program will need to be modified according to actual execution of civil works activities.

1.4.2 Phase 2

Letter of Credit and Advance payment for phase 2b need to be put in place in order not to further impact
phase 2b schedule.

2 DESIGN, PROCUREMENT AND MANUFACTURING

First Design Review Meeting held 13-14 Sept 2012


Second Design Review Meeting held 19-20 June 2013
Third Design Review Meeting proposed 9-10 September 2014 (GRR-COO-MET-14-052-L), postponed, to
be re-scheduled when BOP & Control System contractors will be known and available.
Phase 2b drawings are under preparation.

2.1 Turbine – Mechanical

Page 5 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

2.1.1 Achievements

Phase 1:

All components shipped except consumables and U9 runner.

Monthly progress status


Design Procurement Manufacturing
Description of items (%) (%) (%) Remark

TURBINE:
U9 runner 100 100 100 U9 runner at Antwerp port

Phase 2A:

Monthly progress status


Design Procurement Manufacturing
Description of items (%) (%) (%) Remark
TURBINE:
U8 stay ring 100 100 50 Under welding
U7 stay ring 100 100 50 Under welding
U6 stay ring 100 100 45 Under welding

Head cover, bottom ring, operating ring


U8 distributor 100 100 65
and supporting cone under machining

Wicket gates under procurement


Head cover and supporting cone under
U7 distributor 100 90 45 machining
Bottom ring and operating ting under
welding
Wicket gates under procurement
U6 distributor 100 70 35 Head cover & bottom ring under welding
Supporting cone under machining

Blades welding complete, heat treatment


100 100 60
U8 runner performed
U7 runner 100 100 10 Blades machining complete
U6 runner 100 100 0

Inspection on the horizontal lathe


performed
100 70
Inspection of coupling holes scheduled (see
U8 turbine shaft 100 GRR-HET-MET-16-043-L)
Final inspection scheduled (see GRR-HET-
100 70
U7 turbine shaft 100 MET-16-041-L)
U6 turbine shaft 100 100 0

Page 6 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

U8 turbine guide Pads shipped to Ethiopia


100 100
bearing 100 Rest of the parts ready for shipment
U7 turbine guide
100 85 60 Pads ready for shipment
bearing
U6 turbine guide
80 30
bearing 100 Pads ready for shipment

U8 shaft seal 100 100 100 Ready for shipment


U7 shaft seal 100 100 60
U6 shaft seal 100 100 30

U8 thrust bearing 100 100 100 Shipped to Ethiopia


U7 thrust bearing 100 100 100 Shipped to Ethiopia
U6 thrust bearing 100 80 50 Pads ready for shipment

2.1.2 Forecast

Shipment of the following components to Ethiopia:


U9 runner
U8 turbine guide bearing and shaft seal

2.1.3 Issues and Concerns

Alstom Hydro France is still waiting for updated UHP Drawings taking into account Alstom Hydro France’s
comments (see GRR-COO-MET-14-042-T dated June 10, 2014) and the agreed interface regarding
penstock-spiral case chamber (see also our letter GRR-HET-MET-14-075-L dated Oct 28, 2014.

The spiral case internal pressure during concreting.


In our letter GRR-HET-MET-15-066-L dated Aug 31, 2015, we mentioned that the acceptable pressure
values for Alstom Hydro France are 0.84 MPa for final arrangement and 0.54 MPa for early generation
units.
According to the latest comments we received from ER (see GERDP-JE-DR-15-243-A), the pressure shall
be 1 MPa for final arrangement and 0.66 MPa for early generation units. We have analyzed this proposal
and our answer is given through the letter GRR-HET-MET-16-007-L dated March 8, 2016.

2.2 Turbine – Governing System

2.2.1 Achievements

Phase 1:

All components are shipped except consumables

Phase 2A:

Monthly progress status


Design Procurement Manufacturing
Description of items (%) (%) (%) Remark

Page 7 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

GOVERNING SYSTEM:

U8, U7 & U6 governor cubicles 100 100 100 Shipped to Ethiopia


U8, U7 & U6 pressure tanks 100 100 100 ready for shipment
U8, U7 & U6 air compressors 100 100 100 Shipped to Ethiopia
U8, U7 & U6 hydraulic power
units 100 100 90 Final inspection performed

2.2.2 Forecast

2.2.3 Issues and Concerns

ALSTOM Hydro France has received from METEC/UHP on 27/01/2015 in GMO-2395 cable routing
proposal for TSLG.
In order to clarify ALSTOM Hydro France’s scope of supply and cable routing needs, the letter GRR-COO-
MET-15-020-L dated March 2nd has been sent with ALSTOM HYDRO FRANCE cable supply and detailed
routing proposal. As we still not received any answer from METEC on our proposal, we have performed
the cables detail design study as per the routing in our letter.

2.3 Generator

2.3.1 Achievements

Early Generation

Phase 1:

All Offshore procurement done, except material and consumables with limited life time.

Phase 2A:

Monthly progress status


Desi
gn Procurement Manufacturing
Description of items (%) (%) (%) Remark

GENERATOR

First batch shipped to Ethiopia


100 100 100
U8 stator laminations Second batch shipped to Ethiopia
U7 stator laminations 100 100 30 Under punching
U6 stator laminations 100 90 0

U8 stator bars 100 100 35 Trial VET test passed


U7 stator bars 100 85 0
U6 stator bars 100 75 0

Page 8 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

U8 rotor poles 100 100 100 Shipped to Ethiopia


U7 rotor poles 100 90 0
U6 rotor poles 100 100 100 Shipped to Ethiopia

Final inspection scheduled (see GRR-HEG-


U8 rotor spider hub 100 100 70
MET-16-030-L)
U7 rotor spider hub 100 100 30 Under welding
U6 rotor spider hub 100 100 15 Under welding

U8 upper bracket central hub 100 100 40 Under machining


U7 upper bracket central hub 100 100 10 Plates cutting complete
U6 upper bracket central hub 100 100 0

Final inspection scheduled (see GRR-HEG-


U8 generator shaft 100 100 40
MET-16-031-L)
U7 generator shaft 100 100 0
U6 generator shaft 100 70 0

U8 generator guide bearing 100 100 100 Shipped to Ethiopia


U7 generator guide bearing 100 100 100 Shipped to Ethiopia
U6 generator guide bearing 100 100 100 Shipped to Ethiopia

2.3.2 Forecast

2.3.3 Issues and Concerns

BOP and control system contractors are not known yet, therefore detail interfaces have not been defined
and completed with them. As all generator parts are already being manufactured or shipped, the BOP and
CS will have to adjust their works to ALSTOM Hydro France works, which we will not be in a position to
modify. This may create difficulties for BOP and CS contractors.

We consequently request again that Metec organize a coordination meeting with BoP and control system
contractors in order to verify that all Alstom Hydro France drawings and documents have been provided to
them in their latest version and taken into account. This meeting is still pending.

Inadequate handling and storage conditions, on site or in Bishoftu bonded warehouse may cause
damages to generator parts, in particular corrosion (see our letter GRR-COO-MET-14-044-L dated June 27th,
2014).

2.4 Excitation

2.4.1 Achievements

Phase 1:

All components shipped.

Page 9 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

Phase 2A:

Monthly progress status


Design Procurement Manufacturing
Description of items (%) (%) (%) Remark

EXCITATION

U8 excitation cubicle 100 100 95 Final inspection performed


U7 excitation cubicle 100 100 50
U6 excitation cubicle 100 95 0

U8 excitation transformer 100 95 NA Final inspection performed


U7 excitation transformer 100 95 NA Final inspection performed
U6 excitation transformer 100 50 NA

2.4.2 Forecast

2.4.3 Issues and Concerns


None

2.5 METEC Scope

2.5.1 Achievements

Purchase Orders Comelex to METEC to be cancelled as per Amendment 4

Phase 1 “Early Generation”


- Primary embedded pipes: GRR-03-2013-001 issued and communicated to METEC on 10/05/13.
Update following UHP drawings GRR-03-2013-001 V3 communicated to METEC on 18/06/14.
- Turbine Coupling Bolts: GRR-09-2013-001 issued and communicated to METEC on 08/10/13.
Minor update GRR-09-2013-001 V3 communicated to METEC on 18/06/14.
- Secondary Embedded Pipes: GRR-10-2013-003 issued and communicated to METEC on 31/10/13.
- Braking and Associated Parts: GRR-11-2013-001 issued and communicated to METEC on 28/11/13.
- Generator Coupling Bolts: GRR-12-2013-001 issued and communicated to METEC on 11/12/13.
Minor update GRR-12-2013-001 V2 communicated to METEC on 24/02/14.
- Rotor Embedded Plates GRR-02-2014-001 issued and communicated to METEC on 19/02/14.
Minor update GRR-02-2014-001 V2 communicated to METEC on 01/03/16.
- Stator Stacking Tools GRR-02-2014-002 issued and communicated to METEC on 20/02/14.
- Stator Temporary Bars wedging GRR-03-2014-003 issued and communicated to METEC on 20/02/14.
- Gen Upper Floor Assembly GRR-03-2014-001 issued and communicated to METEC on 02/04/14.
- Gen Pit Closing GRR-03-2014-002 issued and communicated to METEC on 02/04/14.
- Gen Top Cover Assembly GRR-03-2014-004 issued and communicated to METEC on 20/02/14.
- Gen Main Cooling Pipes GRR-04-2014-001 issued and communicated to METEC on 02/05/14.
- Gen Upper Bracket Piping GRR-05-2014-001 issued and communicated to METEC on 22/05/14.
Minor update GRR-05-2014-001 V2 communicated to METEC on 12/06/15.
Page 10 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

- Gen Rim Stacking Tool GRR-06-2014-001 issued and communicated to METEC on 24/06/14.
Minor update GRR-06-2014-001 V2 communicated to METEC on 11/11/14.
- Gen Common Site Tools GRR-06-2014-002 issued and communicated to METEC on 24/06/14.
- Gen Braking Jack Tool GRR-06-2014-003 issued and communicated to METEC on 03/07/14.
- Gen Oil and Dust Exhaust Piping GRR-06-2014-004 issued and communicated to METEC on 03/07/14.
- Gen Braking and Lifting Piping GRR-06-2014-005 issued and communicated to METEC on 03/07/14.
Minor update GRR-06-2014-001 V2 communicated to METEC on 12/06/15.
- Gen Stator Scaffolding GRR-08-2014-001 issued and communicated to METEC on 29/08/14
- Tur Runner Inspection Platform GRR-09-2014-001 issued and communicated to METEC on 29/09/14.
- Tur Aerial Pipes GRR-11-2014-001 issued and communicated to METEC on 18/12/14.
Minor update GRR-11-2014-001 V2 communicated to METEC on 24/03/15.
Minor update GRR-11-2014-001 V3 communicated to METEC on 06/07/15.
- Tur Distributor Platform GRR-12-2014-001 issued and communicated to METEC on 16/01/15.
- Gen Rotor Scaffolding GRR-02-2015-001 issued and communicated to METEC on 17/02/15.
- Tur Piping Valves GRR-02-2015-002 issued and communicated to METEC on 03/03/15.
- Tur Governing Piping GRR-05-2015-001 issued and communicated to METEC on 12/06/15.
- Tur Servomotor maintenance tool GRR-07-2015-001 issued and communicated to METEC on 23/07/15.
- Tur Bearing dismantling tool GRR-09-2015-001 issued and communicated to METEC on 30/09/15.

Phase 2A (3 Units)
- Tur Embedded Pipes GRR-07-2015-002 issued and communicated to METEC on 24/07/15.

Manufacturing and quality documents for Phase 2A Metec scope was issued on July 13th 2015 to Metec
(GRR-CXE-MET-15-022-L) in order for Metec to confirm feasibility in terms of industrial capabilities and
quality requirement. Metec must also assess compatibility with time requirements of the project.

2.5.2 Forecast

Order GRR-03-2013-001:
- Pipes:
METEC must submit urgently the Quality Working Plan for pipes procurement and quality documentation
for already delivered pipes (see our letter ref GRR-COO-MET-14-041-L).
- Other embedded equipment (same order GRR-03-2013-001):
These equipment are required at site in coordination with Civil Works concreting activities. Comelex has
not had the opportunity to inspect parts nor check quality documentation.

Other parts under Metec responsibility:


Periodic progress report is issued by Metec industries. This report only shows progress of parts that have
been started in factories. Last report issued on October 30th 2015. Unknown progress for other parts:
METEC shall confirm schedule for delivery of raw materials equipment manufacturing as requested in our
letter GRR-CXE-MET-14-022-L sent on July 03rd 2014.
Comelex has not been provided progress report for a long time. There is no visibility on production
progress.

2.5.3 Issues and Concern

No delivery can be approved without approval of the certificates and reports as per the Quality
Working Plans, which are part of the supplier contract between Comelex and METEC.

Piping and other embedded material – order GRR-03-2013-001:


- Pipes:
Comelex has not been requested to inspect the material (quality and quantity).
Page 11 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

For the pipes installed by METEC without Comelex expert supervision, inspection reports (NDT after
weldings, position, and pressure test) should be provided to Comelex by METEC.

- Other embedded materials


These parts must be installed during installation of rebars by Civil Works contractor. If not available at that
time, the progress of site works will be impacted.

- Other parts under metec responsibility


METEC Top Management has clarified that Comelex is not expected to support METEC teams in charge
on a full time basis, but to be available on request for support.
Metec management has instructed the industries in charge of Metec scope of supplies to report on a
weekly basis about progress. Despite intents to hold weekly meetings, Comelex has not yet obtained
proper reporting. Comelex is concerned by the lack of information provided to them in the execution of
Metec scope of supplies.
As project schedule will need to be adjusted to delivery of Metec supplies, METEC should provide a
schedule for supply of the different equipment, showing purchasing of material, manufacturing, and
delivery.
To limit risks of delays on the Project Comelex also advices METEC to get some proposal from its
suppliers at the earliest.
COMELEX reminds METEC that for critical parts (such as coupling Bolts and braking Tracks), strict
fulfilment of quality requirement is essential for the safety of the Plant and consequently no deviation can
be accepted (see letter GRR-CXE-MET-14-022-L).

Metec is also reminded that the quality requirements specified by Alstom Hydro France for METEC
scope of supply remain valid and integrate many Employer‘s Requirements. Quality
documentation such as test reports and material certificates will have to be provided to EEPCo/ER
who has also the right to witness tests, on Site or in Metec factories, as they are performed. If
quality requirement are not followed there could be risks on the safety of the plant and its
performance.
For these reasons ALSTOM Hydro France draws METEC attention to the fact that the works made
by METEC which do not comply with quality requirements may be rejected by EEPCo.

Phase 2A:
The first parts needed at site are in Metec scope of supplies (embedded parts). Metec must ensure that
they will be available for installation in accordance with Site schedule. Also we are still waiting for
confirmation from Metec that the parts, which were not in Metec scope of supplies for phase 1 can be
manufactured in accordance with Contract quality and time requirements for phase 2 (see letter GRR-
CXE-MET-15-022-L dated July 13, 2015).
Embedded Pipes, Pier Nose and drainage box Anchorage have been installed at site by Metec. As we
haven’t received any quality documentation, we are not in position to approve the elements installed. Our
Site Expert Supervisor will only be in position to approve inspections done at site (position, pressure
test…). He is not in position to approve parts supplied by Metec without documentation.
Metec has delivered at Site Unit 06, 07 and 08 Pier Noses and Drainage Boxes.

Partial quality documentation has been issued by Metec for Pier Noses Units 07 and 08.
. ALSTOM Hydro France has commented Pier Nose documentation (through letter GRR-HET-MET-16-
002-L issued on January 28th 2016).
. Dimensional checks of 07 and Unit 08 Pier Noses completed at Site with support of our Supervisor.
Dimensions are accepted.

Partial quality documentation has been issued by Metec for Drainage Boxes Units 07 and 08
. Drainage Boxes have been check at Site. Our observations upon delivery have been made through letter
GRR-HET-MET-16-005-7 issued on Feb 18th 2016.

Page 12 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

Unit 06 Pier Nose: Inspection held by Comelex in Metec facilities on February 19th: Dimensional checks
and welds PT. Report issued through letter GRR-CXE-MET-16-007-L on March 08th 2016.

3 DELIVERY

3.1 Turbine – Mechanical

3.1.1 Achievements

Phase 1 Early Generation :


- Pier noses Unit 9 and 10 shipped (see GRR-HET-MET-13-044-L dated Sep 17, 2013) on Sept 15, 2013
and arrival confirmed at Djibouti sea port on Oct 15, 2013.
- Drainage box and draft tube elbow anchor parts (necessary for second concrete step) delivered FOB on
Jan 15th, 2014. Shipment notification issued to METEC (GRR-HET-MET-14-001-L dated 23/01/2014)
- Draft tube elbows shipped to Djibouti (see letter GRR-HET-MET-14-031-L dated Aug 29, 2014)
- Units 09&10 guide bearings and unit 09 shaft seal shipped to Djibouti (see GRR-HET-MET-15-003-L
dated Jan 16, 2015)
- Unit 10 runner shipment (see letter GRR-HET-MET-15-027-L dated March 5, 2015)
- Units 09&10 Draft tube cones, spiral cases, pit liners, bulk heads and dummy distributors shipment (see
letter GRR-HET-MET-15-030-L dated March 12, 2015)
- Miscellaneous components of partial assemblies 12 (spiral case), 52 (draft tube cone), 81 (spiral case
site tools) and 87 (circular monorails) (see letter GRR-HET-MET-15-035-L dated March 26, 2015)
- Units 9&10 axial valves shipment (see letter GRR-HET-MET-15-028-L dated March 9, 2015)
- Units 9&10 thrust bearing brackets shipment (see letter GRR-HET-MET-15-038-L dated April 14, 2015)
- Units 9&10 thrust bearings and unit 10 shaft seal shipment (see letter GRR-HET-MET-15-037-L dated
April 10, 2015)
- Unit 9 stay ring shipment (see letter GRR-HET-MET-15-039-L dated April 16, 2015)
- Shipment of instrumentation, tools, and miscellaneous components (see letter GRR-HET-MET-15-048-L
dated May 25, 2015)
- Unit 9 shaft shipment (see letter GRR-HET-MET-15-052-L dated June 3, 2015)
- Unit 10 shaft shipment (see letter GRR-HET-MET-15-056-L dated June 29, 2015)
- Unit 9 distributor shipment (see letter GRR-HET-MET-15-057-L dated June 29, 2015)
- Unit 10 stay ring shipment (see letter GRR-HET-MET-15-060-L dated July 10, 2015)
- Units 9&10 thrust collars shipment (see letter GRR-HET-MET-15-068-L dated Sep 10, 2015)
- Miscellaneous components shipment (see letter GRR-HET-MET-15-070-L dated Sep 17, 2015)
- Units 9&10 servomotors (see letter GRR-HET-MET-15-081-L dated Oct 15, 2015)
- Units 9&10 thrust bearing heat exchangers (see letter GRR-HET-MET-15-082-L dated Oct 22, 2015)
- Overspeed detection systems for units 9&10 (see letter GRR-HET-MET-15-099-L dated Dec 22, 2015)
- Unit 10 distributor shipment (see letter GRR-HET-MET-15-091-L dated Dec 8, 2015)
- Unit 9&10 injection skids and shaft seal skids shipment (see letter GRR-HET-MET-15-094-L dated Dec
15, 2015)

Phase 2a:
- Units 6, 7 & 8 circular monorails shipment (see letter GRR-HET-MET-16-001-L dated Jan 21, 2016)
- Shipment of U8 pads for thrust bearing, generator and turbine guide bearings (see letter GRR-HET-
MET-16-013-L dated Mar 29, 2016).
- Shipment of U8, 7 & 6 governor cubicles (see letter GRR-HET-MET-16-023-L dated Apr 28, 2016)
- Shipment of phase 2A turbine miscellaneous components (see letter GRR-HET-MET-16-019-L dated
Apr 11, 2016).
- Shipment of tools for distributor erection (see letter GRR-HET-MET-16-020-L dated Apr 11, 2016).
- Shipment of shaft seal skids and oil injection skids (see letter GRR-HET-MET-16-026-L dated Apr 28,
2016).
- Shipment of phase 2A Thrust bearing heat exchangers (see letter GRR-HET-MET-16-024-L dated Apr
28, 2016).

Page 13 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

- Shipment of stay ring site machining tool (see letter GRR-HET-MET-16-025-L dated Apr 28, 2016).
- Shipment of U8, 7 & 6 governor compressors (see letter GRR-HET-MET-16-032-L dated June 2, 2016).
- Shipment of the U10 shaft after repairs (see letter GRR-HET-MET-16-033-L dated June 16, 2016)
- Shipment of U8 thrust bearing (see letter GRR-HET-MET-16-035-L dated June 17, 2016).
- Shipment of U7 thrust bearing ODC parts (see letter GRR-HET-MET-16-036-L dated June 21, 2016).
- Shipment of U7 thrust bearing (see letter GRR-HET-MET-16-042-L dated Aug 11, 2016).

3.1.2 Forecast

Shipment of U9 runner (see letter GRR-HET-MET-16-030-L dated May 19, 2016).


Shipment of U10 remaining distributor components & spares (see letter GRR-HET-MET-16-040-L dated
Aug 4, 2016)
Shipment of U8 turbine guide bearing and shaft seal (see letter GRR-HET-MET-16-043-L dated Aug 29,
2016)

3.1.3 Issues and Concern

3.2 Turbine – Governing System


3.2.1 Achievements

- Units 09&10 governor cubicles and governor compressors (see letter GRR-HET-MET-15-021-L dated
Feb 27, 2015)
- Units 09 &10 governor pressure tanks shipment (see letter GRR-HET-MET-15-059-L dated July 9, 2015
- Units 9&10 hydraulic power packs (see letter GRR-HET-MET-15-081-L dated Oct 15, 2015)
- Unit 9&10 overspeed detection systems shipment (see letter GRR-HET-MET-15-099-L dated Dec 22,
2015)

3.2.2 Forecast

Shipment of phase 2A governor pressure tanks (see letter GRR-HET-MET-16-039-L dated Jul 26, 2016)

3.2.3 Issues and Concern

3.3 Generator
3.3.1 Achievements

Phase 1:
FOB delivery of Unit 09/SP Stator bars (GRR-AHG9-5001, GRR-AHGSP-5002)
FOB delivery of Unit 09 Stator Core Laminations (GRR-AHG9-P-6001 to 6168 & GRR-AHG9-P-6169 to
6207)
FOB delivery of Unit 09 Stator Core Clamping U9 (GRR-AHG-P-9-5003)
FOB delivery of Unit 09 Rotor Rim Assembly (GRR AHG9P-7001)
FOB delivery of Unit 9&10 Air Coolers (GRR-AHG9P-5005, GRR-AHG10P-5006, GRR-AHGSPP-5007)
FOB delivery of Unit 09/10 Generator Guide Bearing Assembly (GRR-AHG9P-6208, GRR-AHG10P-6209)
FOB delivery of Unit 10 Stator Core Clamping and Unit9/10/SP Stator Wedging (GRR-AHG10P-5004,
GRR-AHG9P-5008, GRR-AHG10P-5009, GRR-AHGSPP-5010, GRR-AHG0P-5015)
Page 14 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

FOB delivery of Unit 10 Stator bars (GRR-AHG10P-5016)


FOB delivery of Unit 9 Rotor Poles (GRR-AHG9P-5011)
FOB delivery of Unit 9 Stator Frame (GRR-AHG9P-7005, GRR-AHG9P-7006)
FOB delivery of Unit 10 Rotor Rim Assembly (GRR-AHG10P-7002)
FOB delivery of Unit 9/10 Upper Shaft (GRR-AHG9P-7003, AHG-AHG10P-7004)
FOB delivery of Unit 9/10/SP of oil coolers (GRR-AHG9P-5020, GRR-AHG10P-5021, GRR-AHGSPP-
5022)
FOB delivery of Unit 10 and Spare Rotor Poles (GRR-AHG10P-5023, GRR-AHGSPP-5024)
FOB delivery of Unit 9 rotor spider and unit 10 Stator Frame (GRR-AHG9P-7009 GRR-AHG10P-
7007/7008)
FOB delivery of Unit 10 Stator Lamination (GRR-AHG10P 6210 to 6415)
FOB delivery of Generator Guide Bearing Spare (GRR-AHGSPP-6210)
FOB delivery of Unit 9/10 Upper Bracket (GRR-AHG9P-7010, GRR-AHG10P-7011)
FOB delivery of Unit 9/10 Generator Equipment (GRR-AHG9P-5028-5030-5032-5036-5038, GRR-
AHG10P-5029-5031-5033-5035-5037)
FOB delivery of Unit 9/10 Generator Connections and miscellaneous (GRR-AHG9P-5040, GRR-AHG9P-
5041, GRR-AHG9P-5042, GRR-AHG10P-5043, GRR-AHG10P-5044)
FOB delivery of Unit 9/10/SP Fire Fighting System (GRR-AHG-9P-5025, GRR-AHG10P-5026, AHGSPP-
5027)
FOB delivery of Stator-Rotor handling Tool (GRR-AHG-TOP-5045, GRR-AHG-TOP-5046)
FOB delivery of Rotor Spider Unit 10 (GRR-AHG-10P-7012)
FOB delivery of Generator auxiliaries (GRR-AHG10P-5047, GRR-AHG9P-5048, GRR-AHG10P-5049,
GRR-AHG9P-5050, GRR-AHGSPP-5051, GRR-AHGTOP-5052, GRR-AHG10P-5055, GRR-AHGTOP-
5056, GRR-AHG0P-5057, GRR-AHGSPP-5058)
FOB delivery of Air guide (GRR-AHG9P-5053, GRR-AHG10P-5054)

Phase 2A:
-Shipment of U8 stator laminations first batch (see letter GRR-HEG-MET-16-013-L dated May 12, 2016).
-Shipment of U8 stator laminations second batch (see letter GRR-HEG-MET-16-015-L dated May 30,
2016).
- Shipment of U8 generator guide bearing (see letter GRR-HET-MET-16-035-L dated June 17, 2016).
- Shipment of U8 rotor poles (see letter GRR-HEG-MET-16-027-L dated July 26, 2016).
- Shipment of U7 generator guide bearing (see letter GRR-HET-MET-16-035-L dated June 17, 2016).
- Shipment of generator guide bearing internal cooler sets (see letter GRR-HEG-MET-16-028-L dated Aug
1, 2016).
- Shipment of phase 2A generator air coolers (see letter GRR-HEG-MET-16-028-L dated Aug 1, 2016).
- Shipment of U6 generator guide bearing and U7 generator guide bearing pads (see letter GRR-HEG-
MET-16-032-L dated Aug 11, 2016).
- Shipment of U6 rotor poles (see letter GRR-HEG-MET-16-034-L dated Sep 5, 2016).

3.3.2 Forecast

Shipment of wiring materials, cables and miscellaneous components (see letter GRR-HEG-MET-16-021-L
dated June 21, 2016).

3.3.3 Issues and Concern


ODC deliveries to Djiboubi instead of Bishoftu will create discrepancies on documents presented to the
banks under the letter of credit. However, Metec has confirmed that they will accept discrepant document
(mail from Mr Zerai Gebretnsae to Sylvain Bouye on Tuesday July 8th 2014).

Page 15 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

3.4 Excitation

3.4.1 Achievements
Activity completed for Phase 1

3.4.2 Forecast
Activity completed for Phase 1.

3.4.3 Issues and Concern


None

3.5 METEC Scope

3.5.1 Achievements

- Delivery by METEC of primary embedded pipes (order GRR-03-2013-001).


No check has been done yet on the delivered material.
No documentation has been issued by METEC to Comelex
- Delivery by METEC of elements for Pressure taps site assembly (order GRR-03-2013-001).
Partial documentation available. Physical check could not be done by Comelex.
Phase 2A:
Pier Noses Unit 08, 07 and 06 at Site. Dimensional Checks completed
- Drainage Boxes Unit 08 and 07 at Site and installed. Final Reception not done by Comelex (some quality
documentation is missing)

3.5.2 Forecast

Delivery by METEC of other embedded parts (order GRR-03-2013-001).


Delivery by METECof Rotors Embedded Plates for Erection Bay (order GRR-02-2014-001)
Delivery by Metec of Phase 2A – Draft Tube anchor plates and Pins.

3.5.3 Issues and Concern

- Quality documentation, which remains necessary (see previous monthly reports) for the parts delivered
by Metec has not been provided to Comelex.

4 SITE SUPERVISION

4.1 GENERAL
4.1.1 Achievements
Site Visit between August 17th and 28th 2016 (Etienne Germain, Project Manager Site Installation). Report
to be issued.

4.1.2 Forecast

4.1.3 Issues and Concern

Although visible pogress have been made regarding erection bay, no information from Metec regarding
the contractual milestones “CW 2 erection bay available” and “BOP 2 overhead crane certified”. Delays on
these CW milestones increasingly impact the project execution programme.
Page 16 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

We recommend that a storage management system (storage condition, inventory, parts identification and
check…) is implemented by Metec in order to limit the risk that delivered parts at site are lost (or difficult to
find on demand) or damaged. Comelex has proposed to Metec a system for site storage management.
For implementation at site, Metec needs to define storage areas with determined categories (classB, …).
. Our team is supporting Metec Site Logisitics on material reception. Based on our experience in
hydropower stations erection, we highly recommend METEC to implement a storage system by Units and
in accordance with erection sequence. We kindly underline that the later such a storage system is put in
place, the harder it is. Hence, Metec is advised to put such system in place before the quantity of parts
dispatched on Site is too high.

Some boxes delivered at Site are damaged or destroyed. Some of them contain sensitive equipment.
Therefore it is essential to:
. Check the content (quality and quantity) for each box damaged (in progress with support of our
Supervisor)
. Repair or change the box in order to store properly the parts.
Comelex reminds Metec of the importance of preserving the package in good conditions, during inland
transportation and handling. Some parts might be damaged or lost every time that a package is damaged.
Any damage or loss may have an impact on the project in terms of costs and time schedule.

No status from METEC regarding the supply of tools. On Early Generation area (Unit 09 and 10), next
steps of installation will be impossible without proper tools.

Metec should urgently submit to Comelex the Welding Book for Spiral Case assembly and erection, as it
must be approved before start of activities. See our letter GRR-CXE-MET-16-019-L.

The Draft Tube Elbow welding book must also be finalized by Metec (qualification of procedure).

For safety reason adherence to proper welding procedures and controls is mandatory.
4.2 TURBINE
4.2.1 Achievements

Erection procedures and inspection sheets for embedded parts have been sent as detailed below:
TF/HET/GRR/050 dated 22/01/2014, Pier Nose + Embedded Parts
TF/CXE/GRR/001 dated 24/02/2014, Draft Tube Elbow
TF/CXE/GRR/002 dated 25/02/2014, Embedded Pipes
TF/CXE/GRR/004 dated 25/03/2014, Embedded Parts Revision

The Welding Book for first embedded pipes has been submitted by METEC and approved with comments.

First Expert Supervisor was at site from November 17th to November 21st 2014.
Second Expert Supervisor was at site from November 27th to December 17th 2014.
Third Exert Supervision mission at site from May 03rd to June 23rd 2015
Fourth Exert Supervision mission at site from September 20th to December 09th 2015 and from Jan 14th
2016 to Jul 28th 2016.

Works supervised:
Early generation
- Control with METEC of ALSTOM HYDRO FRANCE material delivered at site.
- Installation of Unit 09 drainage box and Pier Nose
- Installation of Unit 10 drainage box and Pier Nose
- pre-positioning of Unit 09 and 10 pressure pipes in lower part of tail race, before concreting.
Page 17 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

- Installation of Draft Tube Elbow anchorage and Base Plates


- Welding and setting in the pit of Draft Tube Elbow Unit 09 and 10. Handed Over to Civil Work.
- Installation and welding of Draft Tube Cones Unit 09 and 10. Handed over to Civil Work.
- Installation of Unit 09 and 10 Stay Ring Plates (manufactured at Site because original ones are in
Djibouti, not delivered at Site)
-Installation of Unit 09 and 10 Upper Cone

Phase 2A
- Installation of Unit 08 and 07 Pier Noses and Drainage Boxes.

Inspection of material delivered from Djibouti by Metec done with Metec :


- Pier Nose Unit 09 and Unit 10
- Drainage Box Unit 09 and 10
- Draft Tube Elbows for Unit 09 and 10
- Anchorage for Draft Tube Cones Unit 09 and 10
- Runner First Unit
- Unit 09 Shaft
- Draft Tube Cones Unit 09 and 10
- Upper Cones Unit 09 and 10
- Unit 09 and 10 Spiral Cases
- Unit 09 and 10 Guide Bearings and Shaft Seals
- Unit 09 and 10 Stay Rings
- Different containers delivered at site.

No deviation on quantities: material at site as per Packing List.


Some Spiral Case scrolls have been welded on their support frame during inland transport. As mentioned
in our Letter GRR-HET-MET-16-004-L issued on Feb 04th 2016, the scrolls material (S500Q) might have
been affected by this operation. Measurements have been performed at Site . Unfortunately, the
measurements performed are not correct as the hardness measurement device was not working properly
(wrong calibration) and so the measurements need to be performed again.

Metec has to arrange proper storage to avoid damages and loss.


For example, boxes for dummy distributors, DT cones and turbine guide bearings have been damaged
during handling and are stored outside despite being class C. The proper preservation of parts must be
ensured, for which we advise Metec to repair the boxes and store them in a closed area as recommended.

4.2.2 Forecast

Metec to submit welding book for Spiral Case. In order to ease the realization by Metec of samples for
WPQR, Comelex has provided to Metec plates of adequate material (S500Q). Metec is storing these
plates at its Hebret factory.
Installation of Rotor Embedded Plates on Erection Bay (518 asl). Metec to provide plates.
Installation of Unit 07 and 08 anchor plates and pins for Draft Tube Elbows. Metec to provide parts.

4.2.3 Issues and Concern

Metec must ensure that all lifting of material at site are made according to safety rules : see our
specification HTL 7.55.8000 – section 4.3 provided through letter GRR-CXE-MET-14-021-L. In particular,
it is essential to use conform lifting devices (slings, chain blocks…) and to follow lifting instructions and
plans.

Site works progress is impacted by the non-availability of tools, especially optical level (with skilled
operator), which is now mandatory on a permanent basis for the erection. Metec should assign one to the
Page 18 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

Early Generation area. Comelex has proposed additional expert supervision to Metec topographer (our
letter GRR-CXE-MET-16-010-L dated 01/04/2016)
See our letter GRR-CXE-MET-16-001-L and GRR-CXE-MET-16-012-L regarding necessary tools and
equipment for the next stages of installation. The installation of Stay Ring will be impossible in the current
conditions.

Regarding the lifting of the heaviest part of Stay Ring, Metec has fixed the 400 tons crane. This one has
been tested during E. Germain’s site visit. Metec must define a lifting plan with a positioning of the Crane
according to the maximum distance possible. This would require some coordination with CW contractor
(rebars installed in the closest area of the Pits at elevation 485.8 asl. Otherwise, Metec will have to
provide a Crane of higher capacity. Metec has indicated that a 500 tons Crane is being delivered at
Djibouti for GRR project.

4.3 GENERATOR
4.3.1 Achievements

Erection procedures and inspection sheets for embedded parts:


TF/CXE/GRR/005 dated 02/04/2014, GENERATOR ROTOR EMBEDDED PLATE
TF/CXE/GRR/006 dated 20/05/2014, GENERATOR STATOR
TF/CXE/GRR/010 dated 08/12/2014, ALL GENERATOR ERECTION DOCUMENTATION
TF/CXE/GRR/017 dated 31/03/2016, GENERATOR FIELD MOODIFICATION rev C

Trial assembly of Stator Frames, according to our letter ref GRR-HEG-MET-16-008-L.


Dimensional check of Stator Frames with Laser Tracker. Report to be issued

4.3.2 Forecast

4.3.3 Issues and Concern

Equipment already delivered is still in Bishoftu, and we have concern on their inadequate storage
conditions, especially for core laminations and excitation cubicles. Some Containers have recently been
delivered at Site and we kindly advise Metec to handle and store sensitive electrical parts as carefully as
possible

The stator frames arrived at site and unfortunately they were damaged during the transport from Djibouti
port to the site, in circumstances unknown to us. To see if and how they can be repaired, we have
suggested performing some measurements and a trial assembly (see letter GRR-HEG-MET-16-003-L
dated Feb 4, 2016).

5 COMMISSIONING

5.1 Pre-commissioning

5.2 Commissioning

6 INDUSTRIAL TRANSFER

6.1 Achievements

Page 19 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

- Definition by ALSTOM Hydro France of factory requirements for manufacturing by METEC


- METEC has assigned its Power industry department for coordination of the local manufacturing.
- Comelex has issued all manufacturing documents for Phase 2 scope to be manufactured by Metec
(letter GRR-CXE-MET-15-022-L).
- METEC has delivered to Site Pier Noses for Unit 06, 07 and 08.
- METEC has delivered to Site Drainage Boxes for Unit 07 and 08
- Comelex’s Expert Supervisor for local fabrication arrived on March 18th 2016. He shall support Metec
team on a permanent basis. He has been installed by Metec at “Bantu Workshop”, and is working closely
with the fabrication team. Draft tube elbows manufacturing:
Preparation of assembly area almost completed by Metec.
Alstom Hydro France has approved the Change Material request issued by Metec for Draft Tube.
However, Alstom Hydro France reminds METEC that, regarding the plates planned to be used for the draft
tube elbow manufacturing, it is necessary to obtain the information listed in our letter GRR-HET-MET-16-
038-L.
Cutting of Section 1 and Section 2 of first Draft Tube completed by Metec.
Rolling of Section 1 completed by Metec
Pre-assembly of Section 1 in progress.

Training:
- Introduction session for the team of trainees was held in France between 22nd and 25th April 2014.
- 3 months Training in Chinese Factory from June 13th 2014 to September 09th 2014.
ALSTOM Industrial Transfer coordinator met METEC Power Industry management with the trainees on
October 22th 2014 :
- METEC confirmed during Oct 22th 2014 meeting in Addis that the training was satisfactory and met
METEC expectations, specifying that some support from ALSTOM Hydro France-Comelex will still be
required during manufacturing.

Industrial Scheme:
- Meeting April 28th 2015: Metec is finalizing study showing its strategy: 3 steps for Metec scope for Phase
2A:
. Step 1: Manufacturing of parts which can be done with current Metec means.
. Step 2: Fabrication of components which can be done with improvement of Metec machining facilities
. Step 3: New factory in Nekemt for fabrication and assembly of all components.

- A meeting was held with Comelex Industrial Transfer coordinator and Metec team in charge on July 29th
2015 + join working session on July 30th, 31st 2015:
. Metec will analyse all the documentation for manufacturing provided by Comelex.
. Explanations / clarifications on “industrial engineering” to be completed by Metec, example of Pier Nose
. Discussions on Industrial Scheme and way forward.
- Industrial scheme: Metec has submitted preliminary analyse for “step 1” parts for August 2015. Industrial
engineering to be done accordingly.
- Meetings in Addis between Metec and Comelex Industrial Transfer coordinator on 28-29 oct 2015:
Industrial engineering of Pier Nose and Drainage box have been completed by Metec.
Meeting in Addis between Metec and Comelex Industrial Transfer coordinator on 27 and 28 jan 2016:
. Metec has manufactured and sent to Site Unit 06, 07 and 08 Pier Noses and Unit 06, 07 and 08
Drainage Boxes. Quality documentation not yet finalized.

6.2 Forecast

- Metec has to assign a team from Design office to analyse docs submitted for manufacturing (drawings,
specifications, quality requirements…).
- Metec to ask to Alstom Hydro France/Comelex any clarify required on documents submitted.

Page 20 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

- Meanwhile, it is agreed that regular discussions must be maintained with Alstom Hydro France and
Metec in order to have a joint analyse.
As per Contract and our letter GRR-CXE-MET-15-022-L, Metec has to confirm, according to
manufacturing documents, feasibility in terms of schedule and quality for the scope defined in the contract.

6.3 Issues and Concern

The offshore portion of Phase 2a is starting and the Metec scope of works according to DOW is
significantly bigger and more complex than for phase 1. No evidence has been given yet by Metec that
Metec will have the necessary industrial facilities (heavy equipment, factories) in accordance with Phase
2a time and quality requirements.

Use of improper materials may have non visible impact on characteristics of the parts fabricated, for
example resistance to operating conditions and such impact may be seen only after erection and start of
tests in operating conditions. This would lead to consequences on project safety and time schedule that
must be avoided. This is why ALSTOM Hydro France and Comelex have repeatedly reminded Metec
about the importance and necessity of Quality reports, including preliminary documents, raw material
certificates, procedures, reports… Without proper documentation, it will be impossible for Comelex to be
sure that parts will sustain operating conditions and to accept the works performed, even if our Expert
Supervisor is witnessing fabrication. Comelex remains available to support Metec for quality
documentation.

7 COMMERCIAL AND FINANCIAL

7.1 Contract Price


Off Shore On Shore METEC part
(EUR) *(EUR) included in On
Shore portion
Original Contract Price

Phase 1 85 933 863 10 107 215 1 944 000


Phase 2a 63 489 656 15 987 819 10 028 500
Phase 2b 63 489 656 15 987 819 10 028 500

Contract amendments 0 0 0

Total Contract Value as of report date 212 913 175 42 082 853 22 001 000
* without VAT
Variations

Agreed Variation Orders to be incorporated in an amendment:


• none, as of report date

Variations Orders under negotiation:


• Metec has requested ALSTOM hydro France to propose an amendment to the contract regarding the size
and content of onshore part. This proposed amendment will integrate technical aspects such as the
400MW guaranteed output.
Page 21 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

• VO for “Early Generation Runners”

Proposed Variations Orders:


• none, as of report date

Amendment 3 signed August 22nd 2014:

• No impact on total price, but with modified payment terms for Phase 2a Offshore.

Amendment 4 signed June 8th, 2016

Additional Purchase order for repair of shaft U10


• Signed December 11th 2015, price 132 000 EUR, net of taxes.

7.2 Contract Key Dates

Contract Signing: 15th of June 2012

Notice To Proceed: 25th of January 2013

Start of Phase 2A: 15th of January 2015

7.3 Commercial Issues


• Finalisation of cost and time impact of technical deviations as per Clause 4 of SC which are not
agreed is pending (see GRR-COO-MET-13-012-L). ALSTOM Hydro France has formally
requested an Extension of Time of 13,5 months –GRR-COO-MET-14-003-L dated 24/01/2014),
due to delays in engineering approval and interface data transmission, design changes requests.
• Agreement on Variation Order for “Early Generation Runners” is still pending.
• Cost and time impact of late payment of Onshore Portion (as detailed in 8.4 below)
• Cost and time impact of late payment of Phase 2A Offshore Portion (as detailed in 8.4 below)

7.4 Invoices & Payment Status


As per Amendment 4 signed on June 08th 2016, On Shore new Contract Price for Phase 1 and 2A is
to be invoiced 100% in Ethiopian Birrs. New milestones have been defined for Site Erection
Progress. Progress claims to be submitted by Comelex accordingly.

Page 22 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

Overall status of billing:

Phase Part L/C status Selling L/C L/C Invoiced Paid Open Not
price amounts amounts invoices invoiced
(million open yet
€)

1 +2a Onshore 4.5 4.5 0.0 3.3 3.3 0.0 1.2


1 Offshore open 85.9 85.9 85.9 74.8 74.7 0.1 11.2
2a Offshore To be updated 73.1 63.5 63.5 27.0 26.3 0.7 36.5
2b Onshore to be opened 16.0 6.0 0.0 0.0 0.0 0.0 16.0
Offshore to be opened 63.5 63.5 0.0 0.0 0.0 0.0 63.5
Total 79.5 69.4 0.0 0.0 0.0 0.0 79.5
Total Onshore 20.5 10.4 0.0 3.3 3.3 0.0 17.2
Offshore 222.5 212.9 149.4 101.8 101.0 0.8 111.2
Total 243.0 223.4 149.4 105.1 104.3 0.8 128.3

On 8 June 2016, the parties agreed to modify the prices for Phase 1 and Phase 2a, as defined in
the contract amendment 4 as follows:

Phase 1 Phase 2a
Onshore part 4 489 768 EUR
Offshore part 85 933 863 EUR 73 122 421 EUR

The remaining amount to be invoiced related to the onshore scope amounts to 1 192 646 EUR is payable
in Ethiopian Birrs, using National Bank of Ethiopia selling exchange rate at the date of payment, paid by
direct bank transfer.

Offshore Scope - Phase 1

• Shipments phase 1 , being processed by banks :


o Turbine Auxiliaries-batch 5- milling unit: EUR 40,062

• Alstom Hydro France noted the commitment by METEC to accept discrepancies arising from Place
of Delivery being Djibouti for ODC shipments (refer to e-mail dated 08/07/2014 from Sgt Zerai
Gebretnsae to Sylvain Bouye). ESL doesn’t ship ODC until the Place of Delivery that is indicated in
the Letter of Credit, Bishoftu Bonded Warehouse. Bills of lading needed for payment by the Letter
of Credit therefore include a discrepancy on this point.

Page 23 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT

Offshore scope - Phase 2A

Following the signature of the contractual amendment 4, r the existing letter of credit will have to be
modified to take into account the new total amount of 73 122 421 EUR.

Shipments phase 2A ,being processed by banks :

Turbine Auxiliaries - Batch 2 - Injection and shaft seal skids: EUR 19,472
Governing system – Compressors: EUR 450,668
Oil and Water Collers – EUR 228,949

Extra works

To be paid by METEC on Service Provider account in France by TT:


U10 shaft repairs – EUR132,000

7.5 Correspondence Status


See correspondence register in Annex 4

Page 24 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016

MONTHLY PROGRESS REPORT

8 ATTACHMENTS

Annex 1 - Pictures

Annex 2 - Document Release Schedule

Annex 3 - Schedule of Planned Inspections

Annex 4 - Correspondence Register

Page 25 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Annex 1 - Pictures

U9 runner at Antwerp port

U8 runner under machining


Page 26 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

U7 turbine shaft under machining

U6 bottom ring under welding

Page 27 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Phase 2A governing pressure tanks

U8 upper shaft FAT on vertical lathe

Page 28 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

U8 upper bracket

U8 rotor spider hub FAT on vertical lathe

Page 29 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Annex 2 - Document Release Schedule

Page 30 sur 34
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

028-300 K 12 Welds - Classification Inspection 28/11/2012 04/09/2012 GRR-HEG-MET-12-002T FI ---


ALS_GDR_PROV_001 Equipment Main Data (Turbine and Generator) 10/08/2012 10/08/2012 GRR-COO-MET-12-001E 04/10/2012 MoM_DSM_02 Section 2.1 Commented
Equipment Main Data 08 Equipment Main Data (Phase 2 units) 02/07/2015 02/07/2015 GRR-HET-MET-15-058-L
HS_CPA01000000000EC HS_CPA 01 0000 00 000 EC 2 18 x Corrosion Protection by Paint GFE 10/01/2013 02/04/2013 TF/COO/GRR/002 FA 13/08/2013 GERDP-13-279 AN 11/12/2013 GRR-COO-MET-13-065-T Revision of drawing
HS_CPA02000000000EC HS_CPA 02 0000 00 000 EC 3 7 x Corrosion Protection by Paint GFE 10/01/2013 04/02/2013 TF/COO/GRR/002 FA 13/08/2013 GERDP-13-279 AN 11/12/2013 GRR-COO-MET-13-065-T Revision of drawing
H-6235000AA00-0001DB H-6235 00 0AA 00 - 0001 DB A X Document Numbering Procedure 21/12/2012 09/01/2013 TF/COO/GRR/001 FI ---
H-6235000AA00-0001DB H-6235 00 0AA 00 - 0001 DB B Document Numbering Procedure GFE 15/01/2013 22/03/2013 TF/COO/GRR/004 FI ---
H-6235000AA00-FS00DB-02 H-6235 00 0AA 00 - FS00 DB -02 A x Technical Document Submission & Approbation Process 04/06/2013 18/07/2013 TF/COO/GRR/005 FA DEEMED APPROVED
H-6235000AA00-FS00DB-02 H-6235 00 0AA 00 - FS00 DB -02 B Technical Document Submission & Approbation Process 30/03/2015 07/04/2015 TF/COO/GRR/017 FA 18/09/2015 GERDP-JE-DR-15-092-A RE
H-6235000AA00-0000DF-01 H-6235 00 0AA 00 - 0000 DF -01 A 13 x Site Storate and Workshop Area Guidelines GFR 31/10/2013 05/11/2013 GRR-CXE-MET-13-006-L FI ---
H-6235000AA00-0000DF-01 H-6235 00 0AA 00 - 0000 DF -01 B 16 Site Storate and Workshop Area Guidelines 20/03/2014 20/03/2014 TF/CXE/GRR/003 FI ---
H-6235000AA00-0000EC-03 H-6235 00 0AA 00 - 0000 EC -03 A 8 Piping Specification GFR 09/12/2013 31/01/2014 TF/COO/GRR/008 FA DEEMED APPROVED
H-6235000AA00-0000BB-01 H-6235 00 0AA 00 - 0000 BB -01 A Monthly Progress Report - August 2013 06/09/2013 06/09/2013 GRR-COO-MET-13-035-T FI ---
H-6235000AA00-0000BB-02 H-6235 00 0AA 00 - 0000 BB -02 A Monthly Progress Report - September 2013 06/09/2013 10/10/2013 GRR-COO-MET-13-048-T FI ---
H-6235000AA00-0000BB-03 H-6235 00 0AA 00 - 0000 BB -03 A Monthly Progress Report - October 2013 08/11/2013 13/11/2013 GRR-COO-MET-13-058-T FI ---
H-6235000AA00-0000BB-04 H-6235 00 0AA 00 - 0000 BB -04 A Monthly Progress Report - November 2013 09/12/2013 10/12/2013 GRR-COO-MET-13-063-T FI ---
H-6235000AA00-0000BB-05 H-6235 00 0AA 00 - 0000 BB -05 A Monthly Progress Report - December 2013 15/01/2014 23/01/2014 GRR-COO-MET-14-002-T FI ---
H-6235000AA00-0000BB-06 H-6235 00 0AA 00 - 0000 BB -06 A Monthly Progress Report - January 2014 09/02/2014 10/02/2014 GRR-COO-MET-14-007-T FI ---
H-6235000AA00-0000BB-07 H-6235 00 0AA 00 - 0000 BB -07 A Monthly Progress Report - February 2014 07/03/2014 11/03/2014 GRR-COO-MET-14-013-T FI ---
H-6235000AA00-0000BB-08 H-6235 00 0AA 00 - 0000 BB -08 A Monthly Progress Report - March 2014 09/04/2014 10/04/2014 GRR-COO-MET-14-020-T FI ---
H-6235000AA00-0000BB-09 H-6235 00 0AA 00 - 0000 BB -09 A Monthly Progress Report - April 2014 13/05/2014 14/05/2014 GRR-COO-MET-14-032-T FI ---
H-6235000AA00-0000BB-10 H-6235 00 0AA 00 - 0000 BB -10 A Monthly Progress Report - May 2014 09/06/2014 10/06/2014 GRR-COO-MET-14-035-T FI ---
H-623500MEU00-FS00AB-01 H-6235 00 MEU 00 - FS00 AB -01 D Turbine and Governing DRS - Submitted Drawings and Documents 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED
H-623500MEU00-FS00AB-02 H-6235 00 MEU 00 - FS00 AB -02 D Turbine and Governing DRS - Civil Work Guide Drawings 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED
H-623500MEU00-FS00AB-02 H-6235 00 MEU 00 - FS00 AB -02 D Turbine and Governing DRS - Civil Work Guide Drawings 12/03/2013 20/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEU00-FS00AB-03 H-6235 00 MEU 00 - FS00 AB -03 D Turbine and Governing DRS - Equipment Layouts and Diagrams 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED
H-623500MEU00-FS00AB-04 H-6235 00 MEU 00 - FS00 AB -04 D Turbine and Governing DRS - Drawings for Procurement 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED

H-623500GEN00-FS00AB-01 H-6235 00 GEN 00 - FS00 AB -01 A Generator and Excitation DRS - Submitted Drawings and Documents 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED

H-623500GEN00-FS00AB-02 H-6235 00 GEN 00 - FS00 AB -02 A Generator and Excitation DRS - Civil Work Guide Drawings 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED
H-623500GEN00-FS00AB-02 H-6235 00 GEN 00 - FS00 AB -02 A Generator and Excitation DRS - Civil Work Guide Drawings 12/03/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500GEN00-FS00AB-03 H-6235 00 GEN 00 - FS00 AB -03 A Generator and Excitation DRS - Equipment Layouts and Diagrams 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED
H-623500GEN00-FS00AB-04 H-6235 00 GEN 00 - FS00 AB -04 A Generator and Excitation DRS - Drawings for Procurement 12/03/2013 12/03/2013 TF/COO/GRR/003 FA DEEMED APPROVED
P3921 marked-up Turbine and Generator cross section 06/09/2012 GRR-COO-MET-12007-L FI ---
H-6235000AA00-FS00QA-002 H-6235 00 0AA 00 - FS00 QA -002 B 55 Site Quality Plan Metec Guidelines 03/08/2015 05/08/2015 TF/CXE/GRR/013 FA 21/10/2015 GERDP-JE-DR-15-173-A RE
GRR-09.2013.001 Units 9 & 10 Turbine Coupling Bolts Purchase Order 08/10/2013 GRR-CXE-MET-13-003-L Void due to amendment 4

Revised Purchase Order GRR-09-2013-001 V2 Turbine Coupling Bolts


GRR-09-2013-001 V2 24/02/2014 GRR-CXE-MET-14-005-L Void due to amendment 4
to be supplied by Metec

Revised Purchase Order GRR-09-2013-001 V3 Turbine Coupling Bolts


GRR-09-2013-001 V3 18/06/2014 GRR-CXE-MET-14-016-L Void due to amendment 4
to be supplied by Metec

GRR-10.2013.003.V1 Units 9 & 10 Secondary Embedded Pipes Purchase Order 31/10/2013 GRR-CXE-MET-13-005-L Void due to amendment 4
Procedure for Purchase orders Treatment by Metec 27/11/2013 GRR-CXE-MET-13-007-L Void due to amendment 4
Units 9 & 10 Generator Braking Tracks & Associated parts Purchase
GRR-11-2013-001 27/11/2013 GRR-CXE-MET-13-008-L Void due to amendment 4
Order
GRR-12-2013-001 Generator coupling bolts to be supplied by Metec - Purchase order 11/12/2013 GRR-CXE-MET-13-010-L Void due to amendment 4
GRR-02.2014.001.V1 Units 9 & 10 Rotor Embebbed Plates Purchase Order 19/02/2014 GRR-CXE-MET-14-002-L Void due to amendment 4
GRR-02-2014-001.V2 Rotor Embedded Plate PO n° GRR-02-2014-001.V2 01/03/2016 GRR-CXE-MET-16-006-L Void due to amendment 4
GRR-02.2014.002.V1 Units 9 & 10 Stator Stacking Tool Purchase Order 20/02/2014 GRR-CXE-MET-14-003-L Void due to amendment 4
GRR-02.2014.003.V1 Units - 9 & 10 Stator temporary bar wedging Purchase Order 20/02/2014 GRR-CXE-MET-14-004-L Void due to amendment 4
Revised Purchase Order GRR-03-2013-001 V3 Turbine Primary
GRR-03-2013-001 V3 18/06/2014 GRR-CXE-MET-14-017-L Void due to amendment 4
Embedded Pipes to be Supplied by Metec

Generator Common Tools to be supplied by Metec - Purchase order


GRR-06.2014.002.V1 24/06/2014 GRR-CXE-MET-14-018-L Void due to amendment 4
GRR-06-2014-002
Generator Rim Stacking Tool to be supplied by Metec - Purchase order
GRR-06.2014.001.V1 24/06/2014 GRR-CXE-MET-14-019-L Void due to amendment 4
GRR-06-2014-001
Turbine inspection platform to be supplied by Metec - PO GRR-09-
GRR-09.2014.001.V1 29/09/2014 GRR-CXE-MET-14-029-L Void due to amendment 4
2014-001
Generator Rim Stacking Tool to be supplied by Metec - Updated
GRR-06.2014.001 V2 11/11/2014 GRR-CXE-MET-14-034-L Void due to amendment 4
Purchase Order GRR-06-2014-001 V2

GRR-11.2014.001.V1 Turbine Aerial Pipes to be supplied by Metec - PO GRR 112014-001 18/12/2014 GRR-CXE-MET-14-039-L Void due to amendment 4

GRR-11-2014-001 V2 Revised Purchase Order GRR11-2014-001-V2 for Turbine Aerial Pipes 24/03/2015 GRR-CXE-MET-15-010-L Void due to amendment 4
GRR-11-2014-001 V3 Revised Purchase Order GRR11-2014-001-V3 for Turbine Aerial Pipes 06/07/2015 GRR-CXE-MET-15-021-L Void due to amendment 4
Revised Purchase Order GRR-05-2015-001 V2 Generator Upper
GRR-05.2014.001.V2 12/06/2015 GRR-CXE-MET-15-016-L Void due to amendment 4
Bracket Piping

GRR-06.2014.005.V1 Generator Braking & Lifting Piping to be supplied by Metec 03/07/2014 GRR-CXE-MET-14-025-L Void due to amendment 4

Revised Purchase Order GRR-06-2014-005 V2 Generator Bracking and


GRR-06.2014.005.V2 12/06/2015 GRR-CXE-MET-15-017-L Void due to amendment 4
Lifting Piping

GRR-05.2015.001.V1 Turbine Governing Piping Purchase Order 12/06/2015 GRR-CXE-MET-15-018-L Void due to amendment 4

Distributor inspection Platform to be supplied by Metec - PO GRR-12-


GRR-12.2014.001.V1 16/01/2015 GRR-CXE-MET-15-001-L Void due to amendment 4
2014-001

GRR-02.2015.002.V1 Turbine piping valves to be supplied by Metec - PO GRR-02-2015-002 04/03/2015 GRR-CXE-MET-15-005-L Void due to amendment 4

GRR-03.2014.001.V1 Genrator Upper Floor Assembly to be supplied by Metec 02/04/2014 GRR-CXE-MET-14-008-L Void due to amendment 4

GRR-032014-004V1 Generator Top Cover Assembly to be supplied by Metec 02/04/2014 GRR-CXE-MET-14-010-L Void due to amendment 4

GRR-03.2014.003.V1 Generator Pit Closing to be supplied by Metec 02/04/2014 GRR-CXE-MET-14-009-L Void due to amendment 4

05/09/2016 1 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

GRR-04.2014.001.V1 Generator main cooling piping to be supplied by Metec 02/05/2014 GRR-CXE-MET-14-011-L Void due to amendment 4

GRR-05.2014.001.V1 Generator Upper Bracket Piping to be supplied by Metec 22/05/2014 GRR-CXE-MET-14-012-L Void due to amendment 4

GRR-06.2014.003.V1 Generator braking jack tools to be supplied by Metec 03/07/2014 GRR-CXE-MET-14-023-L Void due to amendment 4

GRR-06.2014.004.V1 Generator Oli & Dust Exhaut Pipes to be supplied by Metec 03/07/2014 GRR-CXE-MET-14-024-L Void due to amendment 4

GRR-08.2014.001.V1 Generator Stator Scaffolding to be supplied by Metec 29/08/2014 GRR-CXE-MET-14-027-L Void due to amendment 4

GRR-02.2015.001.V1 Generator Rotor Scaffolding to be supplied by Metec 17/02/2015 GRR-CXE-MET-15-004-L Void due to amendment 4

GRR-07.2015.001.V1 Turbine servomotor motor tool to be supplied by Metec 23/07/2015 GRR-CXE-MET-15-024-L Void due to amendment 4

GRR-07.2015.002.V1 Phase 2a Turbine embedded pipes to be supplied by Metec 24/07/2015 GRR-CXE-MET-15-025-L Void due to amendment 4

Turbine Bearing and Shaft Seal dismantling tool - To be supplied by


GRR-09.2015.001.V1 30/09/2015 GRR-CXE-MET-15-033-L Void due to amendment 4
Metec

P000261274_E 1100 - HGGD110000R0001 STATOR FRAME _E - 2015-04-21 13/07/2015 GRR-CXE-MET-15-022-L

P000315038_- 2120 - ROTOR SPIDER ARMS_- 2015-05-05 13/07/2015 GRR-CXE-MET-15-022-L

2131 - HGGD213100R0001 SET OF ROTOR COUPLING


P000274023_A 13/07/2015 GRR-CXE-MET-15-022-L
BOLTS_A_2013-12-10

P000266436_F 2200 - ROTOR RIM COMPLETE_F- 2015-05-06 13/07/2015 GRR-CXE-MET-15-022-L

2410 - HGGD241000R0001 BRAKING TRACK AND ROTOR


P000270619_A 13/07/2015 GRR-CXE-MET-15-022-L
BALANCING_A_2014-04-02

P000273473_C 3110 - UPPER BRACKET ARMS - rev.C - 2015-05-07 13/07/2015 GRR-CXE-MET-15-022-L

P000281234_A 4410 - HGGD44100R0001 UPPER FLOOR ASSEMBLY_A_2014-06-24 13/07/2015 GRR-CXE-MET-15-022-L

P000283485_- 4420 - HGGD442000R0001 TOP COVER ASSEMBLY_-_2014-03-18 13/07/2015 GRR-CXE-MET-15-022-L

4820 - HGGD482100R0001 GENERATOR PIT CLOSING_-_2014-02-


P000281240_- 13/07/2015 GRR-CXE-MET-15-022-L
25

5112 - HGGD511200R0001 MAIN COOLING WATER PIPING_-_2014-


P000285457_- 13/07/2015 GRR-CXE-MET-15-022-L
04-04

5121 - HGGD512100R0001 BRAKING AND LIFTING PIPING - rev- -


P000290907_- 13/07/2015 GRR-CXE-MET-15-022-L
2014-06-19

5127 - HGGD512700R0001 JACK OIL LEAK COL PIPE - rev- - 2014-


P000290909_- 13/07/2015 GRR-CXE-MET-15-022-L
06-19

5130 - HGGD513300R0001 UPPER BRACKET OIL AND WATER


P000285399_- 13/07/2015 GRR-CXE-MET-15-022-L
PIPING_-_2014-04-01

5160 - HGGD516000R0001 OIL MIST BRUSH AND BRAKE DUST


P000290910_A 13/07/2015 GRR-CXE-MET-15-022-L
PIPE - revA - 2014-06-19

TURBINE QUALITY DOCUMENTS _


INSPECTION AND TEST PLAN _
20/03/2013 MoM_19-20/2003 Section 5.4 Commented
H-623500MEF00-FS00QT-001 H-6235 00 MEF 00 - FS00 QT -001 A x Inspection and test plan PRE 10/01/2013 08/02/2013 TF/HET/GRR/009 FA
04/08/2014 GERDP-14-462 FI
07/04/2014 GERDP-13-335 RR
H-623500MEF10-PA00QT H-6235 00 MEF 10 - PA00 QT B 4 Inlet - Spiral Case & Stay Ring ITP GFR 17/07/2013 TF/HET/GRR/026 FA 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
06/06/2015 GERDP-JE-DR-14-193-A RE
07/04/2014 GERDP-13-335 RR
H-623500MEF13-SA00QT H-6235 00 MEF 13 - SA00 QT B 4 Inlet - Pit liner ITP GFR 17/07/2013 TF/HET/GRR/026 FA 16/04/2014 GRR-HET-MET-14-015-L No Revision
06/06/2015 GERDP-JE-DR-14-193-A RE
H-623500MEF20-PA00QT H-6235 00 MEF 20 - PA00 QT B 5 x Distributor ITP GFR 10/07/2013 17/07/2013 TF/HET/GRR/026 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
H-623500MEF20-PA00QT H-6235 00 MEF 20 - PA00 QT C 5 Distributor ITP GFR 09/07/2014 19/09/2014 TF/HET/GRR/068 FA 27/01/2015 GERDP-JE-DR-14-282-A RE
H-623500MEF30-PA00QT H-6235 00 MEF 30 - PA00 QT B 4 x Rotor - Runner ITP GFR 10/07/2013 17/07/2013 TF/HET/GRR/026 FA DEEMED APPROVED
H-623500MEF30-PA00QT H-6235 00 MEF 30 - PA00 QT C 4 x Rotor - Welded Runner and Wearing Rings ITP GFR 03/01/2014 20/01/2014 TF/HET/GRR/049 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
GERDP-JE-DR-14-282-A
27/01/2015
H-623500MEF30-PA00QT H-6235 00 MEF 30 - PA00 QT D 4 Rotor - Welded Runner and Wearing Rings ITP GFR 04/09/2014 19/09/2014 TF/HET/GRR/068 FA GERDP-JE-DR-14-193-A RE
06/06/2015
H-623500MEF31-SA00QT H-6235 00 MEF 31 - SA00 QT B 4 x Rotor - Shaft & Bolts - ITP GFR 10/07/2013 17/07/2013 TF/HET/GRR/026 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
07/04/2014 GERDP-13-335 RR
H-623500MEF31-SA00QT H-6235 00 MEF 31 - SA00 QT C 4 Rotor - Shaft & Bolts - ITP GFR 17/07/2014 19/09/2014 TF/HET/GRR/068 FA 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
27/01/2015 GERDP-JE-DR-14-282-A RE
H-623500MEF41-SA00QT H-6235 00 MEF 41 - SA00 QT B 4 x Guide Bearing ITP GFR 10/07/2013 17/07/2013 TF/HET/GRR/026 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
27/01/2015 GERDP-JE-DR-14-282-A
H-623500MEF41-SA00QT H-6235 00 MEF 41 - SA00 QT C 4 Guide Bearing ITP GFR 04/09/2014 19/09/2014 TF/HET/GRR/068 FA RE
06/06/2015 GERDP-JE-DR-14-193-A

07/04/2014 GERDP-13-335 RR
H-623500MEF46-SA00QT H-6235 00 MEF 46 - SA00 QT B 4 Shaft Seal ITP GFR 17/07/2013 TF/HET/GRR/026 FA 16/04/2014 GRR-HET-MET-14-015-L No Revision
06/06/2015 GERDP-JE-DR-14-193-A RE
H-623500MEF50-FS00QT H-6235 00 MEF 50 - FS00 QT B 4 x Draft tube ITP GFR 06/06/2013 13/06/2013 TF/HET/GRR/020 FA DEEMED APPROVED
H-623500MEF50-PA00QT H-6235 00 MEF 50 - PA00 QT C 4 x Draft tube ITP GFR 17/07/2013 TF/HET/GRR/026 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
27/01/2015 GERDP-JE-DR-14-282-A
H-623500MEF50-PA00QT H-6235 00 MEF 50 - PA00 QT D 4 Draft tube ITP GFR 09/07/2014 19/09/2014 TF/HET/GRR/068 FA RE
06/06/2015 GERDP-JE-DR-14-193-A
H-623500MEU00-FS00QT H-6235 00 MEU 00 - FS00 QT B 4 Governing ITP GFR 17/07/2013 TF/HET/GRR/026 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L No Revision
H-623500MEE00-FS00QT H-6235 00 MEE 00 - FS00 QT B 4 x Thrust Bearing ITP GFR 10/07/2013 17/07/2013 TF/HET/GRR/026 FA 07/04/2014 GERDP-13-335 RR 16/04/2014 GRR-HET-MET-14-015-L Revision of drawing
27/01/2015 GERDP-JE-DR-14-282-A
H-623500MEF43-SA00QT H-6235 00 MEF 43 - SA00 QT C 4 Thrust Bearing ITP GFR 04/09/2014 19/09/2014 TF/HET/GRR/068 FA RE
06/06/2015 GERDP-JE-DR-14-193-A
PA 30 - ROTOR _
H-623500MEF31-200FQW H-6235 00 MEF 31 - 200F QW A 5 Coupling Bolts shaft proc manuf QWP GFE 04/06/2013 16/09/2013 TF/HET/GRR/032 FI 07/04/2014 GERDP-13-423 RR
H-623500MEF39-803RQS H-6235 00 MEF 39 - 803R QS A Runner Blade QS early generation GFE 15/04/2013 19/09/2014 GRR-HET-MET-14-036-L 09/02/2015 GERDP-JE-DR-14-296-A RE
H-623500MEF32-200FQW H-6235 00 MEF 32 - 200F QW A 5 Coupling bolts runner proc manuf QWP early generation GFE 22/07/2013 16/09/2013 TF/HET/GRR/032 FI 07/04/2014 GERDP-13-423 RR
H-623500MEF32-201MQS H-6235 00 MEF 32 - 201M QS B Welded Runner QS early generation GFE 19/05/2014 28/05/2014 TF/HET/GRR/063 FI ---

