DRAINAGE WORKS

CANAL STRUCTURE
CANALIZATION WORKS
Diamond Dr, Repair 7+049.28 7+099.73 Drainage # 60 0+000
Lateral B 0+000 0+040 Combined Drainage & Drainage 3 0+000 0+781
0+046 0+445 Turn-in Structure at Dr.60 Beside Drainage 4 0+000 1+393
0+460 0+918 Main Canal Sisto Drainage 0+000.00 0+291.00
0+918 1+047 0+302.00 0+870.00
1+057 1+220 0+885.00 1+600.00 NATIONAL IRRIGATION ADMINISTRATION
1+225 1+435 Lateral A-4 Combination Headgate 1 7+193 1+604.00 2+105.00 Irrigation Management Office
1+451 1+652 Lateral A-4 Combination Headgate 2 7+193 2+113.00 2+302.00
1+657 1+865 2+311.00 2+909.00 Davao del Norte
Lateral A-1 Headgate 1+080
1+870 2+100 Lateral A-1c Combination Headgate 3+080 2+923.00 3+450.00
2+112 2+328 Lateral A-1 Headgate 4+800 A 3+457.00 3+923.00 LASANG RIVER IRRIGATION SYSTEM
2+328 2+482 3+929.00 4+735.00
2+504 2+645
Lateral A-1
Lateral A-1
Headgate
Headgate
4+800 B
5+500 A 4+739.00 4+931.50 GENERAL LAYOUT MAP
2+664 2+967 Lateral A-1 Headgate 5+500 B Sapodon Creek 1+397.00 1+593.00
2+981 3+355 Lateral G Headgate 16+275 1+626.00 2+252.00
3+368 3+645 Lateral G Headgate, Turn-out 16+275 2+260.00 2+660.00
Main Canal 1+596 2+856 2+780.00 3+223.00
Lateral A 0+000 1+880 Cebulano Creek 0+000.00 0+298.00
3+320 7+834 Drainage 12-a 0+000.00 1+480.00
Lateral A-1 0+000 1+370 Farm Ditch 1 0+000.00 0+400.00
Lateral A-2 0+600 1+891 Lateral B Side Drainage 0+000 1+115
Lateral A-4 0+000 0+834
Lateral A1-A 0+000 0+736
Lateral B-3 0+000 1+351
Main Canal (Hdgt. Lat. A) 2+700.00 2+840.44
2+870.44 3+040.00
3+060.00 3+525.04 EPSG: 4326 / WGS 84
3+543.28 4+326.65
Main Canal(Tubod) 6+097.76 6+293.23
Main Canal(Diamond-Siphon) 7+099.73 7+292.88
LATERAL "A"
7+322.76 8+106.70
1.
2.
0 + 040
1 + 570
.
.
00
00
STD. PARSHALL FLUME
DR. CROSSING
8+156.99 8+350.00
3. 1 + 680 . 00 DR. PIPE CULVERT 8+391.70 8+552.84
4. 1 + 900 . 00 DR. CROSSING
5. 1 + 995 . 00 RD. CR. & CHECK 8+597.64 8+772.99
6.
7.
2 + 120
2 + 260
.
.
00
00
RD. CROSSING
RD. CROSSING
8+806.64 9+494.38
8.
9.
Lateral A
2 + 980
3 + 090
Lateral A-2
10. 3 + 330
.
.
.
00
00
00
THR. CR. & DROP
THR. CR., CH. & VERT. DROP
COMB. HDGATE LAT. A - 1
5+297
0+000
5+417
0+575 LEGEND
11. 4 + 207 . 00 THR. CR. & VERT. DROP
Main Canal
12. 4 + 745 . 00 RD. CR. & DROP
13+805 14+105
13. 4 + 805 . 00 RD. CR. & CHECK
14. 5 + 155
15. 5 + 300
.
.
00
00
RD. CR. & CHECK
COMB. HDGATE LAT. A - 2
STRUCTURES
16. 5 + 314 . 00 THR., CR. & VERT. DROP
17. 6 + 476 . 00 COMB. HDGATE LAT. A - 3
18. 6 + 834
19. 7 + 190
.
.
00
00
THR. CR. & DROP
COMB. HDGATE LAT. A - 4
DAMSITE
20. 7 + 534 . 00 TH. CR. & DROP
21. 7 + 715 . 00 UNGATED CR. CH. & DROP
22. 7 + 834 . 00 RD. CR. & DROP
23. 8 + 134 . 00 STD. CH. & DROP LMC 2016-16 STRUCTURES
24. 8 + 434 . 00 TH. CR. & DROP
25. 8 + 694 . 00 RD. CR. & DROP
26. 9 + 204 . 00 STD. CH. & DROP
27. 9 + 604
28. 9 + 863
.
.
00
74
TH. CROSSING
T.O & CR. W/ ORIFICE
LMC 2016-16 CANALIZATION
20. 4 + 790 . 00 STD. CHECK & DROP
21. 4 + 900 . 00 STD. DROP
22. 5 + 180 . 00 TO & CR W/ ORIFICE
CANAL
MUNICIPALITY OF PROVINCIAL ROAD
CARMEN
SECONDARY ROAD

NATIONAL ROAD

NIA-DDN IMO
LASANG CY 2019
PACKAGE 1 - 100.00%
PACKAGE 2 - 100.00%
PACKAGE 3 - 73.79%
LASANG DAM
7°20'24.4" N, 125°35'0.28" E PACKAGE 4 - 79.11%
PACKAGE 5 - 95.13%
PANABO CITY

PREPARED: CHECKED:

J.B. BONAJOS N.L. SAHOT


ENGINEER A PRINCIPAL ENGINEER A
SUBMITTED BY:

LARRY C. FRANADA
Division Manager A