Professional Documents
Culture Documents
Study of Septic Tank: Ips College of Architecture
Study of Septic Tank: Ips College of Architecture
Disadvantages:-
Its size should be very large to serve many people.
Smell problem.
It needs periodic cleaning.
Effluent quantity difficult to monitor.
Faecal sludge management is often not carried out properly (
often just dumped in environment.)
Relies on water for toilet flushing.
Septage facility required.
Operation can be impacted by power failure.
Element of septic tank:-
Inlet – waste water coming through it.
Outlet – filter waste water dispose through it.
Sludge – it is solid waste which deposited at bottom of the
tank.
Scum – it is waste which float on the surface of water .
Inspection port – by this we can inspect the tank.
Access port – it is a kind of manhole for treatment of septic
tank.
Inlet baffle or outlet tee - prevents sewage back-flow into the
inlet or outlet pipe.
Effluent – it is waste water which present in tank.
How to design septic tank:-
For understanding here we designing a septic tank for 8 people in
a house which get filled in 10 Days.
The average waste generated from each human / Day
including kitchen waste = 95 to 150 liters/Day.
Calculation:-