05/09/2016 2 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

PA 70 - PIPING _
H-623500MEF78-200FQW H-6235 00 MEF 78 - 200F QW A 3 Embedded pipes procurement QWP GFE 11/04/2013 12/04/2013 TF/HET/GRR/015 FI 19/12/2014 GERDP-JE-DR-14-251-A RE
H-623500MEF78-200MQW H-6235 00 MEF 78 - 200M QW A 3 Embedded pipes manufacturing QWP GFE 11/04/2013 12/04/2013 TF/HET/GRR/015 FI 19/12/2014 GERDP-JE-DR-14-251-A RE
H-623500MEF86-SA0FQW H-6235 00 MEF 86 - SA0F QW Lifting tool for PA 60 proc manuf QWP GFE 27/05/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
QUALITY DATABOOK _
H-623509MEF11-201FQC001 H-6235 09 MEF 11 - 201F QC 001 A 99 STAY RING #9 ABD ASB 16/10/2015 30/10/2015 TF/HET/GRR/110 ASB 07/12/2015 GERDP-JE-DR-15-266-RA FI
H-623510MEF11-201FQC001 H-6235 10 MEF 11 - 201F QC 001 A 114 STAY RING #10 ABD ASB 27/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623509MEF12-SA0FQC001 H-6235 09 MEF 12 - SA0F QC 001 A 162 Spiral Case #9 ABD ASB 04/02/2015 02/03/2015 TF/HET/GRR/092 ASB 18/09/2015 GERDP-JE-DR-15-084-A FI
H-623510MEF12-SA0FQC001 H-6235 10 MEF 12 - SA0F QC 001 A 170 Spiral Case #10 ABD ASB 06/02/2015 02/03/2015 TF/HET/GRR/092 ASB 18/09/2015 GERDP-JE-DR-15-084-A FI
H-623509MEF13-201FQC001 H-6235 09 MEF 13 - 201F QC 001 A Pit Liner #9 ABD ASB 22/01/2015 29/01/2015 TF/HET/GRR/086 FI
H-623510MEF13-201FQC001 H-6235 10 MEF 13 - 201F QC 001 A Pit Liner #10 ABD ASB 29/01/2015 TF/HET/GRR/086 FI
H-623500MEU14-SA0FQC001 H-6235 00 MEU 14 - SA0F QC 001 A 33 Governing Cubicle Manufacturing Data Book Unit 09 & 10 ASB 27/01/2015 29/01/2015 TF/HET/GRR/086 FI
H-623510MEF21-201FQC001 H-6235 10 MEF 21 - 201F QC 001 A 118 HEAD COVER #10 ABD ASB 26/04/2016 27/06/2016 TF/HET/GRR/120 ASB 09/08/2016 GERDP-JE-DR-16-111-A FI
H-623500MEF21-202FQC001 H-6235 00 MEF 21 - 202F QC 001 A 27 Upper Wearing Plate Manufacturing Quality Data Book-Unit 09 &10 ASB 27/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623509MEF21-SA0FQC001 H-6235 09 MEF 21 - SA0F QC 001 A 88 Head Cover – Wearing Ring Manufacturing Quality Data Book-Unit 09 ASB 02/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623500MEF22-202FQC001 H-6235 00 MEF 22 - 202F QC 001 A 27 Lower Wearing Plate Manufacturing Quality Data Book-Unit 09 &10 ASB 27/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623509MEF22-201FQC001 H-6235 09 MEF 22 - 201F QC 001 A 58 Bottom Ring Manufacturing Quality Data Book-Unit 09 ASB 10/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623510MEF22-201FQC001 H-6235 10 MEF 22 - 201F QC 001 A 100 Bottom Ring Manufacturing Quality Data Book-Unit 10 ASB 26/04/2016 27/06/2016 TF/HET/GRR/120 ASB 09/08/2016 GERDP-JE-DR-16-111-A FI
H-623509MEF24-201FQC001 H-6235 09 MEF 24 - 201F QC 001 A 695 Wicket Gates Manufacturing Quality Data Book-Unit 09 ASB 06/01/2016 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623509MEF25-201FQC001 H-6235 09 MEF 25 - 201F QC 001 A 65 Operating Ring Quality Data Book-Unit 09 ASB 30/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-049-A FI
H-623510MEF25-201FQC001 H-6235 10 MEF 25 - 201F QC 001 A 63 Operating Ring Quality Data Book-Unit 10 ASB 26/04/2016 27/06/2016 TF/HET/GRR/120 ASB 09/08/2016 GERDP-JE-DR-16-111-A FI
H-623509MEF31-201FQC001 H-6235 09 MEF 31 - 201F QC 001 A Turbine Shaft Customer Quality Data Book Unit 09 ASB 04/06/2015 16/07/2015 TF/HET/GRR/101 FI 07/08/2015 GERDP-JE-DR-15-150-A FI
H-623510MEF31-201FQC001 H-6235 10 MEF 31 - 201F QC 001 A 66 Turbine Shaft Customer Quality Data Book Unit 10 ASB 09/09/2015 24/09/2015 TF/HET/GRR/105 FI 05/11/2015 GERDP-JE-DR-15-216-A FI
H-623510MEF31-201FQE001 H-6235 10 MEF 31 - 201F QE 001 A 20 Turbine Shaft Final inspection After repair Unit 10 24/03/2016 04/04/2016 GRR-HET-MET-16-017-L FI

H-623510MEF32-SA00QC001 H-6235 10 MEF 32 - SA00 QC 001 A Early Generation Runner Customer Quality Data Book Unit 10 ASB 28/05/2015 16/07/2015 TF/HET/GRR/101 FI 07/08/2015 GERDP-JE-DR-15-150-A FI

H-623510MEF39-801FQC-001 H-6235 10 MEF 39 - 801F QC 001 A 30 Runner Band #10 - PA39_801 As-Built Data Book ASB 20/03/2014 20/05/2014 TF-HET-GRR-061 18/08/2014 GERDP-JE-DR-14-209-A RN 22/09/2014 GRR-HET-MET-14-036-L No revision of drawing
H-623510MEF39-802FQC-001 H-6235 10 MEF 39 - 802F QC 001 A 33 Runner Crown #10 - PA39_802 As-Built Data Book ASB 20/03/2014 20/05/2014 TF-HET-GRR-061
H-623510MEF39-803FQC-001 H-6235 10 MEF 39 - 803F QC -001 A 375 Early Generation Blades Manufacturing Quality Data Book - Unit 10 ASB 07/11/2014 10/12/2014 TF/HET/GRR/081 FI
H-623509MEF39-802FQC001 H-6235 09 MEF 39 - 802F QC 001 A 28 Runner Band #9 - PA39_801 As-Built Data Book ASB 30/09/2014 30/10/2014 TF/HET/GRR/073 FI ---
H-623509MEF39-801FQC001 H-6235 09 MEF 39 - 801F QC 001 A 27 Runner Crown #9 - PA39_802 As-Built Data Book ASB 30/09/2014 30/10/2014 TF/HET/GRR/073 FI RN GERDP-JE-DR-14-209-A --- 22/09/2014 GRR-HET-MET-14-036-L No revision of drawing
H-623509MEF39-803FQC001 H-6235 09 MEF 39 - 803F QC 001 A 115 Runner Blades #9 - PA39_803 As-Built Data Book ASB 13/10/2014 30/10/2014 TF/HET/GRR/073 FI 05/11/2015 GERDP-JE-DR-15-214-A FI
H-623510MEF39-805FQC001 H-6235 10 MEF 39 - 805F QC 001 A Early Generation Runner Tip Customer Quality Data Book Unit 10 ASB 28/05/2015 16/07/2015 TF/HET/GRR/101 FI 07/08/2015 GERDP-JE-DR-15-150-A FI
H-623509MEF39-805FQC001 H-6235 09 MEF 39 - 805F QC 001 A Early Generation Runner Tip Customer Quality Data Book Unit 09 ASB 15/07/2015 13/10/2015 TF/HET/GRR/107 ASB
H-623508MEF39-812FQC001 H-6235 08 MEF 39 - 812F QC 001 A 10 Runner Band #8 Customer Quality Data Book ASB 20/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-050-A FI
H-623508MEF39-811FQC001 H-6235 08 MEF 39 - 811F QC 001 A 10 Runner Crown #8 Customer Quality Data Book ASB 20/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-050-A FI
H-623508MEF39-813FQC001 H-6235 08 MEF 39 - 813F QC 001 A 73 Runner Blades #8 Customer Quality Data Book ASB 20/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-050-A FI
H-623507MEF39-812FQC001 H-6235 07 MEF 39 - 812F QC 001 A 10 Runner Band #7 Customer Quality Data Book ASB 20/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-050-A FI
H-623507MEF39-811FQC001 H-6235 07 MEF 39 - 811F QC 001 A 10 Runner Crown #7 Customer Quality Data Book ASB 20/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-050-A FI
H-623507MEF39-813FQC001 H-6235 07 MEF 39 - 813F QC 001 A 73 Runner Blades #7 Customer Quality Data Book ASB 20/11/2015 02/03/2016 TF/HET/GRR/117 ASB 11/05/2016 GERDP-JE-DR-16-050-A FI
H-623509MEF41-SA00QW001 H-6235 09 MEF 41 - SA0F QC 001 A Turbine Guide Bearing Customer Quality Data Book Unit 09 ASB 26/02/2015 16/09/2015 TF/HET/GRR/104 21/10/2015 GERDP-JE-DR-15-211-A FI
H-623510MEF41-SA00QW001 H-6235 10 MEF 41 - SA0F QC 001 A Turbine Guide Bearing Customer Quality Data Book Unit 10 ASB 26/02/2015 16/09/2015 TF/HET/GRR/104 21/10/2015 GERDP-JE-DR-15-211-A FI
H-623509MEF43-SA0FQC001 H-6235 09 MEF 43 - SA0F QC 001 A Thrust Bearing Complete Customer Quality Data Book Unit 09 ASB 19/08/2015 13/10/2015 TF/HET/GRR/107 ASB 05/11/2015 GERDP-JE-DR-15-214-A FI
H-623510MEF43-SA00QC001 H-6235 10 MEF 43 - SA00 QC 001 A Thrust Bearing Complete Customer Quality Data Book Unit 10 ASB 24/08/2015 13/10/2015 TF/HET/GRR/107 ASB 05/11/2015 GERDP-JE-DR-15-214-A FI
H-623509MEF46-SA0FQC001 H-6235 09 MEF 46 - SA0F QC 001 A 106 Shaft Seal Customer Manufacturing Quality Data Book - Unit 09 ASB 26/02/2015 29/01/2015 TF/HET/GRR/092 ASB 18/09/2015 GERDP-JE-DR-15-084-A FI
H-623510MEF46-SA0FQC001 H-6235 10 MEF 46 - SA0F QC 001 A 103 Shaft Seal Customer Manufacturing Quality Data Book - Unit 10 ASB 06/03/2015 16/04/2015 TF/HET/GRR/095 ASB
H-623509MEF51-201FQC001 H-6235 09 MEF 51 - 201F QC 001 A Draft Tube Elbow #9 ABD ASB 15/09/2014 02/10/2014 TF/HET/GRR/069 09/02/2015 GERDP-JE-DR-14-296-A RE
H-623510MEF51-201FQC001 H-6235 10 MEF 51 - 201F QC 001 A Draft Tube Elbow #10 ABD ASB 15/09/2014 02/10/2014 TF/HET/GRR/069 09/02/2015 GERDP-JE-DR-14-296-A RE
H-623500MEF51-203FQC H-6235 00 MEF 51 - 203F QC A 46 Pier Nose #9 #10 – PA51_203/210 As-Built Data Book ASB 16/07/2013 06/08/2013 TF/HET/GRR/027 FI ---
H-623500MEF51-203FQC H-6235 00 MEF 51 - 209F QC A 48 Drain Box #9 #10 - PA51_209 As-Built Data Book ASB 31/01/2014 24/02/2014 TF/HET/GRR/054 FI 04/08/2014 GERDP-14-462 FI
H-623509MEF52-SA0FQC001 H-6235 09 MEF 52 - SA0F QC 001 A 114 Draft Tube Cone #9 ABD (including manhole door) ASB 12/02/2015 02/03/2015 TF/HET/GRR/092 ASB 18/09/2015 GERDP-JE-DR-15-084-A FI
H-623510MEF52-SA0FQC001 H-6235 10 MEF 52 - SA0F QC 001 A 113 Draft Tube Cone #10 ABD (including manhole door) ASB 17/02/2015 02/03/2015 TF/HET/GRR/092 ASB 18/09/2015 GERDP-JE-DR-15-084-A FI
H-623509MEF61-SA0FQC001 H-6235 09 MEF 61 - SA0F QC 001 A 76 SERVO MOTOR - Quality Data Book - Unit 09 ASB 19/05/2015 16/10/2015 TF/HET/GRR/108 ASB 05/11/2015 GERDP-JE-DR-15-214-A FI
H-623510MEF61-SA0FQC001 H-6235 10 MEF 61 - SA0F QC 001 A 76 SERVO MOTOR - Quality Data Book - Unit 10 ASB 19/05/2015 16/10/2015 TF/HET/GRR/108 ASB 05/11/2015 GERDP-JE-DR-15-214-A FI

H-623509MEF39-803RDD001 H-6235 09 MEF 39 - 803R DD 001 A x Excavation report blade 15 GFE 06/01/2014 22/01/2014 GRR-HET-MET-14-059-T 04/08/2014 GERDP-14-463 FI

H-623509MEF39-803RDD002 H-6235 09 MEF 39 - 803R DD 002 A x Excavation report blades 5,13,14 GFE 29/01/2014 06/03/2014 GRR-HET-MET-14-006-T 25/12/2014 GERDP-JE-DR-14-246-A RN

H-623510MEF39-803RDD001 H-6235 10 MEF 39 - 803R DD 001 A x Unit 10 Early Generation Excavation Report GFE 09/06/2014 10/06/2014 GRR-HET-MET-14-024-T 01/12/2014 GERDP-JE-DR-14-229-A RR 08/12/2014 GRR-HET-MET-14-061-T H-623510MEF39-803RDD001 rev B

H-623510MEF39-803RDD001 H-6235 10 MEF 39 - 803R DD 001 B 99 Unit 10 Early Generation Excavation & Repair Report GFE 03/12/2014 08/12/2014 TF/HET/GRR/080 09/02/2015 GERDP-JE-DR-15-030-A RE

H-623500MEF39-813RDD001 H-6235 00 MEF 39 - 813R DD 001 A 103 Excavation Reports 2, 5, 6, 7, 8, 10 GFE 08/10/2015 12/10/2015 TF/HET/GRR/106 18/11/2015 GERDP-JE-DR-15-215-A
FI
H-623500MEF39-813RDD002 H-6235 00 MEF 39 - 813R DD 002 A 98 Excavation Reports 12, 13, 14 GFE 15/10/2015 18/01/2016 TF/HET/GRR/115

Signed during Inspection


H-623509MEF20-PA00QE-001 H-6235 09 MEF 20 - PA00 QE -001 A Distributor Workshop assembly Inspection report U9 GFE 13/02/2015 13/02/2015 FI
(including METEC)

H-623510MEF20-PA00QE-001 H-6235 10 MEF 20 - PA00 QE -001 A Distributor Workshop assembly Inspection report U10 GFE 18/08/2015 01/09/2015 TF/HET/GRR/102 21/10/2015 GERDP-JE-DR-15-211-A RE

H-623509MEF31-201FQE-001 H-6235 09 MEF 31 - 201F QE -001 A Turbine Shaft Final Inspection Report on Horizonthal Lathe GFE 09/12/2014 09/12/2014 Signed during Inspection FI

H-623510MEF32-201FQE-001 H-6235 10 MEF 32 - 201F QE -001 A Welded Runner Final Inspection Report on Horizonthal Lathe GFE 19/12/2014 19/12/2014 Signed during Inspection FI
H-623509MEF32-201FQE-001 H-6235 09 MEF 32 - 201F QE -001 A 25 Welded Runner Final Inspection Report on Horizonthal Lathe - Unit 09 GFE 18/05/2016 14/06/2016 TF/HET/GRR/119 FI 16/08/2016 GERDP-JE-DR-16-098-A RE

H-623509MEF32-201FQE-002 H-6235 09 MEF 32 - 201F QE -002 A 78 Runner Final Inspection Report of step 2 – Unit 09 GFE 08/06/2016 14/06/2016 TF/HET/GRR/119 FI 16/08/2016 GERDP-JE-DR-16-098-A RE

H-623506MEF39-810RQE-001 H-6235 06 MEF 39 - 810R QE -001 A 18 Runner Crown Band Casting Inspection Report – Unit 06 GFE 17/02/2016 14/06/2016 TF/HET/GRR/119 FI 16/08/2016 GERDP-JE-DR-16-098-A RE

H-623508MEF39-813RQE-001 H-6235 08 MEF 39 - 813R QE -001 A Runner Blade Casting Inspection Report U8 GFE 20/08/2015 01/09/2015 TF/HET/GRR/102 21/10/2015 GERDP-JE-DR-15-211-A RE
Final Inspection - Draft tube elbow workshop assembly Report - Units 9
H-623500MEF51-201FQM001 H-6235 00 MEF 51 - 201F QM 001 A GFE 27/03/2014 27/03/2014 Signed during Inspection FI
& 10
H-623506MEF39-813RQE-001 H-6235 06 MEF 39 - 813R QE -001 A Runner Blade Casting Inspection Report U6 GFE 29/12/2015 14/01/2016 TF/HET/GRR/114 FI
MEF - TURBINE _

FS00 - GENERAL DOCUMENTS _


CIVIL WORKS DRAWINGS _
H-623500MEF00-FS00LC-001 H-6235 00 MEF 00 - FS00 LC -001 A x Generalities - Load on Concrete Structure 10/08/2012 TF/HET/GRR/001 FA 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing

05/09/2016 3 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-623500MEF00-FS00LC-001 H-6235 00 MEF 00 - FS00 LC -001 A x Generalities - Load on Concrete Structure 25/03/2013 TF/COO/GRR/005_DHL FA
H-623500MEF00-FS00LC-001 H-6235 00 MEF 00 - FS00 LC -001 B 1 x Generalities - Load on Concrete Structure GFR 14/06/2013 18/06/2013 TF/HET/GRR/021 FA 02/12/2013 GERDP-13-433 RR 20/12/2013 GRR-HET-MET-13-058-L No revision of drawing
H-623500MEF00-FS00LC-001 H-6235 00 MEF 00 - FS00 LC -001 C 1 Generalities - Load on Concrete Structure GFR 04/11/2013 04/12/2013 TF/HET/GRR/043 FA 08/07/2015 GERDP-JE-DR-14-014-A RR
H-623500MEF00-FS00LC-005 H-6235 00 MEF 00 - FS00 LC -005 A x Civil works - first concrete step - front view 29/10/2012 TF/HET/GRR/004 FA 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
H-623500MEF00-FS00LC-005 H-6235 00 MEF 00 - FS00 LC -005 B 1 x Civil works - first concrete step - front view GFR 05/02/2013 22/02/2013 TF/HET/GRR/011 FA DEEMED APPROVED
H-623500MEF00-FS00LC-005 H-6235 00 MEF 00 - FS00 LC -005 B 1 x Civil works - first concrete step - front view GFR 05/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEF00-FS00LC-005 H-6235 00 MEF 00 - FS00 LC -005 C 1 Civil works - first concrete step - front view GFE 27/02/2014 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF00-FS00LC-006 H-6235 00 MEF 00 - FS00 LC -006 A x Civil works - first concrete step - top view 29/10/2012 TF/HET/GRR/004 FA 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
H-623500MEF00-FS00LC-006 H-6235 00 MEF 00 - FS00 LC -006 B 1 x Civil works - first concrete step - top view GFR 05/02/2013 22/02/2013 TF/HET/GRR/011 FA DEEMED APPROVED
H-623500MEF00-FS00LC-006 H-6235 00 MEF 00 - FS00 LC -006 B 1 x Civil works - first concrete step - top view GFR 05/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEF00-FS00LC-006 H-6235 00 MEF 00 - FS00 LC -006 C 1 x Civil works - first concrete step - top view GFR 22/04/2013 13/06/2013 TF/HET/GRR/020 FA DEEMED APPROVED
H-623500MEF00-FS00LC-006 H-6235 00 MEF 00 - FS00 LC -006 D 1 Civil works - first concrete step - top view GFE 28/02/2014 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF00-FS00LC-007 H-6235 00 MEF 00 - FS00 LC -007 A x Civil works-2nd concrete step -Drain box & Pier Noze 09/11/2012 TF/HET/GRR/005 FA 22/11/2012 UHP_HMD-2181 Commented 28/11/2013 GRR-HET-MET-12-011-T Revision of drawing
H-623500MEF00-FS00LC-007 H-6235 00 MEF 00 - FS00 LC -007 B 3 x Civil works-2nd concrete step -Drain box & Pier Noze 22/11/2012 TF/HET/GRR/007 FA DEEMED APPROVED
H-623500MEF00-FS00LC-007 H-6235 00 MEF 00 - FS00 LC -007 C 3 x Civil works-2nd concrete step -Installation of Drain box & Pier Noze GFR 05/02/2013 22/02/2013 TF/HET/GRR/011 FA DEEMED APPROVED
H-623500MEF00-FS00LC-007 H-6235 00 MEF 00 - FS00 LC -007 C 3 x Civil works-2nd concrete step -Installation of Drain box & Pier Noze GFR 05/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEF00-FS00LC-007 H-6235 00 MEF 00 - FS00 LC -007 D 3 X Civil works-2nd concrete step -Installation of Drain box & Pier Noze GFR 17/04/2013 13/06/2013 TF/HET/GRR/020 FA DEEMED APPROVED
H-623500MEF00-FS00LC-007 H-6235 00 MEF 00 - FS00 LC -007 E 4 Civil works-2nd concrete step -Installation of Drain box & Pier Noze GFE 26/02/2014 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF00-FS00LC-008 H-6235 00 MEF 00 - FS00 LC -008 A 1 x Civil works - 3rd concrete step - Front View 22/11/2012 TF/HET/GRR/007 FA DEEMED APPROVED
H-623500MEF00-FS00LC-008 H-6235 00 MEF 00 - FS00 LC -008 B 1 x Civil works - 3rd concrete step GFR 11/02/2013 22/02/2013 TF/HET/GRR/011 FA DEEMED APPROVED
H-623500MEF00-FS00LC-008 H-6235 00 MEF 00 - FS00 LC -008 B 1 x Civil works - 3rd concrete step GFR 11/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEF00-FS00LC-008 H-6235 00 MEF 00 - FS00 LC -008 C 1 x Civil works - 3rd concrete step GFR 17/05/2013 13/06/2013 TF/HET/GRR/020 FA DEEMED APPROVED
H-623500MEF00-FS00LC-008 H-6235 00 MEF 00 - FS00 LC -008 D 2 Civil works - 3rd concrete step GFE 27/02/2014 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF00-FS00LC-009 H-6235 00 MEF 00 - FS00 LC -009 A 2 x Civil works-4rd concrete step GFR 12/02/2013 22/02/2013 TF/HET/GRR/011 FA DEEMED APPROVED
H-623500MEF00-FS00LC-009 H-6235 00 MEF 00 - FS00 LC -009 A 2 x Civil works-4rd concrete step GFR 12/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEF00-FS00LC-009 H-6235 00 MEF 00 - FS00 LC -009 B 2 X Civil works-4rd concrete step GFR 22/04/2013 13/06/2013 TF/HET/GRR/020 FA DEEMED APPROVED
H-623500MEF00-FS00LC-009 H-6235 00 MEF 00 - FS00 LC -009 C 2 Civil works-4rd concrete step GFE 17/06/2013 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF00-FS00LC-010 H-6235 00 MEF 00 - FS00 LC -010 A 3 x Civil works-5th concrete step GFR 13/02/2013 22/02/2013 TF/HET/GRR/011 FA DEEMED APPROVED
H-623500MEF00-FS00LC-010 H-6235 00 MEF 00 - FS00 LC -010 A 3 x Civil works-5th concrete step GFR 13/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
H-623500MEF00-FS00LC-010 H-6235 00 MEF 00 - FS00 LC -010 B 3 x Civil works-5th concrete step GFR 08/03/2013 08/04/2013 TF/HET/GRR/014 FA DEEMED APPROVED
H-623500MEF00-FS00LC-010 H-6235 00 MEF 00 - FS00 LC -010 C 3 x Civil works-5th concrete step GFR 23/04/2013 13/06/2013 TF/HET/GRR/020 FA DEEMED APPROVED
H-623500MEF00-FS00LC-010 H-6235 00 MEF 00 - FS00 LC -010 D 4 Civil works-5th concrete step GFE 27/02/2014 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
Can be considered as
H-623500MEF00-FS00LC-011 H-6235 00 MEF 00 - FS00 LC -011 A 4 x Civil works-6th concrete step PRE 27/02/2013 01/03/2013 TF/HET/GRR/012 FA 22/12/2013 GERDP-13-247
approved
H-623500MEF00-FS00LC-011 H-6235 00 MEF 00 - FS00 LC -011 A 4 x Civil works-6th concrete step PRE 27/02/2013 25/03/2013 TF/COO/GRR/005_DHL FA
H-623500MEF00-FS00LC-011 H-6235 00 MEF 00 - FS00 LC -011 B 4 x Civil works-6th concrete step GFR 27/05/2013 13/06/2013 TF/HET/GRR/020 FA 16/09/2013 Salini_P5000-05.25-537_18 July 13 Commented
H-623500MEF00-FS00LC-011 H-6235 00 MEF 00 - FS00 LC -011 C 4 x Civil works-6th concrete step GFE 03/03/2014 17/06/2014 TF/HET/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF00-FS00LC-011 H-6235 00 MEF 00 - FS00 LC -011 D 4 Civil works-6th concrete step GFE 08/08/2014 05/01/2015 TF/HET/GRR/082 FI
TECHNICAL SPECIFICATIONS _
MoM_16-17/01/2013 Section 1
ETOF-GEN-012-0067 ETOF-GEN-012-0067 2 x Turbine Addendum Early Generation Period 04/02/2013 GRR-COO-MET-13-003L FI 18/01/2013 AN
GRR-MET-ALS-13-001-L
ETOF-GEN-012-0067 ETOF-GEN-012-0067 3 Turbine Addendum Early Generation Period 25/01/2013 Sent via Email FI ---
H-623500MEF00-FS00EC001 H-6235 00 MEF 00 - FS00 EC 001 A 31 x Painting Specification GFR 04/03/2013 24/06/2013 TF/HET/GRR/023 FA 13/08/2013 GERDP-13-279 AN 11/12/2013 GRR-COO-MET-13-065-T Revision of drawing
H-623500MEF00-FS00EC001 H-6235 00 MEF 00 - FS00 EC 001 C 81 x Painting Specification GFE 09/12/2013 11/12/2013 TF/COO/GRR/007 FI 27/05/2014 GERDP-14-292 RN 03/11/2014 GRR-COO-MET-14-076-T Update of document
27/01/2105 GERDP-JE-DR-14-312-A RE
H-623500MEF00-FS00EC001 H-6235 00 MEF 00 - FS00 EC 001 D 81 Painting Specification GFE 14/10/2014 03/11/2014 TF/COO/GRR/012 FI
09/02/2015 GERDP-JE-DR-14-311-A FI
H-623500MEF00-FS00EC002 H-6235 00 MEF 00 - FS00 EC 002 A 15 Pipe specification GFE 04/04/2013 08/04/2013 TF/HET/GRR/014 FI ---
INDUSTRIALIZATION DOCUMENTS FROM R&D _
H-623500MEF00-FS00BB001 H-6235 00 MEF 00 - FS00 BB 001 A 683 Model Test Final Report 29/07/2013 09/09/2013 TF/HET/GRR/030 FA DEEMED APPROVED
H-623500MEF00-FS00BB001 H-6235 00 MEF 00 - FS00 BB 001 A 683 Model Test Final Report 29/07/2013 17/09/2013 TF/HET/GRR/033_DHL FA DEEMED APPROVED
H-623500MEF00-FS00BB001 H-6235 00 MEF 00 - FS00 BB 001 A 683 Model Test Final Report 29/07/2013 26/09/2014 TF/COO/GRR/014_DHL FA DEEMED APPROVED
H-623500MEF00-FS00BB002 H-6235 00 MEF 00 - FS00 BB 002 A 29 CFD report for Early Generation Runner 31/07/2013 04/09/2013 TF/HET/GRR/029 FI 10/02/2014 GERDP-14-052 RN 31/03/2014 GRR-HET-MET-14-011-L Update of document
Model Test Procedure - Preliminary Tests and acceptance Tests
EHESC13051 H-6235 00 MEF 00 - FS00 DB 001 A 11 GFE 14/06/2013 17/06/2013 Sent via Email FA 22/07/2013 GERDP-13-255 AN
Program
H-623500MEF00-FS00BE001 H-6235 00 MEF 00 - FS00 BE 001 A 11 Preliminary tests and acceptance tests program GFE 14/06/2013 18/06/2013 TF/HET/GRR/022 FI ---
CALCULATION DOCUMENTS _
H-623500MEF00-FS00ED-001 H-6235 00 MEF 00 - FS00 ED -001 A x Loads on Concrete Calculation 10/08/2012 TF/HET/GRR/001 FA 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
H-623500MEF00-FS00ED-001 H-6235 00 MEF 00 - FS00 ED -001 B 17 x Loads on Concrete Calculation GFR 04/06/2013 18/06/2013 TF/HET/GRR/021 FA 02/12/2013 GERDP-13-433 RR 20/12/2013 GRR-HET-MET-13-058-L No revision of drawing
H-623500MEF00-FS00ED-001 H-6235 00 MEF 00 - FS00 ED -001 C 17 Loads on Concrete Calculation GFR 04/11/2013 04/12/2013 TF/HET/GRR/043 FA 08/07/2015 GERDP-JE-DR-14-014-A RR
H-623500MEF00-FS00ED-003 H-6235 00 MEF 00 - FS00 ED -003 A x Transient calculation 29/10/2012 TF/HET/GRR/004 FA DEEMED APPROVED
H-623500MEF00-FS00ED-003 H-6235 00 MEF 00 - FS00 ED -003 C 9 x Transient calculation GFR 07/10/2013 20/11/2013 TF/HET/GRR/039 FA DEEMED APPROVED
H-623500MEF00-FS00ED-003 H-6235 00 MEF 00 - FS00 ED -003 D 9 Transient calculation GFR 13/01/2014 28/05/2014 TF/HET/GRR/063 FA 18/08/2014 GERDP-14-495 RE
H-623500MEF10-PA10ED-001 H-6235 00 MEF 10 - PA10 ED -001 A 11 Stay ring and spiral case calculation GFR 08/04/2013 12/04/2013 TF/HET/GRR/015 FA 22/06/2013 GERDP-13-210 RC 02/07/2013 GRR-HET-MET-13-031-L No revision of drawing
H-623500MEF10-PA10ED-002 H-6235 00 MEF 10 - PA10 ED -002 A 5 Stay vane – Natural frequencies and Karman Vortices GFR 22/04/2013 26/04/2013 TF/HET/GRR/016 FA 22/06/2013 GERDP-13-210 AP
H-623500MEF10-PA10QD-001 H-6235 00 MEF 10 - PA10 QD -001 B 5 INSPECTION PROCEDURE SPIRAL CASE SHELL GFE 08/07/2014 23/02/2015 TF/HET/GRR/089 FI 18/09/2015 GERDP-JE-DR-15-069-A RE 06/10/2015 GRR-HET-MET-15-077-L
H-623500MEF10-PA10QD-002 H-6235 00 MEF 10 - PA10 QD -002 B 36 INSPECTION SHEETS SPIRAL CASE SHELL GFE 08/07/2014 23/02/2015 TF/HET/GRR/089 FI 18/09/2015 GERDP-JE-DR-15-069-A RE 06/10/2015 GRR-HET-MET-15-077-L
H-623500MEF10-PA10ED-003 H-6235 00 MEF 10 - PA10 ED -003 A 5 Spiral case : analytic calculation buckling GFE 27/09/2013 02/10/2013 TF/HET/GRR/034 FI ---
H-623500MEF20-PA20ED-001 H-6235 00 MEF 20 - PA20 ED -001 A 30 Distributor calculation GFR 21/06/2013 24/06/2013 TF/HET/GRR/023 FA 04/08/2014 GERDP-14-462 RE
No revision of drawing
H-623500MEF50-PA50ED-001 H-6235 00 MEF 50 - PA50 ED -001 A 19 Draft tube - analytic calculation GFR 05/04/2013 12/04/2013 TF/HET/GRR/015 FA 22/06/2013 GERDP-13-212 RC 02/07/2013 GRR-HET-MET-13-032-L
04/08/2014 GERDP-14-462 in RE status

No revision of drawing
H-623500MEF50-PA50ED-002 H-6235 00 MEF 50 - PA50 ED -002 A 13 Draft tube cone FE analysis GFR 05/04/2013 12/04/2013 TF/HET/GRR/015 FA 22/06/2013 GERDP-13-212 RC 02/07/2013 GRR-HET-MET-13-032-L
04/08/2014 GERDP-14-462 in RE status
24/07/2013 MoM_2013-07-24_Point1 AP
H-623500MEF30-PA30ED-001 H-6235 00 MEF 30 - PA30 ED -001 A 29 Runner static stress GFR 16/04/2013 07/06/2013 TF/HET/GRR/018 FA 16/10/2014 GRR-HET-MET-14-039-L
04/08/2014 GERDP-14-462 RN
24/07/2013 MoM_2013-07-24_Point1 AP
H-623500MEF30-PA30ED-002 H-6235 00 MEF 30 - PA30 ED -002 A 11 Runner local stress analysis GFR 16/04/2013 07/06/2013 TF/HET/GRR/018 FA
04/08/2014 GERDP-14-462 RE
24/07/2013 MoM_2013-07-24_Point1 AP
H-623500MEF30-PA30ED-003 H-6235 00 MEF 30 - PA30 ED -003 A 18 Runner fatigue calculation GFR 16/04/2013 07/06/2013 TF/HET/GRR/018 FA
04/08/2014 GERDP-14-462 RE
H-623500MEF30-PA30ED-004 H-6235 00 MEF 30 - PA30 ED -004 A 24 Runner welding optimization GFR 31/05/2013 07/06/2013 TF/HET/GRR/018 FA 24/07/2013 MoM_2013-07-24_Point1 AP
H-623500MEF30-PA30ED-005 H-6235 00 MEF 30 - PA30 ED -005 A 6 x Shaft line calculation GFR 08/09/2014 13/10/2014 TF/HET/GRR/070 FI 25/12/2014 GERDP-JE-DR-14-292-A RR
H-623500MEF30-PA30ED-005 H-6235 00 MEF 30 - PA30 ED -005 B 6 Shaft line calculation GFR 10/02/2015 25/02/2015 TF/HET/GRR/090 FI
ASSEMBLY DRAWINGS _
H-623500MEF00-PA00TL-001 H-6235 00 MEF 00 - PA00 TL -001 A Turbine cross section GFE 07/11/2013 17/12/2013 TF/HET/GRR/045 FA 01/05/2014 GERDP-14-246 RE
H-623500MEF00-PA00TL-001 H-6235 00 MEF 00 - PA00 TL -001 A Turbine cross section GFE 07/11/2013 20/12/2013 TF/HET/GRR/046_DHL FA 01/05/2014 GERDP-14-246 RE
H-623500MEF00-PA00TL-001 H-6235 00 MEF 00 - PA00 TL -001 A Turbine cross section GFE 07/11/2013 02/12/2014 TF/COO/GRR/015_DHL FI
PA01 - GENERAL MATERIAL FOR FUNCTIONAL SYSTEM _
H-623500MEF02-PA00PB001 H-6235 00 MEF 02 - PA00 PB 001 A List of Spare Parts Turbine 17/01/2013 MoM_16-17/01/2013_attachment FA DEEMED APPROVED 02/07/2013 GRR-HET-MET-13-030-L Reminder for response
PA10 - INLET _
ASSEMBLY DRAWING _

05/09/2016 4 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

Revision of drawing
10/06/2013 GRR-HET-MET-13-023-L
18/05/2013 GERDP-13-153 RC Interface with penstock is frozen
H-623500MEF10-PA00TL-001 H-6235 00 MEF 10 - PA00 TL -001 A 3 x Spiral case assembly GFE 29/01/2013 15/02/2013 TF/HET/GRR/010 FI 02/07/2013 GRR-HET-MET-13-030-L
22/11/2013 GERDP-13-432 RR See subsequent drawing revision
31/01/2014 GRR-COO-MET-14-005-T
GRR-COO-MET-14-005-T
H-623500MEF10-PA00TL-001 H-6235 00 MEF 10 - PA00 TL -001 D 3 x Spiral case assembly GFE 15/10/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 RR 20/03/2014 GRR-HET-MET-14-009-L Update of document
H-623500MEF10-PA00TL-001 H-6235 00 MEF 10 - PA00 TL -001 D 3 x Spiral case assembly GFE 15/10/2013 20/12/2013 TF/HET/GRR/046_DHL FI 10/02/2014 GERDP-14-042 RR 20/03/2014 GRR-HET-MET-14-009-L Update of document
H-623500MEF10-PA00TL-001 H-6235 00 MEF 10 - PA00 TL -001 F 3 x Spiral case assembly GFE 11/04/2014 16/05/2014 TF/HET/GRR/059 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF10-PA00TL-001 H-6235 00 MEF 10 - PA00 TL -001 F 3 x Spiral case assembly GFE 11/04/2014 02/12/2014 TF/COO/GRR/015_DHL FI ---
H-623500MEF10-PA00TL-001 H-6235 00 MEF 10 - PA00 TL -001 G 3 Spiral case assembly GFE 09/12/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-042-A RE
18/05/2013 GERDP-13-153 RC Revision of drawing
H-623500MEF10-PA00TL-002 H-6235 00 MEF 10 - PA00 TL -002 A 2 x Spiral case assembly - Anchoring / Support GFE 29/01/2013 15/02/2013 TF/HET/GRR/010 FI 20/03/2014 GRR-HET-MET-14-009-L
22/11/2013 GERDP-13-432 RR See subsequent drawing revision
H-623500MEF10-PA00TL-002 H-6235 00 MEF 10 - PA00 TL -002 E 3 Spiral case assembly - Anchoring / Support GFE 14/08/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 RR 20/03/2014 GRR-HET-MET-14-009-L No revision of drawing
H-623500MEF10-PA00TL-002 H-6235 00 MEF 10 - PA00 TL -002 E 3 Spiral case assembly - Anchoring / Support GFE 14/08/2013 20/12/2013 TF/HET/GRR/046_DHL FI 10/02/2014 GERDP-14-042 RR 20/03/2014 GRR-HET-MET-14-009-L No revision of drawing
H-623500MEF10-PA00TL-002 H-6235 00 MEF 10 - PA00 TL -002 E 3 Spiral case assembly - Anchoring / Support GFE 14/08/2013 02/12/2014 TF/COO/GRR/015_DHL FI
H-623500MEF10-PA00TD-001 H-6235 00 MEF 10 - PA00 TD -001 A 1 x Stay ring and Spiral case - Transportation GFE 30/11/2012 15/02/2013 TF/HET/GRR/010 FI 22/11/2013 GERDP-13-432 RR 20/03/2014 GRR-HET-MET-14-009-L See subsequent drawing revision
H-623500MEF10-PA00TD-001 H-6235 00 MEF 10 - PA00 TD -001 C 1 Stay ring and Spiral case - Transportation GFE 12/08/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 FI
H-623500MEF10-PA00TH-001 H-6235 00 MEF 10 - PA00 TH -001 A 2 x Spiral Case - Hydraulic Layout GFE 29/01/2013 15/02/2013 TF/HET/GRR/010 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF10-PA00TH-001 H-6235 00 MEF 10 - PA00 TH -001 D 2 Spiral Case - Hydraulic Layout GFE 09/10/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 RE
H-623500MEF10-PA00TS-001 H-6235 00 MEF 10 - PA00 TS -001 A 1 x Spiral Case - Stay Ring - Painting Scheme GFE 29/01/2013 15/02/2013 TF/HET/GRR/010 FI 18/05/2013 GERDP-13-153 RC 20/03/2014 GRR-HET-MET-14-009-L Revision of drawing
H-623500MEF10-PA00TS-001 H-6235 00 MEF 10 - PA00 TS -001 C 1 Spiral Case - Stay Ring - Painting Scheme GFE 09/08/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 RE
MATERIAL LIST _ 41718 GRR-HET-MET-14-009-L
H-623500MEF11-SA00PB001 H-6235 00 MEF 11 - SA00 PB 001 A 8 x Stay ring -Parts list GFE 05/02/2013 10/06/2013 TF/HET/GRR/019 FI 04/08/2014 GERDP-14-462 FI 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF11-SA00PB001 H-6235 00 MEF 11 - SA00 PB 001 G 11 x Stay ring -Parts list GFE 31/01/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF11-SA00PB001 H-6235 00 MEF 11 - SA00 PB 001 H 11 Stay ring -Parts list GFE 21/11/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-042-A FI 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF11-SA00PB001 H-6235 00 MEF 11 - SA00 PB 001 I 11 Stay ring -Parts list GFE 15/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF12-SA00PB001 H-6235 00 MEF 12 - SA00 PB 001 A 12 x Spiral Case -Parts list GFE 05/02/2013 10/06/2013 TF/HET/GRR/019 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-SA00PB001 H-6235 00 MEF 12 - SA00 PB 001 B 11 x Spiral Case -Parts list GFE 13/06/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 FI
H-623500MEF12-SA00PB001 H-6235 00 MEF 12 - SA00 PB 001 C 11 Spiral Case -Parts list GFE 10/12/2013 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-SA00PB001 H-6235 00 MEF 12 - SA00 PB 001 D 11 Spiral Case -Parts list GFE 15/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF13-SA00PB001 H-6235 00 MEF 13 - SA00 PB 001 B 5 Upper turbine pit GFE 17/10/2013 22/11/2013 TF/HET/GRR/042 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF13-SA00PB001 H-6235 00 MEF 13 - SA00 PB 001 C 5 Upper turbine pit GFE 15/10/2015 04/02/2016 TF/HET/GRR/116 FI
SA12 - MANUFACTURING DRAWINGS - SPIRAL CASE _ 41718 GRR-HET-MET-14-009-L
H-623500MEF12-201STW001 H-6235 00 MEF 12 - 201S TW 001 A 3 x Shell Definition And Welding GFE 29/01/2013 10/06/2013 TF/HET/GRR/019 FI 04/08/2014 GERDP-14-462 RE 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-201STW001 H-6235 00 MEF 12 - 201S TW 001 C 3 x Shell Definition And Welding GFE 24/07/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 RR 20/03/2014 GRR-HET-MET-14-009-L Update of document
H-623500MEF12-201STW001 H-6235 00 MEF 12 - 201S TW 001 D 3 x Shell Definition And Welding GFE 09/12/2013 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-201STW001 H-6235 00 MEF 12 - 201S TW 001 E 3 x Shell Definition And Welding GFE 12/05/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 RE 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-201STW001 H-6235 00 MEF 12 - 201S TW 001 F 3 Shell Definition And Welding GFE 07/10/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-042-A RE
H-623500MEF12-271FTB001 H-6235 00 MEF 12 - 271F TB 001 A 1 x Man Hole Door - Detail GFE 29/01/2013 10/06/2013 TF/HET/GRR/019 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-271FTB001 H-6235 00 MEF 12 - 271F TB 001 B 1 Man Hole Door - Detail GFE 17/06/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 RE
H-623500MEF12-273FTU001 H-6235 00 MEF 12 - 273F TU 001 A 1 x Axle and Washer - Detail GFE 29/01/2013 10/06/2013 TF/HET/GRR/019 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-273FTU001 H-6235 00 MEF 12 - 273F TU 001 B 1 Axle and Washer - Detail GFE 17/06/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 FI
H-623500MEF12-351FTU001 H-6235 00 MEF 12 - 351F TU 001 A 1 x Support Detail GFE 29/01/2013 10/06/2013 TF/HET/GRR/019 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-351FTU001 H-6235 00 MEF 12 - 351F TU 001 B 1 Support Detail GFE 17/06/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 FI
H-623500MEF12-363FTB001 H-6235 00 MEF 12 - 363F TB 001 A 1 x Anchor GFE 29/01/2013 10/06/2013 TF/HET/GRR/019 FI --- 20/03/2014 GRR-HET-MET-14-009-L
H-623500MEF12-363FTB001 H-6235 00 MEF 12 - 363F TB 001 B 1 Anchor GFE 17/06/2013 21/11/2013 TF/HET/GRR/040 FI 10/02/2014 GERDP-14-042 FI
H-623500MEF12-299QM H-6235 00 MEF 12 - 299 QM A 5 Spiral case shells - Inspection Procedure GFE 16/06/2014 24/06/2014 TF-CXE-GRR-007 FI 01/12/2014 GERDP-JE-DR-14-247-A RN 23/02/2015 GRR-COO-MET-15-016-T revision of drawing
H-623500MEF12-300QM H-6235 00 MEF 12 - 300 QM A 37 Spiral case shells - Inspection Sheets GFE 16/06/2014 24/06/2014 TF-CXE-GRR-007 FI 01/12/2014 GERDP-JE-DR-14-247-A RN 23/02/2015 GRR-COO-MET-15-016-T revision of drawing
H-623500MEF12-051TB001 H-6235 00 MEF 12 - 051 TB 001 A 1 Spiral case dimensional report GFE 05/03/2014 23/02/2015 TF/HET/GRR/089 FI 18/09/2015 GERDP-JE-DR-15-069-A RE 20/03/2014 GRR-HET-MET-14-009-L
SA13 - MANUFACTURING DRAWINGS - UPPER TURBINE PIT _
H-623500MEF13-SA00TL001 H-6235 00 MEF 13 - SA00 TL 001 A 1 Pit liner - Assembly view GFE 21/10/2013 22/11/2013 TF/HET/GRR/042 FI 27/01/2015 GERDP-JE-DR-14-011-A RE
H-623500MEF13-SA00TL003 H-6235 00 MEF 13 - SA00 TL 003 B 2 Pit Liner - Bracing and lifting GFE 13/11/2013 22/11/2013 TF/HET/GRR/042 FI 27/01/2015 GERDP-JE-DR-14-011-A FI
H-623500MEF13-201FTB H-6235 00 MEF 13 - 201F TB B 6 Pit Liner in 2 parts GFE 12/11/2013 22/11/2013 TF/HET/GRR/042 FI 27/01/2015 GERDP-JE-DR-14-011-A RE
H-623500MEF13-202FTB H-6235 00 MEF 13 - 202F TB A 1 Servomotor anchoring - Anchoring plate Detail GFE 21/06/2013 22/11/2013 TF/HET/GRR/042 FI 27/01/2015 GERDP-JE-DR-14-011-A RE
H-623500MEF13-203FTB H-6235 00 MEF 13 - 203F TB A 1 Servomotor anchoring - Anchoring rod detail GFE 16/10/2013 22/11/2013 TF/HET/GRR/042 FI 27/01/2015 GERDP-JE-DR-14-011-A RE
H-623500MEF13-204FTB H-6235 00 MEF 13 - 204F TB A 1 Concrete plug detail GFE 16/10/2013 22/11/2013 TF/HET/GRR/042 FI 27/01/2015 GERDP-JE-DR-14-011-A RE
PA20 - DISTRIBUTOR _
ASSEMBLY DRAWING _
H-623500MEF20-PA00TL-001 H-6235 00 MEF 20 - PA00 TL -001 C 6 x Distributor - Upper cross section assembly GFE 29/11/2013 11/12/2013 TF/HET/GRR/044 FI 21/04/2014 GERDP-14-197 RR
H-623500MEF20-PA00TL-001 H-6235 00 MEF 20 - PA00 TL -001 C 6 x Distributor - Upper cross section assembly GFE 29/11/2013 20/12/2013 TF/HET/GRR/046_DHL FI 21/04/2014 GERDP-14-197 RR
H-623500MEF20-PA00TL-001 H-6235 00 MEF 20 - PA00 TL -001 D 6 Distributor - Upper cross section assembly GFE 03/03/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A RE
H-623500MEF20-PA00TL-001 H-6235 00 MEF 20 - PA00 TL -001 D 6 Distributor - Upper cross section assembly GFE 03/03/2014 02/12/2014 TF/COO/GRR/015_DHL FI ---
H-623500MEF20-PA00TL-002 H-6235 00 MEF 20 - PA00 TL -002 D 2 x Distributor - Lower cross section assembly GFE 29/11/2013 11/12/2013 TF/HET/GRR/044 FI 21/04/2014 GERDP-14-197 RR
H-623500MEF20-PA00TL-002 H-6235 00 MEF 20 - PA00 TL -002 D 2 x Distributor - Lower cross section assembly GFE 29/11/2013 25/03/2014 TF/HET/GRR/057 FI 21/04/2014 GERDP-14-197 RR
H-623500MEF20-PA00TL-002 H-6235 00 MEF 20 - PA00 TL -002 E 2 Distributor - Lower cross section assembly GFE 02/03/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 RE
H-623500MEF20-PA00TL-003 H-6235 00 MEF 20 - PA00 TL -003 A 1 x Distributor - Thrust Bearing cone support assembly GFE 03/03/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A RN 16/03/2015 GRR-HET-MET-15-033-T revision of drawing
H-623500MEF20-PA00TL-003 H-6235 00 MEF 20 - PA00 TL -003 B 1 Distributor - Thrust Bearing cone support assembly GFE 05/03/2015 16/03/2015 TF/HET/GRR/094 FI 04/09/2015 GERDP-JE-DR-15-080-A RE
MATERIAL LIST _
H-623500MEF21-SA00PB001 H-6235 00 MEF 21 - SA00 PB 001 E 8 x Distributor Part List (PA21) GFE 24/01/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF21-SA00PB001 H-6235 00 MEF 21 - SA00 PB 001 F 8 Distributor Part List (PA21) GFE 31/10/2014 05/01/2015 TF/HET/GRR/082 FI 02/09/2015 GERDP-JE-DR-15-042-A.pdf FI
H-623500MEF21-SA00PB001 H-6235 00 MEF 21 - SA00 PB 001 G 7 Distributor Part List (PA21) GFE 19/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF21-SP00PB001 H-6235 00 MEF 21 - SP00 PB 001 A 2 Distributor Spare Parts List (PA21) GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RR 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF22-SA00PB001 H-6235 00 MEF 22 - SA00 PB 001 F 4 Distributor Part List (PA22) GFE 23/09/2013 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF22-SA00PB001 H-6235 00 MEF 22 - SA00 PB 001 G 4 Distributor Part List (PA22) GFE 19/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF22-SP00PB001 H-6235 00 MEF 22 - SP00 PB 001 A 2 Distributor Spare Part List (PA22) GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RR 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF23-SA00PB001 H-6235 00 MEF 23 - SA00 PB 001 B 2 Distributor Part List (PA23) GFE 27/02/2014 25/03/2014 TF/HET/GRR/057 FI ---
H-623500MEF23-SA00PB001 H-6235 00 MEF 23 - SA00 PB 001 D 2 Distributor Part List (PA23) GFE 20/10/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF23-SP00PB001 H-6235 00 MEF 23 - SP00 PB 001 A 2 Distributor Spare Part List (PA23) GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RE 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF24-SA00PB001 H-6235 00 MEF 24 - SA00 PB 001 C 3 Distributor Part List (PA24) GFE 13/01/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF24-SA00PB001 H-6235 00 MEF 24 - SA00 PB 001 D 3 Distributor Part List (PA24) GFE 20/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF24-SP00PB001 H-6235 00 MEF 24 - SP00 PB 001 A 2 Distributor Spare Part List (PA24) GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RE 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF25-SA00PB001 H-6235 00 MEF 25 - SA00 PB 001 D 5 Distributor Part List (PA25) GFE 26/02/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF25-SA00PB001 H-6235 00 MEF 25 - SA00 PB 001 E 5 Distributor Part List (PA25) GFE 21/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF25-SP00PB001 H-6235 00 MEF 25 - SP00 PB 001 A 2 Distributor Spare Part List (PA25) GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RR 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
SA21 - HEAD COVER MANUFACTURING DRAWINGS _
PA30- ROTOR _
ASSEMBLY DRAWING _
H-623500MEF30-PA00TL001 H-6235 00 MEF 30 - SA00 TL 001 A 2 x Runner and shaft assembly GFE 17/12/2013 19/12/2013 TF/HET/GRR/048 FI ---
H-623500MEF30-PA00TL001 H-6235 00 MEF 30 - SA00 TL 001 A 2 x Runner and shaft assembly GFE 17/12/2013 20/12/2013 TF/HET/GRR/046_DHL FI 04/08/2014 GERDP-14-463 RE
H-623500MEF30-SA00TL001 H-6235 00 MEF 30 - SA00 TL 001 B 2 x Runner and shaft assembly GFE 20/12/2013 25/03/2014 TF/HET/GRR/057 FI ---
H-623500MEF30-SA00TL001 H-6235 00 MEF 30 - SA00 TL 001 C 2 x Runner and shaft assembly GFE 28/04/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 RN
H-623500MEF30-SA00TL001 H-6235 00 MEF 30 - SA00 TL 001 C 2 x Runner and shaft assembly GFE 28/04/2014 02/12/2014 TF/COO/GRR/015_DHL FI

05/09/2016 5 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-623500MEF30-SA00TL001 H-6235 00 MEF 30 - SA00 TL 001 D 2 Runner and shaft assembly GFE 22/07/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-042-A RE
MATERIAL LIST _
H-623500MEF31-SA00PB001 H-6235 00 MEF 31 - SA00 PB 001 A 2 x Shaft Part List GFE 10/09/2013 16/09/2013 TF/HET/GRR/032 FI 04/08/2014 GERDP-14-462 RE
H-623500MEF31-SA00PB001 H-6235 00 MEF 31 - SA00 PB 001 B 2 x Shaft Part List GFE 18/12/2013 19/12/2013 TF/HET/GRR/048 FI ---
H-623500MEF31-SA00PB001 H-6235 00 MEF 31 - SA00 PB 001 C 2 Shaft Part List GFE 28/04/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 FI
H-623500MEF31-SA00PB001 H-6235 00 MEF 31 - SA00 PB 001 D 2 Shaft Part List GFE 22/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF32-SA00PB001 H-6235 00 MEF 32 - SA00 PB 001 C 2 x Runner Part List GFE 10/08/2013 16/09/2013 TF/HET/GRR/032 FI ---
H-623500MEF32-SA00PB001 H-6235 00 MEF 32 - SA00 PB 001 E 2 x Runner Part List GFE 10/09/2013 19/12/2013 TF/HET/GRR/048 FI 21/04/2014 GERDP-14-197 RR
H-623500MEF32-SA00PB001 H-6235 00 MEF 32 - SA00 PB 001 F 2 x Runner Part List GFE 14/03/2014 19/12/2013 TF/HET/GRR/048 FI ---
H-623500MEF32-SA00PB001 H-6235 00 MEF 32 - SA00 PB 001 H 2 Runner Part List GFE 22/04/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 FI
H-623500MEF32-SA00PB001 H-6235 00 MEF 32 - SA00 PB 001 I 2 Runner Part List GFE 30/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF32-SA01PB001 H-6235 00 MEF 32 - SA01 PB 001 B 2 Final Runner Part List GFE 30/10/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF32-SA00LT H-6235 00 MEF 32 - SA00 LT 1 Handling and lifting drawing 05/03/2015 GRR-HET-MET-15-027-L
H-623500MEF33-SA00PB001 H-6235 00 MEF 33 - SA00 PB 001 G 7 Axial valve GFE 03/12/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-043-A FI
H-623500MEF33-SA00PB001 H-6235 00 MEF 33 - SA00 PB 001 H 7 Axial valve GFE 22/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF39-SA00PB001 H-6235 00 MEF 39 - SA00 PB 001 I 2 x Runner Procurement GFE 27/11/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-043-A FI
SA31 - SHAFTS MANUFACTURING DRAWINGS _
H-623500MEF31-201FTB H-6235 00 MEF 31 - 201F TB C 2 x Turbine shaft GFE 15/05/2014 19/11/2014 TF/HET/GRR/077 FI ---
H-623500MEF31-202FTU H-6235 00 MEF 31 - 202F TU B 1 x Stud, rod & nut M120x4 (item 202 to 204) GFE 10/09/2013 16/09/2013 TF/HET/GRR/032 FI 07/04/2014 GERDP-13-423 RR
H-623500MEF31-202FTU H-6235 00 MEF 31 - 202F TU C 1 x Stud, rod & nut M120x4 (item 202 to 204) GFE 28/04/0014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 RN
H-623500MEF31-202FTU H-6235 00 MEF 31 - 202F TU D 1 Stud, rod & nut M120x4 (item 202 to 204) GFE 06/05/2014 02/06/2014 TF/HET/GRR/064 FI
SA32 - RUNNER MANUFACTURING DRAWINGS _
H-623500MEF32-201FTB H-6235 00 MEF 32 - 201F TB I 2 Runner Machining Details GFE 31/10/2014 31/10/2014 TF/HET/GRR/078 09/02/2015 GERDP-JE-DR-14-323-A.pdf RE 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF32-202FTU H-6235 00 MEF 32 - 202F TU B 1 x Stud & nut M85x4 - Pin Ø205 & Screw (item 202 to 205) GFE 10/09/2013 16/09/2013 TF/HET/GRR/032 FI 07/04/2014 GERDP-13-423 RR
H-623500MEF32-202FTU H-6235 00 MEF 32 - 202F TU C 1 x Stud & nut M85x4 - Pin Ø205 & Screw (item 202 to 205) GFE 12/02/2014 17/02/2014 TF/HET/GRR/052 FI
H-623500MEF32-202FTU H-6235 00 MEF 32 - 202F TU D 1 Stud & nut M85x4 - Pin Ø205 & Screw (item 202 to 205) GFE 28/04/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 RE
H-623500MEF33-PA00TL001 H-6235 00 MEF 33 - PA00 TL 001 F Axial valve - general assembly GFE 26/11/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-043-A RE
H-623500MEF33-PA00TL002 H-6235 00 MEF 33 - PA00 TL 002 D 2 Axial valve - general assembly - top view GFE 26/11/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-043-A RE
SA39 - RUNNER PROCUREMENT DRAWINGS _
H-623500MEF39- 801F TP H-6235 00 MEF 39 - 801F TP H Runner Crown Procurement GFE 18/12/2013 22/09/2014 GRR-HET-MET-14-036-L 09/02/2015 GERDP-JE-DR-14-296-A RE 22/09/2014 GRR-HET-MET-14-036-L None
H-623500MEF39- 801F QC-001 H-6235 00 MEF 39 - 801F QC -001 A 33 Runner Crown As-Built Data Book - Unit 10 - Early Generation ASB 20/05/2014 TF/HET/GRR/061 FI 18/08/2014 GERDP-14-493 RN
H-623500MEF39- 802F TP H-6235 00 MEF 39 - 802F TP G Runner Band Procurement GFE 12/12/2013 22/09/2014 GRR-HET-MET-14-036-L 09/02/2015 GERDP-JE-DR-14-296-A RE
H-623500MEF39-802FQC-001 H-6235 00 MEF 39 - 802F QC -001 A 30 Runner Band As-Built Data Book - Unit 10 - Early Generation ASB 20/05/2014 TF/HET/GRR/061 FI 18/08/2014 GERDP-14-493 RN
H-623500MEF39- 803F TP001 H-6235 00 MEF 39 - 803F TP 001 D 1 x Runner Blade Procurement GFE 16/04/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF39- 803F TP001 H-6235 00 MEF 39 - 803F TP 001 D 1 x Runner Blade Procurement GFE 16/04/2013 26/06/2013 TF/HET/GRR/024_DHL FI 04/08/2014 GERDP-14-462 RE
GERDP-14-495
H-623500MEF39- 803F TP001 H-6235 00 MEF 39 - 803F TP 001 E 1 Runner Blade Procurement GFE 02/08/2013 28/05/2014 TF/HET/GRR/063 GFE 18/08/2014 RR 19/10/2014 GRR-HET-MET-14-036-L Transmittal of H-623500MEF39-803RQS
GERDP-JE-DR-14-211-A
H-623510MEF39-803RDD-001 H-6235 10 MEF 39 - 803R DD -001 A x Unit 10 Early Generation Excavation Report GFE 06/06/2014 10/06/2014 GRR-HET-MET-14-024-T FI 12/11/2014 GERDP-JE-DR-14-229-A RR 03/12/2014 GRR-HET-MET-14-061-T Revision of document
H-623500MEF39- 813F TP H-6235 00 MEF 39 - 813F TP B Theoretical blade for casting GFE 02/09/2014 08/01/2015 TF/COO/GRR/016_DHL
H-623500MEF39- 813F TP H-6235 00 MEF 39 - 813F TP B Theoretical blade for casting GFE 02/09/2014 29/01/2015 TF/HET/GRR/086 FI ---
PA40 - GUIDE BEARING AND SEALS _
ASSEMBLY DRAWING _
MATERIAL LIST _
H-623500MEF 41 -SA00PB H-6235 00 MEF 41 - SA00 PB A 8 x Turbine guide bearing Part List GFE 28/01/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF 41 -SA00PB H-6235 00 MEF 41 - SA00 PB C 8 Turbine guide bearing Part List GFE 22/10/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF43-SP00PB01 H-6235 00 MEF 43 - SP00 PB 01 A 2 x Thrust Bearing Spare PART LIST PA43 GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RE 02/03/2015 GRR-HET-MET-15-022-T revision of drawing
H-623500MEF43-SP00PB01 H-6235 00 MEF 43 - SP00 PB 01 B 3 Thrust Bearing Spare PART LIST PA43 GFE 12/02/2015 26/02/2015 TF/HET/GRR/091 FI 30/04/2015 GERDP-JE-DR-15-072-A RE
H-623500MEF43-SA00PB H-6235 00 MEF 43 - SA00 PB D 12 Thrust bearing Part List GFE 10/07/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-043-A FI
H-623500MEF43-SA00PB H-6235 00 MEF 43 - SA00 PB F 12 Thrust bearing Part List GFE 22/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF 46 -SA00PB H-6235 00 MEF 46 - SA00 PB C 9 x Shaft Seal Part List GFE 06/01/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF 46 -SA00PB H-6235 00 MEF 46 - SA00 PB E 10 Shaft Seal Part List GFE 22/10/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF 46 -SP00PB01 H-6235 00 MEF 46 - SP00 PB 01 A 6 Shaft Seal Spare Part List GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RE 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF 48 -SA00PB001 H-6235 00 MEF 48 - SA00 PB E 3 Safety devices GFE 10/11/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF 48 -SA00PB001 H-6235 00 MEF 48 - SP00 PB 01 A 2 Safety devices Spare parts list GFE 13/11/2014 18/11/2014 TF/HET/GRR/076 FI 09/02/2015 GERDP-JE-DR-14-323-A RR 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing
H-623500MEF 41 -SA41TL001 H-6235 00 MEF 41 - SA41 TL 001 A 2 x Turbine guide bearing GFE 28/01/2014 11/02/2014 TF/HET/GRR/051 FI 14/03/2014 GERDP-14-127 RN
H-623500MEF 41 -SA41TL001 H-6235 00 MEF 41 - SA41 TL 001 A 2 x Turbine guide bearing GFE 28/01/2014 25/03/2014 TF/HET/GRR/057 FI 14/03/2014 GERDP-14-127 RN 20/10/2014 no revision of drawing
H-623500MEF 41 -SA41TL001 H-6235 00 MEF 41 - SA41 TL 001 B 2 x Turbine guide bearing - General assembly GFE 17/10/2014 20/10/2014 TF/HET/GRR/072 25/01/2015 GERDP-JE-DR-14-307-A RR 24/03/2015 GRR-HET-MET-15-034-L revision of drawing
H-623500MEF43-SA00TL-002 H-6235 00 MEF 43 - SA00 TL -002 A 3 THRUST BEARING GENERAL ASSEMBLY GFE 21/05/2014 16/03/2015 TF/HET/GRR/094 FI 04/09/2015 GERDP-JE-DR-15-080-A RE
H-623500MEF43-301FTB H-6235 00 MEF 43 - 301F TB D THRUST COLLAR GFE 24/03/2016 04/04/2016 GRR-HET-MET-16-017-L
H-623500MEF 46 -SA00TL-001 H-6235 00 MEF 46 - SA00 TL -001 B 5 Shaft seal GFE 08/11/2013 19/12/2013 TF/HET/GRR/048 FI 21/04/2014 GERDP-14-197 RE
H-623500MEF 46 -SA00TL-001 H-6235 00 MEF 46 - SA00 TL -001 B 5 x Shaft seal GFE 08/11/2013 25/03/2014 TF/HET/GRR/057 FI 21/04/2014 GERDP-14-197 RE
PA50 - DRAFT TUBE - DISCHARGE _
ASSEMBLY DRAWING _
Commented
H-623500MEF50-PA00TH-001 H-6235 00 MEF 50 - PA00 TH -001 B Draft tube Hydraulic Profile 15/11/2012 22/01/2013 TF/HET/GRR/008 FI 28/04/201322/11/2013 GERDP-13-108GERDP-13-432 31/01/2014 GRR-COO-MET-14-005-T
See subsequent drawing revision04/08/2014 GERDP-14-462 'RE'
RR
H-623500MEF50-PA00TH-001 H-6235 00 MEF 50 - PA00 TH -001 B Draft tube Hydraulic Profile - 15/11/2012 20/12/2013 TF/HET/GRR/046_DHL FI ---
H-623500MEF50-PA00TH-001 H-6235 00 MEF 50 - PA00 TH -001 B Draft tube Hydraulic Profile - 15/11/2012 02/12/2014 TF/COO/GRR/015_DHL FI ---
17/01/2013 MoM_16-17/01/2013 Section 3 07/02/2013 GRR-HET-MET-13-002-L
TF/HET/GRR/006 22/01/2013 ER_GERDP-SCM/FSU-13/011/CEXT 08/02/2013 GRR-HET-MET-13-003-L
H-623500MEF 51 -SA00TL-001 H-6235 00 MEF 51 - SA00 TL -001 B x Draft tube elbow General arrangement 19/11/2012 FI RC Revision of drawing
TF/HET/GRR/008 06/03/2013 ER_GERDP-SCM/FSU-13/073/CEXT
15/03/2013 ER_GERDP-SCM/FSU-13/080/CEXT
H-623500MEF 51 -SA00TL-001 H-6235 00 MEF 51 - SA00 TL -001 C 4 Draft tube elbow General arrangement GFE 15/04/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF 51 -SA00TL-001 H-6235 00 MEF 51 - SA00 TL -001 C 4 Draft tube elbow General arrangement GFE 15/04/2013 26/06/2013 TF/HET/GRR/024_DHL FI ---
H-623500MEF 51 -SA00TL-001 H-6235 00 MEF 51 - SA00 TL -001 C 4 Draft tube elbow General arrangement GFE 15/04/2013 21/11/2013 TF/HET/GRR/041 FI 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
See subsequent drawing revision04/08/2014 GERDP-14-462 'RE'
H-623500MEF 51 -SA00TL-001 H-6235 00 MEF 51 - SA00 TL -001 C 4 Draft tube elbow General arrangement GFE 15/04/2013 20/12/2013 TF/HET/GRR/046_DHL FI 10/02/2014 GERDP-14-041 RE
H-623500MEF 51 -SA00TL-001 H-6235 00 MEF 51 - SA00 TL -001 C 4 Draft tube elbow General arrangement GFE 15/04/2013 02/12/2014 TF/COO/GRR/015_DHL FI
H-623500MEF51-SA00TL-002 H-6235 00 MEF 51 - SA00 TL -002 A 1 x Draft tube Pier General arrangement GFE 19/11/2012 TF/HET/GRR/006 FA 22/01/2013 GERDP-13-011 AN
H-623500MEF51-SA00TL-002 H-6235 00 MEF 51 - SA00 TL -002 B 1 Draft tube Pier General arrangement GFE 15/11/2013 22/01/2013 TF/HET/GRR/008 FI ---
H-623500MEF51-SA00TL-002 H-6235 00 MEF 51 - SA00 TL -002 B 1 Draft tube Pier General arrangement GFE 15/11/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-SA00TL-002 H-6235 00 MEF 51 - SA00 TL -002 B 1 Draft tube Pier General arrangement GFE 15/11/2013 20/12/2013 TF/HET/GRR/046_DHL FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-SA00TL-002 H-6235 00 MEF 51 - SA00 TL -002 B 1 Draft tube Pier General arrangement GFE 15/11/2013 02/12/2014 TF/COO/GRR/015_DHL FI
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 A x Draft tube Cone General arrangement PRE 25/10/2012 19/11/2012 TF/HET/GRR/006 FA 22/01/2013 GERDP-13-011 AN 08/02/2013 GRR-HET-MET-13-003-L
15/03/2013 GERDP-13-085 No revision of drawing
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 B x Draft tube Cone General arrangement GFE 06/05/2013 22/01/2013 TF/HET/GRR/008 FI --- 02/07/2013 GRR-HET-MET-13-032-L
15/03/2013 GERDP-13-080 04/08/2014 GERDP-14-462 in RE status
See subsequent drawing revision
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 C 2 x Draft tube Cone General arrangement GFE 10/06/2013 13/06/2013 TF/HET/GRR/020 FI 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
04/08/2014 GERDP-14-462 'RE'
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 F 2 x Draft tube Cone General arrangement GFE 12/10/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 RR 20/03/2014 GRR-HET-MET-14-008-L No revision of drawing
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 F 2 x Draft tube Cone General arrangement GFE 12/10/2013 20/12/2013 TF/HET/GRR/046_DHL FI 10/02/2014 GERDP-14-041 RR 20/03/2014 GRR-HET-MET-14-008-L No revision of drawing
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 G 2 Draft tube Cone General arrangement GFE 07/05/2014 16/05/2014 TF/HET/GRR/059 FI
H-623500MEF52-SA00TL-001 H-6235 00 MEF 52 - SA00 TL -001 G 2 Draft tube Cone General arrangement GFE 07/05/2014 02/12/2014 TF/COO/GRR/015_DHL FI

