Download as pdf
Download as pdf
You are on page 1of 9
Proposed 2021-2025 Capital Program Let NYS THRUWAY AUTHORITY 1g List as of 9/25/2020 Now York Division Projects ESTIMATED. Lermng CONSTRUCTION YEAR_GTR._ITEMNO. MILEPOST _PROJECT DESCRIPTION CONTRACT VALUE 2021 3—-H3631. «MP: 60000 1-95, New England Thruway: Highway Improvements 2022-2023 $10,000,000 1 B7631 MP: 600.17 1-05 (New England Thruway) Brcge Maintenance Cleaning for Stee Preservation - 2021 $700,000, 3 82841 MP 605.76 _MPINES.76: North Avenue Beige over 195 (Now England Thruway) - Replacement '518,0,000 1 HaM31 MP: 608.80 1.95, New England Thruway: Nort of Ext 17 1 north of Ext 188 Nodhbound Only andronty $25,000,000, (of Ext 19 torarh of Ext 21; Pavement Resurfacing 1 Has. NY Div, New York Ovision: Pavement Safety Siping - 2021 $700,000 2021 Total $54,400,000 2002 9 —-HO1.—MP; 12.85 MP 12.8: Impravaments ta -7 Interchange 9 Ramp Inlersection wih Route 9 and Construct $14,000,000 Route si.87 Pedestrian Bridge 4 Haat MP 1620. South of Nyack (MP 162) 0 south of Spring Valley Toll Barer Pavement Resurfacing $84,000,000 4 -HI651 (MP: 2940 L287IRoute 17S (Ext 15, MP 29.4) to north of Suter (MP 38.7): Pavement Resurfacing $35,000,000 1 H4ao1.—-MP: 43000. South of Harrman Tol Bator (xi 16, MP 43.0) to north of Woodbury Tal Barrier (MP 46.0): $6,000,000 Pewement Resuracing 2 ATS MP: 45:20 Harman Malntenence Section and Toll Buiding (Ext 16, MP 45.2 Connect o Muricipal 1,600,000 Water, Sewer and Gas 47621 MP: 60.95 MP.60.96: Meadow Hil Road Bridge over Thruvay - Rehabiltaton $2,500,000 345.1 MP: 600.00 1-05, New England Thruway: Highway improvements 2022-2023 $48,000,000 4 B780.1 MP: 600.17 95 (New England Thruway) Bridge Mintenenco Cleaning for Stool Proservaton - 2022 $700,000, 4 H864.2 MP: 640.00 Garden Stat Parkway Conector (MP GS0.00 to MP GS2 40}: Pavement Resurfacing $3,500,000 + tet NYDiv. Replacement of I'S Equipment in New York Divison $2,500,000 4 pres NYDiv. New York Dison: On-Demand Repar Contract - 2023-2024 $3,000,000 2022 Total $149,800, 000 Now York Division Projects ESTIMATED uertine CONSTRUCTION YEAR QTR._ITEMNO. MILEPOST _PROJECT DESCRIPTION CONTRACT VALUE oes 2 HONS! MP: 4.00 Moor Dogan Exressnay (MP 0.00) Cross Wescese Expresnoy (Ent 8 MP 11. ‘524,000,000 ravement Resurfacing 1 H1I9.1 MP: 2400. Nort of Garden State Parkuay Connector (MP 24.0) to soutn of -287!Roule 17S (Ext 15, MP $12,200,000 20 Pavement Resurfacing 1 HIBL MP: 46.00. North of Hariman Tol Barrer (MP 46.0) © Newburgh (MP 601) Pavernent Resurfacing $28,200,000 4355.1 MP; 600.00 1-85, New England Thruway: Highway Rehabilation 2024-2025, $84,000,000 4556-1 MP: 600.00 1.85, New England Thruway: Highway Improvements 2024-2025 $10,000,000 1 B782.1 MIP: 600.17 185 (New England Thruway) Bridge Matntenaroe Cleaning for Ste! Preservation - 2029, $700,000, 487281 MP: 600.23 Rebitaton of Four -95 (New England Thruway) Brides $1,500,000 4 poms MP: eo1se._222n4 ste and Dre Avene Pedestrian Brées and Bayes oe Brice Subsuctire $3800, 000 2023 Total $124 00 000 202 —2—-HISBA—MP: 11.90.1287 (MP 11.00) © Governor Mario M. Cuomo Bridge Toll Bair (MP 13.0}: Pavement 3,900,000 Resurfacing 