TECHNICAL DATA

OBSERVE FLOW
CONSTRUCTION NOTES
PROPERTY UNI CGN 400 CGN 700 CGN 900 MATERIALS TYPE STEEPNESS COMPACTION SOIL TYPE
CONCENTRATION
THICKNESS Inches 0.30 0.30 0.30 Cut 3:1 - 1:1 Absent/Unlikely N/A Clay to Clay - Loam 1. THE CONTRACTOR SHALL WORK WITHIN THE
CGN 400
WIDTH Mts. 1 or 2 1 or 2 1 or 2 Engineered Fill 3:1 - 2:1 Absent/Unlikely 75% Clay to Clay - Loam CONSTRUCTION LIMITS OR EASEMENTS INDICATED IN
LENGTH Mts. 50 50 50 Cut 1:1 Likely/Present N/A Clay to Loam THE PLANS. HE SHALL, HOWEVER, PROVIDE FOR ALL
CGN 700
Engineered Fill 3:1 - 1:1 Likely/Present 75% Silty - Clay Loam OTHER AREAS HE MAY REQUIRE FOR HIS OWN USE. IT
WEIGHT g/sq. m. 400 700 900
IS THE INTENT OF THE PLANS TO LEAVE UNDISTURBED
TENSILE STRENGHT lbs./ft. 420 x 430 1220 x 610 1560 x 50
COCO PEAT MULCH -
EVERYTHING WHICH DOES NOT ADVERSELY AFFECT
ELOGATION % 26 x 32 34 x 38 42 x 32 THE FINISHED WORK. ALL AREAS DISTURBED BY
LIVE STAKE - LIVE KAKAWATI - OR EQUIVALENT LOCAL SPECIES-CUTTING;
FLOW VELOCITY ft./sec. 9 11 16 Length- 050 to 1.0 m; Diameter - 8 cm to 15 cm CONSTRUCTION SHALL BE SODDED OR RESTORED TO
BAMBOO PEG - MATURE BAMBOO PEGS; Length : 25 cm to 30 cm; Width : 3 cm to 4 cm ITS ORIGINAL CONDITION AS DIRECTED BY THE
NYLON ROPE/TWINE - DIAMETER- 5 mm;SYNTHETIC POLYMIDE STRANDED ROPE. AVE. NET WT. - 2.95 kgs./22m; ENGINEER.
MIN. BREAKING LOAD - 408 kgs.
NYLON TWINE - DIAMETER-3mm; SYNTHETIC POLYMIDE STRANDED ROPE. AVE. NET WT. -106 kgs/220m; 2. LOCATION OF EXISTING DRAINAGE STRUCTURES ON
GRASS SEED - CENTROSEMA (CENTOSEMA PUESCENS) - OR LOCALE EQUIVALENT SEEDS THE PLANS SHALL BE VERIFIED IN THE FIELD, INVERT
LEGUMINOUS CREEPING AND TWINING GROUND CIVER; ELEVATION OF PROPOSED STRUCTURE AND SIDE
FAIRLY RESISTANT TO DROUHT; PHADAPTABILITY: 4.9-5.5 PH
DITCHES SHALL BE ADJUSTED TO SUIT EXISTING FIELD
VETIVER GRASS- SLIPS WITH DEVELOPED ROOTS READY FOR TRANSPLANTING;
CONDITIONS. EXISTING DRAINAGE STRUCTURE TO BE
EXTENDED SHALL BE CHECKED FOR DEFECTS. ALL
DEFECTS SHALL BE REPAIRED AND CORRECTED
BEFORE CONSTRUCTING THE EXTENSIONS.
GUARDRAIL COLUMN, PAINTED
WITH DOWEL WELDED AT BASE
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
GA# 12 PREFAB STEEL FLEX
ESTABLISHING HIS OWN SOURCES OF COMMON
GUARDRAIL BEAM PAINTED BORROW AS OUTLINED IN THE SPECIAL PROVISIONS.

PERSPECTIVE 3.000
4. REMOVAL AND/OR RELOCATION OF MINOR
SCALE NTS STRUCTURE SUCH AS KILOMETER POSTS, GUARDRAIL,
SIGNS, STONE MASONRY, PAVEMENT, MONUMENT, ETC.
SHALL BE CONSIDERED AS A SUBSIDIARY OBLIGATION
OF THE CONTRACTOR, COVERED UNDER THE

0.33
CONTRACT UNIT PRICES FOR OTHER PAY ITEMS

0.700
INVOLVED IN THE CONTRACT.

RROW SHOULDERING 5. ALL WORKS SHALL BE MADE IN CONFORMITY WITH


THE STANDARD SPECIFICATIONS FOR HIGHWAYS AND
BRIDGES 1988, SPECIAL PROVISIONS AND
2.800
SUPPLEMENTARY SPECIFICATION PERTAINING TO THIS
5
8"X 6" MACHINE BOLT WITH PROJECT.
NUT AND WASHER
GA# 12 PREFAB STEEL FLEX
GUARDRAIL BEAM PAINTED 6. ALL EXISTING BRIDGES SHALL BE PROVIDED WITH
GUARDRAIL COLUMN, PAINTED
CONCRETE CLASS "A" APPROACH SLAB IN
FRONT ELEVATION WITH DOWEL WELDED AT BASE ACCORDANCE WITH THE PLANS OR AS DIRECTED BY
SCALE NTS THE ENGINEER.