05/09/2016 6 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-623500MEF52-SA00TL-002 H-6235 00 MEF 52 - SA00 TL -002 A x Draft tube Cone Bracing GFE 25/10/2012 22/01/2013 TF/HET/GRR/008 FI ---
H-623500MEF52-SA00TL-002 H-6235 00 MEF 52 - SA00 TL -002 B Draft tube Cone Bracing GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
MATERIAL LIST _
H-623500MEF 51 -SA00PB-001 H-6235 00 MEF 51 - SA00 PB -001 C 12 x Draft Tube Elbow Part List GFE 05/06/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF 51 -SA00PB-001 H-6235 00 MEF 51 - SA00 PB -001 E 12 x Draft Tube Elbow Part List GFE 05/06/2013 26/06/2013 TF/HET/GRR/024_DHL FI ---
H-623500MEF 51 -SA00PB-001 H-6235 00 MEF 51 - SA00 PB -001 F 12 Draft Tube Elbow Part List GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF 51 -SA00PB-001 H-6235 00 MEF 51 - SA00 PB -001 G 10 Draft Tube Elbow Part List GFE 09/10/2015 04/02/2016 TF/HET/GRR/116 FI
H-623500MEF 51 -SA00PB-001 H-6235 00 MEF 51 - SA00 PB -001 F 12 Draft Tube Elbow Part List GFE 28/06/2013 08/01/2015 TF/COO/GRR/016_DHL FI
H-623500MEF52-SA00PB-001 H-6235 00 MEF 52 - SA00 PB -001 C 10 x Draft Tube Cone Part List GFE 10/06/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-SA00PB-001 H-6235 00 MEF 52 - SA00 PB -001 F 10 x Draft Tube Cone Part List GFE 14/10/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-SA00PB-001 H-6235 00 MEF 52 - SA00 PB -001 H 10 Draft Tube Cone Part List GFE 04/04/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 FI
H-623500MEF52-SA00PB-001 H-6235 00 MEF 52 - SA00 PB -001 I 10 Draft Tube Cone Part List GFE 15/10/2015 04/02/2016 TF/HET/GRR/116 FI
SA51 - DRAFT TUBE ELBOW AND DIFFUSOR MANUFACTURING DRAWINGS _
H-623500MEF51-201FTB-001 H-6235 00 MEF 51 - 201F TB -001 C 9 x Draft Tube Elbow Details GFE 16/04/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF51-201FTB-001 H-6235 00 MEF 51 - 201F TB -001 C 9 x Draft Tube Elbow Details GFE 16/04/2013 26/06/2013 TF/HET/GRR/024_DHL FI ---
H-623500MEF51-201FTB-001 H-6235 00 MEF 51 - 201F TB -001 E 9 x Draft Tube Elbow Details GFE 27/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-201FTB-001 H-6235 00 MEF 51 - 201F TB -001 F 9 x Draft Tube Elbow Details GFE 08/01/2014 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A RE 16/03/2015 GRR-HET-MET-15-033-T
H-623500MEF51-201FTB-001 H-6235 00 MEF 51 - 201F TB -001 G 9 Draft Tube Elbow Details GFE 24/06/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-042-A FI
H-623500MEF51-201FTB-001 H-6235 00 MEF 51 - 201F TB -001 G 9 Draft Tube Elbow Details GFE 24/06/2014 08/01/2015 TF/COO/GRR/016_DHL FI
H-623500MEF51-201FTD-001 H-6235 00 MEF 51 - 201F TD -001 D 2 x Draft Tube Elbow Transportation GFE 11/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-201FTD-001 H-6235 00 MEF 51 - 201F TD -001 F 2 Draft Tube Elbow Transportation GFE 14/04/2014 28/05/2014 TF/HET/GRR/063 FI 18/08/2014 GERDP-14-495 FI
H-623500MEF51-201FBF H-6235 00 MEF 51 - 201F BF A 24 Draft Tube Elbow Handling and Transport GFR 01/07/2014 29/08/2014 GRR-HET-MET-14-031-L
H-623500MEF53-203FBF H-6235 00 MEF 53 - 203F BF A 17 Pier Nose Handling and Transport GFE 12/03/2013 03/04/2013 GRR-HET-MET-13-010-L
H-623500MEF51-203FTU-001 H-6235 00 MEF 51 - 203F TU -001 C 1 Draft Tube Pier Nose Manufacturing GFE 08/02/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-204FTU-001 H-6235 00 MEF 51 - 204F TU -001 C 1 x Draft Tube Elbow Anchoring Parts GFE 25/04/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF51-204FTU-001 H-6235 00 MEF 51 - 204F TU -001 C 1 x Draft Tube Elbow Anchoring Parts GFE 25/04/2013 26/06/2013 TF/HET/GRR/024_DHL FI ---
H-623500MEF51-204FTU-001 H-6235 00 MEF 51 - 204F TU -001 D 1 Draft Tube Elbow Anchoring Parts GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-204FTU-001 H-6235 00 MEF 51 - 204F TU -001 D 1 Draft Tube Elbow Anchoring Parts GFE 28/06/2013 08/01/2015 TF/COO/GRR/016_DHL FI
H-623500MEF51-208FTU-001 H-6235 00 MEF 51 - 208F TU -001 A 2 x Draft Tube Elbow Drain Box GFE 06/06/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF51-208FTU-001 H-6235 00 MEF 51 - 208F TU -001 C 2 Draft Tube Elbow Drain Box GFE 06/06/2013 26/06/2013 TF/HET/GRR/024_DHL FI ---
H-623500MEF51-208FTU-001 H-6235 00 MEF 51 - 208F TU -001 C 2 Draft Tube Elbow Drain Box 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF51-208FTU-001 H-6235 00 MEF 51 - 208F TU -001 C 2 Draft Tube Elbow Drain Box 06/06/2013 08/01/2015 TF/COO/GRR/016_DHL FI
SA52 - DRAFT TUBE CONE MANUFACTURING DRAWINGS _
H-623500MEF52-025TB-001 H-6235 00 MEF 52 - 025 TB -001 A Manhole door Porthole GFE 02/09/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-201FTB-001 H-6235 00 MEF 52 - 201F TB -001 B 3 x Draft Tube Cone GFE 10/06/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-201FTB-001 H-6235 00 MEF 52 - 201F TB -001 D 3 x Draft Tube Cone GFE 05/11/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 RR
H-623500MEF52-201FTB-001 H-6235 00 MEF 52 - 201F TB -001 E 3 x Draft Tube Cone GFE 24/02/2014 25/03/2014 TF/HET/GRR/057 FI
H-623500MEF52-201FTD-001 H-6235 00 MEF 52 - 201F TD -001 B 1 x Draft Tube Cone -transportation GFE 10/06/2013 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-201FTD-001 H-6235 00 MEF 52 - 201F TD -001 C 1 Draft Tube Cone -transportation GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
See subsequent drawing revision
H-623500MEF52-202FTB-001 H-6235 00 MEF 52 - 202F TB -001 A 2 x Upper Cone GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
04/08/2014 GERDP-14-462 'RE'
H-623500MEF52-202FTB-001 H-6235 00 MEF 52 - 202F TB -001 C 2 x Upper Cone GFE 16/10/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 RR
H-623500MEF52-202FTB-001 H-6235 00 MEF 52 - 202F TB -001 D 2 x Upper Cone GFE 17/01/2014 25/03/2014 TF/HET/GRR/057 FI
18/08/2014 GERDP-14-495 RE
H-623500MEF52-202FTB-001 H-6235 00 MEF 52 - 202F TB -001 F 2 Upper Cone GFE 15/05/2014 28/05/2014 TF/HET/GRR/063 FI
01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF52-202FTD-001 H-6235 00 MEF 52 - 202F TD -001 A 1 x Upper Cone -transportation GFE 10/11/2012 13/06/2013 TF/HET/GRR/020 FI 04/08/2014 GERDP-14-462 FI
H-623500MEF52-202FTD-001 H-6235 00 MEF 52 - 202F TD -001 C 1 Upper Cone -transportation GFE 20/12/2013 25/03/2014 TF/HET/GRR/057 FI 01/12/2014 GERDP-JE-DR-14-245-A FI
H-623500MEF52-206FTB-001 H-6235 00 MEF 52 - 206F TB -001 A 1 x Anchor GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-206FTB-001 H-6235 00 MEF 52 - 206F TB -001 B 1 Anchor GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-207FTU-001 H-6235 00 MEF 52 - 207F TU -001 A 1 x Detail of Items 207,208,221,223,226,227 GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-207FTU-001 H-6235 00 MEF 52 - 207F TU -001 A 1 Detail of Items 207,208,221,223,226,227 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-220FTB-001 H-6235 00 MEF 52 - 220F TB -001 A 1 x Man Hole Door GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-220FTB-001 H-6235 00 MEF 52 - 220F TB -001 D 1 Man Hole Door GFE 05/11/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-230FTB-001 H-6235 00 MEF 52 - 230F TB -001 A 1 x Cover left bank GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-230FTB-001 H-6235 00 MEF 52 - 230F TB -001 B 1 Cover left bank GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-231FTB-001 H-6235 00 MEF 52 - 231F TB -001 A 1 x Breaking Bolt GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-231FTB-001 H-6235 00 MEF 52 - 231F TB -001 B 1 Breaking Bolt GFE 01/07/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 RN 20/03/2014 GRR-HET-MET-14-008-L No revision of drawing
H-623500MEF52-232FTB-001 H-6235 00 MEF 52 - 232F TB -001 A 1 x Cover right bank GFE 22/11/2012 13/06/2013 TF/HET/GRR/020 FI ---
H-623500MEF52-232FTB-001 H-6235 00 MEF 52 - 232F TB -001 B 1 Cover right bank GFE 28/06/2013 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 FI
H-623500MEF52-235MTB-001 H-6235 00 MEF 52 - 235M TB -001 A 1 x Labyrinth GFE 25/10/2012 13/06/2013 TF/HET/GRR/020 FI 10/02/2014 GERDP-14-041 RR
H-623500MEF52-235MTB-001 H-6235 00 MEF 52 - 235M TB -001 A 1 Labyrinth 21/11/2013 TF/HET/GRR/041 FI 10/02/2014 GERDP-14-041 RR
H-623500MEF57-201TB001 H-6235 00 MEF 61 - PA61 TL 001 B Servomotor General Assembly GFE 06/11/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-044-A RE
H-623500MEF57-201TB001 H-6235 00 MEF 61 - PA61 PB 001 B Servomotor part list GFE 25/09/2014 05/01/2015 TF/HET/GRR/082 FI 09/02/2015 GERDP-JE-DR-15-044-A FI
H-623500MEF57-201TB001 H-6235 00 MEF 61 - PA61 PB 001 C 2 Servomotor part list GFE 22/10/2015 04/02/2016 TF/HET/GRR/116 FI
PA 70 - PIPES _
ASSEMBLY DRAWING _
H-623500MEF70-SA00TL-001 H-6235 00 MEF 70 - SA00 TL -001 A 5 Turbine pressure measurement GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 71 -SA00TL-001 H-6235 00 MEF 71 - SA00 TL -001 A 1 Penstock and spiral case drainage GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 72 -SA00TL-001 H-6235 00 MEF 72 - SA00 TL -001 A 1 Balancing general assembly GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 72 -SA00TL-002 H-6235 00 MEF 72 - SA00 TL -002 A 1 Head cover drainage GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 73 -SA00TL-001 H-6235 00 MEF 73 - SA00 TL -001 A Axial valve piping GFE 25/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 73 -SA00TL002 H-6235 00 MEF 73 - SA00 TL 002 A 2 Axial valve pipe general arrgt GFE 22/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-001 H-6235 00 MEF 74 - SA00 TL -001 A Shaft seal Aerial pipes GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-002 H-6235 00 MEF 74 - SA00 TL -002 A Inflatable seal Aerial pipes GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-003 H-6235 00 MEF 74 - SA00 TL -003 A x Thrust bearing piping Water circulation GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-003 H-6235 00 MEF 74 - SA00 TL -003 B Thrust bearing piping Water circulation GFE 09/03/2015 11/03/2015 TF/HET/GRR/093 FI 04/09/2015 GERDP-JE-DR-15-080-A RE
H-623500MEF 74 -SA00TL-004 H-6235 00 MEF 74 - SA00 TL -004 A Thrust bearing piping Oil injection GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-005 H-6235 00 MEF 74 - SA00 TL -005 A x Thrust bearing piping Oil circulation GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-005 H-6235 00 MEF 74 - SA00 TL -005 B Thrust bearing piping Oil circulation GFE 18/06/2015 30/06/2015 TF/HET/GRR/098 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 74 -SA00TL-006 H-6235 00 MEF 74 - SA00 TL -006 A x Guide bearing piping Water circulation GFE 05/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00TL-006 H-6235 00 MEF 74 - SA00 TL -006 B Guide bearing piping Water circulation GFE 09/03/2015 11/03/2015 TF/HET/GRR/093 FI 04/09/2015 GERDP-JE-DR-15-080-A RE
H-623500MEF 75 -SA00TL001 H-6235 00 MEF 75 - SA00 TL 001 A x Draft tubedrainage piping GFE 14/05/2014 05/01/2015 TF/HET/GRR/083 FI ---
03/12/2013 Salini_P5000-05.25-299_27 Nov 12
H-623500MEF 78 -SA00TL-001 H-6235 00 MEF 78 - SA00 TL -001 A 5 x 1st Concrete Embedded pipes GFR 19/10/2012 29/10/2012 TF/HET/GRR/004 FA Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
22/11/2013 UHP_HMD-2181
H-623500MEF 78 -SA00TL-001 H-6235 00 MEF 78 - SA00 TL -001 B 5 x 1st Concrete Embedded pipes GFR 06/02/2013 19/03/2013 TF/HET/GRR/013 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-001 H-6235 00 MEF 78 - SA00 TL -001 C 5 1st Concrete Embedded pipes GFR 26/03/2013 08/04/2013 TF/HET/GRR/014 FA 16/09/2013 Salini_P5000-05.25-537_18 July 13 Commented
H-623500MEF 78 -SA00TL-002 H-6235 00 MEF 78 - SA00 TL -002 B 7 x 2nd Concrete Embedded pipes GFR 07/02/2013 19/03/2013 TF/HET/GRR/013 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-002 H-6235 00 MEF 78 - SA00 TL -002 C 7 x 2nd Concrete Embedded pipes GFR 19/04/2013 15/05/2013 TF/HET/GRR/017 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-002 H-6235 00 MEF 78 - SA00 TL -002 D 7 2nd Concrete Embedded pipes GFR 22/05/2013 18/06/2013 TF/HET/GRR/021 FA 16/09/2013 Salini_P5000-05.25-537_18 July 13 Commented
H-623500MEF 78 -SA00TL-003 H-6235 00 MEF 78 - SA00 TL -003 - 5 x 4th concrete step – Embedded Pipes PRE 12/02/2013 19/03/2013 TF/HET/GRR/013 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-003 H-6235 00 MEF 78 - SA00 TL -003 B 5 x 4th concrete step – Embedded Pipes GFR 26/03/2013 08/04/2013 TF/HET/GRR/014 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-003 H-6235 00 MEF 78 - SA00 TL -003 C 5 4th concrete step – Embedded Pipes GFR 23/04/2013 18/06/2013 TF/HET/GRR/021 FA 16/09/2013 Salini_P5000-05.25-537_18 July 13 Commented

05/09/2016 7 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-623500MEF 78 -SA00TL-004 H-6235 00 MEF 78 - SA00 TL -004 A 2 x 5th concrete step – Embedded Pipes PRE 28/03/2013 08/04/2013 TF/HET/GRR/014 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-004 H-6235 00 MEF 78 - SA00 TL -004 B 2 x 5th concrete step – Embedded Pipes GFR 23/04/2013 18/06/2013 TF/HET/GRR/021 FA DEEMED APPROVED
H-623500MEF 78 -SA00TL-004 H-6235 00 MEF 78 - SA00 TL -004 C 2 5th concrete step – Embedded Pipes GFE 27/02/2014 17/06/2014 TF/HEG/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-248-A FI
H-623500MEF 78 -SA00TL-005 H-6235 00 MEF 78 - SA00 TL -005 A 9 x 6th concrete step – Embedded Pipes PRE 21/06/2013 10/09/2013 TF/HET/GRR/031 FI ---
H-623500MEF 78 -SA00TL-005 H-6235 00 MEF 78 - SA00 TL -005 C 9 6th concrete step – Embedded Pipes GFR 14/10/2014 16/10/2014 TF/HET/GRR/071 FI 25/01/2015 GERDP-JE-DR-14-307-A RR
H-623500MEF 78 -SA00TL-006 H-6235 00 MEF 78 - SA00 TL -006 A 9 x 6th concrete step – Embedded Pipes PRE 21/06/2013 10/09/2013 TF/HET/GRR/031 FI ---
H-623500MEF 78 -SA00TL-006 H-6235 00 MEF 78 - SA00 TL -006 B 11 6th concrete step – Embedded Pipes GFE 17/12/2014 05/01/2015 TF/HET/GRR/083 FI ---
MATERIAL LIST _
H-623500MEF 71 -SA00PB-01 H-6235 00 MEF 71 - SA00 PB -01 A 3 x Aerial pipes for PA10 GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 71 -SA00PB-001 H-6235 00 MEF 71 - SA00 PB -001 C 3 Aerial pipes for PA10 GFE 23/10/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF 72 -SA00PB-01 H-6235 00 MEF 72 - SA00 PB -01 A 3 Aerial pipes for PA20 GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 72 -SA00PB-01 H-6235 00 MEF 72 - SA00 PB -01 B 3 Aerial pipes for PA20 GFE 23/10/2015 04/02/2016 TF/HET/GRR/116 FI ---
H-623500MEF 73 -SA00PB H-6235 00 MEF 73 - SA00 PB B Axial valve Aerial pipe GFE 22/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 73 -SA00PB H-6235 00 MEF 73 - SA00 PB C Axial valve Aerial pipe GFE 23/10/2015 04/02/2016 TF/HET/GRR/116 FI ---
H-623500MEF 74 -SA00PB H-6235 00 MEF 74 - SA00 PB A x Guide bearing, shaft seal and thrust bearing piping GFE 08/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 74 -SA00PB H-6235 00 MEF 74 - SA00 PB B Guide bearing, shaft seal and thrust bearing piping GFE 09/03/2015 11/03/2015 TF/HET/GRR/093 FI --- 04/09/2015 GERDP-JE-DR-15-080-A FI
H-623500MEF 74 -SA00PB001 H-6235 00 MEF 74 - SA00 PB 001 C 8 Guide bearing, shaft seal and thrust bearing piping GFE 18/06/2015 30/06/2015 TF/HET/GRR/098 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 74 -SA00PB001 H-6235 00 MEF 74 - SA00 PB 001 D 8 Guide bearing, shaft seal and thrust bearing piping GFE 23/10/2015 04/02/2016 TF/HET/GRR/116 FI

H-623500MEF 74 -SP00PB01 H-6235 00 MEF 74 - SP00 PB 01 A Guide bearing, shaft seal and thrust bearing piping - SPARE PARTS GFE 08/08/2014 05/01/2015 TF/HET/GRR/083 FI 09/02/2015 GERDP-JE-DR-14-323-A RR 02/03/2015 GRR-HET-MET-15-022-T No revision of drawing

H-623500MEF 75 -SA00PB H-6235 00 MEF 75 - SA00 PB A Draft tube piping GFE 25/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF 75 -SA00PB H-6235 00 MEF 75 - SA00 PB B 3 Draft tube piping GFE 26/10/2015 04/02/2016 TF/HET/GRR/116 FI ---
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB A x Embedded pipes Part List GFR 29/10/2012 TF/HET/GRR/004 FA 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB B x Embedded pipes Part List GFR 09/11/2012 TF/HET/GRR/005 FA DEEMED APPROVED
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB C 2 x Embedded pipes Part List GFR 22/11/2012 TF/HET/GRR/007TF/HET/GRR/013 FA DEEMED APPROVED
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB D 2 x Embedded pipes Part List GFR 26/03/2013 08/04/2013 TF/HET/GRR/014 FA DEEMED APPROVED
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB E 2 x Embedded pipes Part List GFR 22/04/2013 15/05/2013 TF/HET/GRR/017 FA DEEMED APPROVED
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB F 3 x Embedded pipes Part List GFE 06/09/2013 10/09/2013 TF/HET/GRR/031 FI ---
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB G 3 x Embedded pipes Part List GFE 27/09/2013 11/10/2013 TF/HET/GRR/035 FI ---
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB H 3 x Embedded pipes Part List GFE 15/10/2013 22/10/2013 TF/HET/GRR/036 FI 21/04/2014 GERPD-14-215 ---
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB I 11 x Embedded pipes Part List GFE 28/03/2014 01/04/2014 GRR-HET-MET-14-012-L FI 18/08/2014 GERDP-14-491 FI
H-623500MEF 78 -SA00PB H-6235 00 MEF 78 - SA00 PB J 11 Embedded pipes Part List GFE 06/06/2014 17/06/2014 TF/HEG/GRR/065 FI 25/01/2015 GERDP-JE-DR-14-249-A FI
H-623500MEF71-201FTB H-6235 00 MEF 71 - 201F TB A 1 Drilled block GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF71-202FTB H-6235 00 MEF 71 - 202F TB A 1 Support GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF71-204FTB H-6235 00 MEF 71 - 204F TB A 1 Drilled block GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF71-205FTB H-6235 00 MEF 71 - 205F TB A 1 Support GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF71-206FTB H-6235 00 MEF 71 - 206F TB A 1 Drain boss GFE 19/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF72- 201F TB H-6235 00 MEF 72 - 201F TB A 1 Support GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF72- 202F TB H-6235 00 MEF 72 - 202F TB A 1 Pump support GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF72- 203F TB H-6235 00 MEF 72 - 203F TB A 1 Support GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF72- 204F TU H-6235 00 MEF 72 - 204F TU A 1 Support for floating switch GFE 30/09/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF73- 201F TU001 H-6235 00 MEF 73 - 201F TU 001 A Axial valve support 25/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF73- 202F TB001 H-6235 00 MEF 73 - 203F TB 001 A Support distributor 22/08/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-201FTB H-6235 00 MEF 74 - 201F TB A Flange GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-202FTB H-6235 00 MEF 74 - 202F TB A Spacer seal carrer GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-203FTB H-6235 00 MEF 74 - 203F TB A Removable connection GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-204FTB H-6235 00 MEF 74 - 204F TB A Support GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-205FTB H-6235 00 MEF 74 - 205F TB A Machined sleeve pit liner side GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-206FTB H-6235 00 MEF 74 - 206F TB A Machined sleeve shaft seal side GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-207FTB H-6235 00 MEF 74 - 207F TB A Pipe support GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-208FTB H-6235 00 MEF 74 - 208F TB A Wedge to be adjusted GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-209FTB H-6235 00 MEF 74 - 209F TB A Diaphragm GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-210FTB H-6235 00 MEF 74 - 210F TB A Support plate GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-211FTB H-6235 00 MEF 74 - 211F TB A Pipe support GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-212FTB H-6235 00 MEF 74 - 212F TB A Pipe support wedge GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-214FTB H-6235 00 MEF 74 - 214F TB A Bended pipes GFE 15/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-218FTB H-6235 00 MEF 74 - 218F TB A Wedge to be adjusted GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-219FTB H-6235 00 MEF 74 - 219F TB A Pipe support GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-220FTB H-6235 00 MEF 74 - 220F TB A Wedge to be adjusted GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-301FTU H-6235 00 MEF 74 - 301F TU A Diaphragm and boss GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF74-305FTU H-6235 00 MEF 74 - 305F TU A Supports GFE 28/07/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF75- 201F TB001 H-6235 00 MEF 75 - 201F TB 001 A Cone inlet and cone inlet pressure support 20/05/2014 05/01/2015 TF/HET/GRR/083 FI ---
PRESSURE TAPS PIPES - DRAFT TUBE OUTLET PRESSURE
H-623500MEF75- 202F TB001 H-6235 00 MEF 75 - 202F TB 001 A 20/05/2014 05/01/2015 TF/HET/GRR/083 FI ---
DRILLED BLOCK
PRESSURE TAPS PIPES - DRAFT TUBE OUTLET PRESSURE -
H-623500MEF75- 203FTB001 H-6235 00 MEF 75 - 203F TB 001 A 20/05/2014 05/01/2015 TF/HET/GRR/083 FI ---
Support
PRESSURE TAPS PIPES - DRAFT TUBE OUTLET PRESSURE -
H-623500MEF75- 204FTB001 H-6235 00 MEF 75 - 204F TB 001 A 20/05/2014 05/01/2015 TF/HET/GRR/083 FI ---
Manometer support
SA78 - EMBEDDED PIPING MANUFACTURING DRAWINGS _
H-623500MEF78-201FTB001 H-6235 00 MEF 78 - 201F TB 001 A Pressure tap 09/11/2012 TF/HET/GRR/005 FI 04/08/2014 GERDP-14-462 FI
H-623500MEF78-202FTB001 H-6235 00 MEF 78 - 202F TB 001 A Pressure tap perforated plate 09/11/2012 TF/HET/GRR/005 FI 04/08/2014 GERDP-14-462 FI
H-623500MEF78-203FTU001 H-6235 00 MEF 78 - 203F TU 001 A Pressure tap Closing plates Details 203 to 211 09/11/2012 TF/HET/GRR/005 FI 04/08/2014 GERDP-14-462 FI
H-623500MEF78-212FTB001 H-6235 00 MEF 78 - 212F TB 001 B Pressure tap Welding Sleeve GFR 11/04/2013 30/04/2013 GRR-HET-MET-13-017 FI 04/08/2014 GERDP-14-462 FI
H-623500MEF78-213FTB001 H-6235 00 MEF 78 - 213F TB 001 A 1 x Support Base Plate 22/11/2012 TF/HET/GRR/007 FA 04/08/2014 GERDP-14-462 FI
H-623500MEF78-213FTB001 H-6235 00 MEF 78 - 213F TB 001 B 1 x Support Base Plate GFR 08/04/2013 30/04/2013 GRR-HET-MET-13-017 FI ---
H-623500MEF78-213FTB001 H-6235 00 MEF 78 - 213F TB 001 C 1 Support Base Plate GFR 10/06/2014 05/01/2015 TF/HET/GRR/083 FI ---
H-623500MEF78-214FTB001 H-6235 00 MEF 78 - 214F TB 001 A 1 Thermodynamic Boss PRE 19/04/2013 15/05/2013 TF/HET/GRR/017 FA 04/08/2014 GERDP-14-462 FI
H-623500MEF78-217FTB001 H-6235 00 MEF 78 - 217F TB 001 A 1 6th Concrete Step - Wicket Gate Drainage Pipe Detail PRE 15/10/2013 22/10/2013 TF/HET/GRR/036 FI 21/04/2014 GERPD-14-215 ---
H-623500MEF78-220FTU001 H-6235 00 MEF 78 - 220F TU 001 A 1 6th Concrete Step Details 220, 221, 222 & 223 PRE 05/09/2013 10/09/2013 TF/HET/GRR/031 FI 04/08/2014 GERDP-14-462 FI
PA80 - TOOLS _
ASSEMBLY DRAWING _
H-623500MEF80-PA00TL001 H-6235 00 MEF 80 - PA00 TL 001 B 2 Spiral case test pressure GFE 20/05/2014 23/05/2014 TF/HET/GRR/062 FI 18/08/2014 GERDP-14-494 RN 06/11/2014 GRR-HET-MET-14-046-L No revision of drawing
H-623500MEF81-SA00TL001 H-6235 00 MEF 81 - SA00 TL 001 B 2 Spiral case - shell bracing and shell handling lugs GFE 28/05/2014 02/06/2014 TF/HET/GRR/064 FI ---
H-623500MEF81-SA00TL002 H-6235 00 MEF 81 - SA00 TL 002 A x Stay Ring Handling (1/4 or Full ) GFE 23/05/2014 02/06/2014 TF/HET/GRR/064 FI ---
H-623500MEF81-SA00TL002 H-6235 00 MEF 81 - SA00 TL 002 B 2 Stay Ring Handling (1/4 or Full ) GFE 06/11/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF 82 -SA00TL001 H-6235 00 MEF 82 - SA00 TL 001 A Wicket gate handling GFE 07/10/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF 82 -SA00TL002 H-6235 00 MEF 82 - SA00 TL 002 A Upper housing handling GFE 07/10/2014 05/01/2015 TF/HET/GRR/085 FI
H-623500MEF 82 -SA00TL004 H-6235 00 MEF 82 - SA00 TL 004 A Lifting 2A1, 2B1, 201 - Bottom ring GFE 07/10/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF 82 -SA00TL006 H-6235 00 MEF 82 - SA00 TL 006 A Lifting 2A1, 2B1, 201 - Head cover GFE 07/10/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF 82 -SA00TL007 H-6235 00 MEF 82 - SA00 TL 007 A Handling operating ring GFE 08/10/2014 05/01/2015 TF/HET/GRR/085 FI
H-623500MEF 82 -SA00TL008 H-6235 00 MEF 82 - SA00 TL 008 A Handling cone GFE 07/10/2014 05/01/2015 TF/HET/GRR/085 FI

05/09/2016 8 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-623500MEF83PA00TL003 H-6235 00 MEF 83 PA00 TL 003 C 3 Tooling for axial valve pressure test and pressure test GFE 04/08/2014 05/01/2015 TF/HET/GRR/085 FI
H-623500MEF83SA00TL004 H-6235 00 MEF 83 SA00 TL 004 A 1 Handling of central pipe GFE 07/10/2014 05/01/2015 TF/HET/GRR/085 FI
H-623500MEF 86 -SA00TL001 H-6235 00 MEF 86 - SA00 TL 001 A 2 Tool for partial assembly 60 GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
MATERIAL LIST _
H-623500MEF 81 -SA00PB001 H-6235 00 MEF 81 - SA00 PB 001 H Pressure test assembly (workshop) GFE 23/05/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF 81 -SA00PB001 H-6235 00 MEF 81 - SA00 PB 001 J Pressure test assembly (workshop) GFE 28/10/2015 04/02/2016 TF/HET/GRR/116 FI ---
H-623500MEF 81 -SA01PB001 H-6235 00 MEF 81 - SA01 PB 001 A Lifting devices PA10 GFE 06/11/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF82-SA00PB001 H-6235 00 MEF 82 - SA00 PB 001 A x Lifting devices PA82 GFE 04/11/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF82-SA00PB001 H-6235 00 MEF 82 - SA00 PB 001 B Lifting devices PA82 GFE 21/05/2015 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF82-SA01PB001 H-6235 00 MEF 82 - SA01 PB 001 A Lifting devices PA82 GFE 21/05/2015 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF82-SA01PB001 H-6235 00 MEF 82 - SA01 PB 001 C Lifting devices PA82 GFE 28/10/2015 04/02/2016 TF/HET/GRR/116 FI ---
H-623500MEF 83 -SA00PB001 H-6235 00 MEF 83 - SA00 PB 001 E 5 Tool for partial assembly 30 GFE 28/10/2014 05/01/2015 TF/HET/GRR/085 FI
H-623500MEF 83 -SA00PB001 H-6235 00 MEF 83 - SA00 PB 001 I 5 Tool for partial assembly 30 GFE 28/10/2015 04/02/2016 TF/HET/GRR/116
H-623500MEF 86 -SA00PB001 H-6235 00 MEF 86 - SA00 PB 001 A 5 x Tool for partial assembly 60 GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI ---
H-623500MEF 86 -009F H-6235 00 MEF 86 - 009F SERVOMOTOR TOOLS TECHNICAL GUIDE GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 86 -010F H-6235 00 MEF 86 - 010F SERVOMOTOR TOOLS TECHNICAL GUIDE GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 86 -014F H-6235 00 MEF 86 - 014F SERVOMOTOR TOOLS TECHNICAL GUIDE GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 86 -015F H-6235 00 MEF 86 - 015F SERVOMOTOR TOOLS TECHNICAL GUIDE GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 86 -018F H-6235 00 MEF 86 - 018F SERVOMOTOR TOOLS TECHNICAL GUIDE GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 86 -019F H-6235 00 MEF 86 - 019F SERVOMOTOR TOOLS TECHNICAL GUIDE GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF 87 -SA00PB001 H-6235 00 MEF 87 - SA00 PB 001 A 2 Tool for partial assembly 70 30/06/2014 05/01/2015 TF/HET/GRR/085 FI ---
H-623500MEF 88 -SA00PB001 H-6235 00 MEF 88 - SA00 PB 001 A Standard and common tools 25/07/2014 05/01/2015 TF/HET/GRR/085 FI ---
SA81 - TOOLS FOR PARTIAL ASSEMBLY 10 - MANUFACTURING DRAWINGS _
H-623500MEF86- 201F TU001 H-6235 00 MEF 86 - 201F TU 001 A 1 Structure translation GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF86-210FTU001 H-6235 00 MEF 86 - 210F TU 001 A 1 Servomotor support GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF86-230FTU001 H-6235 00 MEF 86 - 230F TU 001 A 1 Structure trailer GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
H-623500MEF86-240FTB001 H-6235 00 MEF 86 - 240F TB 001 A 1 Truck handling GFE 14/04/2015 30/06/2015 TF/HET/GRR/099 FI 04/09/2015 GERDP-JE-DR-15-145-A FI
SA88 - TOOLS FOR PARTIAL ASSEMBLY 80 - MANUFACTURING DRAWINGS _
H-623500MEF89-SA00PB001 H-6235 00 MEF 89 - SA00 PB 001 A List of Turbine Special Tools GFE 17/01/2013 MoM_16-17/01/2013_attachment FA 02/07/2013 GRR-HET-MET-13-030L Reminder for response
H-623500MEF88-PA00EC001 H-6235 00 MEF 88 - PA00 EC 001 A 20 Turbine Standard Tool List GFE 26/01/2015 10/03/2016 TF/CXE/GRR/011 FI 04/09/2015 GERDP-JE-DR-15-080-A FI 18/09/2015 GRR-HET-MET-15-071-L No revision of drawing
H-623500MEF88-PA00EC002 H-6235 00 MEF 88 - PA00 EC 002 A Turbine Specific Tool List GFE 26/01/2015 10/03/2016 TF/CXE/GRR/011 FI 04/09/2015 GERDP-JE-DR-15-080-A FI 18/09/2015 GRR-HET-MET-15-071-L No revision of drawing
H-623500MEF91-SA00TL001 H-6235 00 MEF 91 - SA00 TL 001 A x Runner platform 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A RR 11/09/2015 GRR-HET-MET-15-069-L Revision of drawing
H-623500MEF91-SA00TL001 H-6235 00 MEF 91 - SA00 TL 001 B 1 x Runner platform 07/08/2015 07/09/2015 TF/HET/GRR/103 21/10/2015 GERDP-JE-DR-15-211-A RN 21/12/2015 Revision of drawing
H-623500MEF91-SA00TL001 H-6235 00 MEF 91 - SA00 TL 001 C 1 Runner platform 18/12/2015 21/12/2015 TF/HET/GRR/112 10/02/2016 GERDP-JE-DR-16-001-RA RE
H-623500MEF91-SA00TL002 H-6235 00 MEF 91 - SA00 TL 002 A Runner platform - Arm 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-SA00TL003 H-6235 00 MEF 91 - SA00 TL 003 A Runner platform - Lower support 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-SA00TL004 H-6235 00 MEF 91 - SA00 TL 004 A Runner platform - Upper support 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-SA00TL005 H-6235 00 MEF 91 - SA00 TL 005 A Runner platform - Synoptic installation 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A RR
H-623500MEF91-SA00TL006 H-6235 00 MEF 91 - SA00 TL 006 A Runner platform - Synoptic installation 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A RR
H-623500MEF92-SA00TL001 H-6235 00 MEF 92 - SA00 TL 001 A Distributor platform 03/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A RN
H-623500MEF92-SA00TL002 H-6235 00 MEF 92 - SA00 TL 002 A Distributor platform 03/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A RN
H-623500MEF91-SA00PB001 H-6235 00 MEF 91 - SA00 PB 001 A x Runner platform 23/06/2013 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-SA00PB001 H-6235 00 MEF 91 - SA00 PB 001 B Runner platform part list 07/08/2015 07/09/2015 TF/HET/GRR/103 21/10/2015 GERDP-JE-DR-15-211-A FI
H-623500MEF92-SA00PB001 H-6235 00 MEF 92 - SA00 PB 001 A Turbine pit platform 06/11/2014 05/01/2015 TF/HET/GRR/084 FI ---
H-623500MEF91-201FTB H-6235 00 MEF 91 - 201F TB A Beam GFE 15/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-203FTB H-6235 00 MEF 91 - 203F TB A Beam supplement GFE 16/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-204FTB H-6235 00 MEF 91 - 204F TB A Arm GFE 16/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-208FTB H-6235 00 MEF 91 - 208F TB A Arm axis GFE 16/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-209FTB H-6235 00 MEF 91 - 209F TB A Cross GFE 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-216FTB H-6235 00 MEF 91 - 216F TB A Lower support GFE 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-217FTB H-6235 00 MEF 91 - 217F TB A Upper support GFE 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-219FTB H-6235 00 MEF 91 - 219F TB A Boards GFE 17/04/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF91-021F H-6235 00 MEF 91 - 021F A Platform supplier data 07/09/2015 TF/HET/GRR/103 FI
H-623500MEF92-201FTB H-6235 00 MEF 92 - 201F TB A Details platform GFE 03/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-223FTB H-6235 00 MEF 92 - 223F TB A Details platform GFE 27/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-226FTB H-6235 00 MEF 92 - 226F TB A Details platform GFE 27/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-231FTB H-6235 00 MEF 92 - 231F TB A Details platform GFE 03/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-244FTB H-6235 00 MEF 92 - 244F TB A Details platform GFE 27/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-249FTB H-6235 00 MEF 92 - 249F TB A Gate GFE 27/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-262FTB H-6235 00 MEF 92 - 262F TB A Details platform GFE 27/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
H-623500MEF92-268FTB H-6235 00 MEF 92 - 268F TB A Details platform GFE 27/10/2014 05/01/2015 TF/HET/GRR/084 FI 10/03/2015 GERDP-JE-DR-15-045-A FI
PA99 - ERECTION DOCUMENTS _
DOCUMENTS _
H-623500MEF99-FS00DC003 H-6235 00 MEF 99 - FS00 DC 003 A x Erection Procedure - Preliminary Synoptical 23/07/2013 Handed over during the Model Test FI 10/02/2014 GERDP-14-053 RE
H-623500MEF99-FS00QW-001 H-6235 00 MEF 99 - FS00 QW -001 A 15 x Field Quality Working Plan - Embedded Pipes GFE 17/02/2014 25/02/2014 TF/CXE/GRR/002 FI ---
H-623500MEF99-FS00QW-001 H-6235 00 MEF 99 - FS00 QW -001 C 15 X Field Quality Working Plan - Embedded Pipes GFE 17/02/2014 13/05/2015 TF/CXE/GRR/012 FI 27/07/2015 GERDP-JE-DR-15-121-A RN 03/08/2015 GRR-CXE-MET-15-026-L Revision of document
H-623500MEF99-FS00QW-001 H-6235 00 MEF 99 - FS00 QW -001 D 21 Field Quality Working Plan - Embedded Parts GFE 30/07/2015 03/08/2015 GRR-CXE-MET-15-026-L FI 21/10/2015 GERDP-JE-DR-15-171-A RE
H-623500MEF99-001DC H-6235 00 MEF 99 - 001 DC B Erection Procedure - Pier Nose Installation 16/01/2014 21/01/2014 TF/HET/GRR/050 FI 21/04/2014 GERDP-14-197 RE
H-623500MEF99-002DC H-6235 00 MEF 99 - 002 DC B Inspection Sheets - Pier Nose Installation 18/09/2013 21/01/2014 TF/HET/GRR/050 FI 21/04/2014 GERDP-14-197 RR
H-623500MEF99-003DC H-6235 00 MEF 99 - 003 DC B x Erection Procedure - Embedded Parts Installation Part 2 19/12/2013 21/01/2014 TF/HET/GRR/050 FI 21/04/2014 GERDP-14-197 RE
H-623500MEF99-003DC H-6235 00 MEF 99 - 003 DC C Erection Procedure - Embedded Parts Installation Part 2 GFE 14/03/2014 25/03/2014 TF/CXE/GRR/004 FI 01/12/2014 GERDP-JE-DR-14-245-A RE
H-623500MEF99-004DC H-6235 00 MEF 99 - 004 DC A x Inspection Sheets - Embedded Parts Installation Part 2 10/01/2014 21/01/2014 TF/HET/GRR/050 FI 21/04/2014 GERDP-14-197 RR
H-623500MEF99-004DC H-6235 00 MEF 99 - 004 DC B Inspection Sheets - Embedded Parts Installation Part 2 17/03/2014 25/03/2014 TF/CXE/GRR/004 FI 01/12/2014 GERDP-JE-DR-14-245-A RE
H-623500MEF99-005DC H-6235 00 MEF 99 - 005 DC A 5 x Inspection Procedure - Draft Tube Elbow Parts 28/01/2014 24/02/2014 TF/CXE/GRR/001 FI 04/08/2014 GERDP-14-462 RE
H-623500MEF99-006DC H-6235 00 MEF 99 - 006 DC A 7 x Inspection Sheet - Draft Tube Elbow Parts 28/01/2014 24/02/2014 TF/CXE/GRR/001 FI 04/08/2014 GERDP-14-462 RE
MEU - GOVERNING SYSTEMS _
00 - GENERAL APPLICATION _
00 - GENERAL DOCUMENTS _
H-623500MEU00-FS00FB -01 H-6235 00 MEU 00 - FS00 FB -01 B x Governing Diagram (PID) PRE 30/08/2012 12/09/2012 TF/HET/GRR/002 FA 07/09/2013 GERDP-13-254 RR 26/09/2013 GRR-COO-MET-13-042-L No revision of drawing
H-623500MEU00-FS00FB -01 H-6235 00 MEU 00 - FS00 FB -01 C 6 x Schematic Diagram of Governor Hydraulic System (PID) GFE 28/10/2013 31/10/2013 TF/HET/GRR/037 FI ---
H-623500MEU00-FS00FB -01 H-6235 00 MEU 00 - FS00 FB -01 C 6 x Schematic Diagram of Governor Hydraulic System (PID) GFE 28/10/2013 20/12/2013 TF/HET/GRR/046_DHL FI
H-623500MEU00-FS00FB -01 H-6235 00 MEU 00 - FS00 FB -01 D 6 x Schematic Diagram of Governor Hydraulic System (PID) GFE 20/02/2014 25/02/2014 TF/HET/GRR/055 FI 04/08/2014 GERDP-14-462 RE 16/10/2014 GRR-HET-MET-14-039-L No revision of drawing
H-623500MEU00-FS00FB -01 H-6235 00 MEU 00 - FS00 FB -01 E 6 Schematic Diagram of Governor Hydraulic System (PID) GFE 04/11/2014 12/11/2014 TF/HET/GRR/074 FI 25/01/2015 GERDP-JE-DR-14-325-A RE
H-623500MEU00-FS00FB -01 H-6235 00 MEU 00 - FS00 FB -01 E 6 Schematic Diagram of Governor Hydraulic System (PID) GFE 04/11/2014 02/12/2014 TF/COO/GRR/015_DHL FI
25/10/2013 MoM_25/10/2012 Item 7
02/11/2012 GRR-HET-MET-12-006-T Information
06/02/2013 UHP_GMO-237
H-623500MEU00-FS00FB -02 H-6235 00 MEU 00 - FS00 FB -02 A x Turbine Auxiliairy Diagram (PID) PRE 07/09/2012 12/09/2012 TF/HET/GRR/002 FA RR 21/02/2013 GRR-COO-MET-13-007-L Update of consumer lists
18/06/2013 MoM 18/06/2013 Item 1.10
26/09/2013 GRR-COO-MET-13-042-L Document will be revised
07/09/2013 GERDP –13-254
H-623500MEU00-FS00FB -04 H-6235 00 MEU 00 - FS00 FB -04 B 7 x Schematic Diagram of Turbine Hydraulic System (PID) GFE 28/10/2013 31/10/2013 TF/HET/GRR/037 FI ---
H-623500MEU00-FS00FB -04 H-6235 00 MEU 00 - FS00 FB -04 B 7 x Schematic Diagram of Turbine Hydraulic System (PID) GFE 28/10/2013 20/12/2013 TF/HET/GRR/046_DHL FI ---

05/09/2016 9 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-623500MEU00-FS00FB -04 H-6235 00 MEU 00 - FS00 FB -04 C 7 x Schematic Diagram of Turbine Hydraulic System (PID) GFE 20/02/2014 25/02/2014 TF/HET/GRR/055 FI 04/08/2014 GERDP-14-462 RR
04/08/2014 GERDP-14-462 RR
H-623500MEU00-FS00FB -04 H-6235 00 MEU 00 - FS00 FB -04 D 7 Schematic Diagram of Turbine Hydraulic System (PID) GFE 04/11/2014 12/11/2014 TF/HET/GRR/074 FI
25/01/2015 GERDP-JE-DR-14-325-A RE
H-623500MEU00-FS00FB -04 H-6235 00 MEU 00 - FS00 FB -04 D 7 Schematic Diagram of Turbine Hydraulic System (PID) GFE 04/11/2014 02/12/2014 TF/COO/GRR/015_DHL FI
H-623500MEU00-FS00FP-01 H-6235 00 MEU 00 - FS00 FP -01 A 13 x Governing Equipment and Safety Device List GFR 25/10/2013 31/10/2013 TF/HET/GRR/037 FA 01/05/2014 GERDP-14-214 FI
05/11/2014 GMO_2088 FI
H-623500MEU00-FS00FP-01 H-6235 00 MEU 00 - FS00 FP -01 B 12 Governing Equipment and Safety Device List GFE 04/11/2014 12/11/2014 TF/HET/GRR/074 FA 27/11/2014 GRR-HET-MET-14-057-L
25/01/2015 GERDP-JE-DR-14-325-A FI
H-623500MEU00-FS00FP-02 H-6235 00 MEU 00 - FS00 FP -02 A 17 x Turbine Equipment and Safety Device List GFR 25/10/2013 31/10/2013 TF/HET/GRR/037 FA 01/05/2014 GERDP-14-214 FI
05/11/2014 GMO_2088 FI
H-623500MEU00-FS00FP-02 H-6235 00 MEU 00 - FS00 FP -02 B 15 Turbine Equipment and Safety Device List GFE 05/11/2014 12/11/2014 TF/HET/GRR/074 FA 27/11/2014 GRR-HET-MET-14-057-L
25/01/2015 GERDP-JE-DR-14-325-A FI
H-623500MEU00-FS00FE-01 H-6235 00 MEU 00 - FS00 FE -01 A 40 Governing System Operating Sequences GFR 09/06/2014 12/06/2014 TF/COO/GRR/010 FA 01/12/2014 GERDP-JE-DR-14-226-A RR
H-623500MEU00-FS00ED-01 H-6235 00 MEU 00 - FS00 ED -01 A 6 Governing System Calculation Sheet GFR 25/02/2014 28/02/2014 TF/HET/GRR/056 FA 04/08/2014 GERDP-14-462 RE
H-623500MEU00-FS00DB-01 H-6235 00 MEU 00 - FS00 DB -01 A 17 x Governing System Technical Specification GFR 15/05/2013 05/07/2013 TF/HET/GRR/025 FA 13/08/2013 GERDP-13-283 RN 03/09/2013 GRR-HET-MET-13-041-T Revision of drawing
H-623500MEU00-FS00DB-01 H-6235 00 MEU 00 - FS00 DB -01 B 18 x Governing System Technical Specification 20/08/2013 03/09/2013 TF/HET/GRR/028 FA DEEMED APPROVED
H-623500MEU00-FS00DB-01 H-6235 00 MEU 00 - FS00 DB -01 C 18 x Governing System Technical Specification GFE 26/03/2014 18/06/2014 TF/HET/GRR/066 FI 18/08/2014 GERDP-14-492 RR 12/09/2014 GRR-HET-MET-14-033-L No revision of drawing
H-623500MEU00-FS00DB-01 H-6235 00 MEU 00 - FS00 DB -01 D 18 Governing System Technical Specification GFE 02/12/2014 04/02/2015 TF/HET/GRR/088 FI 30/04/2015 GERDP-JE-DR-15-059-A RE
02/11/2012 GRR-HET-MET-12-006-T Information
25/10/2013 MoM_25/10/2012 Item 7
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 A x Consumers List PRE - 01/10/2012 GRR-HET-MET-12-003-T FI Commented 21/02/2013 GRR-COO-MET-13-007-L Update of consumer lists
06/02/2013 UHP_GMO-237
04/08/2014 GERDP-14-462 FI
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 C x Consumers List - 13/02/2013 GRR-COO-MET-13-007-L FI 18/06/2013 MoM_18/06/2013 Item 1.10 RC
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 D x Consumers List GFE 31/10/2013 21/11/2013 TF/HET/GRR/038 FI ---
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 E x Consumers List GFE 06/02/2014 18/02/2014 TF/HET/GRR/053 FI 03/09/2014 GERDP-JE-DR-14-128-A FI
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 F x Consumers List GFE 11/03/2014 21/03/2014 TF/HET/COO/009 FI ---
04/08/2014 GERDP-14-465
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 G x Consumers List GFE 24/06/2014 25/06/2014 TF/HET/COO/011 FI FI 27/11/2014 GRR-HET-MET-14-057-L
05/11/2014 GMO_2088
H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 H x Consumers List GFE 23/10/2014 12/11/2014 TF/COO/GRR/014 FI 25/12/2014 GERDP-JE-DR-14-324-A. FI

H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 I 7 x Consumers List GFE 18/06/2015 19/06/2015 TF/HET/GRR/097 FI 30/07/2015 GERDP-JE-DR-15-134-A FI

H-623500MEF00-FS00ED-01 H-6235 00 MEF 00 - FS00 ED -01 J 7 Consumers List GFE 18/12/2015 21/12/2015 TF/HET/GRR/113 FI 20/02/2016 GERDP-JE-DR-16-003-RA FI
H-623500MEU02-PA00PB001 H-6235 00 MEU 02 - PA00 PB 001 A List of Spare Parts Governing - 17/01/2013 MoM_16-17/01/2013_attachment FA 02/07/2013 GRR-HET-MET-13-030L Reminder for response
10 - SPEED GOVERNOR ELECTRONIC CUBICLES _
GENERAL DOCUMENTATION _
H-623500MEU10-PA00FF-01 H-6235 00 MEU 10 - PA00 FF -01 A 9 x Speed Governor Functional Diagram PRE 23/09/2013 19/12/2013 TF/HET/GRR/047 FI 09/04/2014 GERDP-14-204 RN
H-623500MEU10-PA00FF-01 H-6235 00 MEU 10 - PA00 FF -01 B 9 x Speed Governor Functional Diagram GFR 17/03/2014 28/03/2014 TF/HET/GRR/058 FA DEEMED APPROVED
H-623500MEU10-PA00FF-01 H-6235 00 MEU 10 - PA00 FF -01 C 9 x Speed Governor Functional Diagram GFE 16/04/2014 18/06/2014 TF/HET/GRR/066 FA 18/08/2014 GERDP-14-492 RN 12/09/2014 GRR-HET-MET-14-033-L No revision of drawing
H-623500MEU10-PA00FF-01 H-6235 00 MEU 10 - PA00 FF -01 D 9 Speed Governor Functional Diagram GFE 12/12/2014 04/02/2015 TF/HET/GRR/088 FA 30/04/2015 GERDP-JE-DR-15-059-A RE
H-623500MEU10-PA00FF-02 H-6235 00 MEU 10 - PA00 FF -02 A 9 x THGP Functional Diagram GFR 20/03/2014 28/03/2014 TF/HET/GRR/058 FA DEEMED APPROVED
H-623500MEU10-PA00FF-02 H-6235 00 MEU 10 - PA00 FF -02 B 9 x THGP Functional Diagram GFE 01/04/2014 19/05/2014 TF/HET/GRR/060 FI 18/08/2014 GERDP-14-481 RN 16/09/2014 GRR-HET-MET-14-034-L No revision of drawing
H-623500MEU10-PA00FF-02 H-6235 00 MEU 10 - PA00 FF -02 C 9 THGP Functional Diagram GFE 15/05/2014 04/02/2015 TF/HET/GRR/088 FA 30/04/2015 GERDP-JE-DR-15-059-A RE
H-623500MEU10-PA00FP-01 H-6235 00 MEU 10 - PA00 FP -01 A 16 x Speed Governor Input Output List GFR 21/03/2014 28/03/2014 TF/HET/GRR/058 FA DEEMED APPROVED
H-623500MEU10-PA00FP-01 H-6235 00 MEU 10 - PA00 FP -01 B 16 x Speed Governor Input Output List GFE 16/04/2014 18/06/2014 TF/HET/GRR/066 FA 18/08/2014 GERDP-14-492 RE
H-623500MEU10-PA00FP-01 H-6235 00 MEU 10 - PA00 FP -01 C 16 Speed Governor Input Output List GFE 12/12/2014 04/02/2015 TF/HET/GRR/088 FA 30/05/2015 GERDP-JE-DR-15-059-A RE 21/05/2015 GRR-HET-MET-15-047-L No revision of drawing
H-623500MEU10-PA00FP-02 H-6235 00 MEU 10 - PA00 FP -02 A 12 x THGP Input Output List GFR 01/04/2014 19/05/2014 TF/HET/GRR/060 FA 18/08/2014 GERDP-14-481 RN
H-623500MEU10-PA00FP-02 H-6235 00 MEU 10 - PA00 FP -02 B 12 THGP Input Output List GFE 15/05/2014 04/08/2014 TF/HET/GRR/067 FA 29/10/2014 GERDP-JE-DR-14-256-A RN 17/09/2015 GRR-HET-MET-14-041-L No revision of drawing
H-623500MEU10-PA00FP-03 H-6235 00 MEU 10 - PA00 FP -03 A 12 Speed Governor Communication List GFR 28/03/2014 19/05/2014 TF/HET/GRR/060 FA 18/08/2014 GERDP-14-481 RN
H-623500MEU10-PA00TL-01 H-6235 00 MEU 10 - PA00 TL -01 A 4 Speed Governor General Arrangement GFR 17/02/2014 28/03/2014 TF/HET/GRR/058 FA 19/12/2015 GERDP-JE-DR-14-304-A RN
H-623500MEU10-PA00TL-02 H-6235 00 MEU 10 - PA00 TL -02 A 4 x THGP General Arrangement GFR 01/04/2014 19/05/2014 TF/HET/GRR/060 FA 18/08/2014 GERDP-14-481 RE 05/03/2015 GRR-HET-MET-15-026-L No revision of drawing
H-623500MEU10-PA00TL-02 H-6235 00 MEU 10 - PA00 TL -02 B 4 THGP General Arrangement GFE 01/12/2014 04/02/2015 TF/HET/GRR/088 FA 30/05/2015 GERDP-JE-DR-15-059-A RE
H-623500MEU10-PA00FE-01 H-6235 00 MEU 10 - PA00 FE -01 A 34 x T-SLG Operating Instructions GFR 24/03/2014 28/03/2014 TF/HET/GRR/058 FA 19/12/2014 GERDP-JE-DR-14-304-A RR 05/03/2015 GRR-HET-MET-15-026-L No revision of drawing
H-623500MEU10-PA00FE-01 H-6235 00 MEU 10 - PA00 FE -01 B 34 T-SLG Functional Description GFE 12/01/2015 30/01/2015 TF/HET/GRR/087 FA 30/05/2015 GERDP-JE-DR-15-059-A RE 21/05/2015 GRR-HET-MET-15-047-L revision of drawing
H-623500MEU10-PA00FE-02 H-6235 00 MEU 10 - PA00 FE -02 A 34 x B&R X20 GOPU Operating Instructions GFR 02/04/2014 19/05/2014 TF/HET/GRR/060 FA 18/08/2014 GERDP-14-481 RN
H-623500MEU10-PA00FE-02 H-6235 00 MEU 10 - PA00 FE -02 B 34 B&R X20 GOPU Operating Instructions GFE 12/01/2015 04/02/2015 TF/HET/GRR/088 FA 30/05/2015 GERDP-JE-DR-15-059-A RE
H-623500MEU11-SA00PB-01 H-6235 00 MEU 11 - SA00 PB -01 B 2 Parts List GFE 22/01/2015 04/02/2015 TF/HET/GRR/088 FI 30/04/2015 GERDP-JE-DR-15-059-A FI
H-623500MEU11-SA00FS-01 H-6235 00 MEU 11 - SA00 FS -01 A 67 x Speed Governor Wiring Diagram GFR 07/04/2014 18/06/2014 TF/HET/GRR/066 FA 18/08/2014 GERDP-14-492 RE
H-623500MEU11-SA00FS-01 H-6235 00 MEU 11 - SA00 FS -01 B 68 Speed Governor Wiring Diagram GFE 02/12/2014 04/02/2015 TF/HET/GRR/088 FA 30/05/2015 GERDP-JE-DR-15-059-A RE
H-623500MEU11-SA00TB-01 H-6235 00 MEU 11 - SA00 TB -01 A 16 x Speed Governor Detail Arrangement GFR 17/04/2014 18/06/2014 TF/HET/GRR/066 FA 18/08/2014 GERDP-14-492 RN 12/09/2014 GRR-HET-MET-14-033-L No revision of drawing
H-623500MEU11-SA00TB-01 H-6235 00 MEU 11 - SA00 TB -01 B 16 Speed Governor Detail Arrangement GFE 12/09/2014 04/02/2015 TF/HET/GRR/088 FA 30/05/2015 GERDP-JE-DR-15-059-A RE
27/01/2015 GERDP-JE-DR-14-011-A
H-623500MEU13-SA00PB-01 H-6235 00 MEU 13 - SA00 PB -01 A 2 TSOFT - Equipment List GFE 22/01/2015 04/02/2015 TF/HET/GRR/088 FI FI
30/04/2015 GERDP-JE-DR-15-059-A
H-623500MEU14-SA00QA-01 H-6235 00 MEU 14 - SA00 QA -01 A x Workshop Test Program for FAT 30/09/2014 18/11/2014 TF/HET/GRR/075 FI 25/01/2015 GERDP-JE-DR-14-325-A RN 03/03/2015 GRR-HET-MET-15-024-L Revision of document
H-623500MEU14-SA00QA-01 H-6235 00 MEU 14 - SA00 QA -01 B Workshop Test Program for FAT 21/11/2014 28/11/2014 TF/HET/GRR/079 FI
H-623500MEU17-SA00PB-01 H-6235 00 MEU 17 - SA00 PB -01 B 2 Parts List GFE 22/01/2015 04/02/2015 TF/HET/GRR/088 FI 30/04/2015 GERDP-JE-DR-15-059-A FI
H-623500MEU17-SA00MA-01 H-6235 00 MEU 17 - SA00 MA -01 A 38 THGP Wiring Diagram GFR 19/08/2014 04/08/2014 TF/HET/GRR/067 FA DEEMED APPROVED
H-623500MEU17-SA00TB-01 H-6235 00 MEU 17 - SA00 TB -01 A 14 x THGP Detail Arrangement GFR 01/04/2014 04/08/2014 TF/HET/GRR/067 FA DEEMED APPROVED
29/10/2014 GERDP-JE-DR-14-256-A
H-623500MEU17-SA00TB-01 H-6235 00 MEU 17 - SA00 TB -01 B 14 THGP Detail Arrangement GFE 01/12/2014 04/02/2015 TF/HET/GRR/088 FA RE
30/05/2015 GERDP-JE-DR-15-059-A
H-623500MEU18-SA00PB-01 H-6235 00 MEU 18 - SA00 PB -01 A 2 Parts List GFE 22/01/2015 04/02/2015 TF/HET/GRR/088 FI 30/04/2015 GERDP-JE-DR-15-059-A FI
H-623500MEU19-SP00PB-01 H-6235 00 MEU 19 - SP00 PB -01 A Speed Governor - Electronic Spare Parts List for Phase 1 02/07/2015 07/07/2015 TF/HET/GRR/100 FI 07/08/2015 GERDP-JE-DR-15-151-A RE
H-623500MEU19-SP00PB-02 H-6235 00 MEU 19 - SP00 PB -02 A Speed Governor - Electronic Spare Parts List for Phase 2 12/11/2015 18/11/2015 TF/HET/GRR/111 FI ---
30 - PRESSURIZED SYSTEM _
31 - GOVERNOR AIR/OIL PRESSURE TANK _
H-623500MEU31-SP00PB-01 H-6235 00 MEU 31 - SP00 PB -01 A X Governor Pressure Tanks Spare Parts List for Phase 1 03/07/2015 07/07/2015 TF/HET/GRR/100 FI 07/08/2015 GERDP-JE-DR-15-151-A RE

H-623500MEU31-SP00PB-01 H-6235 00 MEU 31 - SP00 PB -01 B 2 Governor Pressure Tanks Spare Parts List for Phase 1 11/01/2016 25/04/2016 TF/HET/GRR/118 FI 16/08/2016 GERDP-JE-DR-16-075-A RE

H-623500MEU31-SP00PB-02 H-6235 00 MEU 31 - SP00 PB -02 A X Governor Pressure Tanks Spare Parts List for Phase 2 06/11/2015 18/11/2015 TF/HET/GRR/111 FI ---
H-623500MEU31-SP00PB-02 H-6235 00 MEU 31 - SP00 PB -02 B 2 Governor Pressure Tanks Spare Parts List for Phase 2 11/04/2016 25/04/2016 TF/HET/GRR/118 FI 16/08/2016 GERDP-JE-DR-16-075-A RN
H-623500MEU31-SA00TL-01 H-6235 00 MEU 31 - SA00 TL -01 A 1 General Arrangement GFR 24/02/2014 25/02/2014 TF/HET/GRR/055 FA 04/08/2014 GERDP-14-462 RE
H-623500MEU31-SA00MA-01 H-6235 00 MEU 31 - SA00 MA -01 A 8 Marshalling Box Wiring Diagram 26/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623509MEU31-FS0FQC-001 H-6235 09 MEU 31 - FS0F QC -001 A 74 OIL-AIR PRESSURE TANK QUALITY Data Book- unit 09 ASB 19/03/2015 23/10/2015 TF/HET/GRR/109 ASB 18/11/2015 GERDP-JE-DR-15-225-A FI
H-623510MEU31-FS0FQC-001 H-6235 10 MEU 31 - FS0F QC -001 A 74 OIL-AIR PRESSURE TANK QUALITY Data Book- unit 10 ASB 20/03/2015 23/10/2015 TF/HET/GRR/109 ASB 18/11/2015 GERDP-JE-DR-15-225-A FI

05/09/2016 10 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

36 - GOVERNOR AIR PRESSURE TANK _


H-623500MEU36-SA00TL-01 H-6235 00 MEU 36 - SA00 TL -01 A 1 General Arrangement GFR 24/02/2014 25/02/2014 TF/HET/GRR/055 FA 04/08/2014 GERDP-14-462 RE
H-623500MEU36-SA00MA-01 H-6235 00 MEU 36 - SA00 MA -01 A 8 Marshalling Box Wiring Diagram 21/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623509MEU36-FS0FQC-001 H-6235 09 MEU 36 - FS0F QC -001 A 67 OIL-AIR PRESSURE TANK QUALITY Data Book- unit 09 ASB 20/03/2015 23/10/2015 TF/HET/GRR/109 ASB 18/11/2015 GERDP-JE-DR-15-225-A FI
H-623510MEU36-FS0FQC-001 H-6235 10 MEU 36 - FS0F QC -001 A 67 OIL-AIR PRESSURE TANK QUALITY Data Book- unit 10 ASB 20/03/2015 23/10/2015 TF/HET/GRR/109 ASB 18/11/2015 GERDP-JE-DR-15-225-A FI
38 - HP AIR COMPRESSORS _
H-623500MEU38-SP00PB-01 H-6235 00 MEU 38 - SP00 PB -01 A HP Air Compressor Spare Parts List for Phase 1 21/04/2015 07/07/2015 TF/HET/GRR/100 FI 07/08/2015 GERDP-JE-DR-15-151-A RE
H-623500MEU38-SP00PB-02 H-6235 00 MEU 38 - SP00 PB -02 A HP Air Compressor Spare Parts List for Phase 2 05/11/2015 18/11/2015 TF/HET/GRR/111 FI ---
H-623500MEU38-SA00TL-01 H-6235 00 MEU 38 - SA00 TL -01 A 1 General Arrangement GFR 24/02/2014 25/02/2014 TF/HET/GRR/055 FA 04/08/2014 GERDP-14-462 RE
H-623500MEU38-SA00MA-01 H-6235 00 MEU 38 - SA00 MA -01 A 27 Marshalling Box Wiring Diagram 31/12/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
50 - HYDRAULIC POWER UNIT _
H-623500MEU54-SA00MA-01 H-6235 00 MEU 54 - SA00 MA -01 A 12 Marshalling Box Wiring Diagram (Parts -01 To -0X) 10/06/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
58 - GOVERNOR SUMP TANK _
H-623500MEU58-SP00PB-01 H-6235 00 MEU 58 - SP00 PB -01 A X Governor Sump Tank Spare Parts for Phase 1 26/06/2015 07/07/2015 TF/HET/GRR/100 FI 07/08/2015 GERDP-JE-DR-15-151-A RE
H-623500MEU58-SP00PB-01 H-6235 00 MEU 58 - SP00 PB -01 B Governor Sump Tank Spare Parts for Phase 1 04/11/20154 18/11/2015 TF/HET/GRR/111 FI
H-623500MEU58-SP00PB-02 H-6235 00 MEU 58 - SP00 PB -02 A Governor Sump Tank Spare Parts for Phase 2 09/11/20154 18/11/2015 TF/HET/GRR/111 FI ---
H-623500MEU58-SA00TL-01 H-6235 00 MEU 58 - SA00 TL -01 A 1 General Arrangement GFR 24/02/2014 25/02/2014 TF/HET/GRR/055 FA 04/08/2014 GERDP-14-462 RE
H-623509MEU58-SA0FQC-001 H-6235 09 MEU 58 - SA0F QC -001 A 42 OIL SUMP TANK QUALITY Data Book- unit 09 ASB 21/05/2015 23/10/2015 TF/HET/GRR/109 ASB 18/11/2015 GERDP-JE-DR-15-225-A FI
H-623510MEU58-SA0FQC-001 H-6235 10 MEU 58 - SA0F QC -001 A 42 OIL SUMP TANK QUALITY Data Book- unit 10 ASB 21/05/2015 23/10/2015 TF/HET/GRR/109 ASB 18/11/2015 GERDP-JE-DR-15-225-A FI
H-623500MEU63-SA00PB-01 H-6235 00 MEU 63 - SA00 PB -01 B 4 Parts List 20/05/2015 25/05/2015 TF/HET/GRR/096 FI 23/07/2015 GERDP-JE-DR-15-113-A FI
H-623500MEU63-SP00PB-01 H-6235 00 MEU 63 - SP00 PB -01 A Speed & Overspeed Detection Spare Parts for Phase 1 03/07/2015 07/07/2015 TF/HET/GRR/100 FI 07/08/2015 GERDP-JE-DR-15-151-A RE
H-623500MEU63-SP00PB-02 H-6235 00 MEU 63 - SP00 PB -02 A Speed & Overspeed Detection Spare Parts for Phase 2 05/11/2015 18/11/2015 TF/HET/GRR/111 FI ---
H-623500MEU63-SA00TL-01 H-6235 00 MEU 63 - SA00 TL -01 A 1 General Arrangement 22/04/2015 25/05/2015 TF/HET/GRR/096 FA 23/07/2015 GERDP-JE-DR-15-113-A RE
H-623500MEU63-SA00TL-02 H-6235 00 MEU 63 - SA00 TL -02 A 1 General Arrangement 22/04/2015 25/05/2015 TF/HET/GRR/096 FA 23/07/2015 GERDP-JE-DR-15-113-A RE
H-623500MEU65-SA00PB-01 H-6235 00 MEU 65 - SA00 PB -01 A 3 Parts List 30/09/2014 19/06/2015 TF/HET/GRR/097 FI 30/07/2015 GERDP-JE-DR-15-134-A FI
H-623500MEU65-SA00MB-01 H-6235 00 MEU 65 - SA00 MB -01 A 6 x Cables List 29/06/2015 19/06/2015 TF/HET/GRR/097 FI ---
30/07/2015 GERDP-JE-DR-15-134-A
H-623500MEU65-SA00MB-01 H-6235 00 MEU 65 - SA00 MB -01 B 6 Cables List 03/07/2015 07/07/2015 TF/HET/GRR/100 FI FI
07/08/2015 GERDP-JE-DR-15-150-A
H-623500MEU65-SA00FF-01 H-6235 00 MEU 65 - SA00 FF -01 A 10 Cables Routing Diagram 30/05/2015 19/06/2015 TF/HET/GRR/097 FI 30/07/2015 GERDP-JE-DR-15-134-A FI
H-623500MEU65-SA00MA-02 H-6235 00 MEU 65 - SA00 MA -02 A 22 Marshalling Box Wiring Diagram (Thrust bearing monitoring) 19/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623500MEU65-SA00MA-04 H-6235 00 MEU 65 - SA00 MA -04 A 8 Marshalling Box Wiring Diagram (Turbine hydraulic measures) 13/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623500MEU65-SA00MA-05 H-6235 00 MEU 65 - SA00 MA -05 A 8 Marshalling Box Wiring Diagram (Aeration valve control) 12/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623500MEU65-SA00MA-06 H-6235 00 MEU 65 - SA00 MA -06 A 8 Marshalling Box Wiring Diagram (Aeration valve monitoring) 12/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623500MEU66-SA00MA-01 H-6235 00 MEU 66 - SA00 MA -01 A 22 Marshalling Boxes Wiring Diagram 19/05/2015 19/06/2015 TF/HET/GRR/097 FA 30/07/2015 GERDP-JE-DR-15-134-A RE
H-623500MEU71-SA00PB-01 H-6235 00 MEU 71 - SA00 PB -01 B 9 Parts List 13/05/2015 25/05/2015 TF/HET/GRR/096 FI 23/07/2015 GERDP-JE-DR-15-113-A FI
H-623500MEU71-SA00TL-01 H-6235 00 MEU 71 - SA00 TL -01 B 6 General Arrangement 06/05/2015 25/05/2015 TF/HET/GRR/096 FA 23/07/2015 GERDP-JE-DR-15-113-A RE
MKB - VERTICAL GENERATOR 03/09/2012 _