4 A1691 MP: 1880 MP 18.60: New York Maintenance Fact - Replace Metal Bulcngs $2,500,000 4 A8611 MP: 1880 _MP18.8: Nyack Maintenance - Construct Vehicle Wash Bay and Storage $2,313,000 1 ABTA MP: 45:20. MP-45.2; Harriman Mahtenance Secon - Equipment Storage Buling Wash Bay $950,000, 4359.1 MP: 45.20 _MP-45.2; Replacement ofa Deterorsted Roo! athe Harman Mairtenance Section $870,000, 4 AST0.1. NP: 4520 -MP-452: Harman Mahntenance Section - Renovations $4,000,000 2 88641 NP: 47.50 MP-47.55: Pine Hil Road Bridge over Thruway - Replacement $0,500,000 1 Hest NY Div, New York Oision: Various Culvert RehabitatonstReplacements~ 2028 $6,000,000 2024 Total $23,535,000 New York Division Projects ESTIMATED. LerTIne consreuction YEAR QTR. _ITEMNO. MILEPOST _PROJECT DESCRIPTION CONTRACT VALUE 202515551. MP: 60.10 Newurgh (Ex 17, MP 60.) 0 south of Now Paltz (St 18, MP 68.0}: Pavement Resurfacing $10,000,000, 1 B6611 MP: 605.09 MPINES.00: 1.05 (New Engiand Thruway) Viaduct, Raroad Span (New Rechele)- ‘$4,000,000 Rehabilaton 1822251 MP: @X1T.64_MP-607 64 Chatsworth Avenue Bridge over 195 (New England Thruway) - Rehaistaton 2,500,000 4 B7O01 MP: 607.72. MPINET.72: Larchmont Staion Plaza - Substructure Repais 52,000,000 1 H341 MP: 608.60 195 (New England Thruway), Mamaroneck (MP NE8.8, Ext 18A) to White Plains (MPNET0.8, $2,500,000, [Exit 185} Pavernent Resurfacing (SB Only) 2025 Total $27,000,000 2021-2025 Now York Division Total $37,833,000 Albany Division Projects 2021286861 «MP: 84.14 Albany Dison: Ere Scour Repairs at Various Locations $1,200,000 1 HSS1.3 MP: 121.20 North of Coxsackie (MP 121 2) o south of Albany (MP 141.9: Safety Upgrades $5,000,000 13082 MP. 141.92 MP 14192: Administrative Headquarters - Computer Room Renovations 2,000,000 1 BT35.1 MP: 601.08 MP 801.08: Castleton Bridge - Rehabiltaton 360,000,000 1 Hr482 ALB DW. Albany and Syracuse Ovisons: Pavement Safety Siping - 2021 $650,000 2 HB4 ALB Div. Albany Division: Various Culvert Rehabitaons Replacements - 2024 $3,500,000 2021 Total 302,260,000 2022 AITIAA MP: 103.00 MP 103.NB: Maldon Serve Area - RehabiitateReplace Wastewater Trestment Plant $1,000,000 2 -A308.3 MP: 141.02 MP 141.92: Adminitrative Headquarters - TSOC and State Police - Renovations $3,000,000 mat ‘ALB Div. Replacement of ITS Equipment in Albany Divsion $2,000,000 4 prre2 ALBDW. Albany DWsion: On-Demand Repale Contract - 2023-2024 $3,000,000 2022 Total 55 000,000 Albany Division Projocts ESTIMATED Lertine CONSTRUCTION YEAR _QTR._ITEMNO. MILEPOST _PROJECT DESCRIPTION CONTRACT VALUE 20221 BOTS MP: 81.72 MPBI.72: Thruway ridge over Wall River - Rehabilitation 1,000,000 4 H1198.1 MP: 02.80 Nort of Kingston (MP 03.) to south of Sougetes (MP 100.8): Pavement Resurfacing $8,000,000, 3 BUG MP: 112.67 MP-11257: Loode-Ol Kings Highway Bridge over Thruway - Replacement $6,500,000 + arma ‘ALB DW. Albany Division: Bridge Presowation for Various Bridges - 2023 4,000,000 2023 Total $70,500,000 2024 1 HA351_—_-MP:_ 100.80 South of Saugerties (MP 100 80 10 south of Catskl (MP 109.20) Pavement Resurfacing $7,100,000 1 A3601 MP: 141.90 MP 141.9: Albany Maintenance Fait - Replace Metal Bulding $3,000,000 