7. SHOULD THERE BE ANY DISCREPANCY BETWEEN


5

0.33
8"X 6" MACHINE BOLT WITH SOIL INVESTIGATIONS RESULTS AND FIELD SOIL
NUT AND WASHER
CONDITION IN ANY SECTIONS, THE CONTRACTOR SHALL

0.700
1.500 INFORM THE ENGINEER FOR PROPER INSTRUCTIONS
PART OF RROW
WITH REGARD TO THE FOLLOWING:
CONCRETE SHOULDERING CARRIAGEWAY a. GRADE CUT OF SLOPE
b. WIDTH OF BERM
c. WHETHER TO PROVIDE BERM DITCH AND

0.400
GA# 12 PREFAB STEEL FLEX d. NECESSARY DIMENSIONS.
GUARDRAIL BEAM PAINTED

400 X 400mm CONCRETE


FOOTING
0.200
TABLE OF SLOPE RATIOS
TYPICAL SIDE ELEVATION APPROXIMATE SLOPE RATIOS
3.00 SCALE NTS
m. HEIGHT OF SLOPE NATURE OF CUT FILL
REMARKS
LIVE STAKE LIVE STAKE (m) MATERIAL SLOPE RATIO SLOPE RATIO
(KAKAWATI OR IT (KAKAWATI OR IT
LENGTH 0.80 M. -
EQUIVALENT) LENGTH 0.80 M. - 0.0 TO 1.0 Earth 4 : 1 4 : 1
EQUIVALENT)
1.20 M. 1.20 M.
NYLON ROPE NYLON ROPE 1.1 TO 2.0 Earth 2 : 1 2 : 1

Soft Rock, Coral Varies From Cut slope stake will depend
1.1 TO 2.0 1 2 : 1
FASCINE (COCOLOG) CGR Shale, Cemented Gr. upon stability of material
2 : 1 to 1:1
300 SPACE @ 3.O M. VERTIVER GRASS, ROW
1.1 TO 2.0 Natural Break is Slope resultig
SPACED Hard Rock
Natural Break after Blasting and Scaling of
@ 1.00 M. & PLANT 10 CM. (Design Slope 2 : 1 loosened material. Design
COCONET CGN 700 INTERVAL 1
purposes, Normal Slope used
LIVE STAKE ( KAKAWATI OR 4 : 1)

ITS in Hard Rock will be 41 : 1

SECTION OF EQUIVALENT) LENGTH 0.80


M. - 1.20 M.
OVER 2.0 Earth 121 : 1 121 : 1

FASCINE
SCALE
NTS
:
OVER 2.0 Soft Rock, Coral
Shale, Cemented Gr.
Varies From
1
121 : 1
Cut slope stake will depend
upon stability of material
2 : 1 to 1:1

NYLON ROPE SLOPED EARTH GROUND OVER 2.0 Hard Rock Natural Break 141 : 1 TO 141 : 1 Fill Slopes
(Design Slope 121 : 1 will be used only where Fill
1
2 : 1) material consists of Large
Rock Fragments
FASCINE ( COCOLOG ) CGR
COIR NETS CGN 400 400
COCONET 0.30" SPACE @ 3.0 M.

BAMBOO PEGS,
LENGTH: 25 CM., WIDTH: 3
CM. - 4 CM.
DETAIL " A "
SCALE : NTS

PROJECT & LOCATION : SHEET CONTENTS : DESIGNED : SUBMITTED : REVIEWED: RECOMMENDING APPROVAL : APPROVED : SET NO.: SHEET NO.:
(Sgd.) TOMAS H. LACIERDA, JR.
REPUBLIC OF THE PHILIPPINES ROAD UPGRADING (GRAVEL TO PAVED) BASED ON GRAVEL ROAD Engineer II
STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD
- PAVEMENT MARKING DETAIL
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - HORIZONTAL AND VERTICAL CURVES DRAWN :
OFFICE OF THE DISTRICT ENGINEER STANDARD (HDM-4 PROJECT ANALYSIS)
(Sgd.) GIL M. RUIZAL PMD
IMELDA-BAYOG-KUMALARANG-LAPUYAN- - TYPICAL ROAD CONCRETE PAVEMENT PLAN Engineer II (Sgd.) AMINODIN P. MANIRI (Sgd.) CAYAMOMBAO D. DIA (Sgd.) NENITA A. ROBLES, CESO IV (Sgd.) JORGE U. SEBASTIAN, JR. CESO III 4
ZAMBOANGA DEL SUR 2nd DISTRICT ENGINEERING OFFICE
GUIPOS, ZAMBOANGA DEL SUR
MARGOSATUBIG ROAD ZAMBOANGA DEL SUR
CHECKED :
Engineer V
4 28
Section 1 : K1739+560.00 - K1740+967.00 OIC-District Engineer Chief, Planning and Design Division Assistant Regional Director Regional Director
(Sgd.) NORMAN C. CARPIO
Section 2 : K1743+667.00 - K1743+880.0 0 Engineer III
Chief, Planning and Design Section Date : Date : Date : Date :