FS00 - GENERAL DOCUMENTS _


GENERAL DOCUMENTS _
HGGD000070 H-6235 00 MKB 00 - FS00 QA -01 A X IT Program 03/09/2012 03/09/2012 TF/HEG/GRR/001 FA DEEMED APPROVED
HGGD000070 H-6235 00 MKB 00 - FS00 QA -01 B X IT Program 30/11/2012 08/01/2013 TF/HEG/GRR/007 FA DEEMED APPROVED
HGGD000070 H-6235 00 MKB 00 - FS00 QA -01 C Inspection and Test Plan 31/01/2013 04/02/2013 TF/HEG/GRR/008 FA 20/03/2013 MoM_19-20/03/2013 Section 5.4 Commented
HGGD000171 H-6235 00 MKB 00 - FS00 QA -02 A ITP - Stator Frame 03/05/2013 17/05/2013 TF/HEG/GRR/014 FA DEEMED APPROVED
HGGD000172 H-6235 00 MKB 00 - FS00 QA -03 A ITP - Stator Winding 03/05/2013 29/05/2013 TF/HEG/GRR/017 FA DEEMED APPROVED
HGGD000173 H-6235 00 MKB 00 - FS00 QA -04 A ITP - Stator Assembly 03/05/2013 29/05/2013 TF/HEG/GRR/017 FA DEEMED APPROVED
HGGD000174 H-6235 00 MKB 00 - FS00 QA -05 A 7 x ITP - Rotor Shaft Line 16/05/2013 06/08/2013 TF/HEG/GRR/029 FI ---
HGGD000174 H-6235 00 MKB 00 - FS00 QA -05 B 7 ITP - Rotor Shaft Line 18/12/2015 05/02/2016 TF/HEG/GRR/088 FI GERDP-JE-DR-15-210-A ---
HGGD000175 H-6235 00 MKB 00 - FS00 QA -06 A 5 ITP - Rotor Rim 16/05/2013 31/07/2013 TF/HEG/GRR/026 FI ---
HGGD000176 H-6235 00 MKB 00 - FS00 QA -07 B ITP - Rotor Pole 05/08/2013 06/08/2013 TF/HEG/GRR/029 FA DEEMED APPROVED
HGGD000177 H-6235 00 MKB 00 - FS00 QA -08 A ITP - Rotor Assembly 16/05/2013 06/08/2013 TF/HEG/GRR/029 FI 21/04/2014 GERDP-14-196 RN
HGGD000178 H-6235 00 MKB 00 - FS00 QA -09 A 6 x ITP - Guide Bearing GFE 16/05/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 RR 17/04/2014 GRR-HEG-MET-14-019-L Revision of drawing
HGGD000178 H-6235 00 MKB 00 - FS00 QA -09 C 6 x ITP - Guide Bearing GFR 15/05/2014 26/06/2014 TF/HEG/GRR/067 FA 01/12/2014 GERDP-JE-DR-14-233-A RE
HGGD000178 H-6235 00 MKB 00 - FS00 QA -09 D 6 ITP - Guide Bearing GFE 23/01/2015 23/02/2015 TF/HEG/GRR/082 FA
HGGD000179 H-6235 00 MKB 00 - FS00 QA -10 A ITP - Coolers 16/05/2013 10/02/2014 TF/HEG/GRR/055 FI 14/03/2014 GERPD-14-127 RE
HGGD000180 H-6235 00 MKB 00 - FS00 QA -11 A ITP - Braking and Lifting 16/05/2013 10/02/2014 TF/HEG/GRR/055 FI ---
HGGD000181 H-6235 00 MKB 00 - FS00 QA -12 A ITP - Accessories 16/05/2013 10/02/2014 TF/HEG/GRR/055 FI 14/03/2014 GERPD-14-127 RE
HGGD000182 H-6235 00 MKB 00 - FS00 QA -13 A ITP - Generator Assembly 16/05/2013 29/05/2013 TF/HEG/GRR/017 FA 21/04/2014 GERDP-14-196 RN
HGGD000080 H-6235 00 MKB 00 - FS00 EC -01 A x Painting Specification 26/09/2012 08/01/2013 TF/HEG/GRR/007 FA DEEMED APPROVED
HGGD000080 H-6235 00 MKB 00 - FS00 EC -01 B x Painting Specification 07/08/2013 13/08/2013 TF/HEG/GRR/031 FA 13/08/2013 GERDP-13-279 AN 11/12/2013 GRR-COO-MET-13-065-T Revision of drawing
HGGD000080 H-6235 00 MKB 00 - FS00 EC -01 C 30 x Painting Specification GFE 06/12/2013 11/12/2013 TF/COO/GRR/007 FI 27/05/2014 GERDP-14-292 RN
HGGD010000 H-6235 00 MKB 00 - FS00 LD -01 A 1 x Generator Cross-Section 05/10/2012 12/10/2012 TF/HEG/GRR/005 FA DEEMED APPROVED
HGGD010000 H-6235 00 MKB 00 - FS00 LD -01 A 1 x Generator Cross-Section 05/10/2012 08/07/2013 TF/HEG/GRR/024_DHL FA DEEMED APPROVED
HGGD010000 H-6235 00 MKB 00 - FS00 LD -01 B 1 Generator Cross-Section 17/07/2014 31/07/2014 TF/HEG/GRR/073 FA 09/09/2014 GERDP-JE-DR-14-255-A RE
HGGD010000 H-6235 00 MKB 00 - FS00 LD -01 B 1 Generator Cross-Section 17/07/2014 02/12/2014 TF/COO/GRR/015_DHL FI
HGGD010005 H-6235 00 MKB 00 - FS00 LD -02 A 1 x Piping And Auxiliaries Layout FA 24/09/2012 02/10/2013 TF/HEG/GRR/004 FA 06/02/2012 UHP_GMO-237 Commented 21/02/2013 GRR-COO-MET-13-007-L Revision of drawing
No revision of drawing
HGGD010005 H-6235 00 MKB 00 - FS00 LD -02 B 1 x Piping And Auxiliaries Layout FA 26/04/2013 08/07/2013 TF/HEG/GRR/024_DHL FA 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
04/08/2014 GERDP-14-462 'RE'
No revision of drawing
HGGD010005 H-6235 00 MKB 00 - FS00 LD -02 B 1 x Piping And Auxiliaries Layout FA 26/04/2013 29/04/2013 TF/HEG/GRR/012 FA 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
04/08/2014 GERDP-14-462 'RE'
HGGD010005 H-6235 00 MKB 00 - FS00 LD -02 C 1 x Piping And Auxiliaries Layout GFE 20/12/2013 20/12/2013 TF/HEG/GRR/049 FI ---
HGGD010005 H-6235 00 MKB 00 - FS00 LD -02 D 1 Piping And Auxiliaries Layout GFE 13/03/2014 21/03/2014 TF/COO/GRR/009 FI ---
HGGD010005 H-6235 00 MKB 00 - FS00 LD -02 D 1 Piping And Auxiliaries Layout GFE 13/03/2014 02/12/2014 TF/COO/GRR/015_DHL FI ---
HGGD010006 H-6235 00 MKB 00 - FS00 LD -03 A 1 Generator Equipment Dimensions 11/10/2012 12/10/2012 TF/HEG/GRR/005 FI ---
HGGD010006 H-6235 00 MKB 00 - FS00 LD -03 A 1 Generator Equipment Dimensions 11/10/2012 08/07/2013 TF/HEG/GRR/024_DHL FI ---
HGGD010006 H-6235 00 MKB 00 - FS00 LD -03 A 1 Generator Equipment Dimensions 11/10/2012 02/12/2014 TF/COO/GRR/015_DHL FI ---
HGGD481001 H-6235 00 MKB 01 - 201F TB -01 A 1 Generator Nameplate GFR 11/02/2014 18/02/2014 TF/HEG/GRR/056 FA 03/09/2014 GERDP-JE-DR-14-131-A RR
SA02 - CIVIL WORK DRAWING _
HGGD020000 H-6235 00 MKB 02 - SA00 LC -01 A 3 x Openings and Trenches in Concrete 03/09/2012 04/09/2012 GRR-HEG-MET-12-002T FI 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
HGGD020000 H-6235 00 MKB 02 - SA00 LC -01 B 3 x Openings and Trenches in Concrete 07/01/2013 08/01/2013 TF/HEG/GRR/007 FA DEEMED APPROVED
HGGD020000 H-6235 00 MKB 02 - SA00 LC -01 B 3 x Openings and Trenches in Concrete 07/01/2013 25/03/2013 TF/COO/GRR/005_DHL FA DEEMED APPROVED
no revision of drawing
HGGD020000 H-6235 00 MKB 02 - SA00 LC -01 C 3 x Openings and Trenches in Concrete 24/04/2013 29/04/2013 TF/HEG/GRR/012 FA 25/01/2015 GERDP-JE-DR-14-105-A RN 03/03/2015 GRR-HEG-MET-15-015-L
HGGD020000 H-6235 00 MKB 02 - SA00 LC -01 D 3 x Openings and Trenches in Concrete GFE 20/12/2013 20/12/2013 TF/HEG/GRR/049 FI ---
HGGD020000 H-6235 00 MKB 02 - SA00 LC -01 E 3 Openings and Trenches in Concrete GFE 12/02/2014 21/03/2014 TF/COO/GRR/009 FI 09/02/2015 GERDP-JE-DR-15-014-A RE
HGGD020001 H-6235 00 MKB 02 - SA00 LB -01 A x Generator Foundation Loads 04/09/2012 04/09/2012 GRR-HEG-MET-12-002T FA 03/12/2013 Salini_P5000-05.25-299_27 Nov 12 Commented 10/01/2013 GRR-COO-MET-13-001-L Revision of drawing
HGGD020001 H-6235 00 MKB 02 - SA00 LB -01 B x Generator Foundation Loads GFE 08/02/2013 11/02/2013 TF/HEG/GRR/009 FI 15/03/2013 GERDP-13-063 Commented 25/03/2013 GRR-COO-MET-13-008-T Revision of drawing
HGGD020001 H-6235 00 MKB 02 - SA00 LB -01 C x Generator Foundation Loads GFE 25/03/2013 25/03/2013 TF/HEG/GRR/010 FI 13/04/2013 GERDP-13-105 Commented 30/04/2013 GRR-HEG-MET-13-011-T Revision of drawing
HGGD020001 H-6235 00 MKB 02 - SA00 LB -01 C x Generator Foundation Loads GFE 25/03/2013 25/03/2013 TF/COO/GRR/005_DHL FI 13/04/2013 GERDP-13-105 Commented 30/04/2013 GRR-HEG-MET-13-011-T Revision of drawing
HGGD020001 H-6235 00 MKB 02 - SA00 LB -01 D Generator Foundation Loads GFE 30/04/2013 30/04/2013 TF/HEG/GRR/013 FI 13/05/2014 GERDP-14-254 RE
SA06 - ERECTION DOCUMENTS _

05/09/2016 11 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

3/12/2012 Email_Wogayehu-Gizaw_03/12/2012
11/12/2012 UHP_GMO-2335 28/11/2013 GRR-HEG-MET-12-008-L
HGGD030000 H-6235 00 MKB 06 - SA00 LD -01 A 2 x Erection Bay Layout 26/11/2012 27/11/2012 TF/HEG/GRR/006 FA Commented Revision of drawing
13/04/2013 ER_GERDP-SCM/FSU-13/104/CEXT 03/05/2013 GRR-HEG-MET-13-015-L
12/04/2013 ER_GERDP-SCM/FSU-13/129/CEXT
HGGD030000 H-6235 00 MKB 06 - SA00 LD -01 B 2 x Erection Bay Layout 14/06/2013 17/06/2013 TF/HEG/GRR/019 FI 13/09/2013 GERDP-13-325 RR 02/10/2013 GRR-HEG-MET-13-040-T Revision of drawing
HGGD030000 H-6235 00 MKB 06 - SA00 LD -01 B 2 x Erection Bay Layout 14/06/2013 08/07/2013 TF/HEG/GRR/024_DHL FA 13/09/2013 GERDP-13-325 RR 02/10/2013 GRR-HEG-MET-13-040-T Revision of drawing
HGGD030000 H-6235 00 MKB 06 - SA00 LD -01 D 2 x Erection Bay Layout 27/09/2013 02/10/2013 TF/HEG/GRR/037 FA 10/02/2014 GERDP-14-047 RR 07/04/2014 GRR-HEG-MET-14-015-T Revision of drawing
25/12/2014
HGGD030000 H-6235 00 MKB 06 - SA00 LD -01 E 2 Erection Bay Layout 04/04/2014 07/04/2014 TF/HEG/GRR/060 FI GERDP-JE-DR-14-191-A RR
10/03/2015
HGGD030000 H-6235 00 MKB 06 - SA00 LD -01 E 2 Erection Bay Layout 04/04/2014 02/12/2014 TF/COO/GRR/015_DHL FI ---
HGGD070001 H-6235 00 MKB 99 - FS00 DC -02 - 25 x Generator Erection Manual PRE 25/06/2014 04/07/2014 TF/CXE/GRR/008 FA 02/12/2014 GERDP-JE-DR-14-239 RE
HGGD070001 H-6235 00 MKB 99 - FS00 DC -02 A 25 Generator Erection Manual PRE 01/10/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-032-A RE
HGGD070002 H-6235 00 MKB 99 - FS00 QM -01 A 3 Rotor Embedded Plate Inspection Sheet Book GFR 01/04/2014 02/04/2014 TF/CXE/GRR/005 FA 19/06/2014 GERDP-14-342 RE
HGGD070014 H-6235 00 MKB 99 - FS00 DC -03 - 64 x Stator Erection Manual (in the generator pit) GFR 13/05/2014 21/05/2014 TF/CXE/GRR/006 FA 18/08/2014 GERDP-14-490 RE
HGGD070014 H-6235 00 MKB 99 - FS00 DC -03 A 64 Stator Erection Manual (in the generator pit) GFR 04/12/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-032-A RE
HGGD070005 H-6235 00 MKB 99 - FS00 DC -04 A 60 Stator Erection Manual (on the erection bay) GFR 04/12/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-032-A RE
HGGD070006 H-6235 00 MKB 99 - FS00 DC -05 A 28 Rotor Erection Manual GFR 10/07/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-032-A RE
HGGD070090 H-6235 00 MKB 99 - FS00 DC -10 A 4 x GENERATOR FIELD MODIFICATIONS GFE 28/11/2014 08/12/2014 TF/CXE/GRR/010 FI 09/02/2015 GERDP-JE-DR-15-032-A FI
HGGD070090 H-6235 00 MKB 99 - FS00 DC -10 B 7 x GENERATOR FIELD MODIFICATIONS GFE 19/11/2015 15/12/2015 TF/CXE/GRR/015 FI
HGGD070090 H-6235 00 MKB 99 - FS00 DC -10 C 9 GENERATOR FIELD MODIFICATIONS GFE 29/03/2016 31/03/2016 TF/CXE/GRR/017 FI 11/05/2016 GERDP-JE-DR-16-053-A FI
HGGD070020 H-6235 00 MKB 99 - FS00 DC -20 - 17 GENERATOR STATOR FRAME TEST ASSEMBLY GFE 03/05/2016 04/05/2016 TF/HEG/GRR/090 FI 07/07/2016 GERDP-JE-DR-16-092-A RE
HGGD070009 H-6235 00 MKB 99 - FS00 QM -02 - 66 Stator Erection Inspection Sheet Book (in the generator pit) GFR 16/05/2014 21/05/2014 TF/CXE/GRR/006 FA 18/08/2014 GERDP-14-490 RE
HGGD070010 H-6235 00 MKB 99 - FS00 QM -03 - 68 Stator Erection Inspection Sheet Book (on the erection bay) GFR 13/05/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-033-A RE
HGGD070011 H-6235 00 MKB 99 - FS00 QM -04 A 34 Rotor Erection Inspection Sheet Book GFR 10/07/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-033-A RE
HGGD070012 H-6235 00 MKB 99 - FS00 QM -05 A 27 Structure Bearing Erection Inspection Sheet Book GFR 01/10/2014 08/12/2014 TF/CXE/GRR/010 FA 09/02/2015 GERDP-JE-DR-15-033-A RE
PA10 - STATOR _
SA11 - STATOR FRAME _
H-6235 00 MKB 10 - SA00 PB -01 A 49 Stator Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-283-A FI
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 A 11 x Stator Frame Assembly 16/05/2013 17/05/2013 TF/HEG/GRR/014 FI ---
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 A 11 x Stator Frame Assembly 16/05/2013 27/05/2013 TF/HEG/GRR/016_DHL FI ---
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 B 12 x Stator Frame Assembly 04/07/2013 30/07/2013 TF/HEG/GRR/027_DHL FI ---
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 C 12 x Stator Frame Assembly 07/08/2013 13/08/2013 TF/HEG/GRR/031 FI ---
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 D 12 x Stator Frame Assembly 24/09/2013 27/09/2013 TF/HEG/GRR/038 FI 10/02/2014 GERDP-14-047 RN
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 E 12 x Stator Frame Assembly GFE 13/11/2013 04/12/2013 TF/HEG/GRR/046 FI 03/09/2014 GERDP-JE-DR-14-177-A RN
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 F 12 x Stator Frame Assembly GFE 04/02/2014 18/02/2014 TF/HEG/GRR/056 FI 14/03/2014 GERPD-14-127 RE
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 F 12 x Stator Frame Assembly GFE 04/02/2014 02/12/2014 TF/COO/GRR/015_DHL FI
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 G 12 Stator Frame Assembly GFE 28/10/2014 08/01/2015 TF/COO/GRR/016_DHL FI
HGGD111000 H-6235 00 MKB 11 - SA00 TL -01 G 12 Stator Frame Assembly GFE 28/10/2014 07/01/2015 TF/HEG/GRR/080 FI 15/03/2015 GERDP-JE-DR-15-040-A RE
HGGD111004 H-6235 00 MKB 11 - 213F TB -01 A Stator Frame Stud 16/05/2013 17/05/2013 TF/HEG/GRR/014 FI 24/07/2014 METEC-ALST-T-14-3033-001/GERDP-SCM/FSU-14/429/CEXTRE

H-623509MKB11-SA0FQC-01 H-6235 09 MKB 11 - SA0F QC -01 A 322 Stator Frame Customer Manufacturing Data Book - Unit 09 ASB 18/12/2014 04/02/2015 TF/HEG/GRR/081 FI ---

H-623510MKB11-SA00QC-01 H-6235 10 MKB 11 - SA00 QC -01 A 279 Stator Frame Customer Manufacturing Data Book - Unit 10 ASB 20/01/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
SA12 - STATOR CORE _
HGGD120000 H-6235 00 MKB 12 - SA00 TL -01 A Stator Core Assembly 24/04/2013 17/05/2013 TF/HEG/GRR/014 FI ---
HGGD121010 H-6235 00 MKB 12 - 201F TB -01 A 2 Stator Core Lamination 10/04/2013 17/05/2013 TF/HEG/GRR/014 FI ---
HGGD121010 H-6235 00 MKB 12 - 201F TB -01 A 2 Stator Core Lamination 10/04/2013 27/05/2013 TF/HEG/GRR/016_DHL FI ---
HGGD121010 H-6235 00 MKB 12 - 201F TB -01 A 2 Stator Core Lamination 10/04/2013 08/01/2015 TF/COO/GRR/016_DHL FI ---
HGGD121030 H-6235 00 MKB 12 - 202F TB -01 A 1 Vent Duct Lamination 10/04/2013 17/05/2013 TF/HEG/GRR/014 FI ---
HGGD121030 H-6235 00 MKB 12 - 202F TB -01 A 1 Vent Duct Lamination 10/04/2013 27/05/2013 TF/HEG/GRR/016_DHL FI ---
HGGD121030 H-6235 00 MKB 12 - 202F TB -01 A 1 Vent Duct Lamination 10/04/2013 08/01/2015 TF/COO/GRR/016_DHL FI ---
HGGD121050 H-6235 00 MKB 12 - 203F TB -01 A 1 RTD Lamination 10/04/2013 17/05/2013 TF/HEG/GRR/014 FI ---
HGGD121050 H-6235 00 MKB 12 - 203F TB -01 A 1 RTD Lamination 10/04/2013 27/05/2013 TF/HEG/GRR/016_DHL FI ---
HGGD121050 H-6235 00 MKB 12 - 203F TB -01 A 1 RTD Lamination 10/04/2013 08/01/2015 TF/COO/GRR/016_DHL FI ---
H-6235 06 MKB 12 - SA0F QC -01 A 12 Key Bars Manufacturing Quality Data Book –Unit 06 ASB 08/04/2016 23/05/2016 TF/HEG/GRR/091 ASB 07/07/2016 GERDP-JE-DR-16-094-A FI
H-6235 07 MKB 12 - SA0F QC -01 A 12 Key Bars Manufacturing Quality Data Book –Unit 07 ASB 08/04/2016 23/05/2016 TF/HEG/GRR/091 ASB 07/07/2016 GERDP-JE-DR-16-094-A FI
H-6235 08 MKB 12 - SA0F QC -01 A 14 Key Bars Manufacturing Quality Data Book –Unit 08 ASB 08/04/2016 23/05/2016 TF/HEG/GRR/091 ASB 07/07/2016 GERDP-JE-DR-16-094-A FI
H-6235 09 MKB 12 - SA0F QC -01 A 10 Key Bars Manufacturing Quality Data Book –Unit 09 ASB 10/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 12 - SA0F QC -01 A 10 Key Bars Manufacturing Quality Data Book –Unit 10 ASB 10/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 09 MKB 12 - SA0F QC -02 A 9 Stator Core Press Bolts Manufacturing Quality Data Book –Unit 09 ASB 10/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 12 - SA0F QC -02 A 9 Stator Core Press Bolts Manufacturing Quality Data Book –Unit 10 ASB 10/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 09 MKB 12 - 201F QC -01 A 34 Stator Core Laminations Manufacturing Quality Data Book –Unit 09 ASB 16/10/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 12 - 201F QC -01 A 34 Stator Core laminations Manufacturing Quality Data Book –Unit 10 ASB 16/10/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
SA13 - STATOR WINDING AND CONNECTIONS _
HGGD130000 H-6235 00 MKB 13 - SA00 TL -01 A x Stator Winding Assembly 27/09/2013 30/09/2013 TF/HEG/GRR/039 FI 10/02/2014 GERDP-14-047 RR
09/04/2014 GERDP-14-204 RN
HGGD130000 H-6235 00 MKB 13 - SA00 TL -01 B 3 x Stator Winding Assembly 23/01/2014 31/01/2014 TF/HEG/GRR/053 FI
10/03/2015 GERDP-JE-DR-14-130 RE
HGGD130000 H-6235 00 MKB 13 - SA00 TL -01 C 3 Stator Winding Assembly 01/12/2014 07/01/2015 TF/HEG/GRR/080 FI 10/03/2015 GERDP-JE-DR-15-040-A RE
HGGD130001 H-6235 00 MKB 13 - SA00 TL -02 A 1 Stator Slot Section 22/05/2013 24/05/2013 TF/HEG/GRR/015 FI ---
HGGD130001 H-6235 00 MKB 13 - SA00 TL -02 A 1 Stator Slot Section 22/05/2013 08/07/2013 TF/HEG/GRR/024_DHL FI ---
HGGD130001 H-6235 00 MKB 13 - SA00 TL -02 A 1 Stator Slot Section 22/05/2013 02/12/2014 TF/COO/GRR/015_DHL FI ---
HGGD136000 H-6235 00 MKB 13 - SA00 TL -06 A 1 Stator Bars Wedging 06/09/2013 09/09/2013 TF/HEG/GRR/034 FI ---
HGGD130060 H-6235 00 MKB 13 - SA00 FF -01 A 2 Stator Winding Diagram 28/06/2013 09/09/2013 TF/HEG/GRR/034 FI ---
HGGD130060 H-6235 00 MKB 13 - SA00 FF -01 A 2 Stator Winding Diagram 28/06/2013 08/07/2013 TF/HEG/GRR/024_DHL FI ---
SA14 - STATOR BAR (COILS) _
HGGD131002 H-6235 00 MKB 14 - 201F TB -01 A 3 x Stator Bars Insulated 11/04/2013 29/05/2013 TF/HEG/GRR/017 FI 21/04/2014 GERDP-14-196 RE
HGGD131002 H-6235 00 MKB 14 - 201F TB -01 A 3 x Stator Bars Insulated 11/04/2013 02/07/2013 TF/HEG/GRR/020_DHL FI 21/04/2014 GERDP-14-196 RE
HGGD131002 H-6235 00 MKB 14 - 201F TB -01 B 3 Stator Bars Insulated 31/10/2013 20/12/2013 TF/HEG/GRR/049 FI ---
HGGD131002 H-6235 00 MKB 14 - 201F TB -01 B 3 Stator Bars Insulated 31/10/2013 08/01/2015 TF/COO/GRR/016_DHL FI ---
H-623500MKB14-201FQC-01 H-6235 00 MKB 14 - 201F QC -01 A Advanced Bar Batch Quality Data Book 17/10/2013 22/10/2013 TF/HEG/GRR/041 ASB 27/05/2014 GERDP-14-291 RE
H-623509MKB14-201FQC-01 H-6235 09 MKB 14 - 201F QC -01 A Stator Winding Bars Manufacturing Quality Data Book - Unit 09 ASB 26/02/2014 22/04/2014 TF/HEG/GRR/061 FI ---
H-623510MKB14-201FQC-01 H-6235 10 MKB 14 - 201F QC -01 A 60 Stator Winding Bars Manufacturing Quality Data Book - Unit 10 ASB 16/10/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
SA15 - STATOR AIR GUIDE _
HGGD141000 H-6235 00 MKB 15 SA00 TL -01 A 1 x Upper Air Guide Assembly GFE 31/01/2014 10/02/2014 TF/HEG/GRR/055 FI 03/09/2014 GERDP-JE-DR-14-131-A RE
HGGD141000 H-6235 00 MKB 15 SA00 TL -01 B 1 Upper Air Guide Assembly GFE 12/09/2014 05/11/2014 TF/HEG/GRR/078 FI 19/12/2014 GERDP-JE-DR-14-251-A RE
HGGD142000 H-6235 00 MKB 15 - SA00 TL -02 A 1 x Lower Air Guide Assembly GFE 31/01/2014 10/02/2014 TF/HEG/GRR/055 FI 03/09/2014 GERDP-JE-DR-14-131-A RE
HGGD142000 H-6235 00 MKB 15 - SA00 TL -02 B 1 Lower Air Guide Assembly GFE 16/09/2014 05/11/2014 TF/HEG/GRR/078 FI 19/12/2014 GERDP-JE-DR-14-251-A RE
SA16 - STATOR FOUNDATION _
16/09/2013 Salini_P5000-05.25-537_18 July 13 Commented No revision of drawing
HGGD020010 H-6235 00 MKB 16 - SA00 TL -01 A Stator Anchoring 16/05/2013 17/05/2013 TF/HEG/GRR/014 FA 31/01/2014 GRR-COO-MET-14-005-T
22/11/2013 GERDP –13-432 RR 04/08/2014 GERDP-14-462 'RE'

05/09/2016 12 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

No revision of drawing
HGGD150000 H-6235 00 MKB 16 - SA00 TL -02 A 1 Stator Sole Plates Pinning 16/05/2013 17/05/2013 TF/HEG/GRR/014 FI 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
04/08/2014 GERDP-14-462 'RE'
No revision of drawing
HGGD150000 H-6235 00 MKB 16 - SA00 TL -02 A 1 Stator Sole Plates Pinning 16/05/2013 27/05/2013 TF/HEG/GRR/016_DHL FI 22/11/2013 GERDP-13-432 RR 31/01/2014 GRR-COO-MET-14-005-T
04/08/2014 GERDP-14-462 'RE'
HGGD150000 H-6235 00 MKB 16 - SA00 TL -02 A 1 Stator Sole Plates Pinning 16/05/2013 08/01/2015 TF/COO/GRR/016_DHL FI
HGGD150001 H-6235 00 MKB 16 - 201F TB -01 A 1 x Stator Frame Sole Plates 16/05/2013 31/10/2013 TF/HEG/GRR/042 FI 18/08/2014 GERDP-14-498 RE
HGGD150001 H-6235 00 MKB 16 - 201F TB -01 B 1 Stator Frame Sole Plates 16/10/2014 05/11/2014 TF/HEG/GRR/078 FI 25/01/2015 GERDP-JE-DR-14-320-A RE
HGGD150010 H-6235 00 MKB 16 - 204F TU -01 A 1 Stator Sole Plates Pinning Parts 16/05/2013 31/01/2014 TF/HEG/GRR/052 FI ---
HGGD020010R0001 H-6235 00 MKB 16 - SA00 PB -01 - 1 Stator Anchoring Part List 16/05/2013 31/01/2014 TF/HEG/GRR/052 FI 09/04/2014 GERPD-14-204 FI
HGGD150000R0001 H-6235 00 MKB 16 - SA00 PB -02 - 1 Stator Sole Plate Pinning Part List 16/05/2013 31/01/2014 TF/HEG/GRR/052 FI 09/04/2014 GERPD-14-204 FI
PA20 - ROTOR _
H-6235 00 MKB 20 - SA00 PB -01 A 53 Rotor Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-284-A FI
SA21 - UPPER SHAFT _
HGGD211100 H-6235 00 MKB 21 - SA00 TL -01 A 1 Upper Shaft Complete 31/07/2013 06/08/2013 TF/HEG/GRR/029 FI ---
HGGD213100 H-6235 00 MKB 21 - SA00 TL -02 A 1 x NDE Shaft Coupling Assembly GFE 02/12/2013 04/12/2013 TF/HEG/GRR/046 FI ---
HGGD213100 H-6235 00 MKB 21 - SA00 TL -02 B 1 x NDE Shaft Coupling Assembly GFE 06/12/2013 11/12/2013 TF/HEG/GRR/047 FI 21/04/2014 GERDP-14-197 RE
21/04/2014 GERDP-14-211-A
HGGD213100 H-6235 00 MKB 21 - SA00 TL -02 C 1 NDE Shaft Coupling Assembly GFE 02/10/2014 05/11/2014 TF/HEG/GRR/078 FI RE 03/11/2014 GRR-HET-MET-14-045-L No revision of drawing
25/12/2014 GERDP-JE-DR-14-322-A/GERDP-JE-DR-14-314-A

HGGD211090 H-6235 00 MKB 21 - SA00 ED -01 A 8 Upper Shaft Calculation GFR 03/09/2014 13/10/2014 TF/HEG/GRR/076 FI 25/12/2014 GERDP-JE-DR-14-292-A. RE
HGGD211110 H-6235 00 MKB 21 - 201F TM -01 A 1 Upper Shaft Machining 31/07/2013 02/04/2014 TF/HEG/GRR/059 FI 18/08/2014 GERDP-14-491 RR
H-623509MKB21-201FQC-01 H-6235 09 MKB 21 - 201F QC -01 A 55 Unit 09 Rotor Shaft Machined Machined Quality Data Book ASB 18/09/2014 04/02/2015 TF/HEG/GRR/081 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
H-623510MKB21-201FQC-01 H-6235 10 MKB 21 - 201F QC -01 A 53 Unit 10 Rotor Shaft Machined Machined Quality Data Book ASB 18/09/2014 04/02/2015 TF/HEG/GRR/081 FI
H-623509MKB21-SA0FQC-001 H-6235 09 MKB 21 - SA0F QC -001 A 21 Unit 09 Rotor Bearing Collar Manufacturing Quality Data Book ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI
H-623510MKB21-SA0FQC-001 H-6235 10 MKB 21 - SA0F QC -001 A 21 Unit10 Rotor Bearing Collar Manufacturing Quality Data Book ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 04/09/2015 GERDP-JE-DR-15-183-A FI 18/09/2015 GRR-HET-MET-15-072-L No revision of drawing
H-623500MKB21-201FQM-01 H-6235 00 MKB 21 - 201F QM -01 A 23 Rotor Shaft Machined Final Inspection Report GFE 10/04/2014 10/04/2014 Handed over during FAT FI 01/05/2014 GERDP-14-248 RE
HGGD214010 H-6235 00 MKB 21 - 203F TB -01 A 1 Upper Shaft Sleeve 31/07/2013 02/04/2014 TF/HEG/GRR/059 FI 18/08/2014 GERDP-14-491 RE
HGGD213101 H-6235 00 MKB 21 - 212F TU -01 A 1 NDE Shaft Coupling Parts 02/12/2013 04/12/2013 TF/HEG/GRR/046 FI 03/09/2014 GERDP-JE-DR-14-177-A RE
SA24 - ROTOR SPIDER _
HGGD212000 H-6235 00 MKB 24 - SA00 TL -01 A 2 x Rotor Spider Assembly 22/07/2013 26/07/2013 TF/HEG/GRR/025 FI ---
HGGD212000 H-6235 00 MKB 24 - SA00 TL -01 B 2 Rotor Spider Assembly 08/08/2013 13/08/2013 TF/HEG/GRR/031 FI ---
HGGD212090 H-6235 00 MKB 24 - SA00 ED -01 A 21 Rotor Spider Calculation 03/07/2013 04/07/2013 TF/HEG/GRR/021 FA 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L No revision of drawing
HGGD212091 H-6235 00 MKB 24 - SA00 ED -02 A 10 Rotor Spider Calculation at overload 17/11/2014 25/11/2014 TF/HEG/GRR/079 FI 27/01/2015 GERDP-JE-DR-14-333-A RE
H-623509MKB24-SA0FQC-01 H-6235 09 MKB 24 - SA0F QC -01 A 322 Rotor Spider Manufacturing Quality data Book - Unit 9 ASB 18/12/2014 04/02/2015 TF/HEG/GRR/081 FI
H-623510MKB24-SA0FQC-01 H-6235 10 MKB 24 - SA0F QC -01 A 298 Rotor Spider Manufacturing Quality data Book - Unit 10 ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
H-623509MKB24-SA0FQM-01 H-6235 09 MKB 24 - SA0F QM -01 A Rotor Spider FAT Report Uni 09 ASB 19/06/2014 19/06/2014 given by hand FI
H-623510MKB24-SA0FQM-01 H-6235 10 MKB 24 - SA0F QM -01 A Rotor Spider FAT Report Uni 10 ASB 11/02/2015 11/02/2015 given by hand FI
H-623509MKB24-201RDD-01 H-6235 09 MKB 24 - 201R DD -01 A Coupling Hole Control Report GFE 08/08/2014 - Send to Electroconsul by mail
HGGD212100 H-6235 00 MKB 24 - 201F TM -01 A 1 x Rotor Hub Machining 22/07/2013 26/07/2013 TF/HEG/GRR/025 FI ---
HGGD212100 H-6235 00 MKB 24 - 201F TM -01 B 1 Rotor Hub Machining 05/12/2014 07/01/2015 TF/HEG/GRR/080 FI 10/03/2015 GERDP-JE-DR-15-040-A RE
HGGD212101 H-6235 00 MKB 24 - 201F TW -01 A 1 x Rotor Hub Welding 22/07/2013 26/07/2013 TF/HEG/GRR/025 FI ---
HGGD212101 H-6235 00 MKB 24 - 201F TW -01 B 1 x Rotor Hub Welding 27/09/2013 30/09/2013 TF/HEG/GRR/039 FI 10/02/2014 GERDP-14-047 RE
HGGD212101 H-6235 00 MKB 24 - 201F TW -01 C 1 x Rotor Hub Welding 29/11/2013 04/12/2013 TF/HEG/GRR/046 FI ---
HGGD212101 H-6235 00 MKB 24 - 201F TW -01 D 1 Rotor Hub Welding 05/12/2014 07/01/2015 TF/HEG/GRR/080 FI 10/03/2015 GERDP-JE-DR-15-040-A RE
HGGD212200 H-6235 00 MKB 24 - 203F TB -01 A 1 x Rotor Spider Segment 24/07/2013 26/07/2013 TF/HEG/GRR/025 FI ---
HGGD212200 H-6235 00 MKB 24 - 203F TB -01 B 1 x Rotor Spider Segment 08/08/2013 13/08/2013 TF/HEG/GRR/031 FI ---
HGGD212200 H-6235 00 MKB 24 - 203F TB -01 C 1 x Rotor Spider Segment 27/09/2013 30/09/2013 TF/HEG/GRR/039 FI 10/02/2014 GERDP-14-047 RN
HGGD212200 H-6235 00 MKB 24 - 203F TB -01 D 1 Rotor Spider Segment 29/11/2013 04/12/2013 TF/HEG/GRR/046 FI
SA25 - ROTOR RIM _
HGGD220000 H-6235 00 MKB 25 - SA00 TL -01 A 1 x Rotor Rim Assembly 26/07/2013 31/07/2013 TF/HEG/GRR/026 FI ---
HGGD220000 H-6235 00 MKB 25 - SA00 TL -01 B 1 Rotor Rim Assembly 12/08/2013 13/08/2013 TF/HEG/GRR/032 FI ---
HGGD220000 H-6235 00 MKB 25 - SA00 TL -01 C 1 Rotor Rim Assembly GFE 15/05/2014 28/05/2014 TF/HEG/GRR/066 FI ---
HGGD223000 H-6235 00 MKB 25 - SA00 TL -02 A Rotor Rim Keying 26/07/2013 31/07/2013 TF/HEG/GRR/026 FI ---
HGGD220090 H-6235 00 MKB 25 - SA00 ED -01 A 10 Rotor Rim Calculation 03/07/2013 04/07/2013 TF/HEG/GRR/022 FA 28/07/2013 GERDP-13-261 AP
HGGD220001 H-6235 00 MKB 25 - SA00 FF -01 A 1 Rim Stacking Diagram 05/07/2013 31/07/2013 TF/HEG/GRR/026 FI ---
H-623509MKB25-SA0FQC-01 H-6235 09 MKB 25 - SA0F QC -01 A 24 Rotor Rim Sheet Manufacturing Quality Data Book - Unit 09 ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
H-623510MKB25-SA0FQC-01 H-6235 10 MKB 25 - SA0F QC -01 A 34 Rotor Rim Sheet Manufacturing Quality Data Book - Unit 10 ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
SA26 - POLES _
HGGD230100 H-6235 00 MKB 26 - SA00 TL -01 A 2 x Rotor Pole Assembly GFE 29/07/2013 06/08/2013 TF/HEG/GRR/029 FI ---
HGGD230100 H-6235 00 MKB 26 - SA00 TL -01 A 2 x Rotor Pole Assembly GFE 29/07/2013 30/07/2013 TF/HEG/GRR/027_DHL FI ---
HGGD230100 H-6235 00 MKB 26 - SA00 TL -01 B 2 Rotor Pole Assembly 12/08/2013 13/08/2013 TF/HEG/GRR/032 FI ---
HGGD230100 H-6235 00 MKB 26 - SA00 TL -01 B 2 Rotor Pole Assembly 12/08/2013 02/12/2014 TF/COO/GRR/015_DHL FI ---
HGGD232000 H-6235 00 MKB 26 - SA00 TL -03 A 3 x Rotor Pole Coil GFE 29/07/2013 06/08/2013 TF/HEG/GRR/029 FI ---
HGGD232000 H-6235 00 MKB 26 - SA00 TL -03 A 3 x Rotor Pole Coil GFE 29/07/2013 30/07/2013 TF/HEG/GRR/028_DHL FI ---
HGGD232000 H-6235 00 MKB 26 - SA00 TL -03 C 4 x Rotor Pole Coil GFE 08/07/2014 17/07/2014 TF/HEG/GRR/072 FI 01/12/2014 GERDP-JE-DR-14-251-A RE
HGGD232000 H-6235 00 MKB 26 - SA00 TL -03 C 4 x Rotor Pole Coil GFE 08/07/2014 08/01/2015 TF/COO/GRR/016_DHL FI
HGGD232000 H-6235 00 MKB 26 - SA00 TL -03 D 4 Rotor Pole Coil GFE 15/04/2016 25/04/2016 TF/HEG/GRR/089 FI
HGGD233000 H-6235 00 MKB 26 - SA00 TL -04 A 1 x Rotor Pole Connections Assembly GFE 12/12/2013 16/12/2013 TF/HEG/GRR/048 FI 09/04/2014 GERPD-14-204 RE
HGGD233000 H-6235 00 MKB 26 - SA00 TL -04 B 1 Rotor Pole Connections Assembly GFE 06/02/2014 18/02/2014 TF/HEG/GRR/056 FI 03/09/2014 GERDP-JE-DR-14-131-A RE
HGGD235000 H-6235 00 MKB 26 - SA00 TL -05 A 1 Pole Locking Arrangement GFE 10/12/2013 16/12/2013 TF/HEG/GRR/048 FI 09/04/2014 GERPD-14-204 RE
HGGD230190 H-6235 00 MKB 26 - SA00 ED -01 A 8 Rotor Pole Coil Calculation 03/07/2013 04/07/2013 TF/HEG/GRR/022 FA 28/07/2013 GERDP-13-261 AP
HGGD231090 H-6235 00 MKB 26 - SA00 ED -02 A 8 Rotor Pole Core Calculation 03/07/2013 04/07/2013 TF/HEG/GRR/022 FA 28/07/2013 GERDP-13-261 AP
Rotor Complete Poles Customer Manufacturing
H-623509MKB26-SA0FQC-01 H-6235 09 MKB 26 - SA0F QC -01 A 141 ASB 16/01/2015 04/02/2015 TF/HEG/GRR/081 FI
Quality Data Book – Unit 9
Rotor Complete Poles Customer Manufacturing
H-623510MKB26-SA0FQC-01 H-6235 10 MKB 26 - SA0F QC -01 A 71 ASB 21/01/2015 04/02/2015 TF/HEG/GRR/081 FI
Quality Data Book – Unit 10
28/06/2016 GERDP-IR-032 FI
H-623508MKB26-SA0FQE-01 H-6235 08 MKB 26 - SA0F QE -01 A 6 Rotor complete Poles Manufacturing Final Inspection Report –Unit 08 FI 26/05/2016 14/06/2016 TF/HEG/GRR/092 FI
16/08/2016 GERDP-JE-DR-16-099-A RE

H-623506MKB26-SA0FQE-002 H-6235 06 MKB 26 - SA0F QE -002 A 18 Rotor complete Poles Manufacturing Final Inspection Report –Unit 06 FI 21/06/2016 30/06/2016 TF/HEG/GRR/093 FI 27/07/2016 GERDP-JE-DR-16-112-A RE

SA28 - ROTOR FAN / FLYWHEEL _


HGGD241000 H-6235 00 MKB 28 - SA00 TL -02 A 1 Braking Track Assembly 04/10/2013 11/10/2013 TF/HEG/GRR/040 FI ---
HGGD241090 H-6235 00 MKB 28 - SA00 ED -01 A Braking Track Calculation 13/09/2013 11/10/2013 TF/HEG/GRR/040 FA DEEMED APPROVED
HGGD241001 H-6235 00 MKB 28 - 201F TB -01 A 1 Braking Segment 04/10/2013 11/10/2013 TF/HEG/GRR/040 FI ---
SA29 - COLLECTOR MOVING PARTS _
HGGD245000 H-6235 00 MKB 29 - SA00 TL -02 A 2 Rotor Leads Assembly GFE 18/02/2014 25/02/2014 TF/HEG/GRR/057 FI 13/05/2014 GERDP-14-254 RE
HGGD244000 H-6235 00 MKB 29 - SA00 TL -01 B 1 x Slip Rings Assembly GFE 19/09/2013 20/12/2013 TF/HEG/GRR/049 FI ---
HGGD244000 H-6235 00 MKB 29 - SA00 TL -01 C 1 Slip Rings Assembly GFE 24/03/2014 25/03/2014 TF/HEG/GRR/058 FI 02/12/2014 GERDP-JE-DR-14-244 RE
H-6235 09 MKB 29 - 209F QC -01 A 13 Slipring Manufacturing Quality Data Book –Unit 09 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 29 - 209F QC -01 A 13 Slipring Manufacturing Quality Data Book –Unit 10 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
PA30- BRACKETS / PEDESTALS (INCLUDING BEARINGS) _

05/09/2016 13 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

H-6235 00 MKB 30 - SA00 PB -01 A 12 Bearing Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-284-A FI
SA31 - UPPER BRACKET (INCLUDING BEARINGS) _
HGGD311000 H-6235 00 MKB 31 - SA00 TL -01 A 1 NDE Bracket Assembly 21/11/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 RE
HGGD312000 H-6235 00 MKB 31 - SA00 TL -02 A 1 NDE Bracket Anchoring 21/11/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 FI
HGGD313000 H-6235 00 MKB 31 - SA00 TL -03 A 1 x NDE Guide Bearing 21/07/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 RR 17/04/2014 GRR-HEG-MET-14-019-L Revision of drawing
HGGD313000 H-6235 00 MKB 31 - SA00 TL -03 B 1 NDE Guide Bearing GFE 08/04/2014 28/05/2014 TF/HEG/GRR/066 FI
HGGD314000 H-6235 00 MKB 31 - SA00 TL -05 A 1 NDE Bracket Pinning 21/11/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 FI
HGGD311010 H-6235 00 MKB 31 - 201F TW -01 A 2 x NDE Bracket Welding 21/11/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 RE
HGGD311010 H-6235 00 MKB 31 - 201F TW -01 C 2 NDE Bracket Welding 20/02/2014 25/02/2014 TF/HEG/GRR/057 FI 13/05/2014 GERDP-14-254 RE
HGGD311020 H-6235 00 MKB 31 - 201F TM -01 A 2 x NDE Bracket Machining 21/11/2013 22/11/2013 TF/HEG/GRR/044 FI 10/02/2014 GERDP-14-043 RE
HGGD311020 H-6235 00 MKB 31 - 201F TM -01 B 2 x NDE Bracket Machining 12/02/2014 25/02/2014 TF/HEG/GRR/057 FI 13/05/2014 GERDP-14-254 RE
HGGD311020 H-6235 00 MKB 31 - 201F TM -01 C 2 NDE Bracket Machining 09/10/2014 05/11/2014 TF/HEG/GRR/078 FI 25/01/2015 GERDP-JE-DR-14-320-A RE
H-6235 09 MKB 31 - SA0F QC -003 A 33 Internal Oil-Water Cooler Manufacturing Quality Data Book –Unit 09 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 31 - SA0F QC -003 A 33 Internal Oil-Water Cooler Manufacturing Quality Data Book –Unit 10 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 07 MKB 31 - 215F QE 001 A 17 Generator Guide Pads Final Inspection Report – Unit 07 FI 24/05/2016 14/06/2016 TF/HEG/GRR/092 FI 16/08/2016 GERDP-JE-DR-16-099-A FI
H-6235 08 MKB 31 - 215F QE 001 A 7 Generator Guide Pads Final Inspection Report – Unit 08 FI 03/06/2016 14/06/2016 TF/HEG/GRR/092 FI 16/08/2016 GERDP-JE-DR-16-099-A FI
H-623509MKB31-SA0FQC-001 H-6235 09 MKB 31 - SA0F QC -001 A 271 Unit 09 Upper Bracket Customer Manufacturing Quality Data Book ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
H-623510MKB31-SA0FQC-001 H-6235 10 MKB 31 - SA0F QC -001 A 243 Unit 10 Upper Bracket Customer Manufacturing Quality Data Book ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
Unit 09 Bearing Guide Pad Segment Customer Manufacturing Quality
H-623509MKB31-SA0FQC-002 H-6235 09 MKB 31 - SA0F QC -002 A 22 ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE
Data Book
H-623510MKB31-SA0FQC-002 H-6235 10 MKB 31 - SA0F QC -002 A 22 Bearing Guide Pad Segment Unit 10Manufacturing Quality Data Book ASB 13/07/2015 16/07/2015 TF/HEG/GRR/084 FI 07/08/2015 GERDP-JE-DR-15-149-A. RE

PA40 - MISCELLANEOUS STRUCTURES _


H-6235 00 MKB 40 - SA00 PB -01 A 25 Miscellaneous Structures Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-283-A FI
SA41 - COLLECTOR STATIC PARTS _
HGGD410000 H-6235 00 MKB 41 - SA00 TL -01 A 2 Brush Holder System GFE 28/04/2014 30/04/2014 TF/HEG/GRR/063 FI 19/12/2014 GERDP-JE-DR-14-197-A RE
SA42 - GROUNDING SYSTEM _
HGGD420000 H-6235 00 MKB 42 - SA00 TL -01 A 1 Shaft Grounding GFE 27/03/2014 02/04/2014 TF/HEG/GRR/059 FI 18/08/2014 GERDP-14-491 RE
HGGD421000 H-6235 00 MKB 42 - SA00 TL -02 A 1 x Generator Grounding GFE 31/03/2014 02/04/2014 TF/HEG/GRR/059 FI 19/06/2014 GERDP-14-342 RE
HGGD421000 H-6235 00 MKB 42 - SA00 TL -02 B 1 Generator Grounding GFE 16/04/2014 30/04/2014 TF/HEG/GRR/063 FI 19/12/2014 GERDP-JE-DR-14-197-A RE
SA43 - GENERATOR PIT COVERING _
HGGD441000 H-6235 00 MKB 43 - SA00 TL -01 A 1 x Upper Floor Assembly GFE 25/02/2014 25/02/2014 TF/HEG/GRR/057 FI 13/05/2014 GERDP-14-254 RE
HGGD441000 H-6235 00 MKB 43 - SA00 TL -01 B 1 Upper Floor Assembly GFE 13/06/2014 26/06/2014 TF/HEG/GRR/067 01/12/2014 GERDP-JE-DR-14-233-A RE
HGGD442000 H-6235 00 MKB 43 - SA00 TL -02 A Top Cover Assembly 18/03/2014 25/03/2014 TF/HEG/GRR/058 FI 02/12/2014 GERDP-JE-DR-14-244 RE
SA46 - BRAKE AND LIFTING JACK FOUNDATIONS _
19/12/2014 GERDP-JE-DR-14-197-A RN
HGGD020014 H-6235 00 MKB 46 - SA00 TL -01 A 2 Braking and Lifting Jack Anchoring GFR 15/04/2014 30/04/2014 TF/HEG/GRR/063 FA
07/04/2015 GERDP-JE-DR-15-026-A RE
SA47 - STRUCTURE MISCELLANEOUS _
HGGD484200 H-6235 00 MKB 47 - SA00 TL -03 A 1 Generator Pit Closing and Grating GFE 11/02/2014 18/02/2014 TF/HEG/GRR/056 FI 14/03/2014 GERPD-14-127 RE
HGGD483000 H-6235 00 MKB 47 - SA00 TL -04 A 1 x Concrete Closing Sheet Assembly GFE 30/06/2014 07/07/2014 TF/HEG/GRR/071 FI 09/09/2014 GERDP-JE-DR-14-243-A RE 16/10/2014 GRR-HEG-MET-14-058-L Update of document
HGGD483000 H-6235 00 MKB 47 - SA00 TL -04 B 1 Concrete Closing Sheet Assembly GFE 13/10/2014 16/10/2014 TF/HEG/GRR/077 FI 25/12/2014 GERDP-JE-DR-14-306-A RE
HGGD483010 H-6235 00 MKB 47 - 204F TB -01 A 1 x Concrete Closing Sheets 30/06/2014 16/10/2014 TF/HEG/GRR/071 FI 09/09/2014 GERDP-JE-DR-14-243-A RE 16/10/2014 Update of document
HGGD483010 H-6235 00 MKB 47 - 204F TB -01 B 1 Concrete Closing Sheets 13/10/2014 16/10/2014 TF/HEG/GRR/077 FI 25/12/2014 GERDP-JE-DR-14-306-A RE
PA50 - AUXILIARY SYSTEMS _
H-6235 00 MKB 50 - SA00 PB -01 A 57 Auxiliary Systems Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-284-A FI
SA51 - AIR / WATER COOLING SYSTEM _
HGGD511000 H-6235 00 MKB 51 - SA00 TL -01 A 1 x Air Cooler Assembly 18/02/2014 02/04/2014 TF/HEG/GRR/059 FI 18/08/2014 GERDP-14-491 FI
HGGD511000 H-6235 00 MKB 51 - SA00 TL -01 B 1 Air Cooler Assembly 29/07/2014 31/07/2014 TF/HEG/GRR/073 FI 09/09/2014 GERDP-JE-DR-14-255-A RE
HGGD511200 H-6235 00 MKB 51 - SA00 TL -02 A 2 Main Water Cooling Piping Arrang. 18/03/2014 25/03/2014 TF/HEG/GRR/058 FI 02/12/2014 GERDP-JE-DR-14-244 RE
23/11/2012 UHP_GMO-2208
21/02/2013 GRR-COO-MET-13-008-T
06/02/2012 UHP_GMO-237
HGGD511060 H-6235 00 MKB 51 - SA00 FB -01 A x Water Cooling System Diagram 26/09/2012 02/10/2012 TF/HEG/GRR/004 FA RR 21/02/2013 GRR-COO-MET-13-007-L Revision of drawing
21/05/2013 UHP_GMO-465
12/03/2013 GRR-COO-MET-13-013-L
07/09/2013 GERDP –13-254
HGGD511060 H-6235 00 MKB 51 - SA00 FB -01 B x Water Cooling System Diagram 05/06/2013 17/06/2013 TF/HEG/GRR/018 FI ---
HGGD511060 H-6235 00 MKB 51 - SA00 FB -01 B x Water Cooling System Diagram 05/06/2013 08/07/2013 TF/HEG/GRR/024_DHL FA 16/09/2013 GERDP-JE-DR-13-006-B RR 26/09/2013 GRR-COO-MET-13-042-L No revision of drawing
HGGD511060 H-6235 00 MKB 51 - SA00 FB -01 C 1 x Water Cooling System Diagram GFR 04/11/2013 07/11/2013 TF/HEG/GRR/043 FA 18/08/2014 GERDP-14-496 RE
HGGD511060 H-6235 00 MKB 51 - SA00 FB -01 D 1 Water Cooling System Diagram GFE 26/06/2014 04/07/2014 TF/HEG/GRR/070 FA 04/08/2014 GERDP-14-242 RE
HGGD511060 H-6235 00 MKB 51 - SA00 FB -01 D 1 Water Cooling System Diagram GFE 26/06/2014 02/12/2014 TF/COO/GRR/015_DHL FA
H-6235 09 MKB 51 - 202F QC -01 A 94 Air-Water Cooler Manufacturing Quality Data Book –Unit 09 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 51 - 202F QC -01 A 94 Air-Water Cooler Manufacturing Quality Data Book –Unit 10 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
SA52 - NDE BEARING COOLING SYSTEM _
02/12/2014 GERDP-JE-DR-14-244 RN
HGGD513300 H-6235 00 MKB 52 - SA00 TL -02 A 2 Upper Bearing Oil and Water Piping GFE 28/02/2014 25/03/2014 TF/HEG/GRR/058 FI
07/04/2015 GERDP-JE-DR-15-026-A RE
SA55 - BRAKE AND JACK SYSTEM _
HGGD512100 H-6235 00 MKB 55 - SA00 TL -01 A 1 Braking and Lifting System Arrgt GFE 06/06/2014 26/06/2014 TF/HEG/GRR/067 01/12/2014 GERDP-JE-DR-14-233-A RE
06/02/2012 UHP_GMO-237
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 A x Braking and Lifting Diagram 28/09/2012 02/10/2012 TF/HEG/GRR/004 FA RR 21/02/2013 GRR-COO-MET-13-007-L Revision of drawing
07/09/2013 GERDP –13-254
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 B x Braking and Lifting Diagram 12/06/2013 17/06/2013 TF/HEG/GRR/018 FI ---
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 B x Braking and Lifting Diagram 12/06/2013 08/07/2013 TF/HEG/GRR/024_DHL FA 16/09/2013 GERDP-JE-DR-13-009-B RR 26/09/2013 GRR-COO-MET-13-042-L Revision of drawing
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 C 1 x Braking and Lifting Diagram GFE 04/11/2013 07/11/2013 TF/HEG/GRR/043 FI 18/08/2014 GERDP-14-496 RE
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 D 1 x Braking and Lifting Diagram GFE 03/03/2014 25/03/2014 TF/HEG/GRR/058 FI --- 02/12/2014 GERDP-JE-DR-14-244 RE
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 D 1 x Braking and Lifting Diagram GFE 03/03/2014 02/12/2014 TF/COO/GRR/015_DHL FI ---
HGGD512060 H-6235 00 MKB 55 - SA00 FB -01 E 1 Braking and Lifting Diagram GFE 02/09/2015 23/02/2015 TF/HEG/GRR/083 FI ---
HGGD512300 H-6235 00 MKB 55 - 001F TB -01 A 1 Braking and Lifting Jack 07/07/2014 31/03/2016 TF/CXE/GRR/017 11/05/2016 GERDP-JE-DR-16-053-A FI
HGGD512700 H-6235 00 MKB 55 - SA00 TL -03 A 1 Jack oil Leakage Collection Piping GFE 05/06/2014 26/06/2014 TF/HEG/GRR/067 01/12/2014 GERDP-JE-DR-14-233-A RE
HGGD517000 H-6235 00 MKB 55 - SA00 TL -02 A 1 Brake Dust Exhauster Assembly GFE 28/05/2014 26/06/2014 TF/HEG/GRR/067 01/12/2014 GERDP-JE-DR-14-233-A RE
H-6235 09 MKB 55 - 001F QC -01 A 10 Braking & Lifting Cylinder Manufacturing Quality Data Book –Unit 09 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
H-6235 10 MKB 55 - 001F QC -01 A 10 Braking & Lifting Cylinder Manufacturing Quality Data Book –Unit 10 ASB 01/07/2015 23/10/2015 TF/HEG/GRR/087 ASB 18/11/2015 GERDP-JE-DR-15-224-A FI
SA56 - OIL MIST SUCTION SYSTEM _
HGGD516000 H-6235 00 MKB 56 - SA00 TL -01 A 2 Bearing Oil Mist Assembly GFE 26/05/2014 28/05/2014 TF/HEG/GRR/066 FI ---
SA57 - CARBON DUST SUCTION _
HGGD518000 H-6235 00 MKB 57 - SA00 TL -01 A 1 Brush Dust Piping Arrangement GFE 23/05/2014 28/05/2014 TF/HEG/GRR/066 FI ---
HGGD518300 H-6235 00 MKB 57 - SA00 TL -02 A 1 Brush Dust Suction Arrangement 28/04/2014 30/04/2014 TF/HEG/GRR/063 FI 19/12/2014 GERDP-JE-DR-14-197-A RE
SA58 - FIRE PROTECTION SYSTEM _
HGGD515000 H-6235 00 MKB 58 - SA00 TL -01 A 1 Fire Protection System Arran. 30/06/2014 04/07/2014 TF/HEG/GRR/070 FI 27/01/2015 GERDP-JE-DR-14-240-A RE
HGGD515200 H-6235 00 MKB 58 - SA00 TL -03 A 7 Fire Protection Piping Arrangement GFE 26/06/2014 04/07/2014 TF/HEG/GRR/070 FI 27/01/2015 GERDP-JE-DR-14-240-A RE
HGGD515060 H-6235 00 MKB 58 - SA00 FB -01 A 1 x Fire Protection Diagram 05/07/2013 11/07/2013 TF/HEG/GRR/023 FI 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L Revision of drawing
HGGD515060 H-6235 00 MKB 58 - SA00 FB -01 A 1 x Fire Protection Diagram 05/07/2013 08/07/2013 TF/HEG/GRR/024_DHL FA 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L Revision of drawing
HGGD515060 H-6235 00 MKB 58 - SA00 FB -01 B 1 Fire Protection Diagram GFE 27/03/2014 02/04/2014 TF/HEG/GRR/059 FI 18/08/2014 GERDP-14-491 RN
HGGD515060 H-6235 00 MKB 58 - SA00 FB -01 B 1 Fire Protection Diagram GFE 27/03/2014 02/12/2014 TF/COO/GRR/015_DHL FI
HGGD515300 H-6235 00 MKB 58 - SA00 FS -01 A 6 Fire Protection Electrical Diagram GFE 26/06/2014 04/07/2014 TF/HEG/GRR/070 FI 27/01/2015 GERDP-JE-DR-14-240-A RE

05/09/2016 14 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

PA60 - AUXILIARY SYSTEMS (ELECTRIC) _


GENERAL DOCUMENTS _
H-6235 00 MKB 60 - SA00 PB -01 A 25 Electrical Auxiliary Systems Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-283-A FI
SA61 - INSTRUMENTATION AND ELECTRICAL AUXILIARIES _
HGGD520000 H-6235 00 MKB 61 - PA00 PA -01 A x Instrumentation and Control Devices 09/04/2013 12/04/2013 TF/HEG/GRR/011 FA DEEMED APPROVED
HGGD520000 H-6235 00 MKB 61 - PA00 PA -01 B 13 x Instrumentation and Control Devices 05/07/2013 11/07/2013 TF/HEG/GRR/023 FA 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L Revision of drawing
HGGD520000 H-6235 00 MKB 61 - PA00 PA -01 C 12 x Instrumentation and Control Devices GFR 04/11/2013 07/11/2013 TF/HEG/GRR/043 FA 21/04/2014 GERDP-14-211 RR
HGGD520000 H-6235 00 MKB 61 - PA00 PA -01 D 20 x Instrumentation and Control Devices GFR 23/05/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RN

HGGD520000 H-6235 00 MKB 61 - PA00 PA -01 E 20 Instrumentation and Control Devices GFR 02/09/2014 04/11/2014 TF/COO/GRR/013 FI 25/01/2015 GERDP-JE-DR-14-320-A RE

HGGD520061 H-6235 00 MKB 61 - PA00 FS -01 A 336 x Control Device Diagram GFR 15/05/2014 12/06/2014 TF/COO/GRR/010 FI ---
01/12/2014 GERDP-JE-DR-14-228-A FI
HGGD520061 H-6235 00 MKB 61 - PA00 FS -01 C 338 Control Device Diagram GFR 17/10/2014 04/11/2014 TF/COO/GRR/013 FA
25/01/2015 GERDP-JE-DR-14-320-A FI
HGGD520080 H-6235 00 MKB 61 - PA00 FF -01 A 5 Generator Sequences GFE 11/06/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RE
HGGD520081 H-6235 00 MKB 61 - PA00 FF -02 A 6 Stator Cooling Functional Diagram GFE 11/06/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RE
HGGD520083 H-6235 00 MKB 61 - PA00 FF -03 A 9 Guide Brg Cooling Functional Diagram GFE 11/06/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RE
HGGD520084 H-6235 00 MKB 61 - PA00 FF -04 A 10 Braking and Lifting Functional Diagram GFE 11/06/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RE
HGGD520086 H-6235 00 MKB 61 - PA00 FF -05 A 3 Space Heater Functional Diagram GFE 11/06/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RE
HGGD520087 H-6235 00 MKB 61 - PA00 FF -06 A 3 Shaft Current Functional Diagram GFE 11/06/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RE
HGGD520090 H-6235 00 MKB 61 - PA00 PD -01 A x Electrical Consumer List 03/10/2012 12/10/2012 TF/HEG/GRR/005 FI ---
HGGD520090 H-6235 00 MKB 61 - PA00 PD -01 B x Electrical Consumer List 09/04/2013 12/04/2013 TF/HEG/GRR/011 FI ---
HGGD520090 H-6235 00 MKB 61 - PA00 PD -01 C 6 x Electrical Consumer List 05/07/2013 11/07/2013 TF/HEG/GRR/023 FA 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L Revision of drawing
HGGD520090 H-6235 00 MKB 61 - PA00 PD -01 D 6 x Electrical Consumer List GFR 04/11/2013 07/11/2013 TF/HEG/GRR/043 FA 21/04/2014 GERDP-14-211 FI
HGGD520090 H-6235 00 MKB 61 - PA00 PD -01 E 6 x Electrical Consumer List GFE 03/03/2014 25/03/2014 TF/HEG/GRR/058 FI --- 02/12/2014 GERDP-JE-DR-14-244 FI
HGGD520090 H-6235 00 MKB 61 - PA00 PD -01 F 6 Electrical Consumer List GFE 15/09/2015 16/09/2015 TF/HEG/GRR/086 FI 07/12/2015 GERDP-JE-DR-15-210-RA FI
HGGD520060 H-6235 00 MKB 61 - SA00 FS -01 A 2 x Low Voltage Wiring Diagram GFR 05/07/2013 11/07/2013 TF/HEG/GRR/023 FA 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L No revision of drawing
HGGD520060 H-6235 00 MKB 61 - SA00 FS -01 A 2 x Low Voltage Wiring Diagram GFR 05/07/2013 08/07/2013 TF/HEG/GRR/023 FA 04/11/2013 GERDP-13-363 RR 04/12/2013 GRR-HEG-MET-13-047-L No revision of drawing
HGGD520060 H-6235 00 MKB 61 - SA00 FS -01 B 2 x Low Voltage Wiring Diagram GFR 31/10/2014 07/11/2013 TF/HEG/GRR/043 FA 21/04/2014 GERDP-14-211 RR
HGGD520060 H-6235 00 MKB 61 - SA00 FS -01 C 2 x Low Voltage Wiring Diagram GFE 27/05/2014 12/06/2014 TF/COO/GRR/010 FI 09/09/2014 GERDP-JE-DR-14-178-A RN
HGGD520060 H-6235 00 MKB 61 - SA00 FS -01 D 2 Low Voltage Wiring Diagram GFE 02/09/2014 04/11/2014 TF/COO/GRR/013 FA 25/01/2015 GERDP-JE-DR-14-320-A RE
HGGD520060 H-6235 00 MKB 61 - SA00 FS -01 D 2 Low Voltage Wiring Diagram GFE 02/09/2014 02/12/2014 TF/COO/GRR/015_DHL FI
HGGD527000 H-6235 00 MKB 61 - SA00 TL -01 A 14 Control Devices Installation GFE 12/06/2014 26/06/2014 TF/HEG/GRR/067 01/12/2014 GERDP-JE-DR-14-233-A RE
HGGD527010 H-6235 00 MKB 61 - SA00 TL -02 A 2 Stator RTDs mounting GFE 15/01/2014 21/01/2014 TF/HEG/GRR/050 FI 09/04/2014 GERPD-14-204 RN
HGGD528080 H-6235 00 MKB 61 - 004F EC -01 B 7 Detail Wiring Material Spec GFE 02/09/2014 04/11/2014 TF/COO/GRR/013 FI 25/01/2015 GERDP-JE-DR-14-320-A FI
SA62 - SPECIFIC MONITORING _
HGGD523000 H-6235 00 MKB 62 - SA00 TL -01 A 10 Generator Air gap and Vibration System Assembly GFE 10/06/2014 26/06/2014 TF/HEG/GRR/067 01/12/2014 GERDP-JE-DR-14-233-A RE
HGGD524000 H-6235 00 MKB 62 - SA00 TL -03 A 4 Partial Discharge System GFE 15/05/2014 28/05/2014 TF/HEG/GRR/066 FI ---
HGGD523060 H-6235 00 MKB 62 - SA00 FB -01 B 1 x Air gap and Vibration System monitoring Diagram GFR 16/01/2014 21/01/2014 TF/HEG/GRR/050 FA 09/04/2014 GERPD-14-204 RR
09/04/2014 GERPD-14-204 RR
HGGD523060 H-6235 00 MKB 62 - SA00 FB -01 C 1 Air gap and Vibration System monitoring Diagram GFE 10/06/2014 26/06/2014 TF/HEG/GRR/067 FA
01/12/2014 GERDP-JE-DR-14-233-A RE
HGGD528082 H-6235 00 MKB 63 - SA00 PA -01 C 34 x Generator Cable List 08/07/2015 07/08/2015 TF/HEG/GRR/085 FI 21/10/2015 GERDP-JE-DR-15-173-A FI
HGGD528082 H-6235 00 MKB 63 - SA00 PA -01 D 37 Generator Cable List 02/09/2015 16/09/2015 TF/HEG/GRR/086 FI 07/12/2015 GERDP-JE-DR-15-210-RA FI
SA65 - SPACE HEATERS _
HGGD521000 H-6235 00 MKB 65 - SA00 TL -01 A 1 Space Heaters Arrangement 30/04/2014 30/04/2014 TF/HEG/GRR/063 FI 19/12/2014 GERDP-JE-DR-14-197-A RE
HGGD526000 H-6235 00 MKB 65 - 1 TL -02 B 3 Generator Pit Lighting GFE 30/04/2014 30/04/2014 TF/HEG/GRR/063 FI 19/12/2014 GERDP-JE-DR-14-197-A RE
PA80 - TOOLS _
H-6235 00 MKB 80 - SA00 PB -01 A 26 Tools Part List GFE 19/09/2014 19/09/2014 TF/HEG/GRR/074 FI 31/10/2014 GERDP-JE-DR-14-283-A FI
SA82 - STATOR TOOLS _
HGGD610090 H-6235 00 MKB 82 - SA00 ED -01 A Stator Lifting Tools Calculation 14/02/2014 18/02/2014 TF/HEG/GRR/056 FI 14/03/2014 GERPD-14-127 RE
HGGD610100 H-6235 00 MKB 82 - SA00 LD -01 A 2 x Stator Handling Arrangement 05/02/2014 18/02/2014 TF/HEG/GRR/056 FA 14/03/2014 GERPD-14-127 RE
HGGD610100 H-6235 00 MKB 82 - SA00 LD -01 B 2 Stator Handling Arrangement GFE 13/11/2014 23/02/2015 TF/HEG/GRR/082 FA
HGGD610110 H-6235 00 MKB 82 - SA00 LD -02 A 1 x Stator and Rotor Handling 11/10/2012 12/10/2012 TF/HEG/GRR/005 FA DEEMED APPROVED
HGGD610110 H-6235 00 MKB 82 - SA00 LD -02 B 1 Stator and Rotor Handling 01/10/2013 02/10/2013 TF/HEG/GRR/037 FI 10/02/2014 GERDP-14-047 FI
HGGD610400 H-6235 00 MKB 82 - SA00 LD -04 A 1 x Stator handling beams support tool 10/09/2014 05/11/2014 TF/HEG/GRR/078 25/01/2015 GERDP-JE-DR-14-320-A RE
HGGD611100 H-6235 00 MKB 82 - SA00 LD -03 A 3 1/6 Stator Frame Handling 11/09/2013 16/09/2013 TF/HEG/GRR/036 FA DEEMED APPROVED
HGGD611100 H-6235 00 MKB 82 - SA00 LD -03 B 3 1/6 Stator Frame Handling 27/05/2016 01/07/2016 TF/HEG/GRR/094 FA 27/07/2016 GERDP-JE-DR-16-112-A RE
SA83 - ROTOR TOOLS _
HGGD070004 H-6235 00 MKB 83 - SA00 DC -01 A 4 Rotor Embedded Plate Erection Procedure GFR 24/03/2014 02/04/2014 TF/CXE/GRR/005 FA
HGGD070004 H-6235 00 MKB 83 - SA00 DC -01 A 4 Rotor Embedded Plate Erection Procedure GFR 24/03/2014 08/12/2014 TF/CXE/GRR/010 FA 18/08/2014 GERDP-14-491 RE
HGGD620100 H-6235 00 MKB 83 - SA00 LD -01 A 2 Rotor Handling 05/02/2014 18/02/2014 TF/HEG/GRR/056 FA 14/03/2014 GERPD-14-127 RE
HGGD620200 H-6235 00 MKB 83 - SA00 LD -08 A 1 Rotor Embedded Plate Assembly GFE 22/01/2014 23/01/2014 TF/HEG/GRR/051 FI 13/05/2014 GERDP-14-254 RE
HGGD620210 H-6235 00 MKB 83 - 220F TB -01 A 1 Rotor Embedded Plate GFE 22/01/2014 23/01/2014 TF/HEG/GRR/051 FI 13/05/2014 GERDP-14-254 RE
HGGD623100 H-6235 00 MKB 83 - SA00 LD -07 A 1 x Pole Handling GFR 28/04/2014 30/04/2014 TF/HEG/GRR/063 FA DEEMED APPROVED
01/12/2014 GERDP-JE-DR-14-251-A
HGGD623100 H-6235 00 MKB 83 - SA00 LD -07 C 1 Pole Handling GFE 30/06/2014 17/07/2014 TF/HEG/GRR/072 FA RE
19/12/2014 GERDP-JE-DR-14-197-A
SA84 - OTHER TOOLS _
HGGD631000 H-6235 00 MKB 84 - PA00 EC -01 A 4 Generator Standard Tools for Erection GFE 26/01/2015 10/03/2016 TF/CXE/GRR/011 FI 08/07/2015 GERDP-JE-DR-15-082-A FI
HGGD631000 H-6235 00 MKB 84 - PA00 EC -02 A 2 LIST OF NEED OF SPECIFIC TOOLS FOR GENERATOR ERECTION GFE 26/01/2015 10/03/2016 TF/CXE/GRR/011 FI 08/07/2015 GERDP-JE-DR-15-082-A FI
HGGD632100 H-6235 00 MKB 84 - SA00 LD -05 A 2 Guide Bearing Assembly and Dissassembly GFR 28/04/2014 30/04/2014 TF/HEG/GRR/063 FA 19/12/2014 GERDP-JE-DR-14-197-A RE
HGGD641000 H-6235 00 MKB 84 - SA00 LD -02 A 1 Air cooler Handling GFR 19/02/2014 25/02/2014 TF/HEG/GRR/057 FA DEEMED APPROVED
HGGD640100 H-6235 00 MKB 84 - SA00 TL -05 A 1 Braking and Lifting Jack Handling Tool GFE 05/06/2014 17/07/2014 TF/HEG/GRR/072 FI 01/12/2014 GERDP-JE-DR-14-251-A RE
MKC - EXCITATION SYSTEMS _