1 Hd. MP: 184.40 West of Schenectady 1-800 (Ext 25, MP 15440) o wast of Schenectady Scotia (Ext 25, $9,800,000 [MP 163.30): Pavement Resurfacing 387861 MP: 601,08 MP-801.08: Cetlton Bridge - Rehabilitation $90,000,000 2024 Total $49,600,000 2025 1 HI1341 MP: 100.30 South of Cats (MP 109.3) to south of Coxsackio (MP 121.2): Pavemont Resurtacing 10,000,000 1 Hss91 MP: 148120, Notway (E24, MP 148.2) tot of Serato 2, MP 1544) Pavrant 9,800,000 esurong 1 -H5581 MIP: 817.80 Berkshire Thraway, Canaan Tol Barter (MP BS1Y 8) to Massachusetts State Line (MP $8,500,000 8524.3) Pavement Resurfacing 2028 Total $26,000,000 2021-2025 Albany Division Total $176,350,000 Syracuse Division Projects ESTIMATED ermine ConsTRUcTION YEAR QTR. _ITEMNO, MILEPOST _PROJECT DESCRIPTION CONTRACT VALUE 20219 HOG7-1. MP: 204.10. Electrics Parknay (Ex 37, MP 264.1} o 690 (Ent 38, MP 209.3) Pavement Replacement $55 000,000, 3 8695.1 MP: 287.11 P2871: Thruway Bridge over Onondaga Parkway -Rehabataton $8,000,000 3 8696.1 MP: 287.25 MP-287:25: Thruway Bridge over Onondaga Lake Outlet - Rehabltaon 9,000,000 3 BI931 MP. 288.13 MP-288.1: They Bridge over CSX Raloae (Geddes) - Replacement $8,000,000 3 BO147 MP: 29205 MP-292.06: Canton Street fiege over Thruway - Removal 1,500,000 3 B41 MP 292.49 MP-292.40: Wamers-loia Road Ergo over Tauway - Replacement s.000.000 2 -H1147.2 NP: 304.50. Woedpor (Ext 40, MP 9045) to east of Wario (MP 313.8): Safely Upgrades $2,500,000 4 ars SYRDW. Syracuse Divsien: On-Demand Refit Contact - 2021-2022 $8,000,000 2021 Total $57500,000 2022S —ASS4.2 MP: 304.20 MP 3042: Weodsport Maintenances - Construct Municipal Sewer Cormecton 650,000, 4865.4 MP; 310.00 M210 E8: Por! Byron Service Area - Replace Weterine 500,000, 4 Ha80.1 MP: 320.70 Wiaterioo (Ext 41} 10 Ganeva (Exit 42: Pavement Resuracing 133600,000 1 nas SYRDW. Replacoment ofS Equipment in Syracuse Division $2,000,000 4 ers SYRDWv. Syracuse Division: On-Demand Ropate Contact - 2025-2024 $8,000,000 2022 Total $15,760,000 2023 1—-BYS8.1_—-MP: 197.93 Syracuse Diision: Bridge Preservation for Various Bridoes ‘4,000,000 2 BGS. MP: 210.00 MP's 210 W and 206 WB: Froquois and Chittenango Service Areas - RohabliateyReplace $1,450,000 ‘Wastawater Treatment Pants 1 H1e3.1 MP: 253.00 West of Verona (MP 263.0) 0 west of Canastota (MP 262.0}: Pavement Resurfacing 18,000,000 4 ANT. MP: 304.20 MP 30420: Weedsport Maintenance Section - Renovations fo Secon Mainienance Building $1,250,000 ‘and Roof Replacement 48052 MP: 51000. MP's 10 E8.and 37 £8: Prt Bron ar Cito Sings Sonic Aves-RebiteReplace _ $1.000000 astonster Treatment Plans + A364 [SYRDiv. Syracuse Division: Upgrade Waste Water Trestmant Plants Dvision Wide 2,000,000 2023 Total $28 650,000 ‘Syracuse Division Projects ESTIMATED LerTine consrRuction YEAR QTR. _ITEMNO. MILEPOST PROJECT DESCRIPTION CONTRACT VALUE 2024 1“ HIG21.