New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
CONTENTS
1.0 Introduction...................................................................................................................... 2
2.0 Project Location................................................................................................................ 2
3.0 Salient features of integrated project .............................................................................. 5
4.0 Process description .......................................................................................................... 7
5.0 Description of the Environment ....................................................................................... 8
6.0 Anticipated Environmental Impacts ................................................................................. 9
7.0 Environmental Monitoring Programme ......................................................................... 10
8.0 Additional Studies .......................................................................................................... 11
9.0 Environmental Management Plan ................................................................................. 11
10.0 Environment Management Cost .................................................................................. 14
11.0 Project Benefits ............................................................................................................ 14
12.0 Conclusion .................................................................................................................... 14
1
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
Executive Summary
1.0 Introduction
The Davangere Sugar Company Ltd. (DSCL) is presently operating 4750 TCD sugar factory &
24.0 MW installed capacity Cogeneration Power Plant. DSCL now proposes to set up a 65 KLPD
capacity distillery / ethanol plant, along with incineration boiler/TG & auxiliaries for achieving
Zero Liquid Discharge (ZLD) to produce ethanol, in the existing sugar premises. The proposed
distillery/ethanol plant envisages to utilize Cane Juice & B-Molasses own sugar plant &
procured C- molasses from factories in the surrounding area to set up a 65 KLPD capacity
distillery / ethanol plant, along with incineration boiler / TG & auxiliaries for achieving Zero
Liquid Discharge (ZLD) to produce ethanol.
2
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
3
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
4
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
# Particulate Description
1. Project New 65 KLPD molasses based sugarcane juice distillery/ ethanol
plant at 51/4, 51/5 village Kukkuwada, Tal. & Dist. Davangere,
Karnataka.
2. Available land Total distillery plot area:13 acres
Green belt area: 4.3 acres
3. Product Molasses based distillery / Ethanol Plant (65 KLPD)
- R S & IS / Fuel Ethanol/ENA :65 KLPD
- Fusel oil: 0.195 KLPD
(One at a time)
4. Operation days Sugar factory season: 160 day
Cogeneration : 193 (Seasonal operational days 160 and off season
operational days 33)
Distillery plant will operate for 330 days
(330 days season or 150 days on own Cane Juice, 144 days on own
B-molasses generated & 36 days on procured molasses)
5. Molasses Own Cane juice on at 100 % utilization: 150000 (150 days) MT
requirement Own B-Molasses at 100 % utilization:29250 (144days) MT
Procured Final molasses: 9070 (36 days) MT.
6. Water requirement Total fresh water requirement for proposed distillery will be 498
CMD.
7. Source of water Water permission from Shygala halla is available with sugar
factory
8. Boiler Incineration Boiler – 30 TPH
9. TG Proposed distillery incineration boiler 4 MW TG ( double
extraction cum condensing turbine)
10. DG 250 kVA
11. Electricity Particulates Proposed
requirement Electricity generation 4.0 MW
Electricity consumption 1.5 MW
12. Fuel Concentrated spent wash: 8.45 MT/hr (202.8 MTD)
Coal: 3.48 MT/hr. (83.52 MTD)
13. Steam Steam generation 30 TPH
Steam consumption 18.50
14. Total effluent Proposed Distillery effluent generation: Spent wash 650-685
generation CMD, spent lees 150 CMD (100% lees shall be reuse in process),
process condensate 520 CMD
Existing effluent generation from sugar unit: 472 CMD
15. Effluent treatment Total Spent wash generation will be 650-685 CMD, it will be
system concentrated in MEE and then burn in proposed 30 TPH spent
wash fired boiler. Condensate water will be recycled back in the
process
Existing 1310 CMD ETP from sugar unit
5
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
6
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
Molasses Dilution
Spent lees will
Activated be recycled
Yeast Fermentation Ethanol & CO2
Emission
Molecular Sieve
Spent wash treatment through
MEE & Incineration boiler
RS/ENA/FO/AA/Ethanol
Storage
7
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
8
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
9
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
Occupational Health & Major health hazards are identified in worst case scenario.
Safety
7.0 Environmental Monitoring Programme
The following additional such as risk assessment for storage and handling of alcohol and
mitigation measure due to fire and explosion and handling area has been carried out.
11
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
13
EIA
New 65 KLPD Molasses/Sugarcane Juice Based Distillery/ Ethanol Plant
Executive Summary
12. Conclusion
Zero liquid discharged is proposed with efficient mitigation measures implemented.
Air emissions through stack will be controlled by ESP.
Loss of vegetation and habitat will not be attributed.
Personal protective equipment’s, safety precautions, emergency plan & disaster
management plan shall be in place to avoid the environment hazards.
14