FS00 - GENERAL DOCUMENTS _


GENERAL DOCUMENTS _
HGGD530020 H-6235 00 MKC 00 - SA00 FF -01 A 16 Excitation Transfer Function PRE 20/03/2014 21/05/2014 TF/HEG/GRR/064 FI 01/12/2014 GERDP-JE-DR-14-208-A RE
HGG8530020 H-6235 08 MKC 00 - SA00 FF -01 A 15 Excitation Transfer Function PRE 02/06/2016 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RE
HGGD530061 H-6235 00 MKC 00 - SA00 MA -01 A x Excitation Schematic Diagram PRE 26/07/2013 05/08/2013 TF/HEG/GRR/030 FI 04/11/2013 GERDP-13-364 RN 20/11/2013 GRR-HEG-MET-13-043-L Revision of drawing
HGGD530061 H-6235 00 MKC 00 - SA00 MA -01 C 98 Excitation Schematic Diagram GFE 21/11/2013 04/12/2013 TF/HEG/GRR/045 FI 09/04/2014 GERDP-14-206 RE
HGG8530061 H-6235 08 MKC 00 - SA00 MA -01 A 98 Excitation Schematic Diagram GFE 08/12/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RE
HGGD530062 H-6235 00 MKC 00 - SA00 PB -01 A 16 Excitation Part List 21/01/2014 07/02/2014 TF/HEG/GRR/054 FI 13/05/2014 GERDP-14-254 FI
HGG8530062 H-6235 08 MKC 00 - SA00 PB -01 A 16 Excitation Part List 30/11/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A FI
HGGD530063 H-6235 00 MKC 00 - SA00 MA -02 A 2 x Excitation Transformer Electrical Diagram PRE 06/09/2013 10/09/2013 TF/HEG/GRR/035 FI 10/04/2014 GERDP-13-037 RE
HGGD530063 H-6235 00 MKC 00 - SA00 MA -02 B 2 Excitation Transformer Electrical Diagram PRE 30/01/2014 07/02/2014 TF/HEG/GRR/054 FI 13/05/2014 GERDP-14-254 RN
HGG8530063 H-6235 08 MKC 00 - SA00 MA -02 A 2 Excitation Transformer Electrical Diagram PRE 11/12/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RN
HGGD530066 H-6235 00 MKC 00 - SA00 FP -02 A 28 Excitation Modbus List 10/01/2014 07/02/2014 TF/HEG/GRR/054 FI 13/05/2014 GERDP-14-254 RN
HGGD530068 H-6235 00 MKC 00 - SA00 FP -03 A 12 Excitation Interface List 20/01/2014 07/02/2014 TF/HEG/GRR/054 FI 13/05/2014 GERDP-14-254 RN
HGG8530068 H-6235 08 MKC 00 - SA00 FP -03 A 12 Excitation Interface List 09/12/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A FI
HGGD530071 H-6235 00 MKC 00 - SA00 QM -01 B 48 x Factory Testing Specification 13/05/2014 22/05/2014 TF/HEG/GRR/065 FI ---
HGGD530071 H-6235 00 MKC 00 - SA00 QM -01 C 48 Factory Testing Specification unit 09 04/06/2014 26/06/2014 TF/HEG/GRR/068 FI ---
HGGD530071 H-6235 00 MKC 00 - SA00 QM -02 B 45 Factory Testing Specification Unit 10 06/06/2014 26/06/2014 TF/HEG/GRR/068 FI ---

05/09/2016 15 / 16
DOCUMENT LIST AND FOLLOW-UP STATUS Doc. Num. H-6235000AA00-FS00AB-01

Renewable Power - Hydro Scope: TECHNICAL DOCUMENTS AND DRAWINGS Language English Date:

GRAND RENAISSANCE FOLLOW UP & STATUS


DRAWING STATUS: STATUS GIVEN BY CUSTOMER:
TURBINE TPM: C.Badina ALSTOM NUMBERING "PRE" : Preliminary TRANSMITTAL STATUS: "AP" : Approved "RE" : Released
"GFR" : Good For Review "FI : For Information "AN ": Approved except as Noted "RN" : Released except as Noted or Provisionnaly
GENERATOR TPM: E.Kandel ALSTOM RESPONSE TO CUSTOMER COMMENTS
TITLE / DESCRIPTION "GFE" : Good for
Execution
"FA" : For Approval
"ASB" : As Built
"RC" : Returned for Correction
"RE" : Released
Released
"RR" : To be Revised and Resubmitted

X = Obsolete
"ASB" : As Built "FI" : For Information Only

Manufactu
Subassem

Doc. Type
Functional

Increment

No. Sheet
Number +
System
Workin
Project
Code

Find
Unit

Rev
bly
INTERNAL NUMBERING -

al
Document DOCUMENT TRANSMITTAL SUBMISSION DATE RECEIVING COMMENTS STATUS GIVEN BY DATE OF
DOC. TRANSMIT. REF. REFERENCE OF CUSTOMER LETTER REF OF RESPONSE LETTER ACTION RESULTING FROM RESPONSE
Status DATE EFFECTIVE DATE STATUS FROM CUSTOMER CUSTOMER RESPONSE

HGG8530071 H-6235 08 MKC 00 - SA00 QM -01 A 47 x Factory Testing Specification unit 08 15/02/2016 30/06/2016 GRR-HEG-MET-16-024-L FI ---
H-6235 00 MKC 00 - SA00 FQ -01 A 22 x Controgen Settings 15/05/2014 22/05/2014 TF/HEG/GRR/065 FI ---
H-6235 09 MKC 00 - SA00 FQ -01 B 23 Controgen Settings Unit 09 07/10/2014 08/10/2014 TF/HEG/GRR/075 FI 25/12/2014 GERDP-JE-DR-14-293-A FI
HGGD530075 H-6235 00 MKC 10 - SA00 FQ -02 B 24 x Controgen Settings Unit 10 15/05/2014 26/06/2014 TF/HEG/GRR/068 FI ---
HGGD530075 H-6235 10 MKC 00 - SA00 FQ -01 B 23 Controgen Settings Unit 10 07/10/2014 08/10/2014 TF/HEG/GRR/075 FI 25/12/2014 GERDP-JE-DR-14-293-A FI
HGGD530073 H-6235 00 MKC 00 - PA00 QM -02 B 8 x Excitation FAT specification PRE 16/04/2014 22/04/2014 GRR-HEG-MET-14-020-L] FI ---
HGGD530073 H-6235 00 MKC 00 - PA00 QM -02 C 8 Excitation FAT specification GFE 15/05/2014 22/05/2014 TF/HEG/GRR/065 FI ---
GRR-HEG-MET-16-024-L
HGG8530073 H-6235 08 MKC 00 - PA00 QM -02 A 8 Excitation FAT specification (Phase 2) GFE 01/03/2016 30/06/2016 FI ---
TF/HEG/GRR/096
HGGD530073 H-6235 00 MKC 00 - PA00 QM -03 B 8 Excitation FAT specification unit 10 GFE 16/04/2014 26/06/2014 TF/HEG/GRR/068 FI 01/12/2014 GERDP-JE-DR-14-234-A FI

HGGD530073 H-6235 00 MKC 00 - SA00 QM -03 A 111 Excitation Transformers FAT GFE 23/06/20174 26/06/2014 TF/HEG/GRR/069 FI ---

HGG8530073 H-6235 08 MKC 00 - SA00 QM -03 A 4 x Excitation Transformers FAT (Phase 2) GFE 29/06/2016 30/06/2016 GRR-HEG-MET-16-025-L FI ---
HGGD530074 H-6235 00 MKC 00 - PA00 DC -02 A 34 Excitation Descriptive Guide 26/11/2013 04/12/2013 TF/HEG/GRR/045 FI 09/04/2014 GERDP-14-206 RR
HGG8530074 H-6235 08 MKC 00 - PA00 DC -02 A 35 Excitation Descriptive Guide 08/12/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RN
HGGD530090 H-6235 00 MKC 00 - PA00 ED -01 A 44 Stability Study Report PRE 20/03/2014 21/05/2014 TF/HEG/GRR/064 FI --- 01/12/2014 GERDP-JE-DR-14-208-A RN
HGGD530091 H-6235 00 MKC 00 - PA00 ED -02 A 20 Excitation Calculation Note PRE 29/10/2013 12/05/2014 TF/HEG/GRR/062 FI 03/09/2014 GERDP-JE-DR-14-188-A RE
HGG8530091 H-6235 08 MKC 00 - PA00 ED -02 A 20 Excitation Calculation Note 03/12/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RE
HGGD534100 H-6235 00 MKC 00 - 001F DA -01 A 2 x Excitation Transformer Outline PRE 03/08/2013 06/09/2013 TF/HEG/GRR/033 FI 20/09/2013 UHP_ETO-2028 Will be taken into account
09/04/2014 GERDP-14-206 RN
HGGD534100 H-6235 00 MKC 00 - 001F DA -01 A 2 x Excitation Transformer Outline 03/08/2013 04/12/2013 TF/HEG/GRR/045 FI
10/04/2014 GERDP-13-037 RE
HGGD534100 H-6235 00 MKC 00 - 001F DA -01 B 2 Excitation Transformer Outline 30/01/2014 07/02/2014 TF/HEG/GRR/054 FI ---
HGG8534100 H-6235 08 MKC 00 - 001F DA -01 A 2 Excitation Transformer Outline 30/11/2015 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RN
HGGD535000 H-6235 00 MKC 00 - SA00 TL -01 A x Excitation Cubicle Outline PRE 03/07/2013 05/08/2013 TF/HEG/GRR/030 FI ---
04/11/2013 GERDP-13-364 RE
HGGD535000 H-6235 00 MKC 00 - SA00 TL -01 B x Excitation Cubicle Outline PRE 30/07/2013 06/09/2013 TF/HEG/GRR/033 FI 20/11/2013 GRR-HEG-MET-13-043-L No revision of drawing
10/04/2014 GERDP-13-037 RN
HGGD535000 H-6235 00 MKC 00 - SA00 TL -01 C 7 Excitation Cubicle Outline GFE 21/11/2013 04/12/2013 TF/HEG/GRR/045 FI 09/04/2014 GERDP-14-206 RE
HGGD535100 H-6235 00 MKC 00 - SA00 TA -01 A 20 X Excitation Cubicle Arrangement PRE 14/01/2014 07/02/2014 TF/HEG/GRR/054 FI 13/05/2014 GERDP-14-254 RN
HGG8535100 H-6235 00 MKC 00 - SA00 TA -01 C 20 Excitation Cubicle Arrangement 01/07/2016 TF/HEG/GRR/095 FI 11/08/2016 GERDP-JE-DR-16-113-A RE
HGGD536000 H-6235 00 MKC 00 - SA00 TL -02 A 1 Excitation Cable Arrangement GFE 04/03/2014 28/05/2014 TF/HEG/GRR/066 FI ---
30/05/2015 GERDP-JE-DR-15-070-A RR
HGGD536010 H-6235 00 MKC 00 - 201F TU -01 A 1 Steel Plates 17/03/2014 23/02/2015 TF/HEG/GRR/083 FI
30/07/2015 GERDP-JE-DR-15-133-A RE
30/05/2015 GERDP-JE-DR-15-070-A RR
HGGD536020 H-6235 00 MKC 00 - 202F TU -01 A 1 insulating Plates 17/03/2014 23/02/2015 TF/HEG/GRR/083 FI
30/07/2015 GERDP-JE-DR-15-133-A RE
H-6235 00 MKC 00 - SA00 PB -03 A 6 Excitation Cables Supports Part List 22/01/2015 23/02/2015 TF/HEG/GRR/083 FI 30/04/2015 GERDP-JE-DR-15-071-A FI
HGGD536080 H-6235 00 MKC 00 - SA00 EC -01 A 4 x Excitation Cable Specification GFE 29/11/2013 04/12/2013 TF/HEG/GRR/045 FI 09/04/2014 GERDP-14-206 RN
HGGD536080 H-6235 00 MKC 00 - SA00 EC -01 B 6 Excitation Cable Specification GFE 28/05/2014 07/07/2014 TF/HEG/GRR/071 FI 01/12/2014 GERDP-JE-DR-14-239-A RN 23/02/2015 GRR-HEG-MET-15-013-T No revision of drawing
H-6235 09 MKC 00 - PA00 QC -01 B 227 Excitation Quality Control Plan Unit 09 GFE 02/09/2014 08/10/2014 TF/HEG/GRR/075 FI 25/12/2014 GERDP-JE-DR-14-295-A FI

05/09/2016 16 / 16
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Annex 3 – Schedule of Planned Inspections

Customer Inspection Schedule from 01/07/2016 to 31/10/2016


(Notification Confirmation will be send 5 days before Inspection)
Witness Point Notification
Product Component Type Description Unit Where Comments
Forecasted date Ref:
Generator Guide
Witness Eurobearings
GEN Bearing pads Final Dimensional - NDT 6 05/07/2016 Done
Point (India)
MKB31
GE Alstom
GEN Rotor complete Pole Witness IR, HV, Interturn voltage test on complete pole 7 27/09/2016
Hydro India
MKB26 Point
Turbine shaft final inspection
GE Alstom
TUR Turbine Shaft Witness Step 1 - Visual Inspection and roughness, 8 07/07/2016 Done
Hydro China
MEF31 Point dimensional on the horizontal lathe machine
Turbine shaft final inspection - Step 2
GE Alstom
TUR Turbine Shaft Witness Boroscopic inspection of central bore, Check of 8 14/09/2016
Hydro China
MEF31 Point runner / shaft holes coupling with temp31-34late
Turbine shaft final inspection - Step 3
GE Alstom
TUR Turbine Shaft Witness Spot check (PT/MT)., Check of generator / shaft 8 20/09/2016
Hydro China
MEF31 Point holes coupling with template
GE Alstom
GEN Excitation system Witness Excitation cubicles 8 27/07/2016 Done
Hydro France
MKC00 Point Final Inspection
GE Alstom
GEN Excitation system Witness Excitation cubicles 7 21/10/2016
Hydro France
MKC00 Point Final Inspection
OCREV
GEN Excitation system Witness Excitation Transformers 8&7 26/07/2016 Done
( Italy )
MKC00 Point Final Inspection
OCREV
GEN Excitation system Witness Excitation Transformers 6 & spare 26/10/2016
( Italy )
MKC00 Point Final Inspection

Page 31 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Customer Inspection Schedule from 01/07/2016 to 31/10/2016


(Notification Confirmation will be send 5 days before Inspection)
Product Component Type Description Unit Where Witness Point Comments Status
Forecasted date
Turbine shaft final inspection
GE Alstom
TUR Turbine Shaft Witness Step 1 - Visual Inspection and roughness, 7 06/09/2016
Hydro China
MEF31 Point dimensional on the horizontal lathe machine
Turbine shaft final inspection - Step 2
GE Alstom
TUR Turbine Shaft Witness Boroscopic inspection of central bore, Check of 7 13/09/2016
Hydro China
MEF31 Point runner / shaft holes coupling with template
Turbine shaft final inspection - Step 3
GE Alstom
TUR Turbine Shaft Witness Spot check (PT/MT)., Check of generator / shaft 7 19/09/2016
Hydro China
MEF31 Point holes coupling with template
Final Inspection
GEN Rotor spider Hub Witness Dimensional check : Individual part - check with 8 GE Alstom 12/09/2016
MKB24 Point template on vertical lathe Hydro China

Final Inspection Step 1 :


GE Alstom
TUR RUNNER Witness - Dimension Inspection on vertical lathe machine - 8 10/10/2016
Hydro China
MEF32 Point - Control of coupling holes with template
Visual inspection and roughness water passage
GE Alstom
TUR RUNNER Witness Check of hydraulic profiles, Spot check PT/ UT 8 18/10/2016
Hydro China
MEF32 Point Final Inspection - Step 2
Test after final machining :
GEN Upper shaft Witness Check on vertical lathe : Dimensional check - 8 GE Alstom 08/09/2016
MKB21 Point Magnetic particle test, Test of surface Hydro China

GEN Stator bar Witness Corona protection resistance measurement, AC 8 GE Alstom 20/10/2016
MKB14 Point 100 % High voltage test, 100 % Tan(δ) dielectric Hydro India
test (on the slot portion)

Page 32 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Internal Alstom Hydro France Inspection from 01/07/2016 to 31/10/2016


Product Component Type Description Unit Where Witness Point Comments Status
Forecasted date
FORGIATURA
TUR Thrust collar Witness Final Inspection 6 MODERNA 01/08/2016 Done
MEF 43 Point ARESE SPA
( Italy )
FORGIATURA
TUR Thrust collar Witness Final Inspection 7 MODERNA 13/09/2016 to be confirmed
MEF 43 Point ARESE SPA
( Italy )
FORGIATURA
TUR Thrust collar Witness Final Inspection 8 MODERNA 16/09/2016 to be confirmed
MEF 43 Point ARESE SPA
( Italy )
ROCKFIN
TUR Hydraulic power unit Witness Final Inspection 6, 7, 8 26/07/2016 Done
( Poland )
MEU 58 Point
A.SILVA
TUR Oil pressure tanks - Witness Final Inspection 6, 7, 8 MATOS 28/06/2016 Done
MEU 36 Point ( Portugal )
A.SILVA
TUR Air/Oil pressure Witness Final Inspection 6, 7, 8 MATOS 28/06/2016 Done
tanks - MEU 31 Point ( Portugal )
ROCKFIN
TUR Servomotors Witness Final Inspection 6, 7, 8 09/08/2016 Done
( Poland )
MEF 61 Point

Page 33 sur 34
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT JULY/AUGUST 2016
MONTHLY PROGRESS REPORT Annexes

Annex 4 – Correspondence Register

Page 34 sur 34
GRAND RENAISSANCE Coordination ‐ Correspondance To METEC

METEC response to Alstom's letter
To  To 
Reference Attachment to e‐mail Date By Subject Response required Y/N
METEC Engineer
Date Reference Attachment to email

GRR‐COO‐MET‐12‐001‐e ALS_GDR_prov_001 Main Data TUR & GEN Rev B 10/08/2012 FP Turbine & Generator Main Data X N


GRR‐COO‐MET‐12‐002‐L ALS_GRR_prov 002_Deviation List rev 0 30/08/2012 FP Preliminary deviation list X N
HS_CPA01_000000000EC_rev1
HS_CPA02_000000000EC_rev1
Equivalences ISO ‐ ASME
GRR‐COO‐MET‐12‐003‐L Down payment Alstom ‐ 29.08.12 30/08/2012 FP Down payment second invoice X N
Down payment Comelex ‐ 29.08.12
GRR‐COO‐MET‐12‐004‐L 30/08/2012 FP New powerhouse drawings X Y
GRR‐COO‐MET‐12‐005‐e no 05/09/2012 FP Design Meeting in  Addis Abeba week 37 X Y
GRR‐COO‐MET‐12‐006‐T ALS_GDR_prov_001 Main Data TUR & GEN Rev C 06/09/2012 FP Turbine & Generator Main Data X N 03/09/2012 e‐mail
GRR‐COO‐MET‐12‐007‐L Unit cross section optimization 06/09/2012 FP Turbine optimization, request for approval of modified cross‐section drawing X Y
GRR‐COO‐MET‐12‐008‐L no 18/09/2012 FP Seismic Parameters X Y
GRR‐COO‐MET‐12‐009‐T GRR‐COO‐MET‐12‐009‐T_attachments.zip 24/09/2012 FP Final Minutes of Design Meeting 001 X Y
GRR‐COO‐MET‐12‐010‐T GRR‐COO‐MET‐12‐010‐T_attachment.zip 24/09/2012 FP Responses to Clarification Request #2 ‐ 5.09 X N
GRR‐COO‐MET‐12‐011‐e GRR‐COO‐MET‐12‐011‐e_Draft MoM 11/10/2012 FP Draft MoM  X Y
GRR‐COO‐MET‐12‐012‐L no 23/10/2012 FP Phase 3 Optional Units X N
GRR‐COO‐MET‐12‐013‐L 29/11/2012 FP Comments on Workshop Layout X N 04/12/2012 GRR‐MET‐ALS‐12‐011 GMO_2274 ENG
GRR‐COO‐MET‐12‐014‐L not yet sent Runners for Early Generation ‐ Budgetary Proposal
GRR‐COO‐MET‐12‐015‐L 13/12/2012 FP Amendment of Letter of Credit X Y
GRR‐COO‐MET‐12‐016‐T GRR‐COO‐MET‐12‐016‐T_Transmittal Form TF‐COO‐GRR‐001_attachments 10/01/2013 FP Transmittal Form TF/COO/GRR/001 ‐ Numbering Procedure X X N
GRR‐COO‐MET‐13‐001‐L 10/01/2013 FP GERDP ‐ Delivery of EPC Contractor's Comments on Plant Contractor's design  X X N
documents
GRR‐COO‐MET‐13‐002‐L 01/02/2013 FP L/C deletion of confirmation Clause X N
GRR‐COO‐MET‐13‐003‐L GRR‐COO‐MET‐13‐003‐L_Grd_Renaissance_Turbine_Addendum_Early_Generation_ETOF‐GEN‐12‐67  16/01/2013 FP Runners for Early Generation ‐ Budgetary Proposal X 18/01/2013 GRR‐MET‐ALS‐13‐001‐L
rev2 attachment (ANNULE ET REMPLACE le GRR‐COO‐MET‐12‐014‐L non envoyé)
GRR‐COO‐MET‐13‐004‐L GRR‐COO‐MET‐12‐008‐L 30/01/2013 FP Seismic design X Y
GRR‐COO‐MET‐13‐005‐L 30/01/2013 FP Clearance for Equipment transportation X Y 26/02/2013 GERDP‐SCM/FSU‐ GERDP‐SCM_FSU‐
13/068/CEXT 130_68_CEXT‐attachment‐
Design Live Loads for Site 
Bridge
GRR‐COO‐MET‐13‐006‐L GRR‐COO‐MET‐13‐006‐T_Coal Tar Epoxy Coatings_attachments 04/02/2013 FP Coal Tar Epoxy Based Paints ‐ Transmittal Form TF/COO/GRR/002 X X Y
GRR‐COO‐MET‐13‐007‐L GRR‐COO‐MET‐13‐007‐L_Responses to Questions GMO‐237_attachments 20/02/2013 FP Responses to Questions GMO/237 X N
GRR‐COO‐MET‐13‐008‐L 20/02/2013 FP Temperature of Cooling Water ‐ Response to GMO/2208 X N
GRR‐COO‐MET‐13‐009‐L 26/02/2013 FP New Amendement to Letter of Credit X
GRR‐COO‐MET‐13‐010‐L 27/02/2013 FP Location of the Turbine Speed Load Governor X Y
GRR‐COO‐MET‐13‐011‐L GRR‐COO‐MET‐13‐011‐L_Request for the Powerhouse updated drawings_attachment 27/02/2013 FP Request for the Updated Drawings of the Powerhouse X Y
GRR‐COO‐MET‐13‐012‐L GRR‐COO‐MET‐13‐012‐L_Updated Deviation List_attachments 04/03/2013 FP Updated Deviation List with costs and time of compliance X Y
GRR‐COO‐MET‐13‐013‐L 12/03/2013 FP Temperature of Cooling Water ‐ Response to GMO/465 X Y
GRR‐COO‐MET‐13‐014‐T GRR‐COO‐MET‐13‐014‐T_Transmittal Form TF‐COO‐GRR‐003_attachements 12/03/2013 FP Transmittal Form TF/COO/GRR/003 – Document Release ‐ Schedules for approval X Y

GRR‐COO‐MET‐13‐015‐L 20/03/2013 FP Control System, Protection & Energy Evacuation X N


GRR‐COO‐MET‐13‐016‐T GRR‐COO‐MET‐13‐016‐T_Transmittal Form TF‐COO‐GRR‐004_attachments 22/03/2013 FP Transmittal Form TF/COO/GRR/004 X X Y
GRR‐COO‐MET‐13‐017‐L 11/04/2013 FP Control System, Protection & Energy Evacuation Proposal X
GRR‐COO‐MET‐13‐018‐L 17/04/2013 NL Letter of credit : beneficiary certificate / civil xworks guide drawings X N
GRR‐COO‐MET‐13‐019‐L COO\GRR‐COO‐MET‐13‐019‐L_Request for Transportation  Logistic  30/04/2013 FP Request for Transportation  Logistic Meeting X Y
Meeting_attachment.zip
GRR‐COO‐MET‐13‐020‐L 03/06/2013 FP Visit of Alstom Project Management – request for appointment X Y
GRR‐COO‐MET‐13‐021‐L 23/05/2013 FP Erection All Risks Insurance X Y
GRR‐COO‐MET‐13‐022‐L 10/06/2013 FP split of the contractual event Submittal of Detailed Design for Raw materials ‐Main  X N
equipment procurement.docx
GRR‐COO‐MET‐13‐023‐L COO\GRR‐COO‐MET‐13‐023‐L_Comments of powerhouse drawings_Attachments.zip 10/06/2013 GG Comments on Powerhouse Drawings X N

GRR‐COO‐MET‐13‐024‐L 06/06/2013 Second Design Review Meeting X Y


GRR‐COO‐MET‐13‐025‐L COO\GRR‐COO‐MET‐13‐025‐L‐T13 Deviation Feed Back_Attachments.zip 26/07/2013 FP T13 Deviation Feedback X N
GRR‐COO‐MET‐13‐026‐L COO\GRR‐COO‐MET‐13‐026‐L‐MoM of Design Review Meeting n°2_Attachment.zip 16/07/2013 FP MoM of Design Review Meeting n°2 X N

GRR‐COO‐MET‐13‐027‐L COO\GRR‐COO‐MET‐13‐027‐L‐MoM Design Meeting with METEC‐UHP 18th of June  16/07/2013 FP MoM of Design Meeting 18th of June 2013 X N


2013_Attachment.zip
TF‐COO‐GRR‐005 TF‐COO‐GRR‐005_attachement.zip 18/07/2013 FP Technical Documents Submission & Approval Process X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxCOO 1/5 09/09/2016


GRR‐COO‐MET‐13‐028‐L 10/09/2013 FP Nomination of the Engineer X Y
GRR‐COO‐MET‐13‐029‐L None  07/08/2013 FP Painting Specification  X X N
GRR‐COO‐MET‐13‐030‐L GRR‐COO‐MET‐13‐030‐L_Responses to GTO‐1550_Attachement.pdf 07/08/2013 FP Responses to GTO‐1550 X
GRR‐COO‐MET‐13‐031‐L None  13/08/2013 FP Clarification on Pipe Schedules X N
GRR‐COO‐MET‐13‐032‐L None  13/08/2013 FP Minimum Height of Crane Hook and Drawing Update X Y
GRR‐COO‐MET‐13‐033‐L None 27/08/2013 NL Beneficiary certificate ‐ Submittal of raw material drawings X N
GRR‐COO‐MET‐13‐034‐L None  06/09/2013 CL Grand Ethiopian Renaissance Dam X N
GRR‐COO‐MET‐13‐035‐T COO\GRR‐COO‐MET‐13‐035‐T_Monthly Progress Report August 2013_Attachment.zip 06/09/2013 FP Monthly Progress Report ‐ August 2013 X N

GRR‐COO‐MET‐13‐036‐L None  10/09/2013 FP Turbine & Generator Main Parts Manufacturing Schedule X X Y


GRR‐COO‐MET‐13‐037‐L None  10/09/2013 FP Onshore Letter of Credit and Down payment overdue X Y
GRR‐COO‐MET‐13‐038‐L Alstom Comments on List of Documentation 17/09/2013 FP List of Rechnical Documentation X X N
GRR‐COO‐MET‐13‐039‐L None  20/09/2013 FP Answers to GTO‐1900 ‐ Layout modification X Y
GRR‐COO‐MET‐13‐040‐L None  25/09/2013 FP Confirmation of Meeting Request X Y
GRR‐COO‐MET‐13‐041‐L None  25/09/2013 FP Visit of Alstom Project Management X N
GRR‐COO‐MET‐13‐042‐L None  26/09/2013 FP Answers to GERDP‐SCM/FSU‐13/254/CEXT X N
GRR‐COO‐MET‐13‐043‐L GRR‐COO‐MET‐13‐043‐L_Attachment 27/09/2013 FP Pictures and typical dimensions of Manufactured Parts by METEC X Y
GRR‐COO‐MET‐13‐044‐L 01/10/2013 FP T13 ‐ G48 & G49 Deviation Feed Back X X N
GRR‐COO‐MET‐13‐045‐L None  02/10/2013 FP Clarification on Technical Specifications Part III Appendix A X Y 13/02/2014 GRR‐MET‐ALS‐14‐012
GRR‐COO‐MET‐13‐046‐L None 07/10/2013 FP answers to GERDP‐SCM FSU‐13 280 CEXT  MCL‐13 324 CEXT.docx X N
GRR‐COO‐MET‐13‐047‐L COO\GRR‐COO‐MET‐13‐047‐L Transport & Logistic Investigation Report_Attachment_1.zip 07/10/2013 FP Transport & Logistic Investigation Report X N

COO\GRR‐COO‐MET‐13‐047‐
L%20Transport%20&%20Logistic%20Investigation%20Report_Attachment_2.zip
GRR‐COO‐MET‐13‐048‐T COO\GRR‐COO‐MET‐13‐048‐T_Monthly Progress Report September 2013_Attachment.zip 10/10/2013 FP Monthly Progress Report ‐ September 2013 X N

GRR‐COO‐MET‐13‐049‐L GRR‐COO‐MET‐13‐049‐L_Attachements 11/10/2013 FP Answers to GERDP‐SCM‐FSU‐13‐279‐CEXT on Painting Specification X Y


GRR‐COO‐MET‐13‐050‐L None 11/10/2013 FP Deviation T7 ASME Standard – Spiral Case & Draft Tube X N
GRR‐COO‐MET‐13‐051‐L GRR‐COO‐MET‐13‐051‐L_Attachements 22/10/2013 FP Comments on Powerhouse drawings X N
GRR‐COO‐MET‐13‐052‐L None 04/11/2013 NL L/C : Beneficiary certificate ‐ Pier noze N
GRR‐COO‐MET‐13‐053‐L None 31/10/2013 FP Spiral Case & Draft Tube design thickness X Y
GRR‐COO‐MET‐13‐054‐L H‐6235000AA00‐0000DF‐01 SITE STORAGE AND WORKSHOP AREA GUIDELINE 05/11/2013 FP Workshop Design development X N
GRR‐COO‐MET‐13‐055‐L None  07/11/2013 FP Lowest Elevation of Crane Hook X Reponse au courrier GMO 2311
GRR‐COO‐MET‐13‐056‐L None 13/11/2013 FP Spiral case Bulkhead Installation for Phase 2 X N
GRR‐COO‐MET‐13‐057‐L None 13/11/2013 FP Powerhouse Technical Documents X Réponse Salini Letter P5000‐05,25‐537 du 18/07/2013
GRR‐COO‐MET‐13‐058‐T COO\GRR‐COO‐MET‐13‐058‐T ‐ Monthly Progress Report October 2013_Attachement.zip 13/11/2013 FP Monthly Progress Report October 2013 X N
GRR‐COO‐MET‐13‐059‐L None  14/11/2013 FP Final L1D Powerhouse Layout Drawings X Y C'est une réponse au courrier "Mom at Ukrain du 
GRR‐COO‐MET‐13‐060‐L None 19/11/2013 FP Phase 1 Onshore Letter of Credit and Down payment overdue X Y
GRR‐COO‐MET‐13‐061‐L 25/11/2013 FP Accelerated Integrated Work Implementation Schedule X Réponse au courrier GERDP‐JV‐DR‐13‐002‐A
GRR‐COO‐MET‐13‐062‐L GRR‐COO‐MET‐13‐062‐L Attachements 03/12/2013 FP Request of main equipment data X Y
GRR‐COO‐MET‐13‐063‐T COO\GRR‐COO‐MET‐13‐063‐T_Monthly Progress Report November 2013_Attachement 201 10/12/2013 FP Monthly Progress Report ‐ November 2013 X N
GRR‐COO‐MET‐13‐064‐L None  11/12/2013 FP Clarification on Power Supply Voltages X Y 03/01/2014 METEC‐4‐AT28‐T‐1342‐2014
GRR‐COO‐MET‐13‐065‐T GRR‐COO‐MET‐13‐065‐T_Transmittal Form TF‐COO‐GRR‐007 11/12/2013 FP Transmittal of the Painting Specifications X N
GRR‐COO‐MET‐13‐066‐L None 17/12/2013 FP Response to GMO‐2734 on Cooling Water Temperature X N Réponse au courrier GMO 2734
GRR‐COO‐MET‐13‐067‐L 19/12/2013 NL Beneficiary certificate ‐ Submittal of layouts and diagrams X N
GRR‐COO‐MET‐13‐068‐L COO\GRR‐COO‐MET‐13‐068‐L_Invitation letter_Attachment.pdf 20/12/2013 FP Invitation letter X N
GRR‐COO‐MET‐14‐069‐L COO\GRR‐COO‐MET‐14‐069‐L_Invitation letter_Attachment.pdf 02/01/2014 FP Invitation letter X N
GRR‐COO‐MET‐14‐001‐L W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 20/01/2014 Beneficiary certificate ‐ anchoring plates X
GRR‐COO‐MET‐14‐002‐T COO\GRR‐COO‐MET‐14‐002‐T_ MONTHLY PROGRESS REPORT DECEMBER 2013_Attacheme 23/01/2014 FP Monthly Progress Report ‐ December 2013 X N
GRR‐COO‐MET‐14‐003‐L None 24/01/2014 FP Extension of Time for Completion X Y
GRR‐COO‐MET‐14‐004 None 27/01/2014 FP (NL CANCELLED  ‐Proposal to modify L/C : destination "OR MODJO DRY PORT" x
GRR‐COO‐MET‐14‐005‐T GRR‐COO‐MET‐14‐005‐T_Transmittal TF/HEG/GRR/052_ Attachements 31/01/2014 FP Answers to GERDP‐SCM/FSU‐13/432/CEXT on Mechanical Equipment X N  08/04/2014 GERDP‐SCM/FSU‐14/210/CEXT
None TF‐COO‐GRR‐008_Attachement 31/01/2014 GG Piping System Technical Specification X Y
GRR‐COO‐MET‐14‐006‐T GRR‐COO‐MET‐14‐006‐T_Transmittal TF/HET/GRR/053_Attachements 07/02/2014 FP Comments on L1 Powerhouse Drawings X Y 01/03/2014 UHP‐GMO‐455
GRR‐COO‐MET‐14‐007‐T GRR‐COO‐MET‐14‐007‐T_Monthly Progress Report January 2014_Attachment 10/02/2014 FP Monthly Progress Report ‐ January 2014 X N 
GRR‐COO‐MET‐14‐008‐L GRR‐COO‐MET‐14‐008‐L_Mobile Oil Purifier_Attachment 11/02/2014 FP Mobile Oil Purifier X Y
GRR‐COO‐MET‐14‐009‐L None 11/02/2014 FP Clarification on Power Supply Voltages X 03/01/2014 METEC‐4‐AT28‐T‐1342‐2014
GRR‐COO‐MET‐14‐010‐L GRR‐COO‐MET‐14‐010‐L_Invitation letter_Attachement.pdf 12/02/2014 FP Invitation letter X N 
GRR‐COO‐MET‐14‐011 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 23/02/2014 NL Beneficiary certificate ‐ stator bar U9 N 
GRR‐COO‐MET‐14‐012‐L COO\GRR‐COO‐MET‐14‐012‐L_GERDP ‐Industrial transfer ‐ Training program_Attachment.p 03/03/2014 FP Industrial transfer ‐ Training program X
GRR‐COO‐MET‐14‐013‐T GRR‐COO‐MET‐14‐013‐T_Monthly Progress Report February 2014_Attachment 11/03/2014 FP Monthly Progress Report ‐ February 2014 X N
X Y 01/03/2014 UHP‐GMO‐455
GRR‐COO‐MET‐14‐014‐T GRR‐COO‐MET‐14‐014‐T_Transmittal Form TF/COO/GRR/009_Attachments 21/03/2014 FP Response to GMO/455
UHP‐GMO‐634

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxCOO 2/5 09/09/2016


GRR‐COO‐MET‐14‐015‐L GRR‐COO‐MET‐14‐015‐L_Early Generation Runners_Attachment 24/03/2014 FP Early Generation Runners X Y
GRR‐COO‐MET‐14‐016‐L None 26/03/2014 FP Right bank Powerhouse drawings X Y
GRR‐COO‐MET‐14‐017 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 29/03/2014 NL Beneficiary certificate ‐ core clamping N
GRR‐COO‐MET‐14‐018‐L GRR‐COO‐MET‐14‐018‐L_Invitation letter_Attachment 01/04/2014 FP Trainees invitation letter X N
GRR‐COO‐MET‐14‐019‐L 01/04/2014 NL Beneficiary certificate N
GRR‐COO‐MET‐14‐020‐T GRR‐COO‐MET‐14‐020‐T_Monthly Progress Report March 2014_Attachment 10/04/2014 FP Monthly Progress Report ‐ March 2014 X N
GRR‐COO‐MET‐14‐021‐L None 10/04/2014 FP Nomination of the Engineer X Y
GRR‐COO‐MET‐14‐022 20/04/2014 NL Beneficiary certificate N
GRR‐COO‐MET‐14‐023 20/04/2014 NL Beneficiary certificate N
GRR‐COO‐MET‐14‐024‐L GRR‐COO‐MET‐14‐024‐L_Induction program_Attachment 14/04/2014 FP Trainees induction program X Y
GRR‐COO‐MET‐14‐025‐L GRR‐COO‐MET‐14‐025‐L_Training program_Attachment 16/04/2014 FP Training program France / China X N
GRR‐COO‐MET‐14‐026‐L None 17/04/2014 FP Insurances X Y
GRR‐COO‐MET‐14‐027‐L GRR‐COO‐MET‐14‐027‐L_Training program in Grenoble_Attachment 17/04/2014 FP Program in Grenoble X N
GRR‐COO‐MET‐14‐028‐L GRR‐COO‐MET‐14‐028‐L_Transportation Coordination_Attachment 24/04/2014 FP Transportation coordination X Y
GRR‐COO‐MET‐14‐029‐L None 30/04/2014 FP Data requests and clarifications on Generator and Turbine X Y
GRR‐COO‐MET‐14‐030‐L None 13/05/2014 FP Meeting for Industrial transfer X Y
GRR‐COO‐MET‐14‐031‐L None 14/05/2014 FP Factory visit for erection preparation X Y
GRR‐COO‐MET‐14‐032‐T GRR‐COO‐MET‐14‐032‐T_Monthly Progress Report April 2014_Attachment 14/05/2014 FP Monthly Progress Report ‐ April 2014 X N
MOM meeting METEC Top Management / ALSTOM – COMELEX + Industrial transfer  X
GRR‐COO‐MET‐14‐033‐L GRR‐COO‐MET‐14‐033‐L_Attachment 02/06/2014 FP presentation Y
GRR‐COO‐MET‐14‐034‐L GRR‐COO‐MET‐14‐034‐L_Invitation letter_Attachment 06/06/2014 FP Invitation letters for trainees / China X N
GRR‐COO‐MET‐14‐035‐T GRR‐COO‐MET‐14‐035‐T_Monthly Progress Report May 2014_Attachment 10/06/2014 FP Monthly Progress Report ‐ May 2014 X N
TF‐COO‐GRR‐010 TF‐COO‐GRR‐010_Attachments 12/06/2014 EK Turbine and Generator sequences X N
GRR‐COO‐MET‐14‐036‐L None 12/06/2014 FP Notice under clause 33.7 of the Contract X Y
GRR‐COO‐MET‐14‐037 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 12/06/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐038 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 12/06/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐039 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 12/06/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐040 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 12/06/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐041‐L None 13/06/2014 FP Primary embedded pipes ‐ Waiver of responsability X Y
GRR‐COO‐MET‐14‐042‐T GRR‐COO‐MET‐14‐042‐T_Transmittal TF/HET/GRR/065_Attachments 17/06/2014 FP Powerhouse drawing after modifications at el500 X Y 18/07/2014 METEC/4/AT28/T/2948/UHP‐GMO‐1219
GRR‐COO‐MET‐14‐043‐L None 25/06/2014 FP Waiver of responsability on primary pipes X Y
GRR‐COO‐MET‐14‐044‐L None 27/06/2014 FP Storage conditions for generator parts X Y
Answer to letter 2800 dated June 17th, 2014 and attached design review sheet GERDP-JE- X
GRR‐COO‐MET‐14‐045‐L None 07/07/2014 FP DR-14-192 A dated June 11th Y
Comments on design review sheet GERDP‐JE‐DR‐14‐069 A dated March 31st, 2014 X
GRR‐COO‐MET‐14‐046‐L None 07/07/2014 FP Y
GRR‐COO‐MET‐14‐047 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 06/07/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐048 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 06/07/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐049 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 06/07/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐050‐T GRR‐COO‐MET‐14‐050‐T_Monthly Progress Report June 2014_Attachment 09/07/2014 FP Monthly Progress Report ‐ June 2014 X N
TF‐COO‐GRR‐011 TF‐COO‐GRR‐011_Attachment 09/07/2014 EK Turbine and Governing System Consumer List X N
GRR‐COO‐MET‐14‐051 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 09/07/2014 NL Beneficiary certificate X N
GRR‐COO‐MET‐14‐052‐L None 18/07/2014 FP Third Design Review Meeting X Y
Pas de ref juste un mail None 21/07/2014 FP Information request about Turbine / Generator Scope of Work X Y
GRR‐COO‐MET‐14‐053 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Draft Tube X N
GRR‐COO‐MET‐14‐054 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Stator frame X N
GRR‐COO‐MET‐14‐055 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Generator shaft U9 X N
GRR‐COO‐MET‐14‐056 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Rotor rim X N
GRR‐COO‐MET‐14‐057 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Upper Guide Bearing X N
GRR‐COO‐MET‐14‐058 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Auxiliaries X N
GRR‐COO‐MET‐14‐059 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Excitation system X N
GRR‐COO‐MET‐14‐060 W:\GRAND_RENAISSANCE\01‐PROJECT_MANAGEMENT\10‐Correspondence\COO 25/07/2014 NL Beneficiary certificate ‐ Generator shaft U10
GRR‐COO‐MET‐14‐061‐L None 04/08/2014 FP Extension of Time for Completion  X Y
GRR‐COO‐MET‐14‐062‐L GRR‐COO‐MET‐14‐062‐L_Attachments 12/08/2014 FP Early Generation Runners ‐ Variation Order X Y
GRR‐COO‐MET‐14‐063‐T GRR‐COO‐MET‐14‐063‐T_Monthly Progress Report July 2014_Attachment 11/08/2014 FP Monthly Progress report ‐ July 2014 X
GRR‐COO‐MET‐14‐064 14/08/2014 ML beneficiary certificate
GRR‐COO‐MET‐14‐065‐L None 14/08/2014 ML Letter of credit for phase 2A offshore part – No confirmation instructions X Y
GRR‐COO‐MET‐14‐066‐L None 08/09/2014 FP UHP and other third party documents X Y
GRR‐COO‐MET‐14‐067‐T GRR‐COO‐MET‐14‐067‐T_Monthly Progress Report August 2014_Attachment 12/09/2014 FP Monthly Progress Report ‐ August 2014 X
GRR‐COO‐MET‐14‐068‐L None 30/09/2014 FP Inconsistencies in transmittals of documents from EEPCo/ER X Y
GRR‐COO‐MET‐14‐070‐L None 30/09/2014 FP Selection of Balance of Plant subcontractor X Y
GRR‐COO‐MET‐14‐071‐T GRR‐COO‐MET‐14‐071‐T_Monthly Progress Report September 2014_Attachment 10/10/2014 FP Monthly Progress report ‐ September 2014 X N
GRR‐COO‐MET‐14‐072‐L GRR‐COO‐MET‐14‐072‐L_Attachments 13/10/2014 FP Response to excitation layout issue X Y
GRR‐COO‐MET‐14‐073‐L None 20/10/2014 FP Response to letter GMO 985 X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxCOO 3/5 09/09/2016


GRR‐COO‐MET‐14‐074‐L GRR‐COO‐MET‐14‐074‐L_Conditions for start of phase 2a not met_Attachments 20/10/2014 FP Conditions for start off shore part not met X Y
Pas de ref juste un mail None 27/10/2014 FP Call for Meeting on Pending Design Issues X Y
GRR‐COO‐MET‐14‐075‐L None 28/10/2014 FP Penstock chamber Comments on Salini Letter P5000‐05.25‐978 X Y
GRR‐COO‐MET‐14‐076‐T TF‐COO‐GRR‐012_Attachments 03/11/2014 FP Answer to GERDP‐JE‐DR‐14‐134‐A_Transmittal Form TF‐COO‐GRR‐012 X Y
None TF‐COO‐GRR‐013 04/11/2014 EK Electrical auxiliaries X Y
GRR‐COO‐MET‐14‐077‐T GRR‐COO‐MET‐14‐077‐T_Monthly Progress Report October 2014_Attachment 13/11/2014 FP Monthly Progress report ‐ October 2014 X Y
TF‐COO‐HET‐014_Attachments 14/11/2014 FP
GRR‐COO‐MET‐14‐078‐T Comments on updated Cooling System Drawings X Y
TF‐HET‐GRR‐074_Attachments 14/11/2014 FP
GRR‐COO‐MET‐14‐079‐L None 18/11/2014 FP Response to Letter GMO 1219 X Y 27/01/2015 GTO‐2395
GRR‐COO‐MET‐14‐080‐L None 25/11/2014 FP Plant Contractor's Design documents X Y Answer to SAL P5000‐05.25.972
GRR‐COO‐MET‐14‐081‐L None 27/11/2014 FP URGENT SAFETY NOTICE – Rotor Spider Hub delivery in Djibuti X Y
GRR‐COO‐MET‐14‐082‐L None 28/11/2014 FP Concerns regarding unavailability of vessels X Y
GRR‐COO‐MET‐14‐083‐L None 04/12/2014 FP Answer to Salini Letter 965 X Y Answer to SAL P5000‐05.25.965
GRR‐COO‐MET‐14‐084‐T GRR‐COO‐MET‐14‐084‐T_Monthly Progress Report November_Attachments 09/12/2014 FP Monthly Progress report ‐ November 2014 X N
GRR‐COO‐MET‐14‐085‐L none 22/12/2014 FP Unpaid documents under LC 2a offshore X X
GRR‐COO‐MET‐15‐001‐L GRR‐COO‐MET‐15‐001‐L_Attachments 05/01/2015 FP Answer to salini letter 945 ‐ Response to excitation layout issues X Y Answer to SAL P5000‐05‐25‐945
GRR‐COO‐MET‐15‐002‐L None 06/01/2015 FP Answer to Salini letter 978 X Y Answer to SAL P5000‐05‐25‐978
GRR‐COO‐MET‐15‐003‐L None 09/01/2015 FP Notice under clause 33.7 of the Contract X Y
GRR‐COO‐MET‐15‐004‐T GRR‐COO‐MET‐15‐004‐T_Monthly Progress Report December_Attachments 15/01/2015 FP Monthly Progress Report ‐ December 2014 X N
GRR‐COO‐MET‐15‐005‐L None 19/01/2015 FP Draft tube elbow ‐ Extended Storage in Djibouti X Y 19/01/2015 GRR‐MET‐ALS‐14‐093
GRR‐COO‐MET‐15‐006‐L None 20/01/2015 FP Answer to GERDP‐JE‐DR‐14‐178‐A X Y
GRR‐COO‐MET‐15‐007‐L None 20/01/2015 FP Erection Bay Layout X Y
GRR‐COO‐MET‐15‐008‐L None 30/01/2015 FP Answer to GERDP‐JE‐DR‐14‐309 X Y 30/01/2015 GERDP‐JE‐DR‐14‐309
GRR‐COO‐MET‐15‐009‐L None 30/01/2015 FP Answer to GERDP‐JE‐DR‐14‐313‐A X Y 30/01/2015 P5000‐05 25 978
GRR‐COO‐MET‐15‐010‐L None 30/01/2015 FP Data request on generator and turbine reminder X Y
GRR‐COO‐MET‐15‐011‐L None 03/02/2015 FP Delay of GERDP Equipment delivery X Y
GRR‐COO‐MET‐15‐012‐T GRR‐COO‐MET‐15‐012‐T_Monthly Progress Report January_Attachments 12/02/2015 FP Monthly Progress Report ‐ January 2015
GRR‐COO‐MET‐15‐013‐L None 13/02/2015 JH GERDP ‐ Alstom Contract‐ To Ato GEBRETSION / Vice Prime Minister
GRR‐COO‐MET‐15‐014‐L None 13/02/2015 JH GERDP – L/C CRE302230W  ‐ To Commercial Bank of Ethiopia M Nerudi
GRR‐COO‐MET‐15‐015‐L None 23/02/2015 JH GERDP ‐ RDV ambassadrice
Answer to GERDP‐JE‐DR‐14‐247‐A ‐ transmittal forms TF/HEG/GRR/082 and  X
GRR‐COO‐MET‐15‐016‐T TF‐HEG‐GRR‐082‐Attachments 23/02/2015 FP TF/HET/GRR/089 N
TF‐HET‐GRR‐089‐Attachments
GRR‐COO‐MET‐15‐017‐L None 13/02/2015 FP Visit of Alstom Project Management ‐ To General Kinfe X Y
GRR‐COO‐MET‐15‐018‐L None 26/02/2015 FP Request for site construction progress meeting X Y
GRR‐COO‐MET‐15‐019‐L None 24/02/2015 FP Third Design Review Meeting ‐ Reminder X Y
GRR‐COO‐MET‐15‐020‐L GRR‐COO‐MET‐15‐020‐L_Attachments 02/03/2015 FP Answer to GTO‐2395‐Cable routing clarifications X Y
GRR‐COO‐MET‐15‐021‐T GRR‐COO‐MET‐15‐021‐T_Monthly Progress Report February_Attachments 12/03/2015 FP Monthly Progress Report ‐ February 2015 X N
GRR‐COO‐MET‐15‐022‐L None 13/03/2015 FP Nomination of the Engineer X Y
GRR‐COO‐MET‐15‐023‐L None 16/03/2015 FP Resumption of works following payment to Alstom X Y
GRR‐COO‐MET‐15‐024‐L None 30/03/2015 FP Visit of Alstom Project management X Y
GRR‐COO‐MET‐15‐025‐L None 24/03/2015 FP Phase 1 ‐ Resumption of works following partial payment to Comelex X N
TF‐COO‐GRR‐017 TF‐COO‐GRR‐017_Attachments 07/04/2015 EK General documents ‐ Technical  documents submission & approval process X N
GRR‐COO‐MET‐15‐026‐T GRR‐COO‐MET‐15‐026‐T_Monthly Progress Report March_Attachments 10/04/2015 FP Monthly Progress Report ‐ March 2015 X N
GRR‐COO‐MET‐15‐027‐T GRR‐COO‐MET‐15‐027‐T_Monthly Progress Report April_Attachments 07/05/2015 FP Monthly Progress Report ‐ April 2015 X N
GRR‐COO‐MET‐15‐028‐L GRR‐COO‐MET‐15‐028‐L_Attachments 21/05/2015 FP Answer to GERDP‐JE‐DR‐15‐079‐A X Y
GRR‐COO‐MET‐15‐029‐T GRR‐COO‐MET‐15‐029‐T_Monthly Progress Report May_Attackments 09/06/2015 FP Monthly Progress Report ‐ May 2015 X
GRR‐COO‐MET‐15‐030‐L None 16/06/2015 FP Nomination of the Engineer X Y
GRR‐COO‐MET‐15‐031‐L GRR‐COO‐MET‐15‐031‐L_Attachments 02/07/2015 FP Landing certificates to be issued by ESL X Y
GRR‐COO‐MET‐15‐032‐T GRR‐COO‐MET‐15‐032‐T_Monthly Progress Report June_Attachments 03/07/2015 FP Monthly Progress Report ‐ June 2015 X Y
GRR‐COO‐MET‐15‐033‐T GRR‐COO‐MET‐15‐033‐T_Monthly Progress July_Attachments 07/08/2015 FP Monthly Progress Report ‐ July 2015 X Y
GRR‐COO‐MET‐15‐034‐L GRR‐COO‐MET‐15‐034‐L_Attachments 10/09/2015 FP Djibouti Mission report shaft U10 X Y
GRR‐COO‐MET‐15‐035‐T GRR‐COO‐MET‐15‐035‐T_Monthly Progress Report August_Attachments 15/09/2015 FP Monthly Progress Report ‐ August 2015 X Y
GRR‐COO‐MET‐15‐036‐T GRR‐COO‐MET‐15‐036‐T_Monthly Progress Report September_Attachments 08/10/2015 FP Monthly Progress Report ‐ September 2015 X Y
GRR‐COO‐MET‐15‐037‐L None 16/10/2015 FP Clarifications regarding unit 10 shaft additional tests X Y
GRR‐COO‐MET‐15‐038‐T GRR‐COO‐MET‐15‐038‐T_Monthly Progress Report October_Attachments 10/11/2015 FP Monthly Progress Report ‐ October 2015 X Y
GRR‐COO‐MET‐15‐039‐L GRR‐COO‐MET‐15‐039‐L_Attachments 27/11/2015 FP Letter notification after closing X Y
GRR‐COO‐MET‐15‐040‐L None 10/12/2015 FP Consent to assignment of trade receivables X Y
GRR‐COO‐MET‐15‐041‐T GRR‐COO‐MET‐15‐041‐T_Monthly Progress report_Attachments 10/12/2015 FP Monthly Progress Report ‐ November 2015
GRR‐COO‐MET‐16‐001‐T GRR‐COO‐MET‐16‐001‐T_Monthly Progress report_Attachments 12/01/2016 FP Monthly Progress Report ‐ December 2015 X Y
GRR‐COO‐MET‐16‐002‐L None 08/02/2016 FP Invitation memo Metec inspection in China
GRR‐COO‐MET‐16‐003‐T GRR‐COO‐MET‐16‐003‐T_Monthly Progress report_Attachments 11/02/2016 FP Monthly Progress Report ‐ January 2016 X Y
GRR‐COO‐MET‐16‐004 GRR‐COO‐MET‐16‐004‐L_Attachments 08/03/2016 FP Proposal for amendment 4 X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxCOO 4/5 09/09/2016


GRR‐COO‐MET‐16‐005‐L None 11/03/2016 FP Visit of Y Rannou ‐ To General Kinfe
GRR‐COO‐MET‐16‐006‐T GRR‐COO‐MET‐16‐006‐T_Monthly Progress report_Attachments 11/03/2016 FP Monthly progress report ‐ february 2016 X Y
GRR‐COO‐MET‐16‐007‐L GRR‐COO‐MET‐16‐007‐L_Attachments 17/03/2016 FP Earthing cublicles & excitation cables proposal X Y
GRR‐COO‐MET‐16‐008‐T GRR‐COO‐MET‐16‐008‐T_Monthly Progress report_Attachments 11/04/2016 FP Monthly progress report ‐ March 2016 X Y
GRR‐COO‐MET‐16‐009‐T GRR‐COO‐MET‐16‐009‐T_Monthly Progress report_Attachments 10/05/2016 FP Monthly progress report ‐ April 2016 X Y
GRR‐COO‐MET‐16‐010‐L None 12/05/2016 FP Change of registered address of AHF X Y
GRR‐COO‐MET‐16‐011‐L GRR‐COO‐MET‐16‐011‐L_Attachments 24/05/2016 FP Answers to comments on Alstom technical offer for Units 400MW & 440 MVA X Y
GRR‐COO‐MET‐16‐012‐L None 30/05/2016 FP Phase 2b ‐ Grand Ethiopian Renaissance HPP (the Project) X Y
GRR‐COO‐MET‐16‐013‐T GRR‐COO‐MET‐16‐013‐T_Attachments 14/06/2016 FP Monthly progress report ‐ May 2016 X Y
GRR‐COO‐MET‐16‐014‐T GRR‐COO‐MET‐16‐014‐T_Attachments 18/07/2016 FP Monthly progress report ‐ June 2016 X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxCOO 5/5 09/09/2016


GRAND RENAISSANCE HET ‐ Correspondance To METEC

Reference Transmittal Response  METEC response to Alstom's letter


To  To 
Reference letter  Attachment to e‐mail Date By Subject required 
METEC Engineer
Y/N
Date Mail Attachment to email

GRR‐HET‐MET‐12‐001‐L H‐6235 00 MEF 00‐FS00 LC‐001 A 30/08/2012 FP Preliminary Civil Guide Drawings X


H‐6235 00 MEF 00‐FS00  ED‐001 A N
H‐6235 00 MEF 51‐SA00 TL‐002 A
GRR‐HET‐MET‐12‐002‐T GRR‐HET‐MET‐12‐002‐T_Transmittal Form TF‐HET‐GRR‐ 24/09/2012 FP Transmittal Form TF/HET/GRR/003 X
N
003_attachments
GRR‐HET‐MET‐12‐003‐T GRR‐HET‐MET‐12‐003‐T_Consumers list_attachment 01/10/2012 FP Consumers list X N
GRR‐HET‐MET‐12‐004‐T 16/10/2012 FP Expansion joint X N
GRR‐HET‐MET‐12‐005‐T GRR‐HET‐MET‐12‐005‐T_Transmittal Form  29/10/2012 FP Transmittal Form TF/HET/GRR/004 ‐ Civil Work 1st Step ‐  X
N
004 attachments Embedded Pipes ‐ Transient Calculation Note
GRR‐HET‐MET‐12‐006‐T GRR‐HET‐MET‐12‐006‐T_Shaft seal_attachments 02/11/2012 FP Water for shaft seal X 30/01/2013 13‐011 ‐ Draft Tube  GERDP ‐ ER Comments on 
N General  Alstom  Transmittal Form 
Arrangement Pier  TF‐HET‐GRR‐006
Nose & Cone
GRR‐HET‐MET‐12‐007‐T GRR‐HET‐MET‐12‐007‐T_Reference dimensions for draft  02/11/2012 FP Reference dimensions for draft tube X
N
tube attachments
GRR‐HET‐MET‐12‐008‐T GRR‐HET‐MET‐12‐008‐T_Transmittal Form TF‐HET‐GRR‐ 09/11/2012 FP Transmittal Form TF/HET/GRR/005 ‐ Civil Work 2nd Concrete  X 03/12/2012 Answer to GRR‐HEG‐
005_attachments Step ‐ Embedded Pipes 2nd Concrete Step ‐ Pressure Tap N MET‐12‐008‐L

GRR‐HET‐MET‐12‐009‐T GRR‐HET‐MET‐12‐009‐T_Transmittal Form TF‐HET‐GRR‐ 19/11/2012 FP Transmittal Form TF/HET/GRR/006 ‐ Draft Tube General  X X


X
006 attachments Arrangement, Pier Nose & Cone
GRR‐HET‐MET‐12‐010‐T GRR‐HET‐MET‐12‐010‐T_Transmittal Form TF‐HET‐GRR‐ 22/11/2012 FP Transmittal Form TF/HET/GRR/007 ‐ Civil Work 2nd & 3rd  X
007_attachments Concrete Step ‐ Support Base Plate ‐ Embedded Pipes X

GRR‐HET‐MET‐12‐011‐T GRR‐HET‐MET‐12‐011‐T_answers to HMD2181 and  27/11/2012 FP answers to letter HMD/2181 (20.11.12) and letter GMO/2211  X 27/12/2012 Answer letter GRR‐ 12 11 27_05.25‐299 


GMO2211_attachments (23.11.12) about comments on first and second concrete steps  N HET‐MET‐12‐011‐T Salini's Comments on 
drawings ALSTOM Documents
GRR‐HET‐MET‐12‐012‐T GRR‐HET‐MET‐12‐012‐T_Alstom comments on cross  28/11/2012 FP Alstom comments on cross section 1559‐14‐69C X
N
section 1559‐14‐69C attachment
GRR‐HET‐MET‐12‐013‐L 10/12/2012 FP Answer to GERDP ER’s comments on Early Generation Solution X X
Comparison N

GRR‐HET‐MET‐12‐014‐L 10/12/2012 FP Answer to GMO‐1992 UHP comments on Early Generation X


Solutions Comparison N

GRR‐HET‐MET‐13‐001‐T GRR‐HET‐MET‐13‐001‐T_attachments 22/01/2013 FP Transmittal Form TF/HET/GRR/008 ‐ Draft Tube & Pier Nose X X


N
GRR‐HET‐MET‐13‐002‐L GRR‐HET‐MET‐13‐002‐L_Draft tube liner extension  07/02/2013 FP Draft tube liner extension X X
Y
attachment attachment
GRR‐HET‐MET‐13‐003‐L 08/02/2013 FP Major input data X X
GRR‐HET‐MET‐13‐004‐T GRR‐HET‐MET‐13‐004‐T_Transmittal Form TF‐HET‐GRR‐ 08/02/2013 FP Transmittal Form TF/HET/GRR/009 ‐ Inspection and test plan X X
Y
009 attachments
GRR‐HET‐MET‐13‐005‐L GRR‐HET‐MET‐13‐005‐L_Platform Erection in Draft Tube  13/02/2013 FP Runner Visit platform installation X X
Y
Cone attachment
GRR‐HET‐MET‐13‐006‐T GRR‐HET‐MET‐13‐006‐T_Transmittal Form TF‐HET‐GRR‐ 14/02/2013 FP Transmittal Form TF/HET/GRR/010 – Stay ring and spiral case X X
N
010 attachments
GRR‐HET‐MET‐13‐007‐L 19/02/2013 FP Hydraulic deviations additional information X X N
GRR‐HET‐MET‐13‐008‐T GRR‐HET‐MET‐13‐008‐T_Transmittal Form TF‐HET‐GRR‐ 22/02/2013 FP Transmittal Form TF/HET/GRR/011 ‐ Civil works concrete step X
011 attachments
GRR‐HET‐MET‐13‐009‐T GRR‐HET‐MET‐13‐009‐T_Transmittal Form TF‐HET‐GRR‐ 01/03/2013 FP Transmittal Form TF/HET/GRR/012 ‐ Civil works ‐ Sixth concrete  X
Y
012 attachments step
GRR‐HET‐MET‐13‐010‐T GRR‐HET‐MET‐13‐010‐T_Transmittal Form TF‐HET‐GRR‐ 18/03/2013 FP Transmittal Form TF/HET/GRR/013 – Embedded Pipes X
Y
013 attachments
GRR‐HET‐MET‐13‐010‐L GRR‐HET‐MET‐13‐010‐L_Pier nose handling  03/04/2013 FP Pier nose handling and transport X
Y
procedure attachments
GRR‐HET‐MET‐13‐011‐L 03/04/2013 FP Units 9 & 10 Pier noses – Request of permission to deliver X N
GRR‐HET‐MET‐13‐012‐T GRR‐HET‐MET‐13‐012‐T_Transmittal Form TF‐HET‐GRR‐ 05/04/2013 FP Transmittal Form TF/HET/GRR/014 – Embedded Pipes X
Y
014 attachments
GRR‐HET‐MET‐13‐013‐T GRR‐HET‐MET‐13‐013‐T_Transmittal Form TF‐HET‐GRR‐ 08/04/2013 FP Transmittal Form TF/HET/GRR/015 – Calculation Notes for Draft  X X
Y
015 attachments tube liner and cone and Spiral Case