—_—MP: 197.90 Westof Gansjohare (MP 197 9)10 ast of Lite Falls (MP 210.3) Pavement Resurfacing ‘$10,400,000 1 AITS1—— MP: 252.70 MP 252.70: Verona Mainlonance Section - Equipmont Storage Building Wash Bay $750,000, 385731 MP: 261.73 MP261.75: North Potoboro Strot (Reuto 18) Bridge over Thruway -Replacoment $6,000,000 1 Hii MP: 262.00 Canastota (Ext 34, MP 262 0) to west of Canastota (MP 268.0): Pavement Resurfacing '35,00,000 3 RUA MP: 278.00 MP-278.00: Tarbell Road Maintenance Buldng (M3241) - Reconfigur/Roturbish 8,500,000 1 86792 MP: 285.67 Syracuse Divsion: Bridge Painting et Various Locations 4,000,000 44981 MP: 310.98 MP310.98: Thruway Bridge over Crane Brook - Replacement 10,000,000 3 BOOT MP: 327.54 MP7 St: Thruway Bridge over Cananciagua Outlet - Replacement 13,400,000 3 2003 SYR DW. Construct Sandblast Booth in Syracuse Division 2024 Total 20251 HASO-1_—-MP: 210.90 Lite Falls (Ex 29A, MP 210.2) o Herkimer (Ext 90, MP 220.0: Pavement Resurfacing $10,800,000 4 H5601 MP: 22000 Herkimer (Ext 30, MP 220.0) wost of Utea (MP 238.5): Pavement Resuracing 13,500,000 3 ASSL NP: 252.71 MP252.7%: Verona Maintenance - Constrt Muricpal Sewer / Water Connections $750,000 1 Hi281—-NP: 31380 West of Woodspor (MP 313.8} to Waterloo (Ext 41, MP 220.7): Pavoment Resurfacing $7,000,000, 1 H8611 MP: 327.60 Goneva (Exit 42, MP 327.5) to east of Manchasor (MP 337.5} Pavoment Resurfacing $10,000,000 1 H5621 MP: $87.50 East of Manchestor [MP 337.5) to Canandaigua (Ex 44, MP 347.1): Pavement Resurfacing $10,000,000, 1 A864 MP: 340.20 Manchester Maintenance Sacion: Adin and Reof Replacomomts $1,500,000, 1 HSS71 MP: 347.10 Canandaigua Ext 48, MP 347-1) to Rochester (Ext 45, MP 351 4): Conersta Pavernent 8,000,000 Restoration 2025 Total $61,580,000 2021-2028 Syracuse Division Total $25,700,000 Butfalo Division Projects ESTIMATED. Letine consTRucTiON YEAR _QTR._ITEMNO. MILEPOST _PROJECT DESCRIPTION CONTRACT VALUE 20011 H4LA_—_MP: 48800, _Easol Hetil (HP 4890) Pema tat Line (MP 4080 Estound: Pavement $27,000,000 surfacing haa BUF Div. Syracuse and Buffalo Divisions: Pavement Safety Stiping - 2021 $750,000, Hose.t BBUF Div. Buffalo Dvision: Sign Stucturo - Replacement $1,000,000, errea BUF Div. Buffalo Dvision: On-Demand Ropak Contract - 2022-2028, $8,000,000 2021 Total 57,750,000 2022 1 HINES MP: 378.20 LeRoy (Ext 47, MP 378 2) to West of Balawa (Ext 48, MP 983.7); Pavement Resurfacing $14,500,000 Hi431 MP: 398,70 West of Batavia (MP 385.7 10 West of Pembroke (MP 408.7): Pavement Resurfacing $10,100,000 482001 MP: 411.60 MP-411.60: Ransom Road Bridge over Thramay - Replacement $7,800,000 Hise. MP: 467.00 Dunkik (Exe 59, UP 407.0) to wast of Wesel (Exit 00, MP 483.0) Pavement Resurfacing $16,200,000 + 8068.1 WP: 48.9 MP 495.50, MP 495.60 and MP 485.06: Chautaugua Creek (Eastbound & Westbound) and $1,000,000 Hawley Stee! Bridges - Rebabiitations 4 B7AL1 MP: 90875 Thruway Bridge over Scajaquada Creek - Retaining Well Stabilization 5,500,000 4 8460.1. NP: 914.95 MPO14.35, MP.014.99, MP 020.95 and MP 021.12: Nerh and South Grard Island Bridges - $20,500,000, Reto Repair Roller Bearings, Pie and Hangers + errs ‘South Grand Island Bridges: Mainnance Clering for Stel Preservation - 2022 400,000 1.86451 —-MP: 920.35. North Gran Island Bridges - Ste! Repairs 515,000,000 2022 Total 357,000,000 20251 -HI441 MP: 419.40. East of Willamsvil Toll Baer (MP 4194) to west of Bufalo-Willams Stool (EX 52A,MP $17,800,000, 425 9) Pavement