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 1/8 09/09/2016


GRR‐HET‐MET‐13‐014‐L 15/04/2013 FP Hydraulic deviations additional information X X Y
GRR‐HET‐MET‐13‐015‐L GRR‐HET‐MET‐13‐015‐L_Runner welding‐ 18/04/2013 FP Runner welding X X
revB attachments
GRR‐HET‐MET‐13‐016‐T GRR‐HET‐MET‐13‐016‐T_Transmittal Form TF‐HET‐GRR‐ 25/04/2013 FP Transmittal Form TF/HET/GRR/016 – Calculation Notes for Stay  X X
016–Calculation Notes for Stay Vanes_attachments Vanes Y

GRR‐HET‐MET‐13‐017‐L 30/04/2013 ? SB Courrier COMELEX, préparé par Noémie Giffard, envoyé par  x


Sylvain Bouyé, commande de piping à Metec 

GRR‐HET‐MET‐13‐018‐T HET\GRR‐HET‐MET‐13‐018‐T_Transmittal Form TF‐ 14/05/2013 FP Transmittal Form TF/HET/GRR/017 – Thermodynamic pipe  x


HET‐GRR‐017 – Thermodynamic  Y
pipe_attachments.zip
GRR‐HET‐MET‐13‐019‐L 23/05/2013 Drawings 207‐GEN‐RD‐D‐166 sheets 1 to 3
GRR‐HET‐MET‐13‐020‐L HET\GRR‐HET‐MET‐13‐020‐L_Pier nose site erection  29/05/2013 FP Pier nose site erection procedure x
N
procedure_attachments.zip
GRR‐HET‐MET‐13‐021‐T HET\GRR‐HET‐MET‐13‐021‐T_TF‐HET‐GRR‐ 06/07/2013 FP Transmittal Form TF/HET/GRR/018 – Early Generation Runner  x X
018_Early Generation Runner calculation  calculation notes Y
notes_Attachments.zip
GRR‐HET‐MET‐13‐022‐L HET\GRR‐HET‐MET‐13‐022‐L_Governing  07/06/2013 FP Governing additional information x X
N
information attachments.zip
GRR‐HET‐MET‐13‐023‐T HET\GRR‐HET‐MET‐13‐023‐T_Spiral Case Design‐ 10/06/2013 FP Spiral case design – answers to GERDP‐SCM/FSU‐13/153/CEXT x X
Y
Attachment.zip
HET\GRR‐HET‐MET‐13‐024‐T_Turbine Drawings.pdf HET\GRR‐HET‐MET‐13‐024‐T_Turbine  12/06/2013 FP Transmittal Form TF/HET/GRR/020 – Turbine Drawings x X
Y
Drawings_Attachments.zip.001
HET\GRR‐HET‐MET‐13‐025‐L model test notification.pdf 10/06/2013 FP Final turbine model test notification x N
RF‐HEG‐GRR‐025 RF‐HEG‐GRR‐025 26/07/2013 GG RF‐HEG‐GRR‐025 X N
GRR‐HEG‐MET‐13‐030‐L HET\GRR‐HET‐MET‐13‐027‐T_Transmittal Form TF‐ 18/06/2013 FP Transmittal Form TF‐HET‐GRR‐022‐Test Program X
Y
HET‐GRR‐022‐Test Program 
GRR‐HET‐MET‐13‐028‐L HET\GRR‐HET‐MET‐13‐028‐L ‐ Hydraulic Deviations–  21/06/2013 FP Hydraulic Deviations – answer to GERDP‐SCM/FSU‐13/160/CEXT x x
answer to GERDP‐SCMFSU‐13160CEXT.zip N

GRR‐HET‐MET‐13‐029 GRR‐HET‐MET‐13‐029_Transmittal FormTF‐HET‐GRR‐ 24/06/2013 FP Transmittal FormTF‐HET‐GRR‐023_Distributor Calculation Note  x


023_Distributor Calculation Note & Painting  & Painting Specification Y
Specification
GRR‐HET‐MET‐13‐029‐T GRR‐HET‐MET‐13‐029‐T_Transmittal TF‐HET‐GRR‐ 26/06/2013 CB GRR‐HET‐MET‐13‐029‐T_Transmittal TF‐HET‐GRR‐024 X
024 N

GRR‐HET‐MET‐13‐030‐L None 02/07/2013 FP GRR‐HET‐MET‐13‐030‐L_Expansion Joint ‐ Spare parts list and  x


tools list : Envoi de la commande mise à jour de piping (courrier  Lettre 
préparé par Noémie Giffard)
GRR‐HET‐MET‐13‐031‐L None 02/07/2013 FP GRR‐HET‐MET‐13‐031‐L _ Spiral case calculations ‐ answer to  x
lettre 
GERDP‐SCM/FSU‐13/210/CEXT
GRR‐HET‐MET‐13‐032‐L None  02/07/2013 FP GRR‐HET‐MET‐13‐032‐L _ Draft tube calculations ‐ answer to  x
Lettre 
GERDP‐SCM/FSU‐13/212/CEXT
GRR‐HET‐MET‐13‐033‐L None 04/07/2013 FP GRR‐HET‐MET‐13‐033‐L – Partial penetration welds – answer to  x
Lettre 
GERDP‐SCM/FSU‐13/137/CEXT
GRR‐HET‐MET‐13‐034‐T GRR‐HET‐MET‐13‐034‐T_Transmittal Form  05/07/2013 FP GRR‐HET‐MET‐13‐034‐T_Transmittal Form  x
TF/HET/GRR/025  TF/HET/GRR/025_Governing System Technical Specification  Y

GRR‐HET‐Met‐13‐035‐L None  10/07/2013 FP GRR‐HET‐Met‐13‐035‐L_TSLG Cabinet  X Lettre


GRR‐HET‐MET‐13‐036‐L GRR‐HET‐MET‐13‐036‐L_Preliminary Model Test  15/07/2013 FP GRR‐HET‐MET‐13‐036‐L Preliminary Model Test  X
Letter
Report_attachments Report_attachments
GRR‐HET‐MET‐13‐037‐L None 16/07/2013 FP GRR‐HET‐MET‐13‐037‐L_Pressure fluctuations – answer to  X
Letter
GERDP‐SCM/FSU‐13/160/CEXT
GRR‐HET‐MET‐13‐038‐T GRR‐HET‐MET‐13‐038‐T_Transmitttal Form  17/07/2013 FP GRR‐HET‐MET‐13‐038‐T_Transmitttal Form TF/HET/GRR/026 X
Y
TF/HET/GRR/026
GRR‐HET‐MET‐13‐039‐L GRR‐HET‐MET‐13‐039‐L preliminary model test  19/07/2013 FP GRR‐HET‐MET‐13‐039‐L preliminary model test  X
Letter
report_attachment.zip report_attachment.zip

None TF‐HET‐GRR‐027 TF‐HET‐GRR‐027_Attachement 06/08/2013 GG TF‐HET‐GRR‐027 X N

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 2/8 09/09/2016


GRR‐HET‐MET‐13‐040‐L None None 03/09/2013 FP TSLG cabinet – response to email from METEC dated Aug 9,  X
letter 
2013
GRR‐HET‐MET‐13‐041‐T TF‐HET‐GRR‐028 TF‐HET‐GRR‐028 03/09/2013 FP & GG GRR‐HET‐MET‐13‐041‐T_Transmittal Form TF/HET/GRR/028 X
Y
None TF‐HET‐GRR‐029 TF‐HET‐GRR‐029_Attachement 04/09/2013 GG TF‐HET‐GRR‐029 X Y
None TF‐HET‐GRR‐030 TF‐HET‐GRR‐030 09/09/2013 GG TF‐HET‐GRR‐030 X Y
GRR‐HET‐MET‐13‐042‐T TF‐HET‐GRR‐031 TF‐HET‐GRR‐031_Attachement 10/09/2013 FP GRR‐HET‐MET‐13‐042‐T_Transmittal Form TF‐HET‐GRR‐031 X
N
None TF‐HET‐GRR‐032 TF‐HET‐GRR‐032_Attachements 16/09/2013 GG TF‐HET‐GRR‐032 ‐ Runner and Shaft Part List ‐ Coupling Bolts X
N
GRR‐HET‐MET‐13‐043‐T TF‐HET‐GRR‐033 None 16/09/2013 sent  GG GrandRenaissance ‐ GRR‐HET‐13‐043‐T ‐ TF/HET/GRR/033 ‐  X
by DHL Transmittal Form ‐ Model Test Reports (DHL) Y

GRR‐HET‐MET‐13‐043‐T TF‐HET‐GRR‐033 None 17/09/2013 GG GrandRenaissance ‐ GRR‐HET‐13‐043‐T ‐ TF/HET/GRR/033 ‐ 


Sent by DHL  Transmittal Form ‐ Model Test Reports (DHL) X N
twice
GRR‐HET‐MET‐13‐044‐L None  GRR‐HET‐MET‐13‐044‐L_Attachement 17/09/2013 FP Shipment notification of 2 first pier noses
GRR‐HET‐MET‐13‐045‐T TF‐HET‐GRR‐034 TF‐HET‐GRR‐034_Attachement 02/10/2013 FP Spiral Case Bucking Analytical Calculation X N
None  TF‐HET‐GRR‐035 TF‐HET‐GRR‐035_Attachement 11/10/2013 GG Embedded Pipes X N
None TF‐HET‐GRR‐036 TF‐HET‐GRR‐036_Attachement 22/10/2013 GG GrandRenaissance ‐ TF/HET/GRR/036 ‐ Transmittal Form
X N
GRR‐HET‐MET‐13‐046‐L None  None 07/11/2013 MM Runner Blades Excavation Map x N
None TF‐HET‐GRR‐037 TF‐HET‐GRR‐037_Attachements 31/10/2013 GG Turbine and Governing System PIDs x Y
GRR‐HET‐MET‐13‐047‐L None GRR‐HET‐MET‐13‐047‐L_Attachements 31/10/2013 FP Answer to Document PH Loads X N
GRR‐HET‐MET‐13‐048‐L  None None 18/11/2013 MM Runner Blades Procurement Final NDT Notification x Y
GRR‐HET‐MET‐13‐049‐L  None GRR‐HET‐MET‐13‐049‐L_Attachements 20/11/2012 FP Axial Valve Description  X N
None TF‐HET‐GRR‐038 TF‐HET‐GRR‐038_Transmittal 21/11/2013 GG Turbine and Governing System Consummer List X N
GRR‐HET‐MET‐13‐050‐T TF‐HET‐GRR‐039 TF‐HET‐GRR‐039_Attachement 20/11/2013 FP Transient Calculation Note X Y
None TF‐HET‐GRR‐040 TF‐HET‐GRR‐040_Attachement 21/11/2013 GG Spiral Casing X N
GRR‐HET‐MET‐13‐051‐T TF‐HET‐GRR‐041 TF‐HET‐GRR‐041_Attachements 21/11/2013 GG Draft Tube X N
None  TF‐HET‐GRR‐042 TF‐HET‐GRR‐042_Attachements 22/11/2013 GG Upper Pit Liner  X N
GRR‐HET‐MET‐13‐052‐L None  None  26/11/2013 FP Thrust Bearing Oil DC Pump Operating Time X N
GRR‐HET‐MET‐13‐053‐T TF‐HET‐GRR‐043 TF‐HET‐GRR‐043_Attachement 04/12/2013 FP Loads on concrete drawing and calculation note X Y
GRR‐HET‐MET‐13‐054‐L None None 09/12/2013 MM Blade Final NDT Inpsection X N
None TF‐HET‐GRR‐044 TF‐HET‐GRR‐044_Attachement 11/12/2013 GG Distributor Cross Section Assembly X N
GRR‐HET‐MET‐13‐055‐T TF‐HET‐GRR‐045 TF‐HET‐GRR‐045_Attachement 17/12/2013 FP Cross section X N
GRR‐HET‐MET‐13‐056‐T TF‐HET‐GRR‐046 None 19/12/2013 FP Equipment Layout and Diagrams X
GRR‐HET‐MET‐13‐057‐L None None 19/12/2013 FP Thrust Bearing ‐ deviation G61 X N
None TF‐HET‐GRR‐047 TF‐HET‐GRR‐047 Attachement 19/12/2013 FP Speed Governor Functional Diagram X N
None TF‐HET‐GRR‐048 TF‐HET‐GRR‐048_Attachements 19/12/2013 FP Turbine Equipment Drawings X N
GRR‐HET‐MET‐13‐058‐L None None 20/12/2013 FP Response to GERDP‐SCM/FSU‐13/433/CEXT ‐ Loads on stru X Y
GRR‐HET‐MET‐14‐059‐T  None GRR‐HET‐MET‐14‐059‐T_Attachement 22/01/2014 MM Blade Casting Defect and repair procedure x N
None TF‐HET‐GRR‐049 TF‐HET‐GRR‐049_Attachements 20/01/2014 GG Welded Runner & Wearing Rings ITP X N
None TF‐HET‐GRR‐050 TF‐HET‐GRR‐050_Attachements 21/01/2014 GG Erection Procedures and Inspection Sheets X N
GRR‐HET‐MET‐14‐001 None GRR‐HET‐MET‐14‐001‐L_Drain box and anchors shipm 23/01/2014 FP Drain box & anchor parts shipment notifications X N
GRR‐HET‐MET‐14‐002 None None 31/01/2014 FP Wicket Gate Leakage X N
None TF‐HET‐GRR‐051 TF‐HET‐GRR‐051_Attachment 11/02/2014 FP Turbine Guide Bearing X N
GRR‐HET‐MET‐14‐003‐L None None 13/02/2014 MM Runner Crown and Band Procurement Final NDT Notificatio X Y
None TF‐HET‐GRR‐052 TF‐HET‐GRR‐052_Attachment 17/02/2014 FP Coupling Bolts X N
Voir dans Chrono COO TF‐HET‐GRR‐053 Voir dans Chrono COO 10/02/2014 FP Comments on L1 Powerhouse Drawings X N
None TF‐HET‐GRR‐054 TF‐HET‐GRR‐054_Attachment 24/02/2014 GG Drain box U9‐U10 X N
GRR‐HET‐MET‐14‐004‐T TF‐HET‐GRR‐055 TF‐HET‐GRR‐055_Attachment 25/02/2014 GG Governing System General Arrangement drawings X N
GRR‐HET‐MET‐14‐005‐L None None 26/02/2014 FP Erection Procedure ‐ Preliminary synoptical X N
None TF‐HET‐GRR‐056 TF‐HET‐GRR‐056_Attachment 28/02/2014 GG Governing System Calculation sheet X N
GRR‐HET‐MET‐14‐006‐T GRR‐HET‐MET‐14‐006‐T_Attachement 06/03/2014 MM Blade Casting Defect and repair procedure X N
GRR‐HET‐MET‐14‐007‐ L None None 17/03/2014 MM Blade Final NDT Inpsection X Y
GRR‐HET‐MET‐14‐008‐L None None 20/03/2014 FP Draft Tube and Discharge Cone X Y
GRR‐HET‐MET‐14‐009‐L None None 20/03/2014 FP Spiral Case and Stay Ring X Y
None TF‐HET‐GRR‐057 TF‐HET‐GRR‐057_Attachments Part 1 25/03/2014 GG Turbine Equipments X N
None TF‐HET‐GRR‐057 TF‐HET‐GRR‐057_Attachments Part 2 25/03/2014 GG Turbine Equipments X N

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 3/8 09/09/2016


None TF‐HET‐GRR‐057 TF‐HET‐GRR‐057_Attachments Part 3 25/03/2014 GG Turbine Equipments X N
GRR‐HET‐MET‐14‐010‐L None None 26/03/2014 FP Draft Tube Elbow Workshop Assembly X X Y
None TF‐HET‐GRR‐058 TF‐HET‐GRR‐058_Attachment 28/03/2014 GG Governing System X Y
GRR‐HET‐MET‐14‐011‐L None None 31/03/2014 FP CFD Report ‐ Early Generation X Y answer to GERDP‐SCM/FSU‐14/052/CEXT
Update of embedded pipes part list further to emails from 
Y
GRR‐HET‐MET‐14‐012‐L None GRR‐HET‐MET‐14‐012‐L_Attachment 01/04/2014 FP ER dated March 22 & 23, 2014 X
GRR‐HET‐MET‐14‐013‐L GRR‐HET‐MET‐14‐013‐L_Attachment 11/04/2014 FP Anchoring pins shipment X Y
GRR‐HET‐MET‐14‐014‐L None None 14/04/2014 MM Blade Final NDT Inpsection Confirmation X Y
GRR‐HET‐MET‐14‐015‐L None GRR‐HET‐MET‐14‐015‐L_Attachment 16/04/2014 FP Inspection and test plans comments X Y answer to GERDP‐SCM/FSU‐13/335/CEXT
GRR‐HET‐MET‐14‐016‐L None GRR‐HET‐MET‐14‐016‐L_Attachment 23/04/2014 FP Draft tube elbows shipment X Y
GRR‐HET‐MET‐14‐017‐L None GRR‐HET‐MET‐14‐017‐L_Attachment 23/04/2014 FP Axial Valve Letter X answer to GERDP‐SGERDP‐JE‐DR‐14‐010‐A
GRR‐HET‐MET‐14‐018‐L None None 07/05/2014 MM Runner Crown and Band Procurement Final NDT Notificatio X Y
GRR‐HET‐MET‐14‐019‐L TF‐HET‐GRR‐059 GRR‐HET‐MET‐14‐019‐L_Attachment 16/05/2014 FP Answers to GERDP‐SCM/FSU‐14/210/CEXT on Mechanical e X Y answer to GERDP‐SCM/FSU‐14/210/CEXT
GRR‐HET‐MET‐14‐020‐L None None 16/05/2014 FP Answer to Salini letter P5000‐844 dated March24 2014 X Y answer to P5000‐844
GRR‐HET‐MET‐14‐021‐L TF‐HET‐GRR‐060 GRR‐HET‐MET‐14‐021‐L_Attachments 19/05/2014 FP Governing and Turbine equipment and safety device list X Y answer to GERDP‐SCM/FSU‐14/214/CEXT
None TF‐HET‐GRR‐061 TF‐HET‐GRR‐061_Attachments 20/05/2014 GG Runner Crown and Runner Band Data Books X Y
GRR‐HET‐MET‐14‐022‐L TF‐HET‐GRR‐062 TF‐HET‐GRR‐062_Attachments 23/05/2014 FP Turbine Equipment X Y answer to GERDP‐SCM/FSU‐14/197/CEXT
None TF‐HET‐GRR‐063 TF‐HET‐GRR‐063_Attachments 28/05/2014 GG Turbine documents X Y
None TF‐HET‐GRR‐064 TF‐HET‐GRR‐064_Attachments 02/06/2014 EK Turbine documents X Y
GRR‐HET‐MET‐14‐023‐L None GRR‐HET‐MET‐14‐023‐L_Attachments 03/06/2014 FP Draft tube elbows shipment X Y
GRR‐HET‐MET‐14‐024‐T_Attachments Part 1
GRR‐HET‐MET‐14‐024‐T None GRR‐HET‐MET‐14‐024‐T_Attachments Part 2 10/06/2014 MM U10 Blade Casting Excavation Report X N
GRR‐HET‐MET‐14‐024‐T_Attachments Part 3
GRR‐HET‐MET‐14‐025‐L None None 10/06/2014 MM Unit 09 and 10 Spiral Case FAT x Y
Voir dans Chrono COO TF‐HET‐GRR‐065 Voir dans Chrono COO 17/06/2014 FP Powerhouse drawing after modifications at el500 X Y
None TF‐HET‐GRR‐066 TF‐HET‐GRR‐066_Attachments 18/06/2014 EK Governing System X N
GRR‐HET‐MET‐14‐026‐L None None 26/06/2014 FP Answer to GMO‐634 X Y Answer to GMO‐634
GRR‐HET‐MET‐14‐027‐L None None 30/06/2014 MM U9 & U10 Spiral Case Final Inspection and workshop assem X Y
GRR‐HET‐MET‐14‐028‐L None None 21/07/2014 FP Draft tube elbows shipment X Y
GRR‐HET‐MET‐14‐029‐L None None 01/08/2014 FP Penstock Chamber Size X Y Answer to Metec‐ALST‐T‐14‐2948‐001
None TF‐HET‐GRR‐067 TF‐HET‐GRR‐067_Attachments 06/08/2014 EK Transmittal form Turbine Governor documents X N
GRR‐HET‐MET‐14‐030‐L None None 08/08/2014 FP Turbine Shaft FAT  X Y
GRR‐HET‐MET‐14‐031‐L None GRR‐HET‐MET‐14‐031‐L_Attachments 29/08/2014 FP Draft tube elbows shipment notification X
GRR‐HET‐MET‐14‐032‐L None None 05/09/2014 MM Turbine Shaft FAT  x Y
GRR‐HET‐MET‐14‐033‐L None None 12/09/2014 FP Turbine Speed Governor ‐ Answer to 14‐492 X Y
GRR‐HET‐MET‐14‐034‐L None None 16/09/2014 FP Turbine Speed Governor ‐ Answer to 14‐481 X Y Answer to GERDP‐JE‐DR‐14‐206‐A
GRR‐HET‐MET‐14‐035‐T TF‐HET‐GRR‐068 TF‐HET‐GRR‐068_Attachments 19/09/2014 FP Inspections and test plans X Y
Answer to GERDP‐SCM/FSU‐14/493/CEXT and GERDP‐
Answer to GERDP‐JE‐DR‐14‐209‐A
GRR‐HET‐MET‐14‐036‐L None GRR‐HET‐MET‐14‐036‐L_Attachments 22/09/2014 MM SCM/FSU‐14/495/CEXT  X N
Answer to GERDP‐JE‐DR‐14‐211‐A (Partial)
GRR‐HET‐MET‐14‐037‐L None GRR‐HET‐MET‐14‐037‐L_Attachments 25/09/2014 FP Guide bearings U9&U10 and shaft seal U10 shipment X N
None TF‐HET‐GRR‐069 TF‐HET‐GRR‐069 Part 1_Attachments Transmittal Draft Tube Elbow Quality data book
02/10/2014 X
TF‐HET‐GRR‐069 Part 2_Attachments EK
GRR‐HET‐MET‐14‐038‐T TF‐HEG‐GRR‐076 TF‐HEG‐GRR‐076_Attachments 13/10/2014 FP Answer to GERDP‐JE‐DR‐14‐202‐A X
Y
TF‐HET‐GRR‐070 TF‐HET‐GRR‐070_Attachments r to GERDP‐JE‐DR‐14
GRR‐HET‐MET‐14‐039‐L None None 16/10/2014 FP Answer to GERDP‐JE‐DR‐14‐078‐A X Y Answer to GERDP‐JE‐DR‐14‐078‐A
GRR‐HET‐MET‐14‐040‐L TF‐HET‐GRR‐071 TF‐HET‐GRR‐071_Attachments 16/10/2014 FP Axial Valve drainage pipe TF‐HET‐GRR‐071 X Y
Turbine Speed Governor ‐ Answer to GERDP‐JE‐DR‐14‐256‐
Y
GRR‐HET‐MET‐14‐041‐L None None 17/10/2014 FP A X Answer to GERDP‐JE‐DR‐14‐256‐A
GRR‐HET‐MET‐14‐042‐L TF‐HET‐GRR‐072 TF‐HET‐GRR‐072_Attachments 20/10/2014 FP Answer to GERDP‐JE‐DR‐14‐070‐A TF/HET/GRR/072 X Y
Shipment of units 09 & 10 turbine guide bearings and unit 
Y
GRR‐HET‐MET‐14‐043‐L None GRR‐HET‐MET‐14‐043‐L_Attachments 23/10/2014 FP 09 shaft seal X
GRR‐HET‐MET‐14‐044 (draft) None None 27/10/2014 MM U10 Runner Final Inspection Notification x Y
None TF‐HET‐GRR‐073 TF‐HET‐GRR‐073_Attachments 03/11/2014 EK Transmittal Form Turbine Unit 9 Data Book X Y
GRR‐HET‐MET‐14‐045‐L None None 03/11/2014 FP Answer to GERDP‐JE‐DR‐14‐211‐A Runner & shaft coupling  X Y
Y
GRR‐HET‐MET‐14‐046‐L None None 06/11/2014 FP Answer to GERDP‐JE‐DR‐14‐210‐A Spiral case test pressure X

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 4/8 09/09/2016


Y
GRR‐HET‐MET‐14‐047‐L None None 07/11/2014 Pre‐notification of the unit 09 shaft final inspection  X
Y
GRR‐HET‐MET‐14‐048‐L None None 07/11/2014 Pre‐notification of the unit 10 runner final inspection  X
Pre‐notification of the unit 09 & 10 governor cubicles 
Y
GRR‐HET‐MET‐14‐049‐L None None 10/11/2014 (TSLG) final inspection  X
Voir dans Chrono COO TF‐HET‐GRR‐074 TF‐HET‐GRR‐074_Attachments 14/11/2014 FP Cooling system drawings X Y
GRR‐HET‐MET‐14‐050‐L None None 18/11/2014 FP Answer to Salini letter 933 X Y Answer to Salini letter 933
Governor cubicle (TSLG) workshop test program for FAT‐ 
Transmittal Forms TF/HET/GRR/075 Y
GRR‐HET‐MET‐14‐051‐L TF‐HET‐GRR‐075 TF‐HET‐GRR‐075_Attachments 18/11/2014 FP X
GRR‐HET‐MET‐14‐052‐T TF‐HET‐GRR‐076 TF‐HET‐GRR‐076_Attachments 20/11/2014 FP Spare parts list X Y
GRR‐HET‐MET‐14‐053‐L TF‐HET‐GRR‐077 TF‐HET‐GRR‐077_Attachments 20/11/2014 FP Shaft dimensional inspection program X Y
GRR‐HET‐MET‐14‐054‐L TF‐HET‐GRR‐078 TF‐HET‐GRR‐078_Attachments 20/11/2014 FP Unit 10 runner final inspection program on vertical lathe X Y
GRR‐HET‐MET‐14‐055‐L None None 25/11/2014 FP Notification of the unit 09 shaft final inspection X Y
GRR‐HET‐MET‐14‐056‐L None GRR‐HET‐MET‐14‐056‐L_Attachments 27/11/2014 FP DTC ‐ Spiral case pit liner shipment X Y
GRR‐HET‐MET‐14‐057‐L None None 27/11/2014 FP Response to letter GMO‐2088 X Y
GRR‐HET‐MET‐14‐058‐L None None 28/11/2014 FP Notification of the Unit 10 runner final inspection X Y
GRR‐HET‐MET‐14‐060‐L None None 28/11/2014 FP Notification of the unit 09 shaft final inspection X Y
None TF‐HET‐GRR‐079 TF‐HET‐GRR‐079_Attachments 01/12/2014 FP Turbine Speed Load Governor Workshop Test Program X Y
GRR‐HET‐MET‐14‐061‐T TF‐HET‐GRR‐080 TF‐HET‐GRR‐080_Attachment 03/12/2014 MM U10 BLADES EXCAVATION & REPAIR REPORT X N
None TF‐HET‐GRR‐081 TF‐HET‐GRR‐081_Attachment 10/12/2014 EK Early Generation Blades Manufacturing Quality Data Book   X N
GRR‐HET‐MET‐14‐062‐L None None 22/12/2014 FP DTC ‐ Spiral case pit liner shipment X Y
None TF‐HET‐GRR‐082 TF‐HET‐GRR‐082_Attachments 05/01/2015 EK TF X Y
None TF‐HET‐GRR‐083 TF‐HET‐GRR‐083_Attachments 05/01/2015 EK TF X Y
None TF‐HET‐GRR‐084 TF‐HET‐GRR‐084_Attachments 05/01/2015 EK TF X
None TF‐HET‐GRR‐085 TF‐HET‐GRR‐085_Attachments 05/01/2015 EK TF X
GRR‐HET‐MET‐15‐001‐L None None 08/01/2014 FP U9 Distributor Workshop Assembly Notification X Y
GRR‐HET‐MET‐15‐002‐L None None 08/01/2014 FP U10 Turbine Shaft Final Inspection Notification X Y
Shipment of units 09 & 10 turbine guide bearings and unit 
Y
GRR‐HET‐MET‐15‐003‐L None GRR‐HET‐MET‐15‐003‐L_Ataachments 16/01/2015 FP 09 shaft seal X
GRR‐HET‐MET‐15‐004‐T  None GRR‐HET‐MET‐15‐004‐ T_ Attachment 19/01/2015 MM Answer to GERDP‐JE‐DR‐14‐246‐A Point 4 X Y
GRR‐HET‐MET‐15‐005‐L None GRR‐HET‐MET‐15‐005‐L_Attachment 20/01/2015 FP Thrust bearings U9 & U10 and shaft seal U10 shipment X Y
GRR‐HET‐MET‐15‐006‐L None None 26/01/2014 MM U10 Turbine Shaft Final Inspection Date Modification Notifi X Y
GRR‐HET‐MET‐15‐007‐L None None 26/01/2014 MM U9 Distributor Workshop Assembly Final Notification
GRR‐HET‐MET‐15‐008‐L None GRR‐HET‐MET‐15‐008‐L_Attachments 27/01/2015 FP Shipment of units 9 & 10 governor pressure tanks X N
None TF‐HET‐GRR‐086 TF‐HET‐GRR‐086_Attachments 29/01/2015 EK Turbine documents (runner blade procurement, governing  X N
GRR‐HET‐MET‐15‐009‐L None GRR‐HET‐MET‐15‐009‐L_Attachments 29/01/2015 FP Governor cubicle shipment X N
GRR‐HET‐MET‐15‐010‐T TF‐HET‐GRR‐087 TF‐HET‐GRR‐087_Attachments 30/01/2015 FP SLG Functionnal Description X N
GRR‐HET‐MET‐15‐011‐L None None 30/01/2015 FP Answer to GERDP‐JE‐DR‐14‐226‐A X N
GRR‐HET‐MET‐15‐012‐L  None GRR‐HET‐MET‐15‐012‐L_Attachments 02/02/2015 MM U9 Distributor Workshop Assembly Detail Inspection Progra X N
None TF‐HET‐GRR‐088 TF‐HET‐GRR‐088_Attachments 03/02/2015 EK Governing system (Governing system technical spec) X N
GRR‐HET‐MET‐15‐013‐L None GRR‐HET‐MET‐15‐013‐L_Attachments 03/02/2015 FP Unit 10 runner shipment X N
GRR‐HET‐MET‐15‐014‐L None GRR‐HET‐MET‐15‐014‐L_Attachment 03/02/2015 FP Unit 9 Shaft Shipment X N
GRR‐HET‐MET‐15‐015‐L None GRR‐HET‐MET‐15‐015‐L_Attachment 05/02/2015 FP Governor compressors shipment X N
GRR‐HET‐MET‐15‐016‐L None GRR‐HET‐MET‐15‐016‐L_Attachment 05/02/2015 FP Axial valves shipment X N
GRR‐HET‐MET‐15‐017‐L None None 06/02/2015 MM Unit 10 Turbine Shaft Final Inspection Date Modification No X N
GRR‐HET‐MET‐15‐018‐L None GRR‐HET‐MET‐15‐018‐L_Attachments 10/02/2015 FP Thrust bearings U9 & U10 and shaft seal U10 shipment X N
Runner Unit 9 Transportation on mv ASSOSA ‐ Lifting 
N
Pas de ref juste un mail None None 16/02/2015 FP potential issue X
Voir dans Chrono COO TF‐HET‐GRR‐089 TF‐HET‐GRR‐089_Attachments 23/02/2015 FP Turbine Quality documents X N
GRR‐HET‐MET‐15‐019‐L None GRR‐HET‐MET‐15‐019‐L_Attachments 24/02/2015 FP Stay Ring U9 shipment X N
GRR‐HET‐MET‐15‐020‐T TF‐HET‐GRR‐090 TF‐HET‐GRR‐090_Attachments 24/02/2015 FP Answer to GERDP‐JE‐DR‐15‐292‐A X N
GRR‐HET‐MET‐15‐021‐L None GRR‐HET‐MET‐15‐021‐L_Attachments 27/02/2015 FP Governor cubicles and governor compressors shipment X N
TF‐HET‐GRR‐091 GRR‐HET‐MET‐15‐022‐T_Attachments X
GRR‐HET‐MET‐15‐022‐T 02/03/2015 FP Answer to GERDP‐JE‐DR‐15‐323 TF‐HET‐GRR‐091 Y
Answer to GERDP‐JE‐DR‐14‐323‐A List Spare Parts
None TF‐HET‐GRR‐092 TF‐HET‐GRR‐092_Attachments 03/03/2015 EK TF Turbine Quality documents (draft tube cone, shaft seal, s X N
GRR‐HET‐MET‐15‐023‐L None GRR‐HET‐MET‐15‐023‐L_Attachments 03/03/2015 FP Miscellaneous components of PA 12,52, 81 & 87 X N

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 5/8 09/09/2016


GRR‐HET‐MET‐15‐024‐L None None 03/03/2015 FP Answer to GERDP‐JE‐DR‐15‐325‐A X N
GRR‐HET‐MET‐15‐025‐L None None 05/03/2015 FP Unit 10 Turbine Shaft Final Inspection Date Modification No X N
GRR‐HET‐MET‐15‐026‐L None None 05/03/2015 FP Clarifications to GRR‐HET‐MET‐15‐010‐T X N
GRR‐HET‐MET‐15‐027‐L None GRR‐HET‐MET‐15‐027‐L_Attachments 05/03/2015 FP Unit 10 Runner shipment X N
GRR‐HET‐MET‐15‐028‐L None GRR‐HET‐MET‐15‐028‐L_Attachments 09/03/2015 FP Units 09 &10 axial valves shipment X N
GRR‐HET‐MET‐15‐029‐L None GRR‐HET‐MET‐15‐029‐L_Attachments 10/03/2015 FP Units 09 &10 thrust bearing brackets shipment X N
None TF‐HET‐GRR‐093 TF‐HET‐GRR‐093_Attachments 10/03/2015 EK TF Turbine Bearing Piping X N
Shipment of draft tube cones, spiral cases, pit liners, bulk  Y
GRR‐HET‐MET‐15‐030‐L None GRR‐HET‐MET‐15‐030‐L_Attachments Part 1 12/03/2015 FP X
heads and dummy distributors
GRR‐HET‐MET‐15‐030‐L_Attachments Part 2
GRR‐HET‐MET‐15‐031‐L None GRR‐HET‐MET‐15‐031‐L_Attachment 13/03/2015 FP
Stay Ring U9 shipment ‐ Update of packing lists X N
GRR‐HET‐MET‐15‐032‐L None GRR‐HET‐MET‐15‐032‐L_Attachment 13/03/2015 FP
Thrust bearings U9 & U10 and shaft seal U10 shipment X N
GRR‐HET‐MET‐15‐033‐T TF‐HET‐GRR‐094 TF‐HET‐GRR‐094_Attachment 16/03/2015 FP
Answer to GERDP‐JE‐DR‐14‐245‐A TF‐HET‐GRR‐094 X N
GRR‐HET‐MET‐15‐034‐L None None 24/03/2015 FP
Answer to GERDP‐JE‐DR‐14‐307‐A X
Shipment of miscellaneous components of partial 
N
GRR‐HET‐MET‐15‐035‐L None GRR‐HET‐MET‐15‐035‐L_Attachment 26/03/2015 FP assemblies 12, 52, 81 & 87 X
GRR‐HET‐MET‐15‐036‐L None GRR‐HET‐MET‐15‐036‐L_Attachment 31/03/2015 FP Shipment of unit 9& 10 thrust bearing brackets X N
Shipment of units 09 & 10 thrust bearings and unit 10 shaft
N
GRR‐HET‐MET‐15‐037‐L None GRR‐HET‐MET‐15‐037‐L_Attachment 10/04/2015 FP seal X
GRR‐HET‐MET‐15‐038‐L None GRR‐HET‐MET‐15‐038‐L_Attachment 14/04/2015 FP Thrust bearings brackets U9&U10 shipment X N
None TF‐HET‐GRR‐095 TF‐HET‐GRR‐095_Attachment 16/04/2015 EK Turbine quality data book (Shaft seal manufacturing quality X N
GRR‐HET‐MET‐15‐039‐L None GRR‐HET‐MET‐15‐039‐L_Attachment 17/04/2015 FP Shipment of Unit 9 Stay ring X N
GRR‐HET‐MET‐15‐040‐L None GRR‐HET‐MET‐15‐040‐L_Attachment 21/04/2015 FP Shipment of unit 10 Turbine Shaft X N
GRR‐HET‐MET‐15‐041‐ L  None None 27/04/2015 MM U10 Distributor Workshop Assembly Pre‐Notification X Y
GRR‐HET‐MET‐15‐042‐L None GRR‐HET‐MET‐15‐042‐L_Attachment 28/04/2015 FP Instrumentation, tools and miscellaneous components X N
GRR‐HET‐MET‐15‐043‐L None GRR‐HET‐MET‐15‐043‐L_Attachment 07/05/2015 FP Unit 9 distributor shipment X N
GRR‐HET‐MET‐15‐044‐L None None 19/05/2015 FP U10 Distributor Workshop Assembly Pre‐Notification X Y
GRR‐HET‐MET‐15‐045‐L None GRR‐HET‐MET‐15‐045‐L_Attachment 19/05/2015 FP Shipment of unit 9 distributor X Y
GRR‐HET‐MET‐15‐046‐L None GRR‐HET‐MET‐15‐046‐L_Attachment 19/05/2015 FP Thrust Collars U9 & u10 shipment X Y
GRR‐HET‐MET‐15‐047‐L None None 21/05/2015 FP Answer to GERDP‐JE‐DR‐15‐059‐A X Y
None TF‐HET‐GRR‐096 TF‐HET‐GRR‐096_Attachment 26/05/2015 EK TF Turbine Governing X Y
GRR‐HET‐MET‐15‐048‐L None GRR‐HET‐MET‐15‐048‐L_Attachments 26/05/2015 FP Miscellaneous components of PA 12,52, 81 & 87 X Y
GRR‐HET‐MET‐15‐049‐L None GRR‐HET‐MET‐15‐049‐L_Attachments 26/05/2015 FP Shipment of stay ring U10 X Y
GRR‐HET‐MET‐15‐050‐L None GRR‐HET‐MET‐15‐050‐L_Attachments 26/05/2015 FP Servomotors & hydraulic power packs X Y
GRR‐HET‐MET‐15‐051‐L None GRR‐HET‐MET‐15‐051‐L_Attachments 02/06/2015 FP Shipment of unit 10 shaft X Y
GRR‐HET‐MET‐15‐052‐L None GRR‐HET‐MET‐15‐052‐L_Attachments 04/06/2015 FP Shipment of unit 9  shaft X Y
GRR‐HET‐MET‐15‐053‐L None GRR‐HET‐MET‐15‐053‐L_Attachments 05/06/2015 FP Shipment of units 9 & 10 thrust collars X Y
GRR‐HET‐MET‐15‐054‐L None GRR‐HET‐MET‐15‐054‐L_Attachments 11/06/2015 FP Shipment of stay ring U10 X Y
GRR‐HET‐MET‐15‐055‐L None None 19/06/2015 FP Answer to METEC‐ALST‐T‐15‐5074‐001 X Y
None TF‐HET‐GRR‐097 TF‐HET‐GRR‐097_Attachments 22/06/2015 FP Consumer list & governing system documents X Y
GRR‐HET‐MET‐15‐056‐L None GRR‐HET‐MET‐15‐056‐L_Attachments 29/06/2015 FP Shipment of unit 10 shaft X Y
GRR‐HET‐MET‐15‐057‐L None GRR‐HET‐MET‐15‐057‐L_Attachments 29/06/2015 FP Shipment of unit 9 distributor X Y
Turbine documents (aerial pipes & thrust bearing piping oil 
Y
None TF‐HET‐GRR‐098 TF‐HET‐GRR‐098_Attachments 30/06/2015 FP circulation) X
None TF‐HET‐GRR‐099 TF‐HET‐GRR‐099_Attachments 30/06/2015 EK Turbine tools documents X Y
GRR‐HET‐MET‐15‐058‐L None GRR‐HET‐MET‐15‐058‐L_Attachments 02/07/2015 FP 400MW power generation upgrade X Y
GRR‐HET‐MET‐15‐059‐L None GRR‐HET‐MET‐15‐059‐L_Attachments 09/07/2015 FP Units 9&10 governor pressure tanks X Y
GRR‐HET‐MET‐15‐060‐L None GRR‐HET‐MET‐15‐060‐L_Attachments 10/07/2015 FP Stay ring U10 shipment X Y
GRR‐HET‐MET‐15‐061‐L None GRR‐HET‐MET‐15‐061‐L_Attachments 13/07/2015 FP Shipment of units 9&10 thrust collars X Y
GRR‐HET‐MET‐15‐062‐T TF‐HET‐GRR‐100 TF‐HET‐GRR‐100_Attachments 17/07/2015 FP Governing system spare parts X Y
None TF‐HET‐GRR‐101 TF‐HET‐GRR‐101_Attachments 16/07/2015 EK Turbine data book X Y
GRR‐HET‐MET‐15‐063‐L None None 24/07/2015 FP Unit 10 Distributor workshop assembly notification X Y
Runner Blades Band Crown Unit 8 Procurement Final NDT 
GRR‐HET‐MET‐15‐064‐L None None 30/07/2015 FP Notification X
GRR‐HET‐MET‐15‐065‐L None None 06/08/2015 FP Unit 10 Distributor workshop assembly final notification x N
GRR‐HET‐MET‐15‐066‐L None None 04/09/2015 MDN Spiral case concreting pressure X Y
GRR‐HET‐MET‐15‐067‐L None GRR‐HET‐MET‐15‐067‐L_Attachments 10/09/2015 FP Shipment of miscellaneous components X Y
GRR‐HET‐MET‐15‐068‐L None GRR‐HET‐MET‐15‐068‐L_Attachments 10/09/2015 FP Shipment of units 9&10 thrust collars X

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 6/8 09/09/2016


None TF‐HET‐GRR‐102 TF‐HET‐GRR‐102_Attachments 10/09/2015 EK Turbine inspection documents X Y
GRR‐HET‐MET‐15‐069‐L TF‐HET‐GRR‐103 GRR‐HET‐MET‐15‐069‐L_Attachments 11/09/2015 FP Answer to GERDP‐JE‐DR‐15‐045‐A Runner platform X Y
GRR‐HET‐MET‐15‐070‐L None GRR‐HET‐MET‐15‐070‐L_Attachments 17/09/2015 FP Shipment of miscellaneous X Y
None TF‐HET‐GRR‐104 TF‐HET‐GRR‐104_Attachments 17/09/2015 EK TF Turbine Quality data Books X Y
GRR‐HET‐MET‐15‐071‐L None None 18/09/2015 FP Answer to GERDP‐JE‐DR‐15‐080‐A X Y
GRR‐HET‐MET‐15‐072‐L None None 18/09/2015 FP Answer to GERDP‐JE‐DR‐15‐183‐A X Y
GRR‐HET‐MET‐15‐073‐L None GRR‐HET‐MET‐15‐073‐L_Attachments 18/09/2015 FP Answer to the observations of GERDP‐IR‐024 X Y
GRR‐HET‐MET‐15‐074‐L None None 18/09/2015 FP Runner Blades – Band – Crown Unit 8 Procurement Final ND X Y
GRR‐HET‐MET‐15‐075‐L None None 22/09/2015 FP Runner Blades Unit 7  procurement final NDT notification X Y
None TF‐HET‐GRR‐105 TF‐HET‐GRR‐105‐Attachments 24/09/2015 EK TF for turbine quality data book X Y
GRR‐HET‐MET‐15‐076‐L None GRR‐HET‐MET‐15‐076‐L_Attachments 30/09/2015 FP Shipment of thrust bearing heat exchangers X Y
Answer to GERDP‐JE‐DR‐15‐053‐A and GERDP‐JE‐DR‐15‐
Y
GRR‐HET‐MET‐15‐077‐L None 06/10/2015 FP 069‐A X 22/10/2015 GERDP‐IR‐021 Annex to GERDP‐IR‐021
GRR‐HET‐MET‐15‐078‐L None GRR‐HET‐MET‐15‐078‐L_Attachments 08/10/2015 FP Unit 10 distributor shipment X Y
Runner Band crown Unit 7 Procurement Final NDT 
Y
GRR‐HET‐MET‐15‐079‐L None None 09/10/2015 FP Notification X
GRR‐HET‐MET‐15‐080‐L_TF‐HET‐GRR‐
Y
GRR‐HET‐MET‐15‐080‐T TF‐HET‐GRR‐106 106_Attachments 13/10/2015 FP Excavation report blades (unit 7) X
None TF‐HET‐GRR‐107 TF‐HET‐GRR‐107_Attachments 12/10/2015 EK Transmittal form for Turbine quality data book X Y
GRR‐HET‐MET‐15‐081‐L None GRR‐HET‐MET‐15‐081‐L_Attachments 15/10/2015 FP Shipment of units 9&10 servomotors & hydraulic power pa X Y
None TF‐HET‐GRR‐108 TF‐HET‐GRR‐108_Attachments 16/10/2015 EK Servomotor quality data book X Y
GRR‐HET‐MET‐15‐082‐L None GRR‐HET‐MET‐15‐082‐L_Attachments 23/10/2015 FP Shipment of thrust bearing heat exchangers X Y
None TF‐HET‐GRR‐109 TF‐HET‐GRR‐109_Attachments 23/10/2015 EK
GRR‐HET‐MET‐15‐083‐L None GRR‐HET‐MET‐15‐083‐L Attachments 28/10/2015 MDN Unit 10 distributor shipment X Y
Runner Band crown Unit 7 Procurement Final NDT 
Y
GRR‐HET‐MET‐15‐084‐L None None 30/10/2015 MDN Notification update / confirmation X
None TF‐HET‐GRR‐110 TF‐HET‐GRR‐110_Attachment 02/11/2015 EK TF Stay Ring manufacturing data book X
GRR‐HET‐MET‐15‐085‐L None None 03/11/2015 FP Proposed action plan for the damaged turbine shaft U10 X Y
GRR‐HET‐MET‐15‐086‐L None GRR‐HET‐MET‐15‐086‐L_Attachment 12/11/2015 FP Shipment of injection and shaft seal skids X Y
GRR‐HET‐MET‐15‐087‐L None GRR‐HET‐MET‐15‐087‐L_Attachments 20/11/2015 FP Proposed action plan for the damaged turbine shaft U10 X Y
GRR‐HET‐MET‐15‐088‐T TF‐HET‐GRR‐111 TF‐HET‐GRR‐111_Attachments 26/11/2015 FP Phase 2 governing spare parts ‐ TF/HET/GRR/111 X Y
GRR‐HET‐MET‐15‐089‐L None GRR‐HET‐MET‐15‐089‐L_Attachments 03/12/2015 FP Shipment of overspeed detection system and miscellaneou X Y
GRR‐HET‐MET‐15‐090‐L None 03/12/2015 FP Spiral case scrolls transportation to site X Y
GRR‐HET‐MET‐15‐091‐L None GRR‐HET‐MET‐15‐091‐L_Attachments 08/12/2015 FP Unit 10 distributor shipment X Y
GRR‐HET‐MET‐15‐092‐L None 10/12/2015 FP Runner Blades Unit 6 Procurement Final NDT notification X Y
Runner Band Crown Unit 6 Procurement Final NDT 
Y
GRR‐HET‐MET‐15‐093‐L None 10/12/2015 FP Notification X
GRR‐HET‐MET‐15‐094‐L None GRR‐HET‐MET‐15‐094‐L_Attachments 15/12/2015 FP Shipment of injection and shaft seal skids X Y
GRR‐HET‐MET‐15‐095‐L None None 17/12/2015 FP Fall of shaft unit 9 ‐ Sgt Zerai Injury X Y
GRR‐HET‐MET‐15‐096‐T TF‐HET‐GRR‐112 TF‐HET‐GRR‐112‐Attachments 21/12/2015 FP Answer to GERDP‐JE‐DR‐15‐211‐A_TF‐HET‐GRR‐112 X Y
None TF‐HET‐GRR‐113 TF‐HET‐GRR‐113_Attachments 21/12/2015 EK TF Consumer list X Y
Runner Blades Unit 6 Procurement Final NDT notification 
Y
GRR‐HET‐MET‐15‐097 None 22/12/2015 MDN confirmation X
GRR‐HET‐MET‐15‐098 None GRR‐HET‐MET‐15‐098‐L_Attachments 22/12/2015 MDN Phase 2A circular monorails shipment X
Shipment of overspeed detection system and 
GRR‐HET‐MET‐15‐099 None GRR‐HET‐MET‐15‐099‐L_Attachments 22/12/2015 MDN miscellaneous components X
None TF‐HET‐GRR‐114 TF‐HET‐GRR‐114_Attachments 14/01/2016 EK TF Blade casting inspection report X Y
None TF‐HET‐GRR‐115 TF‐HET‐GRR‐115_Attachments 19/01/2016 EK TF Excavation report X Y
GRR‐HET‐MET‐16‐001‐L None GRR‐HET‐MET‐16‐001‐L_Attachments 21/01/2016 FP Shipment of phase 2A circular monorails X Y
GRR‐HET‐MET‐16‐002‐L None GRR‐HET‐MET‐16‐002‐L_Attachments 28/01/2016 FP Pier nose quality documents X Y
GRR‐HET‐MET‐16‐003‐T TF‐HET‐GRR‐116 TF‐HET‐GRR‐116‐Attachments 04/02/2016 FP Part Lists update X N
GRR‐HET‐MET‐16‐004‐L None None 04/02/2016 fP Spiral case scrolls transportation to site X Y
GRR‐HET‐MET‐16‐005‐L None GRR‐HET‐MET‐16‐005‐L_Attachments 18/02/2016 FP Units 8&7 drainage boxes X Y
None TF‐HET‐GRR‐117 TF‐HET‐GRR‐117_Attachments 29/02/2016 ek TF Turbine Quality data Books X Y
Shipment of U8 pads for thrust bearing, generator & 
Y
GRR‐HET‐MET‐16‐006‐L None GRR‐HET‐MET‐16‐006‐L_Attachments 08/03/2016 FP turbine guide bearings X
GRR‐HET‐MET‐16‐007‐L None None 08/03/2016 FP Spiral case concrete pressure X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 7/8 09/09/2016


Shipment of U8 thrust bearing & U8 generator guide 
Y
GRR‐HET‐MET‐16‐008‐L None GRR‐HET‐MET‐16‐008‐L_Attachments 10/03/2016 FP bearing X
GRR‐HET‐MET‐16‐009‐L None None 15/03/2016 FP Unit 10 shaft final inspection after repairs X Y
GRR‐HET‐MET‐16‐010‐L None GRR‐HET‐MET‐16‐010‐L_Attachments 22/03/2016 FP Unit 9 runner final inspection program on vertical lathe X Y
GRR‐HET‐MET‐16‐011‐L None GRR‐HET‐MET‐16‐011‐L‐Attachments 24/03/2016 FP Shipment of tools for distributor erection X Y
Y
GRR‐HET‐MET‐16‐012‐L None GRR‐HET‐MET‐16‐012‐L_Attachments 24/03/2016 FP Shipment of phase 2A turbine miscellaneous components X
Shipment of U8 pads for thrust bearing, generator & 
Y
GRR‐HET‐MET‐16‐013‐L None GRR‐HET‐MET‐16‐013‐L_Attachments 29/03/2016 FP turbine guide bearings X
GRR‐HET‐MET‐16‐014‐L None GRR‐HET‐MET‐16‐014‐L_Attachments 31/03/2016 FP Shipment of phase 2A Thrust bearing heat exchangers X Y
GRR‐HET‐MET‐16‐015‐L None GRR‐HET‐MET‐16‐015‐L_Attachments 04/04/2016 FP Shipment of phase 2A Governor cubicles (TSLG) X Y
GRR‐HET‐MET‐16‐016‐L None GRR‐HET‐MET‐16‐016‐L_Attachments 04/04/2016 FP Shipment of U10 shaft after repairs X Y
GRR‐HET‐MET‐16‐017‐L None GRR‐HET‐MET‐16‐017‐L_Attachments 05/04/2016 FP Impacts of unit 10 shaft repairs X Y
GRR‐HET‐MET‐16‐018‐L None GRR‐HET‐MET‐16‐018‐L_Attachments 05/04/2016 FP Shipment of Stay ring site machining tool X Y
Y
GRR‐HET‐MET‐16‐019‐L None GRR‐HET‐MET‐16‐019‐L_Attachments 11/04/2016 FP Shipment of phase 2A turbine miscellaneous components X
GRR‐HET‐MET‐16‐020‐L None GRR‐HET‐MET‐16‐020‐L_Attachments 11/04/2016 FP Shipment of tools for distributor erection X Y
Y
GRR‐HET‐MET‐16‐021‐L None GRR‐HET‐MET‐16‐021‐L_Attachments 12/04/2016 FP Shipment of phase 2A shaft seal skids & oil injection skids X
None TF‐HET‐GRR‐118 TF‐HET‐GRR‐118_Attachments 25/04/2016 EK TF Governing spare parts X Y
GRR‐HET‐MET‐16‐022‐L None GRR‐HET‐MET‐16‐022‐L_Attachments 26/04/2016 FP Unit 9 runner final inspection X Y
GRR‐HET‐MET‐16‐023‐L None GRR‐HET‐MET‐16‐023‐L_Attachments 28/04/2016 FP Shipment of phase 2A Governor cubicles X Y
GRR‐HET‐MET‐16‐024‐L None GRR‐HET‐MET‐16‐024‐L_Attachments 28/04/2016 FP Shipment of phase 2A Thrust bearing heat exchangers X Y
GRR‐HET‐MET‐16‐025‐L None GRR‐HET‐MET‐16‐025‐L_Attachments 28/04/2016 FP Shipment of Stay ring site machining tool X Y
Y
GRR‐HET‐MET‐16‐026‐L None GRR‐HET‐MET‐16‐026‐L_Attachments 28/04/2016 FP
Shipment of phase 2A shaft seal skids & oil injection skids X
GRR‐HET‐MET‐16‐027‐L None GRR‐HET‐MET‐16‐027‐L_Attachments 12/05/2016 FP
Shipment of U6 generator guide bearing X Y
Unit 9 runner final inspection ‐ Step 1 confirmation ‐ Step 2
Y
GRR‐HET‐MET‐16‐028‐L None GRR‐HET‐MET‐16‐028‐L_Attachments 12/05/2016 FP notification X
GRR‐HET‐MET‐16‐029‐L None GRR‐HET‐MET‐16‐029‐L_Attachments 17/05/2016 FP Shipment oh phase 2A compressors X Y
GRR‐HET‐MET‐16‐030‐L None GRR‐HET‐MET‐16‐030‐L_Attachments 19/05/2016 FP Shipment of U9 runner X Y
GRR‐HET‐MET‐16‐031‐L None GRR‐HET‐MET‐16‐031‐L_Attachments 19/05/2016 FP Shipment of U7 thrust bearing X Y
GRR‐HET‐MET‐16‐032‐L None GRR‐HET‐MET‐16‐032‐L_Attachments 02/06/2016 FP Shipment oh phase 2A Governor compressors X Y
None TF‐HET‐GRR‐119 TF‐HET‐GRR‐119‐Attachments 14/06/2016 EK Runner documents X Y
GRR‐HET‐MET‐16‐033‐L None GRR‐HET‐MET‐16‐033‐L_Attachments 16/06/2016 FP Shipment of U10 shaft after repairs X Y
GRR‐HET‐MET‐16‐034‐L None None 17/06/2016 FP U8 Turbine shaft final inspection X Y
Shipment of U8 thrust bearing & U8 generator guide 
Y
GRR‐HET‐MET‐16‐035‐L None GRR‐HET‐MET‐16‐035‐L_Attachments 17/06/2016 FP bearing X
GRR‐HET‐MET‐16‐036‐L None GRR‐HET‐MET‐16‐036‐L_Attachments 21/06/2016 FP Shipment of U7 thrust bearing ODC parts X Y
None TF‐HET‐GRR‐120 TF‐HET‐GRR‐120_Attachments 28/06/2016 FP Turbine quality data book X Y
GRR‐HET‐MET‐16‐037‐L None GRR‐HET‐MET‐16‐037‐L_Attachments 01/07/2016 FP U10 shaft repairs X Y
GRR‐HET‐MET‐16‐038‐L None GRR‐HET‐MET‐16‐038‐L_Attachments 05/07/2016 FP Material change request  for draft tube elbow X Y
GRR‐HET‐MET‐16‐039‐L None GRR‐HET‐MET‐16‐039‐L_Attachments 26/07/2016 FP Shipment of phase 2A governor pressure tanks X Y
Shipment of U10 remaining distributor components & 
Y
GRR‐HET‐MET‐16‐040‐L None GRR‐HET‐MET‐16‐040‐L_Attachments 04/08/2016 FP spares X
GRR‐HET‐MET‐16‐041‐L None none 09/08/2016 FP U7 Turbine shaft final inspection notification X Y
GRR‐HET‐MET‐16‐042‐L None GRR‐HET‐MET‐16‐042‐L_ Attachment 11/08/2016 MDN Shipment of U7 thrust bearing X N
GRR‐HET‐MET‐16‐043‐L None GRR‐HET‐MET‐16‐043‐L_ Attachment 29/08/2016 MDN Shipment of U8 turbine guide bearing and shaft seal X Y
GRR‐HET‐MET‐16‐044‐T TF‐HET‐GRR‐121 TF‐HET‐GRR‐121_Attachments 08/09/2016 FP Phase 2A turbine spare parts lists X Y
None TF‐HET‐GRR‐122 TF‐HET‐GRR‐122_Attachments 08/09/2016 EK TF Turbine Quality data Books X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHET 8/8 09/09/2016


GRAND RENAISSANCE HEG ‐ Correspondance To METEC

Reference correspondence  Reference Transmittal Response  METEC response to Alstom's letter


To  To 
Attachment to e‐mail Date By Subject required 
METEC Engineer
Y/N
Date Ref. Mail Attachment to email

GRR‐HEG‐MET‐12‐001‐T HGGD000070_ITP ‐ Grand renaissance ‐ rev A 30/08/2012 FP Generator Inspection & Test Plan X X N


GRR‐HEG‐MET‐12‐002‐T 028‐300_K_WELDS CLASSIFICATION‐INSPECTIONS 06/09/2012 FP Document Transmittal X Y
HGGD020000_A_OPENINGS AND TRENCHES
HGGD020001 A FOUNDATION LOADS
GRR‐HEG‐MET‐12‐003‐T 24/09/2012 FP Distance Between 500T Crane Hooks X Y
GRR‐HEG‐MET‐12‐004‐T GRR‐HEG‐MET‐12‐004‐T_Transmittal Form TF‐HEG‐GRR‐ 02/10/2012 FP Transmittal Form TF/HEG/GRR/004 X X Y
004 attachment.zip
GRR‐HEG‐MET‐12‐005‐T GRR‐HEG‐MET‐12‐005‐T_Transmittal Form TF‐HEG‐GRR‐005_attachments 11/10/2012 FP Transmittal Form TF/HEG/GRR/005 X X Y

GRR‐HEG‐MET‐12‐006‐L 06/11/2012 FP Volume of CO2 and Pressure Loss for Generator Cooling X N


GRR‐HEG‐MET‐12‐007‐T GRR‐HEG‐MET‐12‐007‐T_Transmittal Form TF‐HEG‐GRR‐ 27/11/2012 FP Transmittal Form TF/HEG/GRR/006 X N
006 attachements
GRR‐HEG‐MET‐12‐008‐L 29/11/2012 FP Erection Bay Arrangement X N 03/12/2012 GRR‐MET‐ALS‐12‐010 Answer to GRR‐HEG‐
MET‐12‐008‐L
GRR‐HEG‐MET‐12‐009‐L 30/11/2012 FP Generator Fire Fighting System X N
GRR‐HEG‐MET‐12‐010‐L 17/12/2012 FP Distance Between Cranes & Request of Hook Dimensions X Y 24/12/2012 GRR‐MET‐ALS‐12‐013 Answer to GRR‐HEG‐ Pril_Mail02_1323
MET‐12‐010‐L
GRR‐HEG‐MET‐12‐011‐T GRR‐HEG‐MET‐12‐011‐T_Transmittal Form TF‐HEG‐GRR‐007_attachments 07/01/2013 FP Transmittal Form TF/HEG/GRR/007 X X N

GRR‐HEG‐MET‐13‐001‐L 30/01/2013 FP Phase Sequence X X Y


GRR‐HEG‐MET‐13‐002‐L GRR‐HEG‐MET‐13‐002‐T_Transmittal Form TF‐HEG‐GRR‐ 31/01/2013 FP Transmittal Form TF/HEG/GRR/008 ‐ Generator Inspection and Test Plan X X Y
008 attachements
GRR‐HEG‐MET‐13‐003‐T GRR‐HEG‐MET‐13‐003‐T_Generator Foundation Loads_attachments 11/02/2013 FP Generator Foundation Loads ‐ Transmittal Form TH/HEG/GRR/009 X X N

GRR‐HEG‐MET‐13‐004‐L 05/03/2013 FP Colors of Power Supply Cables X X Y


GRR‐HEG‐MET‐13‐005‐L GRR‐HEG‐MET‐13‐005‐L_Terminal Blocks_attachment 05/03/2013 FP Terminal Blocks X Y
GRR‐HEG‐MET‐13‐006‐L 05/03/2013 FP Heating of Panels, Boards and Cabinets X N
GRR‐HEG‐MET‐13‐007‐L 20/03/2013 FP Characteristics of the overhead lines X Y
GRR‐HEG‐MET‐13‐008‐T GRR‐HEG‐MET‐13‐008‐T_Transmittal Form TF‐HEG‐GRR‐010_attachments 25/03/2013 FP Transmittal Form TF/HEG/GRR/010 ‐ Generator Foundation Loads X X Y

GRR‐HEG‐MET‐13‐009‐L 27/03/2013 FP Power supply for field flashing X X Y


GRR‐HEG‐MET‐13‐010‐T GRR‐HEG‐MET‐13‐010‐T_Transmittal Form TF‐HEG‐GRR‐011_attachments 10/04/2013 FP Transmittal Form TF/HEG/GRR/011 X X Y

GRR‐HEG‐MET‐13‐011‐T HEG\GRR‐HEG‐MET‐13‐011‐T_Generator Foundation  30/04/2013 FP Generator Foundation Loads, response to GERDP‐SCM/FSU‐13/105/CEXT x X y


Loads_GERDP‐SCM‐FSU‐13‐105‐CEXT_attachments.zip
GRR‐HEG‐MET‐13‐012‐T HEG\GRR‐HEG‐MET‐13‐012‐T_Transmittal Form TF‐HEG‐GRR‐ 26/04/2013 FP Transmittal Form TF‐HEG‐GRR‐012 x X Y
012.pdf_attachments.zip
GRR‐HEG‐MET‐13‐013‐L_ 30/04/2013 FP Dimensions of excitation cubicles and Transformer x Y
GRR‐HEG‐MET‐13‐014‐L 03/05/2013 FP Drainage of Generator Pit x N
GRR‐HEG‐MET‐13‐015‐L HEG\GRR‐HEG‐MET‐13‐015‐L_Minimimum Height of Crane  03/05/2013 FP Minimimun Height of Crane Hook x X y
Hook_GERDP‐SCM‐FSU‐13‐104‐CEXT.pdf_attach.zip
GRR‐HEG‐MET‐13‐016‐L HEG\GRR‐HEG‐MET‐13‐016‐L_Generator Data in Transmission  17/05/2013 FP Generator Data in Transmission Line Network Study, ref GERDP/0615/8/13 x X Y
Line Network Study_Grand Renaissance Capability Diagram.pdf

GRR‐HEG‐MET‐13‐017‐T HEG\GRR‐HEG‐MET‐13‐017‐T_Transmittal Form TF‐HEG‐GRR‐ 17/05/2013 FP Transmittal Form TF/HEG/GRR/014 x X y


014_Attachments.zip
GRR‐HEG‐MET‐13‐018‐T HEG\GRR‐HEG‐MET‐13‐018‐T_Transmittal Form TF‐HEG‐GRR‐ 23/05/2013 Transmittal Form TF/HEG/GRR/015 ‐ Stator Slot Section x X y
015_Stator Slot Section_Attachments.zip
GRR‐HEG‐MET‐13‐019‐T HEG\GRR‐HEG‐MET‐13‐019‐T_Transmittal Form TF‐HEG‐GRR‐ 29/05/2013 FP  Transmittal Form TF/HEG/GRR/017 ‐ Generator Stator Bars x X y
017_Generator Stator Bars_attachments.zip

GRR‐HEG‐MET‐13‐021‐L 20/06/2013 FP Generator Fire Protection x y


GRR‐HEG‐MET‐13‐022‐T HEG\GRR‐HEG‐MET‐13‐022‐T 17/06/2013 FP Transmittal Form TF/HEG/GRR/018  X Y
Transmittal Form TF/HEG/GRR/018
GRR‐HEG‐MET‐13‐023‐T HEG\GRR‐HEG‐MET‐13‐023‐T 17/06/2013 FP Transmittal Form TF/HEG/GRR/019 X Y
Transmittal Form TF/HEG/GRR/019
GRR‐HEG‐MET‐13‐024‐T GRR‐HEG‐MET‐13‐024‐T_ Transmittal Form TF/HEG/GRR/020 02/07/2013 by  FP GRR‐HEG‐MET‐13‐024‐T_ Transmittal Form TF/HEG/GRR/020 X N
DHL

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHEG 1/5 09/09/2016


GRR‐HEG‐MET‐13‐025‐L GRR‐HEG‐MET‐13‐025‐L_Endurance Tests on Generator Stator  02/07/2013 FP Tests on Generator Stator Bars  X Letter
Bars_attachment
GRR‐HEG‐MET‐13‐026‐T GRR‐HEG‐MET‐13‐026‐T_Transmittal Form TF/HEG/GRR/021 04/07/2013 FP GRR‐HEG‐MET‐13‐026‐T_Transmittal Form TF/HEG/GRR/021 X Y
GRR‐HEG‐MET‐13‐027‐T GRR‐HEG‐MET‐13‐027‐T_Transmittal Form TF/HEG/GRR/022 04/07/2013 FP GRR‐HEG‐MET‐13‐027‐T_Transmittal Form TF/HEG/GRR/022 X Y
GRR‐HEG‐MET‐13‐028‐T GRR‐HEG‐MET‐13‐028‐T_Transmittal Form TF/HEG/GRR/023 11/07/2013 FP GRR‐HEG‐MET‐13‐028‐T_Transmittal Form TF/HEG/GRR/023 X Y
GRR‐HEG‐MET‐13‐029‐T 08/07/2013 by  FP GRR‐HEG‐MET‐13‐029‐T_Transmittal Form TF/HEG/GRR/024 X Y
GRR‐HEG‐MET‐13‐029‐T_Transmittal Form TF/HEG/GRR/024 DHL 

None TF/HEG/GRR/025 TF/HEG/GRR/025 26/07/2013 GG TF/HEG/GRR/025_Generator Rotor Spider X N


GRR‐HEG‐MET‐13‐030‐L None None 26/07/2013 FP GRR‐HEG‐MET‐13‐030‐L_Endurance Tests on Generator Stator Bars  X Y

None TF/HEG/GRR/026 TF/HEG/GRR/026_attachements 31/07/2013 Generator Rotor Rim X N