Resurfacing 1 H145.1 MP: 430.60. Lackawanna Toll Barer (MP 430.6) to west of Hamburg (MP 490.5): Pavement Resurfacing $7,500,000, 1 BYBL.1 MP: 914.35 South and Nerth Grand Island Bridges: Maintenance Cleaning for Stel Preservation - 2028 $000,000 1 Brr32 BBUF Div. Bufeio Division: Brg Preservation for Various Bridges - 2023, 4,000,000 4 Hone BUF Div. Buco Division: Various Culvert Rehabilctions Replacements 2023 $1,750,000 2023 Total $57 660,000 ufolo Division Projects ESTIMATED Lert ConsTRUCTION YEAR_QTR._ITEMNO, MILEPOST PROJECT DESCRIPTION CONTRACT VALUE 2024 1 HA2-1—MP: 951.40 Vicor (Ext 45, MP 354.4) to Honretta (Ext 48, MP 362.5): Pavement Rehabilton, Safty 7,500,000 Upgrades and Drainage Improvernents 2 87244 MP: 962.44 MP. 962.44: Woot Honrita Interchange Bridge over Theavay - Replacement $9,000,000 1 Ha381 MP: 416.00 East of Depew (Exit 40, MP 416.90} o east of Niagara Falls (Exit $0, MP 419.40}; Pavement $2,500,000 Resuroong 1 Hts21 MP: 425.90 1-90, west of Wiliam St (Ext 52A) to west of West Seneca (Exit 4) and -190 (Niagara $20,600,000 Section), -80 to Route 266 (Ext 17} Pavement Resurfacing 4 86001 MP: 494.48 MP 424.48 EB and 494,49 WE: Thay Bridges over Ere RR - Rebabiltatons $2,000,000 486791 MP; 447.78 Buffalo Division: Bridge Painting at Various Locations $4,000,000 3 85214 MP: 901.06 MP 901.06: Weiss Sect Bridge over Thruway - Removal 1,000,000 48774 MP: 914.5 South and Norh Grand islané Bridges: Maintonance Cleaning fr Steel Preservation - 2024 800,000 385521 MP: 915.46 MPIN‘5.46: Beaver Island State Parkway Bridge over -100 Thruway - Replacement $9,000,000 4 BeHL1 MP: $20.85. MPIN20.35 and MP N2t.12: Neth Grand lland Southbound and Nerhbound Bridges $87,500,000 Painting 2024 Total $03,800,000 2025 1“ HA371 MP: 455.20. East of ver Crock (MF 455.2) © Dunkirk (Exit 59, MP 467.0} Pavement Resurfacing $1,900,000 2025 Total $17,800,000 2021-2026 Buffalo Division Total $260,400,000 Statewide Projets zo 4 Hrs TWY wide Statenie: Pavement Safely Siping - 2022 $2,000,000 202 Total $2,000,000 mm 4 nrg TWY wide Statewide: Pavement Safety Sting - 2023, 2,000,000 2022 Total $2,000,000 ‘Statewide Projects ESTIMATED Lermine CONSTRUCTION YEAR QTR. _ITEMNO. MILEPOST PROJECT DESCRIPTION. CONTRACT VALUE ma 4 BT76A TWY wide NY Owision: Bridge Preservation for Various Bikigos- 2023 $6,000,000 4 HBS TWY wise Statowce: Pavement Salty Strping- 2024 $2,000,000 2028 Total $7,000,800 mae 1 BTS TWY wide Statice: Bridge Rehabitations - 7024-2025 22,500,000 4 nes TWY wide Replacement of ITS Equipment Staonide $3,000,000 2024 Total $25,500;000 2021-2025 Statewide Total $36,500,000 ‘Theuway Project Totals by Division 2021-2028 Now York Division Total: $971,893,000 2021-2025 Albany Division Total: $176,350,000 2021-2025 Syracuse Division Total: $257,700,000 2021-2025 Buffalo Division Total: 260,400,000 2021-2025 Statewide Total: $26,500,000, 2021-2025 Thruway Authority Total: —_61,102,783,000 ‘Thruway Project Totals by Year 2021 Total: 239,400,000 2022 Total: $271,550.00 2023 Total: $221,050.00 2026 Total: $280,333.00 2025 Total:_ 120,450,000 2021-2025 Thruway Authority Tota 61,102,783,000 ‘00/282020

You might also like