GRR‐HEG‐MET‐13‐031‐T TF/HEG/GRR/027 GRR‐HEG‐MET‐13‐031‐T_Transmittal Form TF/HEG/GRR/027 30/07/2013 By  GG GRR‐HEG‐MET‐13‐031‐T_Transmittal Form TF/HEG/GRR/027 X N
DHL 
GRR‐HEG‐MET‐13‐032‐T TF/HEG/GRR/028 GRR‐HEG‐MET‐13‐032‐T_Transmittal Form TF/HEG/GRR/028 30/07/2013 By  GG GRR‐HEG‐MET‐13‐032‐T_Transmittal Form TF/HEG/GRR/028 X N
DHL 
None TF/HEG/GRR/029 TF/HEG/GRR/029_Attachements 06/08/2013 GG TF/HEG/GRR/029_Attachements_Generator Shaft and Pole X Y
None TF/HEG/GRR/030 TF/HEG/GRR/030_Attachements 05/08/2013 GG TF/HEG/GRR/030_Excitation System X Y
GRR‐HEG‐MET‐13‐033‐L None  07/08/2013 FP GRR‐HEG‐MET‐13‐033‐L X Letter 
None TF/HEG/GRR/031 TF/HEG/GRR/031_Attachements 13/08/2013 GG TF/HEG/GRR/031_Attachements X Y
None TF/HEG/GRR/032 TF/HEG/GRR/032_Attachements 13/08/2013 GG TF/HEG/GRR/032_Attachements X N
GRR‐HEG‐MET‐13‐034‐L None  None  13/08/2013 FP GRR‐HEG‐MET‐13‐034‐L_Loads on Generator Pit Upper Floor  X Letter 
GRR‐HEG‐MET‐13‐035‐L None  None  22/08/2013 FP Generator and Excitation System Spare Parts for phase 1 & 2 X Letter 
GRR‐HEG‐MET‐13‐036‐T None  GRR‐HEG‐MET‐13‐036‐T_Transmittal TF/HEG/GRR/033_Attacheme 06/09/2013 FP Excitation Transformer and Cable Length X N
None  TF/HEG/GRR/034 TF‐HEG‐GRR‐034_Attachements 09/09/2013 GG TF‐HEG‐GRR‐034_Attachements X N
GRR‐HEG‐MET‐13‐037‐L None  GRR‐HEG‐MET‐13‐037‐L_Attachements 09/09/2013 FP Endurance Tests on Generator Stator Bar X Letter 
None  TF/HEG/GRR/035 TF/HEG/GRR/035_Attachement 10/09/2013 GG TF/HEG/GRR/035 X N
None TF/HEG/GRR/036 TF/HEG/GRR/036_Attachement 16/09/2013 GG TF/HEG/GRR/036 ‐ 1/6 Statro Frame Handeling X Y
GRR‐HEG‐MET‐13‐038‐L None  None  24/09/2013 FP Elevation of Generator Upper Floor  X Letter 
Voir ligne 68 TF/HEG/GRR/037
None TF/HEG/GRR/038 TF/HEG/GRR/038_Attachments  27/09/2013 GG TF/HEG/GRR/038_GENERATOR STATOR FRAME X N
GRR‐HEG‐MET‐13‐039‐T TF/HEG/GRR/039 TF/HEG/GRR/039_Attachements 30/09/2013 FP Transmittal Form TF/HEG/GRR/039 X N
GRR‐HEG‐MET‐13‐040‐T TF/HEG/GRR/037 TF/HEG/GRR/037_Attachements 02/10/2013 FP Transmittal Form TF/HEG/GRR/037 X Y
None TF/HEG/GRR/040 TF/HEG/GRR/040_Attachements 11/10/2013 GG Transmittal Form TF/HEG/GRR/040_Braking Track X Y
GRR‐HEG‐MET‐13‐041‐L None  GRR‐HEG‐MET‐13‐041‐L_Attachement 22/10/2013 FP GRAND RENAISSANCE – Answer to Questions on Excitation Transformer  X Letter
Cables
None TF/HEG/GRR/041 TF/HEG/GRR/041_Attachement 22/10/2013 GG TF/HEG/GRR/041 X N
GRR‐HEG‐MET‐13‐042‐T TF/HEG/GRR/042 TF/HEG/GRR/042_Attachement 31/10/2013 FP Answers to Salini Letter reference P5000‐05.25‐537 regarding Generator  X N
foundations
None TF/HEG/GRR/043 TF/HEG/GRR/043_Attachement 07/11/2013 GG Generator PID X Y
GRR‐HEG‐MET‐13‐043‐L None GRR‐HEG‐MET‐13‐043‐L_Attachement 20/11/2013 GG Response to GERDP‐SCM‐FSU‐13‐364‐CEXT on Excitation System X N réponse au courrier GERDP‐SCM/FSU‐13/3Client\GERDP‐13‐ 364‐RB 
None TF/HEG/GRR/044 TF/HEG/GRR/044_Attachements 22/11/2013 GG Upper Bracket and Upper Guide Bearing X N
GRR‐HEG‐MET‐13‐044‐L None None 26/11/2013 FP Required Information for the Stability Study X Y 23/04/2014 METEC/4/AT28/T/1922/2014
None  None None ‐ answer by email (Sylvain Bouyé)  28/11/2013 SB Exitation system mirror arrangement X N
GRR‐HEG‐MET‐13‐045‐L None None 02/12/2013 FP Stator Bars 1st Unit ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐13‐046‐L TF/HEG/GRR/045 TF/HEG/GRR/045_Attachement 4/12/02013 FP Response to ETD‐2338 Excitation System X N
None TF/HEG/GRR/046 TF/HEG/GRR/046_Attachement 04/12/2013 GG TF/HEG/GRR/046_Attachement X N
GRR‐HEG‐MET‐13‐047‐L None GRR‐HEG‐MET‐13‐047‐L_Attachement 04/12/2013 FP Response to GERDP‐SCM‐FSU‐13‐363‐CEXT on Generator PID X Y Response to GERDP‐SCM‐FSU‐13‐363‐CEXT on Generator PID
GRR‐HEG‐MET‐13‐048‐T TF/HEG/GRR/047 TF/HEG/GRR/047_Attachements 11/12/2013 FP Transmittal of the NDE Shaft Coupling Assembly X N
None TF/HEG/GRR/048 TF/HEG/GRR/048_Attachements 16/12/2013 GG Pole Locking and Pole Connections X N
GRR‐HEG‐MET‐13‐049‐L None None 16/12/2013 FP Rotor Resting Plate on the Erection Bay  X Letter 10/03/2015 GERDP‐JE‐DR‐14‐130‐A
GRR‐HEG‐MET‐13‐050‐L None None 19/12/2013 FP Generator Fire Protection X Y
GRR‐HEG‐MET‐13‐051‐T TF/HEG/GRR/049 TF/HEG/GRR/049_Attachements 20/12/2013 FP Piping and Auxiliary Layout at el500 X Y
GRR‐HEG‐MET‐14‐052‐L None None 07/01/2014 FP Rotor Poles 1st Unit ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐14‐001‐L None None 17/01/2014 FP Stator Bars 1st Unit Factory Acceptance Test confirmation and Rotor  X Y
None TF/HEG/GRR/050 TF/HEG/GRR/050_Attachement 21/01/2014 GG Air Gap and Vibration Monitoring X Y
GRR‐HEG‐MET‐14‐002 TF/HEG/GRR/051 TF/HEG/GRR/051_Attachement 23/01/2014 GG Rotor Embedded Plate Assembly X N
Voir dans chrono COO  TF/HEG/GRR/052 Voir dans chrono COO  31/01/2014 GG Voir dans chrono COO 
GRR‐HEG‐MET‐14‐003 TF/HEG/GRR/053 TF/HEG/GRR/053_Attachement 31/01/2014 FP GRR‐HET‐MET‐14‐002‐L] x N
GRR‐HEG‐MET‐14‐004‐T TF/HEG/GRR/054 TF/HEG/GRR/054_Attachement 07/02/2014 FP Questions on excitation systems X Y nov‐13 Response to ETD 2479
None TF/HEG/GRR/055 TF/HEG/GRR/055_Attachment 10/02/2014 FP Generator equipment X
None TF/HEG/GRR/056 TF/HEG/GRR/056_Attachments 18/02/2014 FP Generator equipment X N
GRR‐HEG‐MET‐14‐005‐L None GRR‐HEG‐MET‐14‐005‐L_Attachments 25/02/2014 FP Stator Bars U9 & SP shipment notification X N
None TF/HEG/GRR/057 TF/HEG/GRR/057_Attachments 25/02/2014 GG Generator equipment X N

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHEG 2/5 09/09/2016


GRR‐HEG‐MET‐14‐006‐L None None 11/03/2014 FP Rotor NDE Shaft Unit 9&10‐Factory Acceptance Test modification X Y
GRR‐HEG‐MET‐14‐007‐L None GRR‐HEG‐MET‐14‐007‐L_Attachment 18/03/2014 FP Stator Core clamping U9 shipment notification X N
GRR‐HEG‐MET‐14‐008‐L None 20/03/2014 FP Information requested for BOP supplier X Y Response to GRR‐MET‐ALS‐14‐017
GRR‐HEG‐MET‐14‐009‐L None 25/03/2014 FP Stator Bars 2nd Unit ‐ Factory Acceptance Test X Y
None TF/HEG/GRR/058 TF/HEG/GRR/058_Attachment 25/03/2014 GG Generator Equipment X N
GRR‐HEG‐MET‐14‐010 (Draft) None None 25/03/2014 MM Draft Tube Elbow Workshop Assembly x Y
GRR‐HEG‐MET‐14‐011‐L None GRR‐HEG‐MET‐14‐011‐L_Attachment 26/03/2014 FP Stator Core shipment notification X N
GRR‐HEG‐MET‐14‐012‐L None None 27/03/2014 FP Rotor Poles 1st Unit, Factory Acceptance Test confirmation X Y
GRR‐HEG‐MET‐14‐013‐L None None 31/03/2014 FP Stator Frame ‐ Factory Acceptance Test X Y
None TF/HEG/GRR/059 TF/HEG/GRR/059_Attachments 02/04/2014 GG Generator equipment X N
GRR‐HEG‐MET‐14‐014‐L None None 04/04/2014 MM Rotor NDE Shaft ‐ Factory Acceptance Test X Y METEC/4/AT28/T/184GERDP‐14‐248 GERDP‐IR‐003
GRR‐HEG‐MET‐14‐015‐T TF/HEG/GRR/060 TF/HEG/GRR/060_Attachments 07/04/2014 FP Generator Design & Erection Bay Layout X N Response to ER 13‐047
GRR‐HEG‐MET‐14‐016‐L None GRR‐HEG‐MET‐14‐016‐L_Attachments 14/04/2014 FP Excitation transformer ‐ Factory Acceptance test X Y
GRR‐HEG‐MET‐14‐017‐L None None 16/04/2014 FP Stator Bars Unit 10 ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐14‐018‐L None None 17/04/2014 FP Co2 Detection X Y 10/03/2015 GERDP‐JE‐DR‐14‐191‐A
GRR‐HEG‐MET‐14‐019‐L None None 17/04/2014 FP Upper Bracket and Upper Guide Bearing X Y Response to GERDP‐13‐043
None TF/HEG/GRR/061 TF/HEG/GRR/061_Attachments 22/04/2014 GG Stator Bars Quality Data Book Unit 09 X N
GRR‐HEG‐MET‐14‐020‐L None GRR‐HEG‐MET‐14‐020‐L_Attachment 22/04/2014 FP Excitation System Unit 9 ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐14‐021‐L None None 25/04/214 MM Stator Frame ‐ Factory Acceptance Test X Y 30/04/2014 GERDP‐14‐247
GRR‐HEG‐MET‐14‐022‐L None None 25/04/214 MM Rotor Spider ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐14‐023‐L None GRR‐HEG‐MET‐14‐023‐L_Attachment 30/04/2014 FP Star Point Connection and Lead to IBP X Y
None TF/HEG/GRR/063 TF/HEG/GRR/063_Attachments 30/04/2014 GG Generator equipment X Y
GRR‐HEG‐MET‐14‐024_L None GRR‐HEG‐MET‐14‐024_L_Attachment 06/05/2014 MM Stator Frame ‐ Factory Acceptance Test Confirmation X Y
GRR‐HEG‐MET‐14‐025‐L None None 07/05/214 MM Rotor Spider ‐ Factory Acceptance Test ‐ Date Modification x Y
GRR‐HEG‐MET‐14‐026‐L None None 07/05/2014 MM Excitation System Unit 9 ‐ Factory Acceptance Test ‐ Final Notification X Y
GRR‐HEG‐MET‐14‐027‐L None None 07/05/2014 MM Excitation System Unit 10 ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐14‐028‐L TF/HEG/GRR/062 TF/HEG/GRR/062_Attachment 12/05/2014 GG Excitation system ‐ Answer to GERDP‐SCM/FSU‐14‐206‐CEXT X Y Response to GERDP‐14‐206
GRR‐HEG‐MET‐14‐029‐L None GRR‐HEG‐MET‐14‐029‐L_Attachment 16/05/2014 FP Rotor rim Parts U9 shipment notification X Y
GRR‐HEG‐MET‐14‐030‐L None GRR‐HEG‐MET‐14‐030‐L_Attachment 19/05/2014 FP Excitation system U10 ‐ Factory Acceptance Test X Y
GRR‐HEG‐MET‐14‐031‐T TF/HEG/GRR/064 TF/HEG/GRR/064_Attachment 21/05/2014 FP Step‐up Transformer Reactance X Y
None TF/HEG/GRR/065 TF/HEG/GRR/065_Attachments_Part 1 22/05/2014 FP Excitation System Factory Acceptance Tests Unit 09 X Y
None TF/HEG/GRR/065 TF/HEG/GRR/065_Attachments _Part 2 22/05/2014 FP Excitation System Factory Acceptance Tests Unit 10 X Y
GRR‐HEG‐MET‐14‐032‐L None GRR‐HEG‐MET‐14‐032‐L_Attachments 22/05/2014 FP Air coolers U9/U10 SP Shipment Notification X Y
GRR‐HEG‐MET‐14‐033‐L None GRR‐HEG‐MET‐14‐033‐L_Attachments 23/05/2014 FP Excitation system ‐ Redundancy Configuration X Y
GRR‐HEG‐MET‐14‐034‐L None None 28/05/2014 FP Excitation System U10 ‐ Factory Acceptance Test confirmation X Y
None TF/HEG/GRR/066 TF/HEG/GRR/066_Attachments 28/05/2014 GG Generator documents X Y
GRR‐HEG‐MET‐14‐035‐L None None 06/06/2014 FP Rotor Spider ‐ Factory Acceptance Test ‐ Date Modification X Y
GRR‐HEG‐MET‐14‐036‐L None None 12/06/2014 FP Generator Mechanical parts and assembly drawings X Y Response to METEC/4/AT28/T/1739/2014
Response to GERDP‐SCM‐FSU‐14‐207‐CEXT‐Shaft Torque under 
GRR‐HEG‐MET‐14‐037‐L None GRR‐HEG‐MET‐14‐037‐L_Attachment 12/06/2014 FP Fault conditions X Y Response to GERDP‐SCM‐FSU‐14‐207‐CEXT
GRR‐HEG‐MET‐14‐038‐L None GRR‐HEG‐MET‐14‐038‐L_Attachment 17/06/2014 FP Generator Fire Protection X Y 29/09/2014 GERDP‐JE‐DR‐14‐104‐A
GRR‐HEG‐MET‐14‐039‐L None None 17/06/2014 FP Excitation cable Arrangement X Y
GRR‐HEG‐MET‐14‐040‐L None GRR‐HEG‐MET‐14‐040‐L_Attachment 24/06/2014 FP Stator Bars U10 shipment notification X Y
GRR‐HEG‐MET‐14‐041‐L None GRR‐HEG‐MET‐14‐041‐L_Attachment 26/06/2014 FP Stator Core U10 ‐ Shipment notification X Y
GRR‐HEG‐MET‐14‐042‐T_Transmittal 
GRR‐HEG‐MET‐14‐042‐T TF/HEG/GRR/067 TF/HEG/GRR/067_Attachments 26/06/2014 FP Generator Technical Documentation X Y Response to GERDP‐SCM/FSU‐14/204/CEXT
None TF/HEG/GRR/068 TF/HEG/GRR/068_Attachments 27/06/2014 EK Excitation System FAT X Y
None TF/HEG/GRR/069 TF/HEG/GRR/069_Attachments 27/06/2014 EK Excitation transformers FAT X Y
GRR‐HEG‐MET‐14‐043‐L GRR‐HEG‐MET‐14‐043‐L_Attachments 30/06/2014 FP Excitation transformers U9_U10_SP Shipment notification X Y
GRR‐HEG‐MET‐14‐044‐L None None 30/06/2014 MM FAT Stator Frame U10 X Y
GRR‐HEG‐MET‐14‐045‐L None GRR‐HEG‐MET‐14‐045‐L_Attachments 30/06/2014 FP Rotor Poles U9 Shipment Notification X Y
Shipment Notification of Generator Upper Guide Bearing for U9 and 
GRR‐HEG‐MET‐14‐046‐L None GRR‐HEG‐MET‐14‐046‐L_Attachments 01/07/2014 FP U10 X Y
None TF/HEG/GRR/070 TF/HEG/GRR/070_Attachments 04/07/2014 EK Fire protection and water cooling X Y
None TF/HEG/GRR/071 TF/HEG/GRR/071_Attachments 08/07/2014 EK Generator documents X Y
None TF/HEG/GRR/072 TF/HEG/GRR/072_Attachments 18/07/2014 EK Generator documents X Y
None TF/HEG/GRR/073 TF/HEG/GRR/073_Attachments 31/07/2014 EK Generator Cross Section X Y
GRR‐HEG‐MET‐14‐047‐L None GRR‐HEG‐MET‐14‐047‐L_Attachments 01/08/2014 FP Generator Upper Shaft U9+U10 and Rotor Rim for U10 X Y
GRR‐HEG‐MET‐14‐048‐L None GRR‐HEG‐MET‐14‐048‐L_Attachments 01/08/2014 FP Generator Excitation System cubicle U9+U10+SP X Y
GRR‐HEG‐MET‐14‐049‐L None GRR‐HEG‐MET‐14‐049‐L_Attachments 01/08/2014 FP Generator Stator Frame U9 shipment notification X Y
GRR‐HEG‐MET‐14‐050‐L None None 29/08/2014 fp guide bearings late availability of vessels X
Rotor Spider U9 and Stator Frame U10 Unavailability of 
GRR‐HEG‐MET‐14‐051‐L None None 05/09/2014 FP transportation means X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHEG 3/5 09/09/2016


GRR‐HEG‐MET‐14‐053‐L None None 05/09/2014 MMRotor Poles Unit 10 ‐ Factory Acceptance Test x Y
GRR‐HEG‐MET‐14‐054‐L None GRR‐HEG‐MET‐14‐054‐L_Attachment 12/09/2014 FPGenerator Oil Cooler U9‐U10‐ SP shipment notification X Y
GRR‐HEG‐MET‐14‐055‐L None GRR‐HEG‐MET‐14‐055‐L_Attachment 18/09/2014 FPGenerators Instrumentation & Control devices X y Answer to GERDP‐SCM/FSU‐14/211/CEXT
None TF/HEG/GRR/074 TF/HEG/GRR/074_Attachments 19/09/2014 FPGenerator Part Lists X
GRR‐HEG‐MET‐14‐056‐L None None 25/09/2014 MMRotor Poles Unit 10 ‐ Factory Acceptance Test Confirmation X Y
None TF/HEG/GRR/075 TF/HEG/GRR/075_Attachments part 1 09/10/2014 EKExcitation system part 1  X y
None TF/HEG/GRR/075 TF/HEG/GRR/075_Attachments part 2 09/10/2014 EKExcitation system part 2 X Y
Voir dans Chrono HET TF/HEG/GRR/076 TF/HEG/GRR/076_Attachments 13/10/2014 FPAnswer to GERDP‐JE‐DR‐202‐A X Y
GRR‐HEG‐MET‐14‐057‐L None None 13/10/2014 FPExcitation voltage rating X Y Answer to GERDP‐JE‐DR‐14‐131‐A
GRR‐HEG‐MET‐14‐058‐L TF/HEG/GRR/077 TF/HEG/GRR/077_Attachments 16/10/2014 FPGenerator closing plates ‐ Answer to GERDP‐JE‐DR‐14‐243‐A X Y Answer to GERDP‐JE‐DR‐14‐243‐A
GRR‐HEG‐MET‐14‐059‐L None GRR‐HEG‐MET‐14‐059‐L_Attachments 28/10/2014 FPShipment Notification of Generator Rotor Poles Unit 10 and Spares X Y
None TF/HEG/GRR/078 TF/HEG/GRR/078_Attachments 04/11/2014 EKTransmittal Form Generator documents X Y
Shipment Notification of Generator Stator Frame U10 and Rotor 
GRR‐HEG‐MET‐14‐060‐L None GRR‐HEG‐MET‐14‐060‐L_Attachments 18/11/2014 FP SpiderU9 X Y
None TF/HEG/GRR/079 TF/HEG/GRR/079_Attachments 25/11/2014 FP TF Generator calculation at overload X Y
GRR‐HEG‐MET‐14‐061‐L None GRR‐HEG‐MET‐14‐061‐L_Attachments 05/12/2014 FP Generator Auxiliaries and slip rings U9 & U10 shipment notification X Y
GRR‐HEG‐MET‐15‐001‐L None None 05/01/2015 MM Rotor Spider Unit 10 ‐ Factory Acceptance Test  X Y
None TF/HEG/GRR/080 TF/HEG/GRR/080_Attachments 06/01/2015 EK Generator documents X Y
GRR‐HEG‐MET‐15‐002‐L None GRR‐HEG‐MET‐15‐002‐L_Attachments 20/01/2015 FP Stator Laminations U10 and Generator Guide Bearing Spare Shipment X Y
GRR‐HEG‐MET‐15‐003‐L None None 26/01/2014 MM Rotor Spider Unit 10 ‐ Factory Acceptance Test Final Notification X N
Rotor Spider Unit 10 ‐ Factory Acceptance Test Final Notification 
GRR‐HEG‐MET‐15‐004‐L None None 29/01/2015 MM Modification x N
GRR‐HEG‐MET‐15‐005‐L None None 30/01/2015 FP Answer to GERDP‐JE‐DR‐14‐233‐A X N
GRR‐HEG‐MET‐15‐006‐L None None 30/01/2015 FP Answer to GERDP‐JE‐DR‐14‐244‐A X N
GRR‐HEG‐MET‐15‐007‐L None None 30/01/2015 FP Answer to GERDP‐JE‐DR‐14‐197‐A X N
GRR‐HEG‐MET‐15‐008‐L None None 30/01/2015 FP Answer to GERDP‐JE‐DR‐15‐208‐A X N
None TF/HEG/GRR/081 TF/HEG/GRR/081_Attachments 05/02/2015 EK Generator Quality Data Book X N
Generator Connexions and miscellaneous equipment U9 & U10 
GRR‐HEG‐MET‐15‐009‐L None GRR‐HEG‐MET‐15‐009‐L_Attachments 13/02/2015 FP shipment notification X N
GRR‐HEG‐MET‐15‐010‐L None GRR‐HEG‐MET‐15‐010‐L_Attachments 23/02/2015 FP Generator Fire Fighting System U9+U10 shipment notification X N
GRR‐HEG‐MET‐15‐011‐L None GRR‐HEG‐MET‐15‐011‐L_Attachments 23/02/2015 FP Generator Upper Brackets U9+10 shipment notification X N
GRR‐HEG‐MET‐15‐012‐L None GRR‐HEG‐MET‐15‐012‐L_Attachments 23/02/2015 FP Shipment Notification of Generator Stator & Rotor Handling Tool X N
Voir dans chrono COO  TF/HEG/GRR/082 TF/HEG/GRR/082_Attachments 23/02/2015 FP TF Generator documents (general documents inspection and test pla X N
GRR‐HEG‐MET‐15‐013‐T TF/HEG/GRR/083 TF/HEG/GRR/083_Attachments 23/02/2015 FP Answer to GERDP‐JE‐DR‐14‐239‐A X N 30/04/2015 GERDP‐JE‐DR‐15‐071
GRR‐HEG‐MET‐15‐014‐L None None 24/02/2015 FP Answer to GERDP-JE-DR-14-082-A X N 30/04/2015 GERDP‐JE‐DR‐15‐258
GRR‐HEG‐MET‐15‐015‐L None None 03/03/2015 FP Answer to GERDP‐JE‐DR‐14‐105‐A X N
GRR‐HEG‐MET‐15‐016‐L None None 07/04/2015 FP Special tools X N
GRR‐HEG‐MET‐15‐017‐L None GRR‐HEG‐MET‐15‐017‐L_Attachments 17/04/2015 FP Generator Rotor Spider U10 Shipment notification X N
GRR‐HEG‐MET‐15‐018‐L None GRR‐HEG‐MET‐15‐018‐L_Attachments 19/05/2015 FP Generator Auxiliaries shipment notification X Y
GRR‐HEG‐MET‐15‐019‐L None GRR‐HEG‐MET‐15‐019‐L_Attachments 19/05/2015 FP Generator Air Guide shipment notification X Y
GRR‐HEG‐MET‐15‐020‐L None 16/06/2015 FP Answer to GERDP‐JE‐DR‐15‐070‐A X Y
GRR‐HEG‐MET‐15‐021‐L None None 30/06/2015 FP Answer to GERDP‐JE‐DR‐15‐026‐A item 4 X Y
None TF/HEG/GRR/084 TF/HEG/GRR/084_Attachments 16/07/2015 FP Generator data book X Y
TF‐HEG‐GRR‐084
None TF/HEG/GRR/085 TF/HEG/GRR/085_Attachment 07/08/2015 EK TF Generator cable list X Y
None TF/HEG/GRR/086 TF/HEG/GRR/086_Attachments 17/09/2015 EK TF Generator cable & consumer lists X Y
None TF/HEG/GRR/087 TF/HEG/GRR/087_Attachments 26/10/2015 EK TF Generator quality data books X Y
GRR‐HEG‐MET‐15‐022‐L None None 21/12/2015 FP Current Transformer Supply clarification X Y
GRR‐HEG‐MET‐16‐001‐L None None 05/01/2016 FP NDE bearing pads Unit 8 final NDT notification X Y
GRR‐HEG‐MET‐16‐002‐L None None 29/01/2016 FP NDE bearing pads Unit 8 final NDT notification X Y
Proposed action plan for the damaged generator stator frame 
GRR‐HEG‐MET‐16‐003‐L None GRR‐HEG‐MET‐16‐003‐L_Attachments 04/02/2016 FP sectors U9&U10 X Y
GRR‐HEG‐MET‐16‐004‐T TF/HEG/GRR/088 TF/HEG/GRR/088_Attachments 05/02/2016 FP Answer to GERDP‐JE‐DR‐15‐210‐A X Y
GRR‐HEG‐MET‐16‐005‐L None GRR‐HEG‐MET‐16‐005‐L_Attachments 10/03/2016 FP Shipment of U8 Stator laminations first batch X Y
GRR‐HEG‐MET‐16‐006‐L None none 11/04/2016 FP Rotor Poles Unit 8 ‐ Factory acceptance test X Y
GRR‐HEG‐MET‐16‐007‐L None GRR‐HEG‐MET‐16‐007‐L_Attachments 12/04/2016 FP Shipment of U7 generator guide bearing X Y
GRR‐HEG‐MET‐16‐008‐L None GRR‐HEG‐MET‐16‐008‐L_Attachments 25/04/2016 FP Progress of the action plan for damaged stator frame sectors U9 & U X Y
None TF/HEG/GRR/089 TF/HEG/GRR/089_Attachments 25/04/2016 EK TF Rotor Pole Coil X Y
GRR‐HEG‐MET‐16‐009‐L None GRR‐HEG‐MET‐16‐009‐L_Attachments 28/04/2016 FP Shipment oh U8 stator laminations second batch X Y
GRR‐HEG‐MET‐16‐010‐L None None 28/04/2016 FP NDE bearing pads Unit 7 final NDT notification X Y
GRR‐HEG‐MET‐16‐011‐L None None 02/05/2016 FP Rotor Poles Unit 8 ‐ Factory acceptance test X Y
GRR‐HEG‐MET‐16‐012‐L TF‐HEG‐GRR‐090 TF‐HEG‐GRR‐090‐L‐Attachments 04/05/2016 FP Generator Frame damages test assembly X Y
GRR‐HEG‐MET‐16‐013‐L None GRR‐HEG‐MET‐16‐013‐L_Attachments 10/05/2016 FP Shipment of U8 Stator laminations first batch X Y

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHEG 4/5 09/09/2016


None TF‐HEG‐GRR‐091 TF‐HEG‐GRR‐091_Attachments 20/05/2016 FP TF Generator quality data books X Y
GRR‐HEG‐MET‐16‐014‐L None GRR‐HEG‐MET‐16‐014‐L_Attachments 27/05/2016 FP Shipment of U8 Stator laminations second batch X Y
Shipment of U8 Stator laminations second batch ‐ Update of GRR‐
GRR‐HEG‐MET‐16‐015‐L None GRR‐HEG‐MET‐16‐015‐L‐Attachments 30/05/2016 FP HEG‐MET‐16‐014‐L X Y
GRR‐HEG‐MET‐16‐016‐L None None 03/06/2016 FP Rotor Poles Unit 6 ‐ Factory acceptance Test X Y
GRR‐HEG‐MET‐16‐017‐L None None 10/06/2016 FP NDE Bearing pads Unit 6  Final NDT Notification X Y
None TF‐HEG‐GRR‐092 TF‐HEG‐GRR‐092‐Attachments 14/06/2016 EK Generator documents X Y
GRR‐HEG‐MET‐16‐018‐L None GRR‐HEG‐MET‐16‐018‐L_Attachments 14/06/2016 FP Shipment of U8 rotor Poles X Y
GRR‐HEG‐MET‐16‐019‐L None GRR‐HEG‐MET‐16‐019‐L_Attachments 17/06/2016 FP Shipment of U7 generator guide bearing X Y
GRR‐HEG‐MET‐16‐020‐L None GRR‐HEG‐MET‐16‐020‐L_Attachments 20/06/2016 FP Shipment of U8 Stator laminations second batch X Y
GRR‐HEG‐MET‐16‐021‐L None GRR‐HEG‐MET‐16‐021‐L_Attachments 21/06/2016 FP Shipment of wiring materials, cables & miscellaneous components X Y
GRR‐HEG‐MET‐16‐022‐L None GRR‐HEG‐MET‐16‐022‐L_Attachments 28/06/2016 FP Shipment of phase 2A generator guide bearing internal cooler sets X Y
GRR‐HEG‐MET‐16‐023‐L None GRR‐HEG‐MET‐16‐023‐L_Attachments 30/06/2016 FP Shipment oh phase 2A generator air coolers X Y
GRR‐HEG‐MET‐16‐024‐L none GRR‐HEG‐MET‐16‐024‐L_Attachments 30/06/2016 FP U8 Excitation system final inspection X Y
GRR‐HEG‐MET‐16‐025‐L None GRR‐HEG‐MET‐16‐025‐L_Attachments 30/06/2016 FP Excitation transformers final inspection X Y
None TF‐HEG‐GRR‐093 TF‐HEG‐GRR‐093_Attachments 01/07/2016 FP Generator quality document X Y
None TF‐HEG‐GRR‐094 TF‐HEG‐GRR‐094_Attachments 01/07/2016 FP Stator Frame Handling X Y
None TF‐HEG‐GRR‐095 TF‐HEG‐GRR‐095_Attachments 01/07/2016 FP Excitation system documents X Y
GRR‐HEG‐MET‐16‐026‐L None GRR‐HEG‐MET‐16‐026‐L_Attachments 07/07/2016 FP Shipment of U6 rotor poles X Y
GRR‐HEG‐MET‐16‐027‐L None GRR‐HEG‐MET‐16‐027‐L_Attachments 26/07/2016 FP Shipment of U8 poles X Y
Shipment of phase 2A air coolers & generator guide bearing internal 
GRR‐HEG‐MET‐16‐028‐L None GRR‐HEG‐MET‐16‐028‐L_Attachments 01/08/2016 FP coolers X Y
Shipment of phase 2A air coolers & generator guide bearing internal 
GRR‐HEG‐MET‐16‐028‐L_Attachments 01/08/2016 FP coolers X Y
GRR‐HEG‐MET‐16‐029‐L None None 08/08/2016 FP Upgrade of phase 1 generators to 400MW X Y
GRR‐HEG‐MET‐16‐030‐L None None 09/08/2016 FP Rotor spider Unit 8 ‐ Factory acceptance test final notification X Y
GRR‐HEG‐MET‐16‐031‐L None None 09/08/2016 FP Rotor NDE Shaft Unit 8 Factory Acceptance test notification X Y
GRR‐HEG‐MET‐16‐032‐L None GRR‐HEG‐MET‐16‐032‐L_ Attachment 11/08/2016 MDN Shipment of U6 generator guide bearing & U7 generator guide bearin X N
GRR‐HEG‐MET‐16‐033‐L None GRR‐HEG‐MET‐16‐033‐L_Attachment 19/08/2016 FP Rotor Poles Unit 7 Factory acceptance test X N
GRR‐HEG‐MET‐16‐034‐L None GRR‐HEG‐MET‐16‐034‐L_Attachment 05/09/2016 FP Shipment of U6 rotor poles X N
GRR‐HEG‐MET‐16‐035‐L None GRR‐HEG‐MET‐16‐035‐L_Attachment 08/09/2016 FP Shipment of miscellaneous phase 2A generator components X N
None TF‐HEG‐GRR‐096 TF‐HEG‐GRR‐096_Attachments 08/09/2016 EK Transmittal Form Excitation System FAT documents X N
None TF‐HEG‐GRR‐097 TF‐HEG‐GRR‐097_Attachments 08/09/2016 EK Transmittal Form Generator Quality Data Book X N

GRAND RENAISSANCE Chrono ‐ To METEC.xlsxHEG 5/5 09/09/2016


GRAND RENAISSANCE CXE ‐ Correspondance To METEC

Response  METEC response to Alstom's letter
To  To 
Reference Attachment to e‐mail Date By Subject required 
METEC Engineer Date Reference Attachment to email
Y/N
GRR‐CXE‐MET‐13‐001‐L GRR‐CXE‐MET‐13‐001‐L_Attachement 09/07/013 Sylvain Bouye CXE‐GRR‐SIT‐001 ‐ Accomodation at site ‐ ALSTOM/COMELEX requirements X Letter

GRR‐CXE‐MET‐13‐002‐L None  27/08/2013 Sylvain Bouye Units 9 & 10 Embedded Pipes PO Progress Report X Letter


GRR‐CXE‐MET‐13‐003‐L GRR‐CXE‐MET‐13‐003‐L_Attachement 08/10/2013 Sylvain Bouye Units 9 & 10 Turbine Coupling Bolts Purchase Order X

GRR‐CXE‐MET‐13‐004‐L None 31/10/2013 Sylvain Bouye Units 9 & 10 Embedded Pipes PO Late delivery X Letter


GRR‐CXE‐MET‐13‐005‐L GRR‐CXE‐MET‐13‐005‐L_Attachement 31/10/2013 Sylvain Bouye Units 9 & 10 Secondary Embedded Pipes Purchase Order X Letter

GRR‐CXE‐MET‐13‐006‐L GRR‐CXE‐MET‐13‐006‐L_Attachement 05/11/2013 Sylvain Bouye Guide Line for Site Storage and Workshop Area X Letter


GRR‐CXE‐MET‐13‐007‐L CXE\GRR‐CXE‐MET‐007‐L Process  27/11/2013 Sylvain Bouye Procedure for Purchase orders Treatment by Metec X Letter
Purchase orders_ Attachement.pdf
GRR‐CXE‐MET‐13‐008‐L Purchase Order GRR11.2013.001 V1  27/11/2013 Sylvain Bouye Units 9 & 10 Generator Braking Tracks & Associated parts Purchase Order X Letter
Generator Braking Tracks & Associated 
parts
GRR‐CXE‐MET‐13‐009‐L CXE\GRR‐CXE‐MET‐13‐009‐ 06/12/2013 Sylvain Bouye Industrial Transfer Metec Production means Audit report X Letter
L_Attachement.zip
GRR‐CXE‐MET‐13‐010‐L CXE\GRR‐CXE‐MET‐13‐010‐ 11/12/2013 Sylvain Bouye Generator coupling bolts to be supplied by Metec ‐ Purchase order X
L_Attachement GEN COUPLING 
BOLTS.zip
GRR‐CXE‐MET‐14‐001‐L CXE\GRR‐CXE‐MET‐14‐001‐L_Delay in  30/01/2014 Sylvain Bouye Site mobilisation ‐ Delay in Onshore payment X Letter
Onshore payment_Attachment.zip

GRR‐CXE‐MET‐14‐002‐L CXE\GRR‐CXE‐MET‐14‐002‐ 19/02/2014 Sylvain Bouye Units 9 & 10 Rotor Embebbed Plates Purchase Order X Letter


L_Documents PO GRR022014‐
001_Attachments.zip
GRR‐CXE‐MET‐14‐003‐L CXE\GRR‐CXE‐MET‐14‐003‐ 20/02/2014 Sylvain Bouye Units 9 & 10 Stator Stacking Tool Purchase Order X Letter
L_Documents PO GRR022014‐002.zip
GRR‐CXE‐MET‐14‐004‐L CXE\GRR‐CXE‐MET‐14‐004‐ 20/02/2014 Sylvain Bouye Units ‐ 9 & 10 Stator temporary bar wedging Purchase Order X Letter
L_Documents PO GRR022014‐
003_Attachments.zip
TF/CXE/GRR/001 TF/CXE/GRR/001_Attachment 24/02/2014 Sylvain Bouye Draft Tube Elbow Parts Inspection X
GRR‐CXE‐MET‐14‐005‐L None 24/02/2014 Sylvain Bouye Revised Purchase Order GRR‐09‐2013‐001 V2 Turbine Coupling Bolts to be supplie X Letter
TF/CXE/GRR/002 TF/CXE/GRR/002_Attachment 25/02/2014 Sylvain Bouye Field Quality Working Plan for Embedded Pïpes ‐ Guide lines X TF
TF/CXE/GRR/003 TF/CXE/GRR/003_Attachment 20/03/2014 Sylvain Bouye Site Storage and Workshop Guideline Rev B X TF
TF/CXE/GRR/004 21/03/2014 Sylvain Bouye Erection Procedure X TF
GRR‐CXE‐MET‐14‐006‐L CXE\GRR‐CXE‐MET‐14‐006‐L_COMELEX ‐  12/03/2014 Sylvain Bouye Phase 1 ‐ Advance Payment For On shore Portion X Letter
PH1 PAYMENT REQUEST 
ADVANCE_Attachment.pdf

GRR‐CXE‐MET‐14‐007‐L 21/03/2014 Sylvain Bouye Site mission Report X Letter


TF/CXE/GRR/004 TF/CXE/GRR/004_Attachment 25/03/2014 Sylvain Bouye Erection Procedure ‐ Embedded Part Installation X TF
TF/CXE/GRR/005 TF/CXE/GRR/005_Attachment 02/04/2014 Sylvain Bouye Generator Rotor Embedded Plate X TF
GRR‐CXE‐MET‐14‐008‐L 02/04/2014 Sylvain Bouye Genrator Upper Floor Assembly to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐009‐L 02/04/2014 Sylvain Bouye Generator Pit Closing to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐010‐L 02/04/2014 Sylvain Bouye Generator Top Cover Assembly to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐011‐L 02/05/2014 Sylvain Bouye Generator main cooling piping to be supplied by Metec X Letter
TF/CXE/GRR/006 TF/CXE/GRR/006_Attachments 21/05/2014 Sylvain Bouye Erection procedure ‐ Generator Stator X TF
GRR‐CXE‐MET‐14‐012‐L 22/05/2014 Sylvain Bouye Generator Upper Bracket Piping to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐013‐L 27/05/2014 Sylvain Bouye Partial ETB Advance Payment Ph 1 On X Letter
GRR‐CXE‐MET‐14‐014‐L 09/06/2014 Sylvain Bouye Site Medical Facilities X Letter
GRR‐CXE‐MET‐14‐015‐L 13/06/2014 Sylvain Bouye Site visit request X Letter
GRR‐CXE‐MET‐14‐016‐L 18/06/2014 Sylvain Bouye Revised Purchase Order GRR‐09‐2013‐001 V3 Turbine Coupling Bolts to be  X Letter
supplied by Metec
GRR‐CXE‐MET‐14‐017‐L 18/06/2014 Sylvain Bouye Revised Purchase Order GRR‐03‐2013‐001 V3 Turbine Primary Embedded Pipes to  X Letter
be Supplied by Metec
TF/CXE/GRR/007 TF/CXE/GRR/007_Attachments 24/06/2014 Sylvain Bouye Spiral Case Blank Erection Procedure in Factory X TF
GRR‐CXE‐MET‐14‐018‐L 24/06/2014 Sylvain Bouye Generator Common Tools to be supplied by Metec ‐ Purchase order GRR‐06‐2014‐ X Letter
GRR‐CXE‐MET‐14‐019‐L 24/06/2014 Sylvain Bouye Generator Rim Stacking Tool to be supplied by Metec ‐ Purchase order GRR‐06‐201 X Letter
GRR‐CXE‐MET‐14‐020‐L 01/07/2014 Sylvain Bouye Delay in Civil Works activities X Letter
GRR‐CXE‐MET‐14‐021‐L 01/07/2014 Sylvain Bouye Instruction Handling and Storage HTL7 55 8000 X Letter
GRR‐CXE‐MET‐14‐022‐L 03/07/2014 Sylvain Bouye Coupling bolts and braking tracks X Letter
None
GRR‐CXE‐MET‐14‐022‐L_300720 30/07/2014
GRR‐CXE‐MET‐14‐023‐L 03/07/2014 Sylvain Bouye Generator braking jack tools to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐024‐L 03/07/2014 Sylvain Bouye Generator Oli & Dust Exhaut Pipes to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐025‐L 03/07/2014 Sylvain Bouye Generator Braking & Lifting Piping to be supplied by Metec X Letter
TF/CXE/GRR/008 TF/CXE/GRR/008_Attachments 03/07/2014 Sylvain Bouye Generator Erection Manual X TF
GRR‐CXE‐MET‐14‐026‐L None 07/08/2014 Sylvain Bouye Preparation of hand over from Civil Work X Letter
GRR‐CXE‐MET‐14‐027‐L None 29/08/2014 Sylvain Bouye Generator Stator Scaffolding to be supplied by Metec X Letter
GRR‐CXE‐MET‐14‐028‐L 18/09/2014 Sylvain Bouye Site mission Report X Letter
GRR‐CXE‐MET‐14‐029‐L None 29/09/2014 Sylvain Bouye Turbine inspection platform  to be supplied by Metec ‐ PO GRR‐09‐2014‐001 X Letter
GRR‐CXE‐MET‐14‐030‐L None 03/10/2014 Sylvain Bouye Site visit request X Letter
GRR‐CXE‐MET‐14‐031‐L None 24/10/2014 Sylvain Bouye Site Expert Supervision Mobilisation X Letter
GRR‐CXE‐MET‐14‐032‐L None 07/11/2014 Sylvain Bouye Scans of Not negociable copy ‐ Bill of Lading X Letter
GRR‐CXE‐MET‐14‐033‐L P1 None 07/11/2014 Sylvain Bouye Transport & Logistic Investigation Report part 1 X Letter
GRR‐CXE‐MET‐14‐033‐L P2 None 10/11/2014 Sylvain Bouye Transport & Logistic Investigation Report part 2 X Letter
GRR‐CXE‐MET‐14‐034‐L None 11/11/2014 Sylvain Bouye Generator Rim Stacking Tool to be supplied by Metec ‐ Updated Purchase Order  X Letter
GRR‐06‐2014‐001 V2
CXE\GRR‐CXE‐MET‐14‐035 L_SiteNone 17/11/2014 Sylvain Bouye Site Expert Supervision ‐ Mobilisation for erection of Pier Nose and Drainage Box X Letter
GRR‐CXE‐MET‐14‐036‐L None 18/11/2014 Sylvain Bouye Scans of Not negociable copy ‐ Bill of Lading X Letter
GRR‐CXE‐MET‐14‐037‐L None 25/11/2014 Sylvain Bouye Paint data sheets & MSDS X Letter
GRR‐CXE‐MET‐14‐038‐L None 25/11/2014 Sylvain Bouye Site Expert supervision ‐ Arrival of new supervisor X Letter
TF‐CXE‐GRR‐009 None 28/11/2014 Sylvain Bouye Progress Payment requests X TF
TF‐CXE‐GRR‐010 TF‐CXE‐GRR‐010_Attachments 08/12/2014 Sylvain Bouye Erection procedures & inspection sheets ‐ Generator X TF
GRR‐CXE‐MET‐14‐039‐L None 18/12/2014 Sylvain Bouye Turbine Aerial Pipes to be supplied by Metec ‐ PO GRR 112014‐001 X Letter
GRR‐CXE‐MET‐15‐001‐L None 16/01/2015 Sylvain Bouye Distributor inspection Platform to be supplied by Metec ‐ PO GRR‐12‐2014‐001 X Letter
GRR‐CXE‐MET‐15‐002‐L None 28/01/2015 Sylvain Bouye Recommandations following first erection activities X Letter
GRR‐CXE‐MET‐15‐003‐L None 28/01/2015 Sylvain Bouye Storage conditions in Bishoftu bonded warehouse X Letter
GRR‐CXE‐MET‐15‐004‐L None 17/02/2015 Sylvain Bouye Generator Rotor Scaffolding to be supplied by Metec X Letter
GRR‐CXE‐MET‐15‐005‐L None 04/03/2015 Sylvain Bouye Turbine piping valves to be supplied by Metec ‐ PO GRR‐02‐2015‐002 X Letter
Pas de ref juste un mail None 09/03/2015 Sylvain Bouye Big shipment from China ‐ Runner X Letter
TF‐CXE‐GRR‐011 None 10/03/2015 Sylvain Bouye TF Erection tools lists ‐ Turbine & Generator X TF
GRR‐CXE‐MET‐15‐006‐L None 11/03/2015 Sylvain Bouye Residence renewal for resident manager X Letter
GRR‐CXE‐MET‐15‐007‐L None 11/03/2015 Sylvain Bouye Supervisor work permit X Letter
GRR‐CXE‐MET‐15‐008‐L None 16/03/2015 Sylvain Bouye Site generator requirements for testing X Letter
GRR‐CXE‐MET‐15‐009‐L None 19/03/2015 Sylvain Bouye Site visit request for M Neier and Mekonnen X Letter
GRR‐CXE‐MET‐15‐010‐L None 24/03/2015 Sylvain Bouye Revised Purchase Order GRR11‐2014‐001‐V2 for Turbine Aerial Pipes X Letter
GRR‐CXE‐MET‐15‐011‐L None 08/04/2015 Sylvain Bouye Draft tube concreting works X Letter
GRR‐CXE‐MET‐15‐012‐L None 30/04/2015 Sylvain Bouye Visit request for Mr Neier and Mekonnen X Letter 30/04/2015 no ref, juste un mail
GRR‐CXE‐MET‐15‐013‐L None 07/05/2015 Sylvain Bouye Request for support X Letter
GRR‐CXE‐MET‐15‐014‐L None 08/05/2015 Sylvain Bouye Scans of Not negociable copy ‐ Bill of Lading X Letter
GRR‐CXE‐MET‐15‐015‐T TF/GRR/CXE/012 13/05/2015 Sylvain Bouye Turbine embedded Parts Field Quality Working Plan X Letter & TF
GRR‐CXE‐MET‐15‐016‐L None 12/06/2015 Sylvain Bouye Revised Purchase Order GRR‐05‐2015‐001 V2 Generator Upper Bracket Piping X Letter
GRR‐CXE‐MET‐15‐017‐L None 12/06/2015 Sylvain Bouye Revised Purchase Order GRR‐06‐2014‐005 V2 Generator Bracking and Lifting Pipin X Letter
GRR‐CXE‐MET‐15‐018‐L None 12/06/2015 Sylvain Bouye Turbine Governing Piping Purchase Order X Letter
GRR‐CXE‐MET‐15‐019‐L None 23/06/2015 Sylvain Bouye Industrial Transfer Phase 2 ‐ Visit of Mr Reboul X Letter
GRR‐CXE‐MET‐15‐020‐L None 03/07/2015 Sylvain Bouye Handling of heavy parts at site X Letter
GRR‐CXE‐MET‐15‐021‐L None 06/07/2015 Sylvain Bouye Revised Purchase Order GRR11‐2014‐001‐V3 for Turbine Aerial Pipes X Letter
Generator docs X Letter
GRR‐CXE‐MET‐15‐022‐L 15/07/2015 Sylvain Bouye Phase 2A ‐ METEC scope of supply
Turbine docs
GRR‐CXE‐MET‐15‐023‐L None 20/07/2015 Sylvain Bouye Spiral case site welding X Letter
GRR‐CXE‐MET‐15‐024‐L None 23/07/2015 Sylvain Bouye Turbine servomotor motor tool to be supplied by Metec X Letter
GRR‐CXE‐MET‐15‐025‐L None 24/07/2015 Sylvain Bouye Phase 2a Turbine embedded pipes to be supplied by Metec X Letter
GRR‐CXE‐MET‐15‐026‐L None 31/07/2015 Sylvain Bouye Answer to comments on site quality working plans X Letter
TF/GRR/CXE/013 None 06/08/2015 Sylvain Bouye Site Quality Plan guidelines for Metec X TF
GRR‐CXE‐MET‐15‐027‐L None 12/08/2015 Sylvain Bouye Business visa of site expert supervisor X Letter
GRR‐CXE‐MET‐15‐028‐L None 03/09/2015 Sylvain Bouye Welding documents for draft tube elbow installation X Letter
GRR‐CXE‐MET‐15‐028A‐L None 31/08/2015 Bisrat reda Supporting letter for custom process X Letter
GRR‐CXE‐MET‐15‐029‐L None 15/09/2015 Bisrat reda Supporting letter for work permit X Letter
GRR‐CXE‐MET‐15‐030‐L None 16/09/2015 Sylvain Bouye Site visit request form X Letter
GRR‐CXE‐MET‐15‐031‐L None 17/09/2015 Sylvain Bouye Draft Tube Elbow Installation / WPS X Letter
GRR‐CXE‐MET‐15‐032‐L None 07/10/2015 Sylvain Bouye Comments on draft quality working plan X Letter
GRR‐CXE‐MET‐15‐033‐L None 30/09/2015 Sylvain Bouye Turbine Bearing and Shaft Seal dismantling tool ‐ To be supplied by Metec X Letter
GRR‐CXE‐MET‐15‐034‐L None 26/10/2015 Sylvain Bouye Certificates and inspections for material being installed at Site X Letter
GRR‐CXE‐MET‐15‐035‐L None 26/10/2015 Sylvain Bouye Notifications for inspections at Site X Letter
GRR‐CXE‐MET‐15‐036‐L None 26/10/2015 Sylvain Bouye Welders qualifications X Letter
GRR‐CXE‐MET‐15‐037‐L None 10/11/2015 Sylvain Bouye Approved of change request GRR‐HET‐MET‐CRF‐0004 X Letter
GRR‐CXE‐MET‐15‐038‐L None 25/11/2015 Sylvain Bouye October 2015 payment request X Letter
GRR‐CXE‐MET‐15‐039‐L None 25/11/2015 Sylvain Bouye Payment Request for december 2014 progress unpaid amount X Letter
TF‐CXE‐GRR‐014 None 15/12/2015 Sylvain Bouye Phase 2 Tur manufacturing documents paper X TF
TF‐CXE‐GRR‐015 None 15/12/2015 Sylvain Bouye Erection document ‐ Generator Field Modification X TF
TF‐CXE‐GRR‐016 None 18/12/2015 Sylvain Bouye Phase 2 Gen manufacturing docs paper X TF
GRR‐CXE‐MET‐16‐001‐L None 03/02/2016 Sylvain Bouye Draft tube Cones upper parts and stay rings installation X
GRR‐CXE‐MET‐16‐002‐L None 03/02/2016 Sylvain Bouye Delivery at site by Metec of rotor embedded plates (PO GRR02‐2014‐001) X
GRR‐CXE‐MET‐16‐003‐L None 12/02/2016 Sylvain Bouye Mobilization of an expert for supporting METEC on local fabrication of Ph 2a  X
components
GRR‐CXE‐MET‐16‐004‐L None 15/02/2016 Sylvain Bouye Mobilization of an expert for supporting METEC on local fabrication of Ph 2a  X
components
GRR‐CXE‐MET‐16‐005‐L None 23/02/2016 Sylvain Bouye Comments on welding book ref GERDP‐METEC‐F‐QMC‐PQS124.WB01 X Letter
GRR‐CXE‐MET‐16‐006‐L None 01/03/2016 Sylvain Bouye Rotor Embedded Plate PO n° GRR‐02‐2014‐001.V2 X Letter
GRR‐CXE‐MET‐16‐007‐L None 08/03/2016 Sylvain Bouye Inspection report of Pier Nose Unit 06 X Letter
GRR‐CXE‐MET‐16‐008‐L None 22/03/2016 Sylvain Bouye Work permit of local fabrication expert supervisor X Letter
GRR‐CXE‐MET‐16‐009‐L None 25/03/2016 Sylvain Bouye Renewal of Resident Id's X Letter
TF‐CXE‐GRR‐017 None 31/03/2016 Sylvain Bouye Generator Field Modification procedure X TF
GRR‐CXE‐MET‐16‐010‐L None 01/04/2016 Sylvain Bouye Topographer supervision for stay ring positioning X Letter
GRR‐CXE‐MET‐16‐011‐L None 05/04/2016 Sylvain Bouye Expertise during unloading at Djibouti port X Letter
GRR‐CXE‐MET‐16‐012‐L None 29/04/2016 Sylvain Bouye Preconditions for mobilization of welding supervisor for stay ring X Letter
GRR‐CXE‐MET‐16‐013‐L None 17/05/2016 Sylvain Bouye Lifting equipment for stay ring positioning X Letter
GRR‐CXE‐MET‐16‐014‐L None 26/05/2016 Sylvain Bouye Requesting support letter for tools importation X Letter
GRR‐CXE‐MET‐16‐015‐L None 30/05/2016 Sylvain Bouye Requesting support letter for  temporary tracker laser importation X Letter
GRR‐CXE‐MET‐16‐016‐L None
GRR‐CXE‐MET‐16‐017‐L None
GRR‐CXE‐MET‐16‐018‐L None 30/06/2016 Sylvain Bouye
Requesting support letter for AWB#176‐23995753 X Letter
GRR‐CXE‐MET‐16‐019‐L None 30/06/2016 Sylvain Bouye
Welding of Spiral case X Letter
GRR‐CXE‐MET‐16‐020‐L None 30/06/2016 Sylvain Bouye
Use at site of specific turbine & generator parts X Letter
GRR‐CXE‐MET‐16‐021‐L None 07/07/2016 Sylvain Bouye
Support for immigration process X Letter
None 19/07/2016 Sylvain Bouyeyour mail title « regarding Alstom supervisor » dated July 4th, 2016 and your  X Letter
GRR‐CXE‐MET‐16‐022‐L comments about available equipment and tools
None 19/07/2016 Sylvain Bouye your mail title « regarding Alstom supervisor » dated july 4th, 2016 and your  X Letter
GRR‐CXE‐MET‐16‐023‐L comments about his sharing of skills with Metec workers
Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
Taye 31/10/2012 C&B‐ELC GERDP‐12‐211 30/10/2012 ER's comments to METEC Early Generation Documents
GRR‐MET‐ALS‐12‐001 Wegayehu 31/10/2012 C&B‐ELC GERDP‐12‐212 30/10/2012 ER's comments to Alstom document ETOF‐GEN‐012‐067_1
Wegayehu 08/11/2012 UHP GMO‐1992 07/11/2012 UHP Comments on Alstom's document ETOF‐GEN‐012‐067
GRR‐MET‐ALS‐12‐002 Wegayehu 02/12/2012 C&B‐ELC GERDP‐12‐227 20/11/2012 Centralised oil system Not really relevant for Alstom ?
GRR‐MET‐ALS‐12‐003 Taye 22/11/2012 UHP HMD_2181eng HMD_2181eng_attachments 20/11/2012 UHP Comments on embedded piping TL001_A, TL002_A & LC007_A
Taye 23/11/2012 UHP GMO‐2208 22/11/2012 Cooling water temperature 20/02/2013 GRR‐COO‐MET‐13‐008‐L
GRR‐MET‐ALS‐12‐004 Taye 23/11/2012 UHP GMO_2211eng GMO_2211eng‐attachments 23/11/2012 UHP Comments on embedded piping TL001_A, TL002_A & LC007_A e‐mail FP 26/11/12 requesting confirmation that Alstom Turbine cross section is integrated in the 
GRR‐MET‐ALS‐12‐005 Wegayehu 02/12/2012 SALINI 12 11 27_05.25‐299 27/11/2012 Salini's Comments on ALSTOM Documents
GRR‐MET‐ALS‐12‐006 Teshome 05/12/2012 UHP Answer letter GRR‐HET‐MET‐12‐011‐ 27/11/2012 Answer letter GRR‐HET‐MET‐12‐011‐T ‐ Balancing pipe X
T
GRR‐MET‐ALS‐12‐007 Taye 28/11/2012 UHP GMO‐No Ref ‐ Cross section GMO‐No Ref‐Cross  28/11/2012 Cross section 1559‐14‐69C as per Alstom cross section
section_attachment
GRR‐MET‐ALS‐12‐008 Taye 30/11/2012 UHP GMO_2248 ENG GMO_2248 ENG_attachment 28/11/2012 development of ℓeveℓ 2  technological systems 
HPP GERDP
GRR‐MET‐ALS‐12‐009 Wegayehu 02/12/2012 C&B‐ELC GERDP‐12‐234 30/11/2012 METEC Facilities on the Left Bank Letter to Salini ‐> For info only
GRR‐MET‐ALS‐12‐010 Wegayehu 03/12/2012 METEC Answer to GRR‐HEG‐MET‐12‐008‐L 03/12/2012 Erection Bay Arrangement X
GRR‐MET‐ALS‐12‐011 Taye 04/12/2012 UHP GMO_2274 ENG 04/12/2012 Comments on Workshop layout GRR‐COO‐MET‐12‐013‐L
Taye 11/12/2012 UHP GMO‐2335 10/12/2012 EoT Crane distance between hooks GRR‐HEG‐MET‐12‐010‐L
Taye 16/12/2012 C&B‐ELC GERDP‐12‐261 14/12/2012 Delivery of EPC Contracotr's Comments on Plant Contractor's design  09/01/2013 GRR‐COO‐MET‐13‐001‐L
documents
GRR‐MET‐ALS‐12‐012 Taye 17/12/2012 C&B‐ELC GERDP‐12‐259 Comments on Alstom Technical  13/12/2012 ER's comments on Alstom Technical Deviation List
Deviations List
GRR‐MET‐ALS‐12‐013 Wegayehu 24/12/2012 METEC Answer to GRR‐HEG‐MET‐12‐010‐L Pril_Mail02_1323 24/12/2012 Powerhouse crane hook dimensions ‐ Answer GRR‐HEG‐MET‐12‐010‐L X

GRR‐MET‐ALS‐13‐001 hand‐ remittal 18/01/2013 METEC METEC‐AT11‐T‐14669‐2013 18/01/2013 Runners for Early Generation ‐ Instruction


GRR‐MET‐ALS‐13‐002 Wegayehu 30/01/2012 C&B‐ELC GERDP‐13‐010 203‐SHA‐R‐SP‐001‐B, Seismic Hazard  07/01/2013 Delivery of Level 1 Design Seismic Hazard Analysis 30/01/2013 GRR‐COO‐MET‐13‐004‐L
Analysis, Dec 2012
GRR‐MET‐ALS‐13‐003 Wegayehu 30/01/2012 C&B‐ELC GERDP‐13‐011 GERDP ‐ ER Comments on Alstom   09/01/2013 ER's comments on Draft Tube General Arrangement, Pier Nose & Cone
Transmittal Form TF‐HET‐GRR‐006
GRR‐MET‐ALS‐13‐004 Wegayehu 30/01/2012 SALINI SAL‐05.25‐314 L1D River Backwater  12/12/2013 Level 1 Design: River Backwater Profiles
Profiles
GRR‐MET‐ALS‐13‐005 Teshome 31/01/2013 METEC Power house drawings Power house drawings_attachments 31/01/2013 Powerhouse drawing

GRR‐MET‐ALS‐13‐006 Wegayehu 06/02/2013 UHP GMO_237 04/02/2013 Clarifications and questions ‐ Contract No. 12/02‐GERDP 22.07.2012 ‐  Y 20/02/2013 GRR‐COO‐MET‐13‐007‐L GRR‐COO‐MET‐13‐007‐
Level 1 Design of the Right Bank and Left Bank Powerhouses and  L_Responses to Questions 
Switchyard GMO‐237_attachments

GRR‐MET‐ALS‐13‐007 Getachew 06/03/2013 C&B‐ELC GERDP‐13‐067 26/02/2013 Turbine ‐ Wicket Gate Leakage X Y 31/01/2014 GRR‐HET‐MET‐14‐002‐L


GRR‐MET‐ALS‐13‐008 Getachew 06/03/2013 C&B‐ELC GERDP‐13‐068 GERDP‐SCM_FSU‐130_68_CEXT‐ 26/02/2013 Alstom ‐ Turbine and Generator Design Document 3 ‐ Clearance for 
attachment‐Design Live Loads for Site  Equipment Transportation
Bridge Answer to Alstom letter GRR‐COO‐MET‐13‐005‐L
GRR‐MET‐ALS‐13‐009 Getachew 06/03/2013 C&B‐ELC GERDP‐13‐073 27/02/2013 Draft Tube General Liner Extension
GRR‐MET‐ALS‐13‐010 Wegayehu 08/03/2013 UHP GMO_465 GМО_465‐Attachments 05/03/2013 Comments on the system of technical water supply 12/03/2013 COO\GRR‐COO‐MET‐13‐013‐L_Temperature of Cooling Water.pdf
Reponse de UHP sur les températures cooling
GRR‐MET‐ALS‐13‐011 Tesfaye 15/03/2013 C&B‐ELC GERDP‐13‐061 21/02/2013 Alstom ‐ Turbine & Generator Design Document 3 ‐ Runner Platform Transfere GRR HET MET 13 005 L à SALINI

GRR‐MET‐ALS‐13‐012 Tesfaye 15/03/2013 C&B‐ELC GERDP‐13‐063 21/02/2013 Alstom ‐ Turbine & Generator Design Document 3 ‐ Generator  Transfere GRR HETG MET 13 003 T à SALINI


Foundation loads
GRR‐MET‐ALS‐13‐013 Tesfaye 15/03/2013 C&B‐ELC GERDP‐13‐080 08/03/2013 Comments on Alstom GRR HET‐MET‐13‐003‐L  Major input data
GRR‐MET‐ALS‐13‐014 Tesfaye 15/03/2013 C&B‐ELC GERDP‐13‐085 11/03/2013 Comments on METEC/Alstom drawings Level 1 layout
GRR‐MET‐ALS‐13‐015 in meeting 20/03/2013 C&B‐ELC GERDP‐13‐086 11/03/2013 Transmission of seismic data
GRR‐MET‐ALS‐13‐016 F. del‐brenna 20/03/2013 C&B‐ELC GERDP‐13‐087 GERDP‐13‐087 ‐ Transmission of  12/03/2013 Transmission of seismic data
SeismicAccelerations Data 
attachement.zip
GRR‐MET‐ALS‐13‐017 Tesfaye 13/04/2013 C&B‐ELC GERDP‐13‐104 Salini Letter 05.25‐426 02/04/2013 ER & Salini comments on Erection bay layout 03/05/2013 HEG\GRR‐HEG‐MET‐13‐015‐L_Minimimum Height of Crane H HEG\GRR‐HEG‐MET‐13‐01
GRR‐MET‐ALS‐13‐018 Tesfaye 13/04/2013 C&B‐ELC GERDP‐13‐105 Salini Letter 05.25‐399 02/04/2013 Salini comments on Generator Foundation Loads 30/04/2013 HEG\GRR‐HEG‐MET‐13‐011‐T_Generator Foundation Loads_GHEG\GRR‐HEG‐MET‐13‐01
GRR‐MET‐ALS‐13‐019 Tesfaye 13/04/2013 C&B‐ELC GERDP‐13‐107 02/04/2013 Salini comments on Draft Tube Request by e‐mail to have the Salini letter (not produced)
GRR‐MET‐ALS‐13‐020 Wegayehu 13/04/2013 C&B‐ELC GERDP‐13‐108 02/04/2013 ER Comment on Draft tube drawing profile
GRR‐MET‐ALS‐13‐021 Wegayehu 22/04/2013 C&B‐ELC GERDP‐13‐129 205‐GEN‐RD‐D‐153 ‐ Bridge Crane 12/04/2013 Powerhouse bridge Crane clearance
GRR‐MET‐ALS‐13‐022 Getachew 10/05/2013 C&B‐ELC GERDP‐13‐137 26/04/2013 Alstom proposal for partial penetration welds 04/07/2013 HET\GRR‐HET‐MET‐13‐033‐L Partial penetration welds.pdf
GRR‐MET‐ALS‐13‐023 hand‐ remittal 19/04/2013 METEC METALE/2/HG/7/847/2013 18/01/2013 Letter for commencement
GRR‐MET‐ALS‐13‐024 Wegayehu 10/05/2013 EEPCo GERDP‐6.05.8.13 Compensation sizig study for grid  06/05/2013 500kV Transmission line Study
connection of GERDP Power Plant
GRR‐MET‐ALS‐13‐025 Getachew 18/05/2013 C&B‐ELC GERDP‐13‐153 Salini Letter 05.25‐391 10/05/2013 ER & Salini comments on Spiral Case preliminary Design 10/06/2013 GRR‐HET‐MET‐13‐023‐L
GRR‐MET‐ALS‐13‐026 Teshome 20/05/2013 C&B‐ELC GERDP‐13‐154 10/05/2013 Right Bank Power House L1 Design‐ Preliminary Comments
GRR‐MET‐ALS‐13‐027 Teshome 20/05/2013 C&B‐ELC GERDP‐13‐155 10/05/2013 L1 Design Power Intake Lay‐out Not relevant for Alstom
GRR‐MET‐ALS‐13‐028 Getachew 22/05/2013 C&B‐ELC GERDP‐13‐160 20/05/2013 Comments on Alstom GRR HET‐MET‐13‐014‐L  Hydraulic deviations 19/07/2013 HET\GRR‐HET‐MET‐13‐037‐L Pressure Fluctuations.pdf
GRR‐MET‐ALS‐13‐029 Getachew 21/06/2013 C&B‐ELC GERDP‐13‐210 19/06/2013 ER_ Comments on Stay Ring  Spiral Case Calculation 02/07/2013 GRR‐HET‐MET‐13‐031‐L
GRR‐MET‐ALS‐13‐030 Getachew 21/06/2013 C&B‐ELC GERDP‐13‐212 19/06/2013 ER_ Comments on Draft Tube Liner Calculations 02/07/2013 GRR‐HET‐MET‐13‐032‐L
GRR‐MET‐ALS‐13‐031 Wegayehu  13/07/2013 UHP GTO_1550 UHP‐GTO_1550_attachement.zip 12/07/2013 Answer on the question of the MoM dated 16‐06‐2013   X Y 07/08/2013 COO\GRR‐COO‐MET‐13‐030‐L_Responses to Questions GTO‐1COO\GRR‐COO‐MET‐13‐0
GRR‐MET‐ALS‐13‐032 Wegayehu  20/07/2013 C&B‐ELC GERDP‐13‐247 None 12/07/2013 Plant Contractor's Powerhouse Level 1 Design  X X X Y
GRR‐MET‐ALS‐13‐033 Yishak  22/07/2013 C&B‐ELC GERDP‐13‐255 None  17/07/2013 Comments on Alstom Document EHESC13051 X Y 09/09/2013 ER comments addressed in the Final Model Test Report, See TF/HET/GRR/030 dated 09/09/2013
GRR‐MET‐ALS‐13‐034 Yishak  22/07/2013 C&B‐ELC GERDP‐13‐256 None  18/07/2013 Tests on Generator Stator Bars  X Y 26/07/2013 HEG\GRR‐HEG‐MET‐13‐030‐L_Endurance Tests on Generator Stator Bars.pdf
GRR‐MET‐ALS‐13‐035 Wegayehu  20/07/2013 C&B‐ELC GERDP‐13‐248 Letter from Salini 05,25‐524 12/07/2013 Comment on Plant Contractor's Powerhouse Level 1 Design  X X N
GRR‐MET‐ALS‐13‐036 Getachew 28/07/2013 C&B‐ELC GERDP‐13‐261 GERDP‐JE‐DR‐13‐011 22/07/2013 METEC / ALSTOM generator Rotor Calculations  X N
GRR‐MET‐ALS‐13‐037 Kedir Abdu  13/08/2013 C&B‐ELC GERDP –13‐283 GERDP‐JE‐DR‐13‐014‐A 09/08/2013 METEC / ALSTOM Governing System Technical Specifications  X Y 03/09/2013 GRR‐HET‐MET‐13‐041‐L HET\GRR‐HET‐MET‐13‐04
GRR‐MET‐ALS‐13‐038 Wegayehu  13/08/2013 C&B‐ELC GERDP –13‐272 None 05/08/2013 Technical specifications – List of Technical Documentation and Tests for  X Y 17/09/2013 COO\GRR‐COO‐MET‐13‐038‐L_List of Technical DocumentatioCOO\GRR‐COO‐MET‐13‐0
Turbine and Governors 
GRR‐MET‐ALS‐13‐039 Wegayehu  13/08/2013 C&B‐ELC GERDP –13‐279 GERDP‐JE‐DR‐13‐013‐A 09/08/2013 ER's Review of Painting Secification  X Y 11/10/2013 COO\GRR‐COO‐MET‐13‐049‐L_Answers to GERDP‐SCM‐FSU‐1COO\GRR‐COO‐MET‐13‐0

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 1/7 09/09/2016


Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
GRR‐MET‐ALS‐13‐040 Wegayehu  13/08/2013 C&B‐ELC GERDP –13‐280 None 09/08/2013 Request of Turbines and Generators updated sections and plans X Y 07/10/2013 COO\GRR‐COO‐MET‐13‐046‐L answers to GERDP‐SCM FSU‐13 280 CEXT  MCL‐13 324 CE
GRR‐MET‐ALS‐13‐041 Wegayehu  13/09/2013 C&B‐ELC GERDP –13‐324 None 11/09/2013 Request of Updated Turbine Assembly Drawings  X Y 07/10/2013 COO\GRR‐COO‐MET‐13‐046‐L answers to GERDP‐SCM FSU‐13 280 CEXT  MCL‐13 324 CE
GRR‐MET‐ALS‐13‐042 Wegayehu  13/09/2013 C&B‐ELC GERDP –13‐325 GERDP‐JE‐DR‐13‐016‐A 11/09/2013 Right Bank Powerhouse – E&M Equipment – Lowest elevation of the  X Y 07/11/2013 GRR‐COO‐MET‐13‐055‐L
Bridge Cranes lifting hooks
Client\GERDP‐13‐254 ‐ Comments on 
METEC‐UKR Schematic 
GRR‐MET‐ALS‐13‐043 Getachew  07/09/2013 C&B‐ELC GERDP‐SCM/FSU‐13/254‐CEXT 17/07/2013 Comment on METEC/UKR Schematic Diagrams  X Y
Diagrams_Attachements.pdf 26/09/2013 GRR‐COO‐MET‐13‐042‐L
22/10/2013 GRR‐COO‐MET‐13‐051‐L ‐L_Comments on Powerho
GRR‐MET‐ALS‐13‐044 BOUYE Sylvain  20/09/2013 UHP ETO‐2028 None 10/09/2013 GRR Dam Project ‐ Excitation Transformateur  ( Reponse au TF‐HEG‐GRR‐ X N
033)
GRR‐MET‐ALS‐13‐045 Wegayehu  27/08/2013 UHP GTO‐1900 GTO‐1900_ Attachement ? Answer of Alstom questions dated 07.08.2013 concerning GERDP HPP  X N 20/09/2013 COO\GRR‐COO‐MET‐13‐039‐L Answers to GTO‐1900 ‐ Layout modification.pdf
Construction Drawings 
GRR‐MET‐ALS‐13‐046 Teshome 28/08/2013 C&B‐ELC GERDP –13‐283 GERDP‐JE‐DR‐13‐014A 09/08/2013 Governing System Technical Specifications X Y 03/09/2013 GRR‐HET‐MET‐13‐041‐L HET\GRR‐HET‐MET‐13‐04
GRR‐MET‐ALS‐13‐047 BOUYE Sylvain  16/09/2013 SALINI SAL‐05.25‐537_Attachements 18/07/2013 Comments on Alstom/Metec ‐ Powerhouse Technical Documents X Y 07/11/2013 GRR‐COO‐MET‐13‐057‐L 

SAL‐05.25‐537
GRR‐MET‐ALS‐13‐048 BOUYE Sylvain  16/09/2013 C&B‐ELC Pas de lettre d'accompagnement  GERDP‐JE‐DR‐13‐006‐B 20/08/2013 P& Ids : GERDP‐JE‐DR‐13‐006‐B / GERDP‐JE‐DR‐13‐009‐B X Y
GERDP‐JE‐DR‐13‐009‐B 26/09/2013 GRR‐COO‐MET‐13‐042‐L
GRR‐MET‐ALS‐13‐049 BOUYE Sylvain  27/08/2013 UHP GMO‐1912 ETO‐2028 10/09/2013 Response to GRR‐HEG‐MET‐13‐034‐L x N
GRR‐MET‐ALS‐13‐050 Wegayehu  26/09/2013 UHP GMO‐2157 GMO‐2157_Attachement 26/09/2013 GMO‐2157
GRR‐MET‐ALS‐13‐051 Teshome 09/10/2013 UHP Pas de Ref juste un mail Pas de Ref juste un mail 09/10/2013 Question & Clarification  X Y GRR‐HEG‐MET‐13‐041‐L HEG\GRR‐HEG‐MET‐13‐04
GRR‐MET‐ALS‐13‐052 Wegayehu  17/10/2013 C&B‐ELC GERDP –13‐213 None 27/06/2013 ER Comments on METEC (Alstom) Documents Relevant to Corrosion  X N
Protection Systems
GRR‐MET‐ALS‐13‐053 Wegayehu  17/10/2013 METEC METEC/4/AT28/T/2021/2013 None 17/10/2013 Workshop Design Development X Y 05/11/2013 GRR‐COO‐MET‐13‐054‐L
GRR‐MET‐ALS‐13‐054 Wegayehu  16/10/2013 METEC METEC/4/AT28/T/1004/2013 None 14/10/2013 Spiral Case and Draft Tube Design Thickness X Y 31/10/2013 GRR‐COO‐MET‐13‐053‐L
GRR‐MET‐ALS‐13‐055 Wegayehu  21/10/2013 UHP UHP‐GMO‐2311 None 21/10/2013 Response to GRR‐HEG‐MET‐13‐040‐T 07/11/2013 GRR‐COO‐MET‐13‐055‐L None
GRR‐MET‐ALS‐13‐056 BOUYE Sylvain  24/10/2013 UHP UHP‐ETD‐2338 None  23/10/2013 Excitation System X Y GRR‐HEG‐MET‐13‐041‐L HEG\GRR‐HEG‐MET‐13‐04
GRR‐MET‐ALS‐13‐057 Wegayehu  04/11/2013 C&B‐ELC GERDP –13‐364 GERDP‐JE‐DR‐13‐017‐A 26/10/2013 Right Bank Powerhouse – E&M Equipment – ER Comments on the  X Y 20/11/2013 GRR‐HEG‐MET‐13‐043‐L HEG\GRR‐HEG‐MET‐13‐04
Excitation System
GRR‐MET‐ALS‐13‐058 Wegayehu  04/11/2013 C&B‐ELC GERDP –13‐363 GERDP –13‐363_Attachements 26/10/2013 ER Comments on METEC / Alstom Documents  X Y 04/12/2013 GRR‐HEG‐MET‐13‐047‐L HEG\GRR‐HEG‐MET‐13‐04
GRR‐MET‐ALS‐13‐059 Wegayehu  04/11/2013 METEC Pas de Ref juste un mail Pas de Ref juste un mail 04/11/2013 Level 500 Question to UHP 
GRR‐MET‐ALS‐13‐060 Wegayehu  04/11/2013 METEC MOM_UHP_ZAPAROZHYE_29‐10‐ MOM_UHP_ZAPAROZHYE_29‐10‐ 29/10/2013 Technical Meeting ‐ ZAPAROZHYE ‐ Minute of Meeting 29/10/2013 X Y 14/11/2013 GRR‐COO‐MET‐13‐059‐L
2013 2013_Attachements
GRR‐MET‐ALS‐13‐061 Wegayehu  07/11/2013 METEC METEC/4/AT28/1133/201 None 06/11/2013 Draft Tube Design Thickness X N
GRR‐MET‐ALS‐13‐062 Wegayehu  08/11/2013 METEC Pas de Ref juste un mail et  About site excavation information of  27/10/2013 SITE EXCAVATION INFORMATION OF POWER HOUSE, SWITCH YARD AND  X N
attachement power house, switch yard and  DIVERSION CULVERT
GRR‐MET‐ALS‐13‐063 Wegayehu  08/11/2013 METEC Pas de Ref juste un mail et  Switch yard first stage excavation plan  27/10/2013 About TLSG Control Cabinet X N
attachement salini drawings_Attachement
GRR‐MET‐ALS‐13‐064 Teshome 08/11/2013 METEC Pas de Ref juste un mail  None 27/10/2013 About TLSG Control Cabinet X Y Reponse Alstom GRR‐HET‐MET‐13‐040‐L du 3/9/2013
GRR‐MET‐ALS‐13‐065 Taye 13/11/2013 METEC Pas de Ref juste un mail None  18/11/2013 Power Technical Documents  X
GRR‐MET‐ALS‐13‐066 BOUYE Sylvain  25/11/2013 UHP Pas de Ref juste un mail Mail avec attachement 25/11/2013 Exitation system mirror arrangement x y 28/11/2013 Answer by email S Bouye (HEG)
GRR‐MET‐ALS‐13‐067 BOUYE Sylvain  27/11/2013 UHP Pas de ref juste un mail 27/11/2013 Exitation system  X y 28/11/2013 Answer by email S Bouye (HEG)
GRR‐MET‐ALS‐13‐068 Wegayehu  02/12/2013 C&B‐ELC GERDP‐13‐358 GERDP‐JV‐DR‐13‐002‐A 24/10/2013 Coordination activities‐ER report on accelarated work schedule in view oh  X X X Y 25/11/2013 GRR‐COO‐MET‐13‐061‐L
achieving contractual Early generation
GRR‐MET‐ALS‐13‐069 Wegayehu  10/12/2013 C&B‐ELC GERDP‐13‐432 Client\GERDP‐13‐432‐RB PH  06/12/2013 RB PH ‐ Mechanical Equipment ‐ Turbine Components X Y 31/01/2014 GRR‐COO‐MET‐14‐005‐T TF‐HEG‐GRR‐052
Mechanical Equipment‐Turbine 
Components_Attachement.zip
GRR‐MET‐ALS‐13‐070 Wegayehu  10/12/2013 C&B‐ELC GERDP‐13‐433 Client\GERDP‐13‐433‐RB‐PH‐Loads on  06/12/2013 Loads on structure X 20/12/2014 GRR‐HET‐MET‐13‐058‐L
Structure_Attachement.zip
GRR‐MET‐ALS‐13‐071 Wegayehu  11/12/2013 UHP UHP‐GMO‐2734 06/12/2013 Temperature of the cooling water system X X Y 17/12/2013 GRR‐COO‐MET‐13‐066‐L
GRR‐MET‐ALS‐13‐072 Wegayehu  21/12/2013 SALINI 05 25‐642 08/11/2013 Comments on Plant Contractor's Drawings released by the ER X Y
GRR‐MET‐ALS‐13‐073 Wegayehu  21/12/2013 SALINI 05 25‐599 13/09/2013 Comments on Metec/Alstom Turbine & generator design documents X Y

GRR‐MET‐ALS‐14‐074 Wegayehu  30/12/2013 UHP Pas de ref juste un mail 30/12/2013 New Powerhouse design X X Y


GRR‐MET‐ALS‐14‐075 Teshome 03/01/2014 METEC METEC/4/AT28/T/1342/2014 03/01/2014 Response on clarification on power supply voltages X y 11/02/2014 GRR‐COO‐MET‐14‐009‐L
GRR‐MET‐ALS‐14‐001 Teshome 27/01/2014 METEC Pas de ref juste un mail 24/01/2014 Clarifications requests X Y 30/04/2014 GRR‐HEG‐MET‐14‐023‐L GRR‐HEG‐MET‐14‐023‐L_A
GRR‐MET‐ALS‐14‐002 Teshome 27/01/2014 METEC Pas de ref juste un mail 14/12/2013 About stability study data requested by ALSTOM X X 30/04/2014 GRR‐HEG‐MET‐14‐023‐L GRR‐HEG‐MET‐14‐023‐L_A
GRR‐MET‐ALS‐14‐003 Wegayehu  27/01/2014 UHP UHP‐ETD‐2479 09/11/2013 Excitation System X X Y 07/02/2014 HEG\GRR‐HEG‐MET‐14‐004‐T_Questions on Excitation SystemHEG\GRR‐HEG‐MET‐14‐00
GRR‐MET‐ALS‐14‐004 Teshome 27/01/2014 C&B‐ELC GERDP‐13‐225 05/07/2013 Shunt Reactors Bays arrangement X N
GRR‐MET‐ALS‐14‐005 Teshome 04/02/2014 METEC Pas de ref juste un mail 23/01/2014 Generator phases & neutral points of scopes contract X Y
GRR‐MET‐ALS‐14‐006 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14/041/CEXT GERDP‐JE‐DR‐14‐012‐A 10/02/2014 Draft Tube and Discharge Cone X Y 20/03/2014 GRR‐HET‐MET‐14‐008‐L_Draft Tube and Discharge Cone
GRR‐MET‐ALS‐14‐007 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14/049/CEXT GERDP‐JE‐DR‐13‐049‐A 10/02/2014 Computational Fluid Dynamic report ‐ Early Generation X Y
GRR‐MET‐ALS‐14‐008 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14/053/CEXT GERDP‐JE‐DR‐13‐048‐A 10/02/2014 Erection Procedure ‐ Preliminary Synoptical X X Y 26/02/2014 GRR‐HET‐MET‐14‐005‐L
GRR‐MET‐ALS‐14‐009 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14/047/CEXT GERDP‐JE‐DR‐13‐043‐A 10/02/2014 Generator Design and Erection Bay Layout X X Y 07/04/2014 GRR‐HEG‐MET‐14‐015‐T
GRR‐MET‐ALS‐14‐010 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14/042/CEXT GERDP‐JE‐DR‐14‐013‐A 10/02/2014 Spiral Case and Stay Ring X Y 20/03/2014 GRR‐HET‐MET‐14‐009‐L_Spiral Case and Stay Ring
GRR‐MET‐ALS‐14‐011 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14‐043/CEXT GERDP‐JE‐DR‐14‐005‐A 10/02/2014 Upper Bracket and Guide Bearing X Y 17/04/2014 GRR‐HEG‐MET‐14‐019‐L
GRR‐MET‐ALS‐14‐012 Teshome 13/02/2014 METEC Pas de ref juste un mail 12/02/2014 Clarification on technical specification X
GRR‐MET‐ALS‐14‐013 BOUYE Sylvain  18/02/2014 METEC Pas de ref juste un mail 13/02/2014 Excitation transformers drawings X
GRR‐MET‐ALS‐14‐014 Wegayehu  24/02/2014 UHP UHP‐GMO_384 21/02/2014 Answers to our comments on UHP drawings X Y
GRR‐MET‐ALS‐14‐015 Wegayehu  03/03/2014 UHP UHP‐GMO‐455 01/03/2014 Answers to GRR‐COO‐MET‐14‐006‐T X 21/03/2014 GRR‐COO‐MET‐14‐014‐T GRR‐COO‐MET‐14‐014‐T_
GRR‐MET‐ALS‐14‐016 Wegayehu  07/03/2014 SALINI 05.25‐752 05.25‐752_Attachments 26/02/2014 Level 2 Design : Right Bank Powerhouse ‐ U9 & U10 Revised Formwork  X
Drawings & Updated Technical Note
GRR‐MET‐ALS‐14‐017 Teshome 21/03/2014 METEC Pas de ref juste un mail 16/03/2014 About BOP data requested X Y 20/03/2014 GRR‐HEG‐MET‐14‐008‐L_Information Requested for BOP Supplier
GRR‐MET‐ALS‐14‐018 Teshome 21/03/2014 METEC METEC/4/AT28/T/1738/2014 METEC/4/AT28/T/1738/2014_Attachm 25/03/2014 Axial Relief Valve X Y 23/04/2014 GRR‐HET‐MET‐14‐017‐L
ent
GERDP‐SCM/FSU‐14/169/CEXT

Client\METEC‐T‐14‐1738‐001.doc

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 2/7 09/09/2016


Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
GRR‐MET‐ALS‐14‐019 Teshome 21/03/2014 METEC METEC/4/AT28/T/1739/2014 METEC/4/AT28/T/1739/2014_Attache 25/03/2014 Generator Mechanical Parts and Assembly Drawings X Y 12/06/2014 GRR‐HEG‐MET‐14‐036‐L
GERDP‐SCM/FSU‐14/168/CEXT ment
Client\METEC‐T‐14‐1739‐002.doc
GRR‐MET‐ALS‐14‐020 Teshome 28/03/2014 METEC METEC/4/AT28/T/1781/2014 Client\METEC‐4‐AT28‐T‐1781‐ 27/03/2014 Inspection and test plan status X Y
2014_Inspection and test plan 
status.rar
GERDP‐SCM/FSU‐14/173/CEXT
GRR‐MET‐ALS‐14‐021 Teshome 28/03/2014 METEC METEC/4/AT28/T/1780/2014 Client\METEC‐4‐AT28‐T‐1780‐ 27/03/2014 Runner sudden stoppage Load X Y
2014_Runner sudden stoppage 
Load.rar
GRR‐MET‐ALS‐14‐022 BOUYE Sylvain  10/02/2014 C&B‐ELC GERDP‐SCM/FSU‐14/052/CEXT GERDP‐JE‐DR‐13‐049‐A 01/04/2014 Right Bank Powerhouse ‐ Early Generation X 31/03/2014 GRR‐HET‐MET‐14‐011‐L
GRR‐MET‐ALS‐14‐023 MAUGERI Vincenz 01/04/2014 C&B‐ELC GERDP‐JE‐DR‐13‐020 01/04/2014 Right Bank powerhouse ‐ Electrical Equipment Generator X X GRR‐HET‐MET‐14‐015‐L
GRR‐MET‐ALS‐14‐024 MAUGERI Vincenz 01/04/2014 C&B‐ELC GERDP‐JE‐DR‐13‐021 01/04/2014 Right Bank powerhouse ‐ Mechanical equipment Turbine X X GRR‐HET‐MET‐14‐015‐L
GRR‐MET‐ALS‐14‐025 MAUGERI Vincenz 01/04/2014 C&B‐ELC GERDP‐JE‐DR‐13‐022 01/04/2014 Right Bank Powerhouse Turbine Frequency Governor X X GRR‐HET‐MET‐14‐015‐L
GRR‐MET‐ALS‐14‐026 MAUGERI Vincenz 01/04/2014 C&B‐ELC GERDP‐JE‐DR‐13‐036 01/04/2014 Right Bank powerhouse ‐ Mechanical equipment Turbine X X
GRR‐MET‐ALS‐14‐027 Behailu fekele 04/04/2014 METEC METEC/4/AT28/T1813/2014 03/04/2014 Call for design coordination meeting X Y
GRR‐MET‐ALS‐14‐028 Wegayehu  06/04/2014 C&B‐ELC GERDP‐SCM/FSU‐13/423/CEXT GERDP‐JE‐DR‐13‐036‐A 06/04/2014 Mechanical equipment ‐ Turbine parts X X Y

GRR‐MET‐ALS‐14‐029 Teshome 07/04/2014 C&B‐ELC GERDP‐SCM/FSU‐13/335/CEXT GERDP‐JE‐13‐020‐A 07/04/2014 Alstom inspection and Test Plans Comments X X Y 16/04/2014 GRR‐HET‐MET‐14‐015‐L GRR‐HET‐MET‐14‐015‐L_A
GERDP‐JE‐13‐021‐A
GERDP‐JE‐13‐022‐A
GRR‐MET‐ALS‐14‐030 Wegayehu  07/04/2014 SALINI 05‐25‐844 Client\SAL‐05.25‐844‐L1D Power  06/04/2014 Level 1 Design ‐ Power Waterways ‐ Intake Layout ‐ Alternative March  X X Y 16/05/2014 GRR‐HET‐MET‐14‐020‐L
Waterways‐Intake Layout‐Alternative  2014
March 2014_Attachments.msg

GRR‐MET‐ALS‐14‐031 Wegayehu  09/04/2014 C&B‐ELC GERDP‐SCM/FSU‐14/209/CEXT 09/04/2014 Postponement of meetings in Addis X N


GRR‐MET‐ALS‐14‐032 Wegayehu  09/04/2014 C&B‐ELC GERDP‐SCM/FSU‐14/206/CEXT GERDP‐JE‐DR‐14‐009‐A 09/04/2014 Excitation system drawings X X Y 07/05/2014 GRR‐HEG‐MET‐14‐028‐L TF‐HEG‐GRR‐062_Attachm
GRR‐MET‐ALS‐14‐033 Wegayehu  09/04/2014 C&B‐ELC GERDP‐SCM/FSU‐14/210/CEXT 09/04/2014 ER reply to GRR‐COO‐MET‐14‐005‐T X X Y 16/05/2014 GRR‐HET‐MET‐14‐019‐L GRR‐HET‐MET‐14‐019‐L_A
GRR‐MET‐ALS‐14‐034 Wegayehu  09/04/2014 C&B‐ELC GERDP‐SCM/FSU‐14/207/CEXT GERDP‐JE‐DR‐14‐008‐A 08/04/2014 Alstom answer to ER comment on Generator P&ID and generator Spider  X X Y 12/06/2014 GRR‐HEG‐MET‐14‐037‐L GRR‐HEG‐MET‐14‐037‐L_A
Calculation
GRR‐MET‐ALS‐14‐035 Wegayehu  09/04/2014 C&B‐ELC GERDP‐SCM/FSU‐14/204/CEXT GERDP‐JE‐DR‐14‐073‐A 08/04/2014 Generator Technical documentation X X Y 26/06/2014 GRR‐HEG‐MET‐14‐042‐T GRR‐HEG‐MET‐14‐042‐T_
GRR‐MET‐ALS‐14‐036 BOUYE Sylvain  09/04/2014 UHP UHP‐GMO‐634 31/03/2014 Comments on MoM 18/03/2014 X X Y 26/06/2014 GRR‐HET‐MET‐14‐026‐L
GRR‐MET‐ALS‐14‐037 MAUGERI Vincenz 11/04/2014 C&B‐ELC GERDP‐JE‐DR‐13‐037‐A 04/12/2013 Excitation system X GRR‐HEG‐MET‐14‐028‐L
GRR‐MET‐ALS‐14‐038 Teshome 14/04/2014 METEC METEC/4/AT28/T/1868/2014 METEC/4/AT28/T/1868/2014_Attachm 14/04/2014 MoM Clarification for Alstom 10/04/2014 X Y 30/04/2014 GRR‐COO‐MET‐14‐029‐L
ent
GRR‐MET‐ALS‐14‐039 Teshome 19/04/2014 METEC GERDP‐JE‐DR‐13‐036‐A 13/11/2013 Mechanical equipment ‐ Turbine parts ‐ Right Bank Powerhouse X Y

METEC/4/AT28/T/1892/2014 GERDP‐SCM/FSU‐13/423/CEXT
GRR‐MET‐ALS‐14‐040 Teshome 19/04/2014 METEC METEC/4/AT28/T/1892/2014 GERDP‐SCM/FSU‐14/210/CEXT 08/04/2014 ER reply to Metec (Alstom) letter GRR‐COO‐MET‐14‐005‐T X Y GRR‐HET‐MET‐14‐019‐L
GRR‐MET‐ALS‐14‐041 Teshome 19/04/2014 METEC GERDP‐JE‐DR‐14‐007‐A 14/01/2014 Generator Instrumentation and Control devices X X Y 18/09/2014 GRR‐HEG‐MET‐14‐055‐L GRR‐HEG‐MET‐14‐055‐L_A
METEC/4/AT28/T/1892/2014 GERDP‐SCM/FSU‐14/211/CEXT
GRR‐MET‐ALS‐14‐042 Teshome 19/04/2014 METEC GERDP‐JE‐DR‐14‐069‐A 31/03/2014 Generator Technical documentation X Y 07/07/2014 GRR‐COO‐MET‐14‐046‐L
METEC/4/AT28/T/1892/2014 GERDP‐SCM/FSU‐14‐/196/CEXT
GRR‐MET‐ALS‐14‐043 Teshome 19/04/2014 METEC GERDP‐JE‐DR‐14‐072‐A 31/03/2014 Design, Erection Procedures and Quality  sheets X X Y 23/05/2014 GRR‐HET‐MET‐14‐022‐L TF‐HET‐GRR‐062
METEC/4/AT28/T/1892/2014 GERDP‐SCM/FSU‐14/197/CEXT
GRR‐MET‐ALS‐14‐044 Teshome 19/04/2014 METEC GERDP‐JE‐DR‐13‐056‐A 10/04/2014 Embedded Pipes list X Y

METEC/4/AT28/T/1892/2014 GERDP‐SCM/FSU‐14/215/CEXT
GRR‐MET‐ALS‐14‐045 Teshome 19/04/2014 METEC METEC/4/AT28/T/1895/2014 METEC‐T‐14‐1895‐001 14/04/2014 Clarification on MoM  of excitation system X Y GRR‐HET‐MET‐14‐026‐L
GRR‐MET‐ALS‐14‐046 Eyesus Mekonnen 28/04/2014 METEC METEC/4/AT28/T/1922/2014 23/04/2014 Transformer information for Generator stability study X Y
GRR‐MET‐ALS‐14‐047 Teshome 30/04/2014 METEC GERDP‐SCM/FSU‐14/247/CEXT 12/05/2014 Factory Inspection Stator Frames U9‐U10 X Y
GRR‐MET‐ALS‐14‐048 Teshome 30/04/2014 METEC METEC/4/AT28/T/1841/2014 GERDP‐SCM/FSU‐14/248/CEXT 12/05/2014 Right Bank Powerhouse Transmittal of inspection report of generator  X X
shafts U9‐U10
GERDP‐IR‐003
GRR‐MET‐ALS‐14‐049 Teshome 30/04/2014 METEC METEC/4/AT28/T/1840/2014 GERDP‐SCM/SDU‐14/246/CEXT 12/05/2014 Turbine cross section X X Y
GERDP‐JE‐DR‐14‐076‐A
GRR‐MET‐ALS‐14‐050 Teshome 30/04/2014 METEC GERDP‐SCM/FSU‐14/214/CEXT GERDP‐JE‐DR‐13‐057‐A 12/05/2014 Governing and turbine equipment ‐ Safety Device list X X Y 19/05/2014 GRR‐HET‐MET‐14‐021‐L GRR‐HET‐MET‐14‐021‐L_A
GRR‐MET‐ALS‐14‐051 Teshome 13/05/2014 METEC METEC/4/AT28/T/2004/2014 GERDP‐JE‐DR‐14‐082A 13/05/2014 Design review sheet X Y 24/02/2015 GRR‐HET‐MET‐15‐014‐L

METEC‐T‐14‐2004‐001 GERDP‐SCM/FSU‐14/254/CEXT
GRR‐MET‐ALS‐14‐052 Teshome 02/05/2014 METEC Pas de ref juste un mail 16/05/2014 About revised level one drawings X
GRR‐MET‐ALS‐14‐053 BOUYE Sylvain  27/05/2014 METEC METEC/4/AT28/T/2691/2014 GERDP‐SCM/FSU‐14/291/CEXT 27/05/2014 Stator Winding Bars X
GERDP‐JE‐DR‐13‐058‐A
GRR‐MET‐ALS‐14‐054 BOUYE Sylvain  27/05/2014 METEC METEC/4/AT28/T/2692/2014 GERDP‐SCM/FSU‐14/292/CEXT 27/05/2014 Alstom Turbine and Generator Painting Specifications X Y 03/11/2014 GRR‐COO‐MET‐14‐076‐T ‐COO‐GRR‐012_Attachmen
GERDP‐JE‐DR‐14‐134‐A
GRR‐MET‐ALS‐14‐055 Behailu fekele 19/06/2014 METEC METEC/4/AT28/T/2800/2014 GERDP‐SCM/FSU‐14/343/CEXT 19/06/2014 Upper Bracket and Guide Bearing X X Y 07/07/2014 GRR‐COO‐MET‐14‐045‐L
GERDP‐JE‐DR‐14‐192‐A
GRR‐MET‐ALS‐14‐056 Behailu fekele 19/06/2014 METEC METEC/4/AT28/T/2801/2014 GERDP‐SCM/FSU‐14/342/CEXT 19/06/2014 Design review generator X X Y
GERDP‐JE‐DR‐14‐203‐A
GRR‐MET‐ALS‐14‐057 Behailu fekele 20/06/2014 METEC Pas de ref juste un mail None 20/06/2014 Updated cooling System drawings X Y
GRR‐MET‐ALS‐14‐058 Zerai Gebretnsae 08/07/2014 METEC Pas de ref juste un mail none 21/07/2014 Metec undertaking of ODC shipment L/C discrepancy
X

GRR‐MET‐ALS‐14‐059 Behailu fekele 19/07/2014 METEC METEC/4/AT28/T/2948/2014 UHP‐GMO‐985 22/07/2014 Answers to GRR‐COO‐MET‐14‐042‐T X 01/08/2014 GRR‐HET‐MET‐14‐029‐L
UHP‐GMO‐1219 X Y 20/10/2014 GRR‐COO‐MET‐14‐073‐L
18/11/2014 GRR‐COO‐MET‐14‐079‐L
GRR‐MET‐ALS‐14‐060 Behailu fekele 18/07/2014 METEC Pas de ref juste un mail none 22/07/2014 Information request about Turbine / Generator Scope of Work X Y
GRR‐MET‐ALS‐14‐061 Behailu fekele 24/07/2014 METEC METEC/4/AT28/T/3033/2014 GERDP‐SCM/FSU‐14/429/CEXT 25/07/2014 Stator Frame Anchoring STUD X Y
METEC‐ALST‐T‐14‐3033‐001 GERDP‐JE‐DR‐14‐077‐A

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 3/7 09/09/2016


Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
GRR‐MET‐ALS‐14‐062 Behailu fekele 29/07/2014 METEC METEC/4/AT28/T/3063/2014 GERDP‐JE‐DR‐14‐094‐A 30/07/2014 RBPH ‐ Painting System Technical data sheets X y
METEC‐ALST‐T‐14‐3063‐001 GERDP‐SCM/MCL‐14/455/CEXT
GRR‐MET‐ALS‐14‐063 Behailu fekele 04/08/2014 METEC METEC/A/AT28/T/3088/2014 GERDP‐JE‐DR‐14‐078‐A 04/08/2014 Turbine and Governing System Mechanical Equipment X X Y 16/10/2014 GRR‐HET‐MET‐14‐039‐L
METEC‐ALST‐T‐14‐3088‐001 GERDP‐SCM/MCL‐14‐462/CEXT
GRR‐MET‐ALS‐14‐064 Behailu fekele 04/08/2014 METEC METEC/4/AT28/T/3089/2014 GERDP‐JE‐14‐127‐A 04/08/2014 Hydraulic Turbine Final Configuration
X X Y
METEC‐ALST‐T‐14‐3089‐001 GERDP‐SCM/MCL‐14/463/CEXT
GRR‐MET‐ALS‐14‐065 Behailu fekele 04/08/2014 METEC METEC/4/AT28/T/3091/2014 GERDP‐JE‐DR‐14‐242‐A 04/08/2014 Generator water cooling diagram X X Y
METEC‐ALST‐T‐14‐3091‐001 GERDP‐SCM/MCL‐14/461/CEXT
GRR‐MET‐ALS‐14‐066 Behailu fekele 04/08/2014 METEC METEC/4/AT28/T/3092/2014 GERDP‐JE‐DR‐14‐238‐A 04/08/2014 Turbine and Governing System Consumer List
X X X Y
METEC‐ALST‐T‐14‐3092‐001 GERDP‐SCM/MCL‐14/465/CEXT
GRR‐MET‐ALS‐14‐067 Behailu fekele 04/08/2014 METEC METEC/4/AT28/T/3093/2014 GERDP‐JE‐DR‐14‐227‐A 04/08/2014 Shaft Torque Under Fault conditions X Y
METEC‐ALST‐T‐14‐3093‐001 GERDP‐SCM/MCL‐14/464/CEXT
GRR‐MET‐ALS‐14‐068 Behailu fekele 07/08/2014 METEC METEC/4/AT28/T/3147/2014 Salini letter 05.25‐933 07/08/2014 Salini comments on power house design documents X Y 18/11/2014 GRR‐HET‐MET‐14‐050‐L GRR‐COO‐MET‐15‐001‐L
METEC‐ALST‐T‐14‐3147‐001 Salini letter 05.25‐945
GRR‐MET‐ALS‐14‐069 Stefano Castagnol 24/07/2014 C&B‐ELC Pas de ref juste un mail None 08/08/2014 Answer to FAT Stator Frame U10 X N

GRR‐MET‐ALS‐14‐070 Marino Fernando 07/08/2014 C&B‐ELC pas de ref juste un mail None 08/08/2014 Rotor spider ‐ Coupling Holes Dimensional and Geometrical verification X Y

GRR‐MET‐ALS‐14‐071 Behailu fekele 18/08/2014 METEC METEC/4/AT28/T/3218/2014 GERDP‐JE‐DR‐14‐207‐A 04/09/2014 Stator Erection Manual and Inspection Sheets

METEC‐ALST‐T‐14‐3218‐001 GERDP‐JE‐DR‐14‐202‐A 04/09/2014 Generator ‐ Various items X X 13/10/2014 GRR‐HET‐MET‐14‐038‐T TF‐HET‐GRR‐070_Attachm


GERDP‐JE‐DR‐14‐092‐A 04/09/2014 Speed Governor
GERDP‐JE‐DR‐14‐209‐A 04/09/2014 Turbine Unit 10 ‐ Runner Crown and band as‐built X 22/09/2014 GRR‐HET‐MET‐14‐036‐L GRR‐HET‐MET‐14‐036‐L_A
GERDP‐JE‐DR‐14‐210‐A 04/09/2014 Various Equipment ‐ Spiral Case Pressure X 06/11/2014 GRR‐HET‐MET‐14‐046‐L
GERDP‐JE‐DR‐14‐211‐A 04/09/2014 Alstom Turbines ‐ Various Items X 22/09/2014 GRR‐HET‐MET‐14‐045‐L GRR‐HET‐MET‐14‐036‐L_A
GERDP‐JE‐DR‐14‐227‐A 04/09/2014 Alstom Unit ‐ Shaft Torque
GERDP‐JE‐DR‐14‐075‐A 04/09/2014 Water cooling and Breaking and lifting diagrams
GERDP‐JE‐DR‐14‐117‐A 04/09/2014 Stator Frame Sole Plates
GERDP‐JE‐DR‐14‐206‐A 04/09/2014 Turbine Speed Governor X Y 16/09/2014 GRR‐HET‐MET‐14‐034‐L
GRR‐MET‐ALS‐14‐072 Behailu fekele 03/09/2014 METEC METEC/4/AT28/T/3300/2014 GERDP‐JE‐DR‐14‐128‐A 04/09/2014 Power Houses Common Cooling System
METEC‐ALST‐T‐14‐3300‐001 GERDP‐JE‐DR‐14‐131‐A 04/09/2014 Right Bank Power House Generator Equipment X Y 13/10/2014 GRR‐HEG‐MET‐14‐057‐L

GERDP‐JE‐DR‐14‐188‐A 04/09/2014 Right Bank Power House Excitation system


GERDP‐JE‐DR‐14‐177‐A 04/09/2014 Right Bank Power House Generator Mechanical Parts and assembly

GRR‐MET‐ALS‐14‐073 Behailu fekele 09/09/2014 METEC METEC/4/AT28/T/3365/2014 UHP‐GTO‐1671 12/09/2014 Answers to letter GRR‐HET‐MET‐14‐029‐L X


METEC‐ALST‐T‐14‐3365‐001
GRR‐MET‐ALS‐14‐076 Behailu fekele 09/09/2014 METEC METEC/4/AT28/T/3367/2014 12/09/2014 X X 16/10/2014 GRR‐HEG‐MET‐14‐058‐L ‐HEG‐GRR‐077_Attachmen
GERDP‐SCM/FSU‐14‐548/CEXT GRR‐COO‐MET‐15‐006‐L
GERDP‐JE‐DR‐14‐255‐A
METEC‐ALST‐T‐14‐3367‐001 GERDP‐SCM/FSU‐14/546/CEXT 12/09/2014
GERDP‐JE‐DR‐14‐243‐A
GERDP‐SCM/FSU‐14/543/CEXT 12/09/2014
GERDP‐JE‐DR‐14‐178‐A
METEC‐ALST‐T‐14‐3432‐001 GERDP‐SCM/FSU‐14/563/CEXT Generator ‐ Layout details and piping specifications
X
METEC/4/AT28/T/3432/2014 GERDP‐JE‐DR‐14‐104‐A
GERDP‐SCM/FSU‐14/564/CEXT Pier Nose and Drainage ‐ Handover certificate X
GRR‐MET‐ALS‐14‐077 Behailu fekele 23/09/2014 METEC GERDP‐JE‐DR‐14‐264‐A 29/09/2014
GERDP‐SCM/FSU‐14/554 Turbine Speed Governor X 17/10/2014 GRR‐HET‐MET‐14‐041‐L
GERDP‐JE‐DR‐14‐256‐A
GRR‐MET‐ALS‐14‐078 Behailu fekele 09/10/2014 METEC METEC‐ALST‐T‐14‐3561‐001 P5000‐05,25‐978 09/10/2014 Units 9 & 10 frameworks X
METEC/4/AT28/T/3561/2014
GRR‐MET‐ALS‐14‐079 Behailu fekele 09/10/2014 METEC METEC‐ALST‐T‐14‐3563‐001 GERDP‐SCM/FSU‐14‐613/CEXT Excitation system equipment X
09/10/2014
METEC/4/AT28/T/3563/2014 GERDP‐JE‐DR‐212‐A
GRR‐MET‐ALS‐14‐080 Wegayehu 16/10/2014 METEC pas de ref juste un mail 16/10/2014 Embedded Pipes Unit 9 & 10 ‐ Drawing update 14/10/2014 X
GRR‐MET‐ALS‐14‐081 Behailu fekele 27/10/2014 METEC pas de ref juste un mail GERDP‐SCM/FSU‐14/637/CEXT 27/10/2014 Metec pending design issues ‐ Call for meeting X
GRR‐MET‐ALS‐14‐082 Behailu fekele 31/10/2014 METEC METEC‐ALST‐T‐14‐3672‐001 GERDP‐SCM/FSU‐14/628/CEXT 03/11/2014 Design reviews X
METEC/4/AT28/T/3672/2014 GERDP‐JE‐DR‐14‐281‐A
GERDP‐SCM/MCL‐14/643/CEXT
GERDP‐JE‐DR‐14‐284‐A
GERDP‐SCM/MCL‐14/644/CEXT
GERDP‐JE‐DR‐13‐283‐A
GERDP‐SCM/MCL‐14/638/CEXT
GERDP‐JE‐DR‐279‐A
GRR‐MET‐ALS‐14‐083 Behailu fekele 29/10/2014 METEC SAL‐P5000‐05,25‐965 03/11/2014 Salini documents1 X Y 04/12/2014 GRR‐COO‐MET‐14‐083‐L
SAL‐P5000‐05,25‐966
SAL‐P5000‐05,25‐972 X 25/11/2014 GRR‐COO‐MET‐14‐080‐L
SAL‐P5000‐05,25‐978
SAL‐P5000‐05,25‐1020
GRR‐MET‐ALS‐14‐084 behailu fekele 29/10/2014 METEC SAL‐P5000‐05,25‐978 03/11/2014 Salini documents Part 2 X 06/01/2015 GRR‐COO‐MET‐15‐002‐L
GRR‐MET‐ALS‐14‐085 behailu fekele 29/10/2014 METEC SAL‐P5000‐05,,25‐978 03/11/2017 Salini documents Part 1 X 06/01/2015 GRR‐COO‐MET‐15‐002‐L
GRR‐MET‐ALS‐14‐086 behailu fekele 29/10/2014 METEC SAL‐P5000‐05,25‐978 03/11/2014 Salini documents Parts 3 X 06/01/2015 GRR‐COO‐MET‐15‐002‐L
GRR‐MET‐ALS‐14‐087 BOUYE Sylvain  05/11/2014 UHP UHP‐GMO‐2088 07/11/2014 Clarifications required on consummer list X 27/11/2014 GRR‐HET‐MET‐14‐057‐L
GRR‐MET‐ALS‐14‐088 BOUYE Sylvain  05/11/2014 UHP UHP‐GTO‐2078 UHP‐GTO‐2078_Attachments 07/11/2014 UHP proposition for excitation X
GRR‐MET‐ALS‐14‐089 Behailu fekele 26/11/2014 METEC METEC‐ALST‐T‐14‐3819‐001
METEC/4/AT28/T/3819/2014 GERDP‐JE‐DR‐14‐251‐A 02/12/2014 Design reviews X
GERDP‐JE‐DR‐14‐244‐A X 30/01/2015 GRR‐HEG‐MET‐15‐006‐L

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 4/7 09/09/2016


Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
GERDP‐JE‐DR‐14‐239‐A 23/02/2015 GRR‐HEG‐MET‐15‐013‐T TF‐HEG‐GRR‐083_Attachm
GERDP‐JE‐DR‐14‐233‐A 30/01/2015 GRR‐HEG‐MET‐15‐005‐L
GERDP‐JE‐DR‐14‐229‐A 08/12/2014 X 08/12/2014 GRR‐HET‐MET‐14‐061‐T TF‐HET‐GRR‐080_Attachm
GERDP‐JE‐DR‐14‐247‐A x x x Y 23/02/2015 GRR‐COO‐MET‐15‐016‐T TF‐HEG‐GRR‐082_Attachm
TF‐HET‐GRR‐089_Attachm
GERDP‐JE‐DR‐14‐245‐A 16/03/2015 GRR‐HET‐MET‐15‐033‐T TF‐HET‐GRR‐094_Attachm
GERDP‐JE‐DR‐14‐226‐A X 30/01/2015 GRR‐HET‐MET‐15‐011‐L
GERDP‐JE‐DR‐14‐228‐A
GERDP‐JE‐DR‐14‐208‐A 30/01/2015 GRR‐HEG‐MET‐15‐008‐L
GERDP‐JE‐DR‐14‐234‐A
GERDP‐SCM/FSU‐14/704/CEXT
GRR‐MET‐ALS‐14‐090 behailu feleke 19/12/2014 METEC METEC‐ALST‐T‐14‐3896‐001 GERDP‐SCM/FSU‐14/725/CEXT 06/01/2015 ER design reviews X 05/03/2015 GRR‐HET‐MET‐15‐026‐L
METEC/4/AT28/T/3896/014 GERDP‐SCM/FSU‐14/723/CEXT 06/01/2015
GERDP‐SCM/FSU‐14/721/CEXT GERDP‐JE‐DR‐14‐304‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/745/CEXT GERDP‐JE‐DR‐14‐321‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/722/CEXT GERDP‐JE‐DR‐14‐106‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/720/CEXT GERDP‐JE‐DR‐14‐111‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/724/CEXT GERDP‐JE‐DR‐14‐309‐A 06/01/2015 X X 30/01/2015 GRR‐COO‐MET‐15‐008‐L
GERDP‐SCM/FSU‐14/732/CEXT GERDP‐JE‐DR‐14‐197‐A 06/01/2015 X 30/01/2015 GRR‐HEG‐MET‐15‐007‐L
GERDP‐SCM/FSU‐14/726/CEXT GERDP‐JE‐DR‐14‐313‐A 06/01/2015 X 30/01/2015 GRR‐COO‐MET‐15‐009‐L
GERDP‐SCM/FSU‐14/728/CEXT GERDP‐JE‐DR‐14‐112‐A 06/01/2015 X
GRR‐MET‐ALS‐14‐091 behailu feleke 25/12/2014 METEC METEC‐ALST‐T‐14‐3997‐001 06/01/2015 ER design reviews
METEC/4/AT28/T/3997/14 06/01/2015
GERDP‐SCM/FSU‐14/817/CEXT 06/01/2015
GERDP‐SCM/FSU‐14/809/CEXT GERDP‐JE‐DR‐14‐293‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/811/CEXT GERDP‐JE‐DR‐13‐295‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/803/CEXT GERDP‐JE‐DR‐14‐214‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/818/CEXT GERDP‐JE‐DR‐14‐324‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/810/CEXT GERDP‐JE‐DR‐14‐292‐A 06/01/2015 X 24/02/2015 GRR‐HET‐MET‐15‐020‐T TF‐HET‐GRR‐090_Attachm
GERDP‐SCM/FSU‐14/816/CEXT GERDP‐JE‐DR‐14‐322‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/819/CEXT GERDP‐JE‐DR‐14‐314‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/820/CEXT GERDP‐JE‐DR‐14‐306‐A 06/01/2015 X
GERDP‐SCM/FSU‐14/804/CEXT GERDP‐JE‐DR‐14‐246‐A 06/01/2015 X X 22/01/2015 GRR‐COO‐MET‐15‐004‐T GRR‐COO‐MET‐15‐004‐T_
GERDP‐SCM/FSU‐14/801/CEXT GERDP‐JE‐DR‐14‐191‐A 06/01/2015 X 20/01/2015 GRR‐COO‐MET‐15‐007‐L
GERDP‐SCM/FSU‐14/795/CEXT GERDP‐JE‐DR‐14‐326‐A 06/01/2015 X
GRR‐MET‐ALS‐14‐092 Bisrat Reda 12/01/2015 METEC 46/T2623/07 12/01/2015 Confirmation to commencement of phase 2a offshore part X N
GRR‐MET‐ALS‐14‐093 Ebuy 19/01/2015 METEC pas de ref juste un mail None 26/01/2015 Draft tube elbow ‐ storage in Djibouti X
GRR‐MET‐ALS‐15‐094 Behailu feleke 24/01/2015 METEC METEC‐ALST‐T‐15‐4127‐001 26/01/2015 ER Design reviews
METEC/4/AT28/T/4127/15 26/01/2015
GERDP‐SCM/FSU‐15/003/CEXT GERDP‐JE‐DR‐14‐320‐A 26/01/2015
GERDP‐SCM/FSU‐15/016/CEXT GERDP‐JE‐DR‐14‐105‐A 26/01/2015 X 03/03/2015 GRR‐HEG‐MET‐15‐015‐L
GERDP‐SCM/FSU‐15/004/CEXT GERDP‐JE‐DR‐14‐307‐A 26/01/2015 24/03/2015 GRR‐HET‐MET‐15‐034‐L
GERDP‐SCM/FSU‐15/005/CEXT GERDP‐JE‐DR‐14‐325‐A 26/01/2015 X 03/03/2015 GRR‐HET‐MET‐15‐024‐L
GERDP‐SCM/FSU‐15/006/CEXT GERDP‐JE‐DR‐14‐305‐A 26/01/2015
GERDP‐SCM/FSU‐15/017/CEXT GERDP‐JE‐DR‐14‐194‐A 26/01/2015
GERDP‐SCM/FSU‐15/007/CEXT GERDP‐JE‐DR‐14‐248‐A 26/01/2015
GERDP‐SCM/FSU‐15/008/CEXT GERDP‐JE‐DR‐14‐249‐A 26/01/2015
GERDP‐SCM/FSU‐15/028/CEXT GERDP‐JE‐DR‐14‐331‐A 26/01/2015
GRR‐MET‐ALS‐15‐095 bouye sylvain 26/01/2015 METEC METEC/T/AT28/T/2787/015 26/01/2015 Delay of GERDP Equipment delivery X Y 03/02/2015 GRR‐COO‐MET‐15‐011‐L
GRR‐MET‐ALS‐15‐096 behailu feleke 27/01/2015 METEC METEC/4/AT28/T/4153/2015 27/01/2015 ER Design Reviews X
METEC‐ALST‐T‐15‐4153‐001 27/01/2015 X
GERDP‐SCM/FSU‐15/042/CEXT GERDP‐JE‐DR‐14‐332‐A 27/01/2015 X
GERDP‐SCM/FSU‐15/043/CEXT GERDP‐JE‐DR‐14‐333‐A 27/01/2015 X
GERDP‐SCM/FSU‐15/044/CEXT GERDP‐JE‐DR‐14‐312‐A 27/01/2015 X
GERDP‐SCM/FSU‐15/047/CEXT GERDP‐JE‐DR‐14‐282‐A 27/01/2015 X
GERDP‐SCM/FSU‐15/054/CEXT GERDP‐JE‐DR‐14‐011‐A 27/01/2015 X
GERDP‐SCM/FSU‐15/045/CEXT GERDP‐JE‐DR14‐083‐A 27/01/2015 X
GERDP‐SCM/FSU‐15/057/CEXT GERDP‐IR‐016 27/01/2015 X
GERDP‐SCM/FSU‐15/046/CEXT GERDP‐IR‐015 27/01/2015 X
GERDP‐SCM/FSU‐15/051/CEXT GERDP‐JE‐DR‐14‐240‐A 27/01/2015 X
GTO‐2395 X Y 02/03/2015 GRR‐COO‐MET‐15‐020‐L GRR‐COO‐MET‐15‐020‐L_
GRR‐MET‐ALS‐15‐097 behailu feleke 09/02/2015 METEC‐ALST‐T‐15‐4204‐001 09/02/2015 X
METEC/4/AT28/T/4204/2015 09/02/2015 X
GERDP‐SCM/FSU‐15/086/CEXT GERDP‐JE‐DR‐15‐033‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/087/CEXT GERPD‐JE‐DR‐15‐032‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/070/CEXT GERDP‐JE‐DR‐14‐311‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/072/CEXT GERDP‐JE‐DR‐14‐296‐A 09/02/2015 X
METEC
GERDP‐SCM/FSU‐15/081/CEXT GERDP‐JE‐DR‐15‐042‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/071/CEXT GERDP‐JE‐DR‐15‐030‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/080/CEXT GERDP‐JE‐DR‐15‐044‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/073/CEXT GERDP‐JE‐DR‐14‐323‐A 09/02/2015 X 02/03/2015 GRR‐HET‐MET‐15‐022‐T TF‐HET‐GRR‐091_Attachm
GERDP‐SCM/FSU‐15/082/CEXT GERDP‐JE‐DR‐15‐014‐A 09/02/2015 X
GERDP‐SCM/FSU‐15/083/CEXT GERDP‐JE‐DR‐15‐043‐A 09/02/2015 X
METEC‐ALST‐T‐15‐4340‐001 10/03/2015 X
METEC/4/AT28/T/4340 10/03/2015 X
GERDP‐SCM/FSU‐15/092/CEXT GERDP‐JE‐DR‐15‐040‐A 10/03/2015 X
GRR‐MET‐ALS‐15‐098 behailu feleke 10/03/2015 METEC

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 5/7 09/09/2016


Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
GRR‐MET‐ALS‐15‐098 behailu feleke 10/03/2015 METEC
GERDP‐SCM/FSU‐15/112/CEXT GERDP‐JE‐DR‐15‐045‐A 10/03/2015 X X 11/09/2015 GRR‐HET‐MET‐15‐069‐L GRR‐HET‐MET‐15‐069‐L_A
GERDP‐SCM/FSU‐15/093/CEXT GERDP‐JE‐DR‐14‐191‐A 10/03/2015 X
GERDP‐SCM/FSU‐15/106/CEXT GERDP‐JE‐DR‐14‐130‐A 10/03/2015 X
GRR‐MET‐ALS‐15‐099 behailu feleke 12/03/2015 METEC pas de ref juste un mail 12/03/2015 Request for data upper guide bearing and generator air / water cooler X

METEC‐ALST‐T‐15‐4426‐001
GRR‐MET‐ALS‐15‐100 behailu feleke 18/03/2015 METEC METEC/4/AT28/T/4426/07
GERDP‐SCM/FSU‐15/141/CEXT GERDP‐JE‐DR‐15‐058‐A 19/03/2018 ER Design reviews X
GRR‐MET‐ALS‐15‐101 behailu feleke 07/04/2015 METEC METEC‐ALST‐T‐15‐4588‐001
METEC/4/AT28/T/4588
GERDP‐SCL/FSU‐15/187/CEXT GERDP‐JE‐DR‐15‐026‐A 07/04/2015 Answer to technical documentation X
GRR‐MET‐ALS‐15‐102 Asseffa 16/04/2015 METEC Pas de ref None 17/04/2015 Industrial transfer methodology X Y
GRR‐MET‐ALS‐15‐103 bouye sylvain 20/04/2015 METEC METEC NG6/T/3772/2015 None 13/04/2015 Nomination of the Engineer X N 16/06/2015 GRR‐COO‐MET‐15‐030‐L_Nomination of engineer
GERDP‐SCM/FSU‐15/258/CEXT GERDP‐JE‐DR‐15‐071‐A Generator ‐ Excitation system X
GERDP‐SCM/FSU‐15/245/CEXT GERDP‐JE‐DR‐15‐059‐A Alstom Speed Governor X Y 19/05/2015 GRR‐HET‐MET‐15‐047‐L
GERDP‐SCM/FSU‐15/259/CEXT GERDP‐JE‐DR‐15‐079‐A Alstom Turbine ‐ Governor X
GRR‐MET‐ALS‐15‐104 behailu feleke 30/04/2015 METEC 04/05/2015
GERDP‐SCM/FSU‐15/217/CEXT GERDP‐JE‐DR‐15‐072‐A Thrust bearing Spare Part List X
GERDP‐SCM/FSU‐15/218/CEXT GERDP‐JE‐DR‐15‐070‐A Alstom units ‐ Right bank power House X
GERDP‐SCM/FSU‐15/246/CEXT GERDP‐JE‐DR‐15‐055‐A Alstom Turbine Runner X
GRR‐MET‐ALS‐15‐105 behailu feleke 15/05/2015 METEC METEC‐4‐AT28‐T‐4853‐027 19/05/2015
METEC‐ALST‐T‐15‐4853‐001
GERDP‐SCM/FSU‐15/258/CEXT GERDP‐JE‐DR‐15‐071‐A
GERDP‐SCM/FSU‐15/245/CEXT GERDP‐JE‐DR‐15‐059‐A
GERDP‐SCM/FSU‐15/259/CEXT GERDP‐JE‐DR‐15‐079‐A X 21/05/2015 GRR‐COO‐MET‐15‐028‐L
GERP‐SCM/FSU‐15/246/CEXT GERDP‐JE‐DR‐15‐055‐A
GERDP‐SCM/FSU‐15/218/CEXT GERDP‐JE‐DR‐15‐070‐A 16/06/2015 x 16/06/2015 GRR‐HEG‐MET‐15‐020‐L
GERDP‐SCM/FSU‐15/217/CEXT GERDP‐JE‐DR‐15‐072‐A
GERDP‐SCM/FSU‐15/283/CEXT GERDP‐JE‐DR‐15‐068‐A
GRR‐MET‐ALS‐15‐106 behaiku feleke 01/06/2015 METEC METEC‐4‐AT28‐T‐5037
METEC‐ALST‐T‐15‐5037‐001
GERDP‐SCM/FSU‐15/301/CEXT GERDP‐JE‐DR‐15‐038‐A
GERDP‐SCM/FSU‐15/302/CEXT GERDP‐JE‐DR‐15‐031‐A
GERDP‐SCM/FSU‐15/303/CEXT GERDP‐JE‐DR‐15‐013‐A
GERDP‐SCM/FSU‐15/304/CEXT GERDP‐JE‐DR‐15‐015‐A
GRR‐MET‐ALS‐15‐107 behailu feleke 06/06/2015 METEC METEC/4/AT28/T/5074
METEC‐ALST‐T‐15‐5074‐001 19/06/2015 GRR‐HET‐MET‐15‐055‐L
P5000‐05.25‐1335
GERDP‐SCM/FSU‐15/319/CEXT GERDP‐JE‐DR‐14‐193‐A
GRR‐MET‐ALS‐15‐108 Ebuy 16/06/2015 METEC Pas de ref None Answer to GRR‐COO‐MET‐15‐030‐l
GRR‐MET‐ALS‐15‐109 Ebuy 26/06/2015 METEC Pas de ref
GRR‐MET‐ALS‐15‐110 Zerai Gebretnsae 02/07/2015 METEC pas de ref juste un mail None To delay the industrial transfer expert from Alstom 02/07/2015
GRR‐MET‐ALS‐15‐111 Behailu feleke 08/07/2015 METEC METEC/4/AT28/5312/15 09/07/2015 ER design reviews
METEC‐ALST‐T‐15‐5312‐001
GERDP‐SCM/FSU‐15/376/CEXT GERDP‐JE‐DR‐14‐014‐A
GERDP‐SCM/FSU‐15/378/CEXT GERDP‐JE‐DR‐15‐067‐A
GERDP‐SCM/FSU‐15/379/CEXT GERDP‐JE‐DR‐15‐082‐A
GRR‐MET‐ALS‐15‐112 Behailu feleke 08/07/2015 METEC METEC/4/AT28/T/5256 09/07/2015 ER design reviews
METEC‐ALST‐T‐15‐5256‐001
GERDP‐SCM/FSU‐15/355/CEXT GERDP‐JE‐DR‐039‐A
GERDP‐SCM/FSU‐15/346/CEXT GERDP‐SCM/FSU‐14/587/CEXT
GERDP‐JE‐DR‐15‐023‐A
MoM EEP/ER‐METEC/Alstom
GRR‐MET‐ALS‐15‐113 behailu feleke 23/07/2015 METEC METEC‐ALST‐T‐15‐101‐001
METEC/4/AT28/T/101
GERDP‐SCM/FSU‐15/407/CEXT GERDP‐JE‐DR‐15‐113‐A 24/07/2015 EG turbine governor layout and general arrangement
GERDP‐SCM/FSU‐15/427/CEXT GERDP‐JE‐DR‐15‐121‐B 24/07/2015 Quality work plan
GRR‐MET‐ALS‐15‐114 Ebuy 27/07/2015 METEC Pas de ref None 27/07/2015 Request for supervisor
GRR‐MET‐ALS‐15‐115 behailu feleke 17/08/2015 METEC METEC‐ALST‐T‐15‐H230‐001 GERDP‐JE‐DR‐15‐144‐A 14/09/2015 ER design reviews ‐ AVR Alstom clarification X
METEC/4/AT28/T/230/T
GERDP‐SCM/ATE‐15/469/CEXT
GRR‐MET‐ALS‐15‐116 behailu feleke 24/08/2015 METEC METEC/4/AT28/H123
GRR‐MET‐ALS‐15‐117 METEC‐ALST‐T‐15‐H123‐001
GERDP‐SCM/MCL‐15/445/CEXT GERDP‐JE‐DR‐15‐133‐A 14/09/2015 Alstom units reply for clarifications
GERDP‐SCM/MCL‐15/444/CEXT GERDP‐JE‐15‐15‐134‐A 14/09/2015 Alstom turbine ‐ Electrical drawings
GRR‐MET‐ALS‐15‐118 Daniel Mekonnen 09/09/2015 METEC Pas de ref 14/09/2015 WPS document X
GRR‐MET‐ALS‐15‐119 behailu feleke 04/09/2015 METEC METEC‐ALST‐T‐15‐H352‐001 14/09/2015
METEC/4/AT28/H352 14/09/2015
GERDP‐SCM/FSU‐15/518/CEXT GERDP‐JE‐DR‐15‐183‐A 14/09/2015 Rotor bearing collar quality data book X 18/09/2015 GRR‐HET‐MET‐15‐072‐L
GERDP‐SCM/FSU‐15/483/CEXT GERDP‐JE‐DR‐15‐145‐A 14/09/2015 servomotors
GERDP‐SCM/FSU‐15/502/CEXT GERDP‐JE‐DR‐15‐080‐A 14/09/2015 servomotors X 18/09/2015 GRR‐HET‐MET‐15‐071‐L
GERDP‐SCM/FSU‐15/503/CEXT GERDP‐IR‐024 14/09/2015 Unit 10 distributor workshop assembly FAT report X 18/09/2015 GRR‐HET‐MET‐15‐073‐L GRR‐HET‐MET‐15‐073‐L_A
GRR‐MET‐ALS‐15‐120 behailu feleke 07/08/2015 METEC METEC/4/AT28/T/200 17/09/2015
METEC‐ALST‐T‐15‐200‐001 17/09/2015
GERDP‐SCM/ATE‐15/454/CEXT GERDP‐JE‐DR‐15‐149‐A 17/09/2015 Quality documents X
GERDP‐SCM/ATE‐15/456/CEXT GERDP‐JE‐DR‐15‐151‐A 17/09/2015 Governing system X
GERDP‐SCM/ATE‐15/455/CEXT GERDP‐JE‐DR‐15‐150‐A 17/09/2015 Quality data books X

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 6/7 09/09/2016


Chrono/timeline GRAND RENAISSANCE Coordination ‐ Correspondance From Client

Alstom concerned Unit Response  ALSTOM response


Date 
Alstom Reference Sender Originator Originator Reference Attachment Reference Date By Subject required 
of receipt in Alstom COO HEG HET Date Reference Attachment to email
Y/N
GERDP‐SCM/ATE‐15/458/CEXT GERDP‐JE‐DR‐15‐113‐A 17/09/2015 ventilation system design X
GRR‐MET‐ALS‐15‐121 behailu feleke 18/09/2015 METEC METEC/4/AT28//482/15 18/09/2015 X
METEC‐ALST‐T‐15‐H482‐001 18/09/2015 X
GERDP‐SCM/FSU‐15/536/CEXT GERDP‐JE‐DR‐15‐175‐A 18/09/2015 Monthly report July X
GERDP‐SCM/FSU‐15/537/CEXT GERDP‐JE‐DR‐15‐135‐A 18/09/2015 Monthly report May X
GERDP‐SCM/FSU‐15/558/CEXT GERDP‐JE‐DR‐15‐054‐A 18/09/2015 Unit 10 shaft inspection X
GERDP‐SCM/FSU‐15/539/CEXT GERDP‐JE‐DR‐15‐049‐A 18/09/2015 notification of unit10 runner inspection X
GERDP‐SCM/FSU‐15/540/CEXT GERDP‐JE‐DR‐15‐084‐A 18/09/2015 review of alstom quality data books X
GERDP‐SCM/FSU‐15/548/CEXT GERDP‐JE‐DR‐15‐069‐A 18/09/2015 spiral case inspection X
GERDP‐SCM/FSU‐15/534/CEXT GERDP‐JV‐IR‐15‐025‐A 18/09/2015 Unit 8 ‐ Final NDT test on 1‐4 runner blades X
GERDP‐SCM/FSU‐15/553/CEXT GERDP‐JE‐DR‐15‐048‐A 18/09/2015 Shaft inspection unit9 X
GERDP‐SCM/FSU‐15/554/CEXT GERDP‐JE‐DR‐15‐053‐A 18/09/2015 unit 10 rotor spider inspection X
GERDP‐SCM/FSU‐15/519/CEXT GERDP‐JE‐DR‐15‐092‐A 18/09/2015 technical documentation X
GRR‐MET‐ALS‐15‐122 Ashenafi 17/10/2015 METEC Pas de ref None 19/10/2015 Repair action plan for turbine shaft U10 X 03/11/2015 GRR‐HET‐MET‐15‐085‐L
GRR‐MET‐ALS‐15‐123 behailu feleke 22/10/2015 METEC GERDP‐IR‐021 Annex to GERDP‐IR‐021 23/10/2015 Inspection report Generator Rotor Spider Unit 10 X
GRR‐MET‐ALS‐15‐124 behailu feleke 29/10/2015 METEC METEC/4/AT28/T/783/15 03/11/2015 X
METEC‐ALST‐T‐15‐783‐001 03/11/2015 X
GERDP‐SCM/FSU‐15/605/CEXT GERPD‐JE‐DR‐15‐173‐A 03/11/2015 Alstom site quality plan guidelines X
GERDP‐SCM/FSU‐15/606/CEXT GERDP‐JE‐DR‐15‐212‐A 03/11/2015 tool list X
GERDP‐SCM/FSU‐15/608/CEXT GERDP‐JE‐DR‐15‐211‐A 03/11/2015 inspection reports and quality data books X
GERDP‐SCM/FSU‐15/609/CEXT GERDP‐JE‐DR‐15‐171‐A 03/11/2015 review of alstom field quality working plan X
GRR‐MET‐ALS‐15‐125 Ebuy 03/11/2015 METEC Pas de ref None 03/11/2015 X
the negotiation of demand compensation of srgt. Zerai G/tnsae injury 
GRR‐MET‐ALS‐15‐126 behailu feleke 05/11/2015 METEC METEC/4/AT28/T/847 09/11/2015
METEC‐ALST‐T‐15‐847‐001 09/11/2015
GERDP‐SCM/FSU‐15/624/CEXT GERDP‐JE‐DR‐15‐209‐A 09/11/2015 Monthly Progress Report August 2015 X
GERDP‐SCM/FSU‐15/625/CEXT GERDP‐IR‐012 09/11/2015 Quality data books X
GERDP‐IR‐021 09/11/2015 X
GERDP‐JE‐DR‐15‐0214‐A 09/11/2015 X
GERDP‐SCM/FSU‐15/626/CEXT GERDP‐JE‐DR‐15‐216‐A 09/11/2015 Shaft manufacturing data book X
GRR‐MET‐ALS‐15‐127 Ebuy 18/11/2015 METEC Pas de ref None 19/11/2015 Repair of unit 10 turbine shaft X
GRR‐MET‐ALS‐15‐128 behailu feleke 05/12/2015 METEC METEC/4/AT28/M1103/15
METEC‐ALST‐T‐15‐1103‐001
GERDP‐SCM/FSU‐15/653/CEXT GERDP‐JE‐DR‐15‐210‐A 07/12/2015 Generators technical docs X
GERDP‐SCM/FSU‐15/650/CEXT GERDP‐JE‐DR‐15‐213‐A 07/12/2015 X
GERDP‐SCM/FSU‐15/680/CEXT GERDP‐JE‐DR‐15‐266‐A 07/12/2015 Stay ring quality data book X
GRR‐MET‐ALS‐15‐129 behailu feleke 09/12/2015 METEC Pas de ref None 10/12/2015 Clarification about Generator cooling system X
GRR‐MET‐ALS‐16‐130 Wegayehu Gizaw 01/02/2016 METEC Pas de ref None 01/02/2016 GERDP Unit 9&10 turbine governor oil/water coolers pressure drops X

GRR‐MET‐ALS‐16‐131 Adugna Gutu 10/02/2016 METEC METEC‐4‐AT28‐T‐1666‐16 11/02/2016 ER Design reviews X


METEC‐ALST‐T‐16‐1666‐001 11/02/2016 X
GERDP‐SCM/FSU‐16/073/CEXT GERDP‐JE‐DR‐16‐003‐A 11/02/2016 turbine & governor consumer list X
GERDP‐SCM/FSU‐16/079/CEXT GERDP‐JE‐DR‐16‐001‐A 11/02/2016 turbine runner platform X
GERDP‐SCM/FSU‐16/076/CEXT GERDP‐JE‐DR‐15‐243‐A 11/02/2016
GRR‐MET‐ALS‐16‐132 Adugna Gutu 23/02/2016 METEC METEC‐4‐AT28‐9‐1769‐16
METEC‐ALST‐T‐16‐1769‐001
GERDP‐SCM/FSU‐16/095/CEXT GERDP‐IR‐028 29/02/2016 Unit 8 Guide bearing pads X
GRR‐MET‐ALS‐16‐133 Taye Asfaw 27/04/2016 METEC Pas de ref 28/04/2016 Answer to GRR‐HET‐MET‐16‐022‐L Unit 9  runner final inspection X
GRR‐MET‐ALS‐16‐134 Adugna Gutu 11/05/2016 METEC METEC/4/AT28/T/2246/16 13/05/2016
METEC‐ALST‐T‐16‐2246‐001 13/05/2016
GERDP‐SCM/FSU‐16/279/CEXT GERDP‐JE‐DR‐16‐050‐A 13/05/2016 Alstom Units 7&8‐Runner as buily data books
GERDP‐SCM/FSU‐16/275/CEXT GERDP‐JE‐DR‐16‐053‐A 13/05/2016 Alstom generator ‐ Technical documentation
GERDP‐SCM/FSU‐16/283/CEXT GERDP‐JE‐DR‐16‐049‐A 13/05/2016 Alstom turbines 9&10‐Quality data book
GRR‐MET‐ALS‐16‐135 S Bouye 22/06/2016 METEC E/P/E/I/ST33/4/15602/16 23/06/2016 Material change request for draft tube elbow X
GRR‐MET‐ALS‐16‐136 Adugna Gutu 28/06/2016 METEC METEC/4/AT28/M2659/10 01/07/2016
METEC‐ALST‐T‐16‐2659‐001
GERDP‐SCM/FSU‐16/352/CEXT GERDP‐IR‐032 01/07/2016 Rotor poles complete
GERDP‐SCM/FSU‐16/354/CEXT GERDP‐IR‐035 01/07/2016 Runner final inspection
GRR‐MET‐ALS‐16‐137 Ebuy 05/07/2016 METEC Pas de ref 05/07/2016 Answer to expertise during unloading at Djibouti port X
GRR‐MET‐ALS‐16‐138 Adugna Gutu 07/07/2016 METEC METEC/4/AT28/T/2726/16
METEC‐ALST‐T‐16‐2726‐001
GERDP‐SCM/FSU‐16/385/CEXT GERDP‐JE‐DR‐16‐092‐A 08/07/2016 Stator frame test assembly X
GERDP‐SCM/FSU‐16/384/CEXT GERDP‐JE‐DR‐16‐094‐A 08/07/2016 Unit 6,7,8 key bars quality data books X
GERDP‐SCM/FSU‐16‐390/CEXT GERDP‐JE‐DR‐16‐085‐A 08/07/2016 MPR April 2016 X
GRR‐MET‐ALS‐16‐139 Adugna Gutu 27/07/2016 METEC METEC/4/AT28/M123/16
METEC‐ALST‐T‐16‐123‐001
GERDP‐SCM/FSU‐16‐430/CEXT GERDP‐JE‐DR‐16‐112‐A 01/08/2016 Alstom generator X
GRR‐MET‐ALS‐16‐140 Adugna Gutu 28/07/2016 METEC METEC/4/AT28/M81/16
METEC‐ALST‐T‐16‐81‐001
GERP‐SCM/FSU‐16/407/CEXT GERDP‐JE‐DR‐16‐089‐A 01/08/2016
GRR‐MET‐ALS‐16‐141 Adugna Gutu 08/08/2016 METEC METEC‐ALST‐T‐16‐163‐001 06/09/2016
METEC/4/AT28/M163/16
GERDP‐SCM/FSU‐16/462/CEXT GERDP‐JE‐DR‐16‐099‐A Generator guide pad segments & rotor poleU8 X
GERDP‐SCM/FSU‐16/460/CEXT GERDP‐JE‐DR‐16‐075‐A governor pressure tank spare part list X
GERDP‐SCM/FSU‐16/461/CEXT GERDP‐JE‐DR‐16‐098‐A runners 6&9 inspection report X
GERDP‐SCM/FSU‐16/463/CEXT GERDP‐JE‐DR‐16‐068‐A march monthly progress report X
GERDP‐SCM/FSU‐16/464/CEXT GERDP‐JE‐DR‐16‐037‐A february monthly progress report X

GRAND RENAISSANCE Chrono ‐ From Client.xlsxMETEC 7/7 09/09/2016